Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Plans - 733 TURNPIKE STREET 7/22/2004
EXISTING ELECTRIC PANEL �{ E% PROVIDE NEW DOOR OPENING-I. TELEPHONE HW -ELEMENTS - / \ EQUIPMENT 0', HOT WATER 209 4 ISUEIPH NT 109 BATHROOM\ © Kr— ELECTRIC 0 Ip9 I - I�, .� EX ROOM t11RROR 30 ' ? �.•-, � tj� n 1 `, a An 42'L04G GRAB A COMMON HALLWAY _ B A WALLSO VIDE BLOCKNGRN 202 COMMON HALLWAY 7 = / °o 'X e OFFICE ��( 29'W X 30' \ MIRROR \ _ --7 (� - STORAGE 0 _\ ,�— = BATHROOM EX d �j RELOCATED ) 105 PANELRIC PP2 O ELEC - TANNING ROOM T111111 ROOM "T 6 j N C a (O C W 106 $ Q Q RETAIL SALES FLOOR f TANNING ROOM TANNING ROOM 200 �. 0 106 l03 04 e I LOCUS MAP I o TANNING ROOM 102 TANNING ROOM EX I m Ip B 102 S'-0' 0'-0' o I g 101 1 B m f B � CARPET STORE f TANNING SALON w UNIT 2A I UNIT 28 a A I RECEPTION WAITING AREA ® 0 \ PROVIDE NEW DOOR OPENING Q EXISTING WINDOW ' EXISTING WINDOW O GO - _- - O Q 200 w DRAIN LOCATION EX Ex Ex O E%ISTING 100 d. NEW DRAIN LOCATION X NEW HEADER ABOVE TRANSOM C+NDOW `\^ 131 2X12'5 w f/2'MAX HEIGHT THRESHOLD n O Z NEW CONCRETE PATCHREPAIR W '.. PROVIDE NEU CONTROL JOINTS � AT EDGES Z DEMO PLAN PROPO 10SE0 PLAN SCALE I 14" I'-0' SCALE I 14°=1'-0' Z Q a Y w� Q z co ¢ cn Z Q r Z STROBE 07-22-2004 E FIRE Deno NOTES: m LEGEND ',.... d8�' REMOVE PORTION OF EXTERIOR WALL AND PREPARE FOR NEW DOOR MIRROR o O FROVDE BLOCKING O EXISTING WALL TO REMAIN '.. AT ALL ceaB BARS 2 REMOVE EXISTING INTERIOR WALL PAPER TOWEL PROVIDE ACCESSIBLE 11'M,.y a '-• EXISTING WALL TO BE DEMOLISHED eavl31an5: 0 � FAUCETS AND OFFSET w -- DISPENSER DRAIN ASSEMBLY io R;t 3O REMOVE EXISTING DOOR AND INFILL TO MATCH EXISTING WALL el l x m �"^- NEW WALL TO BE CONSTRUCTED ®REMOVE EXISTING DRAIN AND RELOCATE TO NEW LOCATION AS 5HOWN ON PROPOSED FLOOR PLAN(All). - AEI- ® s UALL TYPE LABEL(SEE WALL TYPE SCHEDULE ON AI.2) DEMOLISH PORTION OF CONCRETE SLAB AS NECESSARY TO CONNECT NEW DRAIN INTO EXIST14G DRAINAGE SYSTEM a _ W o OS REMOVE PORTION OF WALL AND PREPARE FOR NEU ENTRY DOOR O - 101 DOOR NUMBER LABEL(SEE DOOR SCHEDULE ON AID IMAX ©REMOVE EXISTING FLOORING AND PREPARE FOR NEW FLOORING TO BE CHOSEN BY TENANT - 101 ROOM NUMBER LABEL BEE FINISH SCHEDULE ON AJ.2) TOILET H.C. H.0. DRYER o H.C.SINK 10 REMOVE EXISTING BATHROOM FIXTURES AND PREPARE FOR NEW HANDICAP TOILET AND SINK MIRROR M• 0 DEMO NOTE LABEL(SEE DEMO NOTES ON AI II - , URINAL aeae mil' A,113 B chk.GP8 Q REMOVE AND RELOCATE EXISTING POWER PANEL TO NEW LOCATION AS SHOWN ON PROPOSED FLOOR PLAN(Al2) HW HOT WATER HEATER - dr. '.. 9O SAWCUT AND REMOVE EXISTING CONCRETE SLAB AND EXCAVATE AS NEEDED TO TIE IN NEW WASTE LINES _ - ©2004 GSD Associates TO EXISTING WASTE LINES. TYPICAL TOILET ROOM MOUNTING HEIGHTS G PPI ELECTRICAL EOUIPMENT j--?;1 SCALE 114°=1-U S,1 i w•� 'S;y'3 GRAPHIC SCALE: 0 I 2 3 4 5 10 20 it ROOM FINISH SCHEDULE-OUT I GENERAL NOTES: 80011 N0. ROOM NAME FLOOR BASE UALLS CEILING REMARKS: 1. THE GENERAL CONTRACTOR GC)SHALL SUPERVISE AND DIRECT THE WORK THE GC SHALL PROVIDE AND PAY FOR ALL LABOR. MATERIALS,EQUIPMENT,TOOLS.CONSTRUCTION EQUIPMENT AND MACHINERY,TRANSPORTATION AND OTHER FACILITIES AND SERVICES 100 RECEPTION VCT-I VB-1 PTO-1 SACT-I NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE WORK,UHETHER TEMPORARY OR PERMANENT AND WHETHER OR NOT INCORPORATED OR TO BE INCORPORATED IN THE WORK. ALL UORK BY THE LC AND/OR ALL SUBCONTRACTORS SHALL BE COMPLETE AND 101 WAITING AREA VCT-I VE I PTD-I SACT-I PROPERLY INSTALLED IN ACCORDANCE WITH ALL MANUFACTURERS RECOMMENDATIONS THE SCOPE OF WORK TO BE COMPLETED IS SHOWN ON THE DRAWINGS OR CAN BE REASONABLY INFERABLE AS BEING REQUIRED TO BE COMPLETED EVEN THOUGH THE WORK MAY NOT BE SHOWN OR 102 TANNING ROOM VCT-1 VB-I PTO-I 5ACT-1 BE PARTIALLY SHOWN 04 THE ORAFINGS, ALL UORK AND MATERIAL SUPPLIED BY THE GC AND/OR THE SUBCONTRACTORS 1 SUPPLIERS SHALL CONFORM NTH THE CONTRACT REQUIREMENTS. ALL PRIMARY CONTRACTS AND SUBCONTRACTS SHALL BE GOVERNED BY THE 103 TANNING ROOM VCT-1 VB-1 PTD-I SACT-I REQUIREMENTS OF THE GENERAL CONDITIONS OF THE CONTRACT. PP IP _ M -I - PTO-I SACT-1 R T / IL THE ELECTRICAL T HALL E RESPONSIBLE FOR THE _ _ 04 TANNING 800 VCT VB I 2. THE ELECTRICAL SYSTEMS ARE 0 BE DESGN BU D BY E E ECT CAL CONTRACTOR IEC). HE EC S B ONS EQUIPMENT PADRE PREPARATION DI STAMPED ELECTRICAL EMERGENCY AS MAY BE REQUIRED FOR THE NEW WORKS BE PROVIDED. THE EXISTING ELECTRICAL EQUIPMENT Al 105 TANNING ROOM VCT-I VB-I PTO-I SACT-I SYSTEMS SPACEISC.POWER,FIRE ALARM,EMERGENCY LIGHTING,AND GENERAL E STAR SOFTENS ARE TO BE LE TENDED AND MODIFIED. XR _ XR _ 106 TANNING ROOM VCT-I NE I PTD-I SACT-1 THE DIN SPACES ARE TO HAVE SEPARATE METERS INSTALLED. PRIOR TO THE START OF ANY WORK THE ELECTRICAL CONTRACTOR EC)IN C COORDINATION WITH THE GC SHALL VERIFY THE PROPOSED LAYOUT AND DESIGN FOR THE NE'H EQUIPMENT AND THE ELECTRICAL AND ONS 101 TANNING ROOM VCT-I V5H PTD-I SACT-I CONTROL REQUIREMENTS FOR THE ELECTRICAL SYSTEM AND INCLUDE ANY AND ALL MODIFICATIONS REOIPRED AS PART OF THEIR SCOPE OF NEW CEILING GRID WORK. THE EC SHALL COOROINATE HIS WORK WITH EXISTING CONDITIONS,AND THE NEW WORK AND WITH ALL OTHER TRADES. THE XR GFCI AND TILES 108 BATHROOM VCT-I VS-I PTD-I SACT-1 LOCATIONS.SIZE.AND UTILITY REQUIREMENTS FOR ALL ELECTRICAL EQUIPMENT SHALL BE PROVIDED BY THE OWNER/TENANT TO THE LC V FOR COORDINATION WITH THE EC PRIOR TO INSTALLATION. O O ! O O XR 109 BATHROOM VCT-I VB-I PTD-I SACT-I S 3. THE MECHANICAL AND HVAC SYSTEMS ARE TO BE DESIGN/BUILD BY THE MECHANICAL CONTRACTOR MC). THE MC SHALL BE T Oj 0 COMMON HALLWAY VCT-I VB-I PTD-1 SACT RESPONSIBLE FOR THE PREPARATION S, STAMPED MECHANICAL AND HVAC DRAWINGS AS MAY BE RE FOR THE NEU WORK 0 BE CI ELECTRICAL ROOM VCT-I VB-1 PTO-[ SACT-I PROVIDED. THE MECHANICAL SYSTEMS,HVAC,PLUMBING.AND FIRE PROTECTION SYSTEMS ARE TO BFI MODIFIED. ANEW HVAC UNIT IS TO C,INSTALLED IN THE SMALLER UNIT AND THE LARGER UNIT DUCT DID FROM SNAIL IN RECONFIGURED AND REBALANCED. THE XR lit STORAGE VCT-I VB-I PTO-I SACT-1 HVAC,HE MECHANICAL AND FIRE PROTECTION SYSTEMS ARE TO BE EXTENDED FROM THE EXISTING SYSTEMS. PRIOR TO THE START OF TH - - GFCI � WORK THE MECHANICAL CONTRACTOR MC) IN COORDINATION LOTH THE GC SHALL VERIFY THE PROPOSED LAYOUT AND DESIGN FOR THE NEW V XR 200 RETAIL SALES FLOOR VCT-1 VB-I PTO-I SACT-1 EQUIPMENT AND MODIFICATION OF THE MECHA141CAL SYSTEMS AS PART OF THEIR SCOPE OF WORK. THE MC SHALL COORDINATE HIS WORK WITH EXISTING CONDITIONS,AND THE NEW WORK AND WITH ALL OTHER TRADES- THE LOCATIONS.SIZE,AND UTILITY REQUIREMENTS FOR ONS ONS XR 201 OFFICE VCT-I VB-1 PTD-I SACT-1 ALL MECHANICAL EQUIPMENT AND FIXTURES SHALL BE PROVIDED BY THE OWNER/TENANT TO THE GC FOR COORDINATION WTH THE MC PRIOR NEW CEILING GRI XR - -- -- -- NEW CEILING GRID TO INSTALLATION. t1') AND TILES v AND TILES 202 COMMON HALLUAY VCT VB-I PTO-I SACT-I 4. ALL WORK SHALL BE EXECUTED IN ACCORDANCE NTH THE LATEST FEDERAL AND LOCAL BUILDING CODES.INSPECTION AUTHORITIES. 0?0 A XR _______ 203 HOT DATER VCT-I VB-I PTD-I SACT-I AND OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION OSHA). �- O S. ALL WORK REQUIRING PATCHES TO EXISTING ADJACENT FINISHES SHALL MATCH ADJACENT FINISHES,OR THE ENTIRE ADJACENT FINISH N Q SHALL BE REPLACED. LT N ... i..- FINISH IV V V — - �I' L. THE WORK SHOWN ON THE DRA!aNGS IS TO BE COMPLETED WHILE THE EXISTING BUILDNG IS PARTIALLY OCCUPIED Ni OTHER AREAS. Ks' w 00 hl THE PROPOSED DEMOLITION AND CONSTRUCTION SHALL BE UNDERTAKEN 11TH PERSONNEL PROTECTION,DUST PROTECTION AND OTHER N w j N I PRECAUTIONS AS NEEDED FOR RENOVATION IN OCCUPIED SPACE. ALL REQUIRED MEANS OF EGRESS SHALL REMAIN IN FULL OPERATIONU p 00 O_..__.__Ii_.—..__ O I O O _._O-_- i I - I� ' WRING RENOVATIONS, TAKE ALL PROPER PRECAUTION TO PROTECT THE OCCUPANTS AND VISITORS FROM INJURY OR UNNECESSARY � O � a CC) CO -� INTERFERENCE DURING CONSTRUCTION COORDINATE AND ARRANGE THE WORK TO BE PERFORMED WTH THE U40ERSTANDi4G THAT THE �o ¢ .0 C O0' 00 _ XR DOOR SCHEDULE DOOR FRAME EXISTING FACIL€TY LLGLL BE OPEN DURING THE CONSTRUCTION.ANY REQURED WORK WHICH WALL CAUSE DISRUPTION TO THE ELECTRIC OR N Q r_ h ----' =. ----_ ' I I-- --� ------ ----=-^ I' OTHER UTILITIES SHALL BE COORDINATED WITH THE GC AND THE OWNER 48 HOURS BEFORE ANY PLANNED DISRUPTION OF SERVICES. � p � t W � O .. X N0. SIZE TYP MAT TYP. MAT. HARDWARE GLASS REMARKS: T CONTRACTORS AND SUB CONTRACTORS ARE REQUIRED TO VI54T THE SITE PRIOR TO BIDDING THE WORK TO VERIFY FIELD CONDITIONS Z F li XR 100 EXISTING - - - - 2 TEMP EX DOOR NEW HARDWARE AND TO BECOME FAMILIAR WTH THE SCOPE OF WORK REQUIRED AT THE SITE,LIMITATIO45 ON CONSTRUCTION.AND OTHER IMPACTS OF r T f A XR. �� ! THE EXISTING CONDITIONS O4 THE WORK REQUIRED. iI 101 3'-0'X 6'-8' A WD A HM I NONE V ll 1 8. THE GENERAL CONTRACTOR AND ALL SUB CONTRACTORS SHALL GUARANTEE ALL LABOR AND EQUIPMENT FOR A 1111111 OF ONE III YEAR NEW HVAC UNIT 1 __ 102 3'-0'X 4'-8" A WD A HM I NONE FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER. -1 li 103 3'-0"X 4'-8' A WD A HM I NONE 9. ITEMS DE5IG4ATEO ON THE DRAW'ItiGS TO BE REMOVED FROM THE EXISTING SITE SHALL BE THE PROPERTY OF THE CONTRACTOR,AND SHALL BE LEGALLY DISP05ED OF UNLESS SPECIFICALLY REQUESTED BY THE OWNER FOR SALVAGE PRIOR TO REMOVAL EXISTING 1 109 3'-O'X 6'-8' A Wro A HM HONE LIGHTING MAY BE REUSED. THE GENERAL CONTRACTOR SHALL IDENTIFY SALVAGE PORTIONS OF THE EXISTING BUILDING FOR USE Ni �I� I ,_. A FUTURE CONSTRUCTION PRIOR TO DEMOLITION. L_� I 105 3'-0'X L e A WD HM NONE %R _ LOG 3'-0"X C'-e" A WD A HM NONE 10. THE GC SHALL IS SURE THAT EACH SUBCONTRACTOR BEARS HIS FULL RESPONSIBILITY FOR DAILY CLEANING AND NECESSARY RUBBISH IL THE V ANDDRALL SUBCONTRACTORS O4 AND IMMEDIATELY UPON COMPLETION OF HIS WORK. IOl 3'-O'X L'-8' A WD A HM 1 NONE `a \x/ TORS SHALL COORDINATE ALL OF THEIR WORK WITH THE HVAC PLUMBING FIRE PROTECTION FIRE A A XR XR / \ 108 3'-0"X C-8' A WD A HM 4 NONE ALARM,ELECTRICAL.AND MECHANICAL/ELECTRICAL WORK WITH THE Q3NER SUPPLIED EQUIPMENT_ ALL SUBCONTRACTORS SHALL BECOME 1__._.__ .... - FAMILIAR LATH THE OWNER'S/TENANTS EQUIPMENT TO BE INSTALLED AND LOCATE AND INSTALL THEIR DUN WORK IN ACCORDANCE UITH THE ° ° ° ° II ° 109 3'-O"X L'-e' A L'D A HM 4 NONE 011NER'S EQINPMENT 50 THAT THERE ARE ADEQUATE FACILITIES AND UTILITIES PROVIDED FOR THE OWNER'S/TENANT'S EQUIPMENT. IF A ll. OORDINATIEN PROBLEM IS OBSERVED OR 15 PROBABLE,THE SUBCONTRACTOR SHALL IMMEDIATELY NOTIFY THE GC UPON 1315COVERY. THE 410 3'-0'X L'-e' A WD A HM 3 NONE GC SHALL NOTIFY THE OWNER AND THE ARCHITECT OF THE COORDINATION ISSUE IN WRITING. �r . .. -._ C III 3'-0'X C-8' A WD A HM 3 ONE 12. THESE DOCUMENTS ARE DESIGNED BASED ON EXISTING DOCUMENTATION AND FIELD INFORMATION. ALL VERIHCATIONS OF EXISTING 112 3'-0'X 6'-8' A WD A HM 5 NONE UTILITIES.MANUFACTURERS INFORMATION AND DATA, AND DIMENSIONAL VERIFICATION IS THE RESPONSIBILITY OF THE GC AND SUBCONTRACTORS PRIOR TO THE START OF WORK. THE GC SHALL VERIFY ALL LOCATIONS AND EXISTING INVERTS OF UTILITIES IN WHICH EX 200 2 3'-O'%C'-8' 0 WD 0 HM 2 TEMP MATCH EXISTING DOOR CONNECTIONS ARE TO BE MADE. ALL VERIFICATION OF UTILITIES SHALL BE MADE PRIOR TO THE START OF CONSTRUCTION. IF THE INFORMATION SHOWN 04 THESE DRAWINGS 15 IN CONFLICT WITH OTHER INFORMATION OR THE LOCATIONS AND INVERTS OF THE EXISTING _j 201 3'-0'X C-8' A WD A HM G NONE UTILITIES OR OTHER EXISTING CONDITIONS ARE IN CONFLICT OR DEVIATE FROM THE INFORMATION OR DESIGNS 14DICATED ON THE --- �- _ PLANS,OR THE EXISTING CONDITIONS 00 NOT ALLOW THE WORK TO BE CONSTRUCTED AS DESIGNED.THE SUBCONTRACTORS SHALL XR ' Al 202 3'-0"X 4'-8' A CID A HM I NONE IMMEDIATELY NOTIFY THE GC IN WRITING WHO SHALL THEN NOTIFY THE ARCHITECT IN':: III XR X- 203 3'-0'X G'-e' A CD A HM 1 NONE RITING. A 13. WHERE MANUFACTURES DATA AND INFORMATION DIFFERS FROM THE INFORMATION SHOY'N ON THESE DRAWNGS,THE GC AND ALL Q T O NS T NIO SUBCONTRACTORS SHALL IMMEDIATELY NOTIFY THE GC AND THE ARCHITECT IN WRITING. 204 3'-O"X C'-8" A WD A HM 3 NONE —_ - DOOR SCHEDULE ALl DOORS TO HAVE LEVER OPERATED NARD'll ARE Z QJJ II/i�7J r� J Pn �� Al T LEGEND v O NEW ELECTRICAL OUTLET ® ! G a p O xR I 1 I o QXf{ OX, A INTERIOR DEMISING WALL � 2'.9'FLUOURESCENr LIGHT FIXTURE � � w w 0 Xli II EXISTING GRID PLAN 5/8'DUE TAPED,FINISHED,AND PAINTED 04 BOTH SIDES C.)(=j QXR ,R O WITH NEW TILES OF STEEL STUDS.FROM FLOOR TO BOTTOM OF ROOF FRAMING —_ ® J(n III—� XR ll.-JJ^^ (�,' _ XR EXISTING LIGHT FIXTURE RELOCATED GFCI NEW GFCI OUTLET ® LU.O v A III v^R 3 1/2'SOUND INSULATION BATTS. Q 4 1/8' � EMERGENCY LIGHT P P 35770'1 OF STUDS FRAMING.O.G FULL HEIGHT TO OSMOKE DETECTOR � m O O 5 ADA STROBE 0 CO B TYPICAL INTERIOR WALL © PULL STATION ® F z ' PLAN 5/8"GLIB TAPED,FINISHED,AND PAINTED ON BOTH W pJ Z SIOE5 OF STEEL STUDS.FROM SLAB TO 130TTON OF HORN STROBE CQ 'p Q CEILING GRID.BRACE TO STRUCTURE AS NEEDED. Q Q < 3 1/2'SOUND INSULATION BATTS. EXIT LIGHT O J Z J`1 : PROPOSED REFLECTED CEILING P��� 4 1/e 3 5/8'STEEL STUDS AT N'O.C.FROM SLAB TOE y(� y Q Z d W SCALE.- i/4"=1'-0° � BOTTOM OF CEILING GRID. (X I LIGHTED EXIT LIGHT � W Z W� O SET 11 SET 15 ON$ NEW SPRINKLER o� Z H OFFICE LOCKSET 1-OFFICE LOCKSET U/VANDAL PROOF EXTERIOR O EXISTING SPRINKLER W Z Q M 3-HINGES COVER PLATE ON STRIKE Z Q H DOOR STOP 3-HINGES SILENCERS I-DOOR STOP p��p �p �� O%R EXISTING CEILING LIGHT RELOCATED . SILENCERS WALL TYPES SET-2 WEATHER STRIPPING �i, ps NEW DUCT SMOKE IN NEW HVAC UNIT dePS: 07-22-2004 1-ENTRANCE PULL13ARS TO MATCH EXISTING ENTRY'S ,--CEILING I- PA"C PADDEL OPERATED DEADBOLT SET ab MATCH EXISTING rsVisi°ns: 3-HINGES I-PASSAGE LATCH SET DOOR TRIM 3'-9' TRANSOM AND I-DOOR STOP 04 CLOSER 3-HINGES TEMPERED G1A55 TRIM TO MATCH NEU HVAC SUPPLY TOP AND BOTTOM MANUAL FLUSHBOLTS I-DOOR STOP 30' 2 3-O 2' EXISTING 2-CLOSERS SILENCERS 1 l 1 THRESHOLD 1/2'MAX HEIGHT. WEATHER STRIPPING L 2 SET 91 - ' INSULATED 11' SET 43 H OFFICE LOCK5ET - TEMPERED L'� I-STOREROOM LOCKSET 3-HINGES GLA55 O 3-HINGES I-CLOSER r o 3 DOOR STOPS I-DOOR STOP EXISTING HVAC SUPPLY RELOCATED XR .SILENCERS SILENCERS v dr.AJB chk(3PS SET 44 II-BATHROOI SET � NEW HVAC RETURN ©2004 GSD AssoaaJei T ` PUSH BUTTON INSIDE LOCK KEYLESS EXTERIOR LOCK BYPASS EXISTING HVAC RETURN RELOCATED.REPAINT EXISTING GRILLS. I-DOOR STOP AO OB O O ® rr 4 L -t T I-DOOR HOLD OPEN DEVICE I- LOSER .SILENCERS WOOD DOOR WOOD DOOR HOLLOW METAL WITH TEMPERED FRAME - MnnDSF]N/I n(>=SCHEDULE L NOTE:ALL HARDWARE TO BE LEVER OPERATED GLASS PANEL GRAPHIC SCALE I�L//'�IR �MIG�lRE IJJUV HE V LE ACCESSIBLE HARDWARE DOO 2A 2N///PO S�, FRAM�2 2�EVATIONS �, = 4 �S LL-(S r%(l�U OU Ilf�g�S�S �% N� V 0 172 3 4 5 !0 20 �v�