Loading...
HomeMy WebLinkAboutMiscellaneous - 114 REA STREET 10/31/2006 WASTEWATER ALTERNATIVES OF NEW ENGLAND, LLC. 7 Kensington Road HAMPTON TON FALLS, NEW HAMPSHIRE. 03844 Telephone: (508) 693-2221 Fax: (508)693-2224 MAINTENANCE October 31, 2006 BUYER: SITE: SELLER: James Yoursg1,1.4-Re.a... . re Wastewater Alternatives of New North A dov&',,`CIA' m �% England,LLC. 01845 27 Kensington Road GiE 6 Z006 Hampton Falls, NH 03844 4 , a�,���.i i E Nei�oV:°F",,, Wastewater Alternatives of NE, LLC. (WANE) agrees to maintain The Clean Solution system with two inspections a year at the above property. WANE also will inspect and report the pressure dosing sytem included in the field. 1. Should the above property be sold, this agreement should be transferred to the new buyer and will become binding on both the seller and the new ownerts]. 2. This agreement contains a maintenance schedule. WANE will provide the following items as shown on the accompanying schematic drawing: 1. a 2100 gal 3 compartment Phoenix tank to serve as a septic tank, an aerobic treatment tank, and a combined pump/settling chamber. 2. 30 cu ft of plastic media and all necessary aerobic components installed in the tank 3. an installed 3.0 scfm compressor WANE will execute biannual service inspections as required by our Massachusetts State approval. WANE also agrees to perform service inspections on the pressure dosing system in the field at the same schedule. WANE will submit reports to both the Board of Health of North Andover as well as the Massachusetts DEP. P,k 10-5 11-3 Ps A.82 IMF 40149 PERFORMANCE SPECIFICATIONS: The system is warranted to discharge clean, odor free water to the dispersal field, equivalent or better than that from a municipal system with secondary treatment (30ppm BOD5, 30ppm SS). THE CLEAN SOLUTIONTm An Alternative Septic System WASTEWATER ALTERNATIVES F NEW ENGLAND, LLC, 27 Kensington Road HAMPTON FALLS, NEW HAMPSHIRE 03844 MAINTENANCE The following maintenance is required every 2 1/2 years: I. Pump out both the settling and septic tanks 2. Inspect compressor 3. Inspect and take corrective action, if necessary: a] Media: If plugged, presure wash excess bacterial growth b] Sludge in BioCon: Pump BioCon tank with screen over pump hose as to not disturb media. c] Diffuser: replace If air pressure fails Maintenance will be performed by a State certified operation and maintenance inspector. There must be a contract between the home owner and the 0&M operator at all times to adhear to Massachusetts State law. Tank pumping is not included in the price and must be arranged by you or the 0&M inspector just prior to the scheduled maintenance appointment. Based on the inspection findings at the first scheduled maintenance, the actual pumping schedule may be modified by mutual consent and any changes will be reduced to writing. In the absence of a written modified maintenance schedule, the above schedule must continue to be performed by the buyer and O&M inspector. For a period of 2 years, WANE will warrant the system and repair any malfunction, including parts and labor, at no cost to you. The homeowner's responsibility during this period is to notify WANE of any failure. Failure to perform this item will void this warranty and result in you being billed for repair costs.This warranty also does not cover damage caused by unreasonable use or acts of God. THIS LIMITED WARRANTY IS IN LIEU OF ALL OTHER EXPRESS WARRANTIES. ANY IMPLIED WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE, MERCHANTABILITY OR OTHERWISE, APPLICABLE TO THE SEWAGE TREATMENT SYSTEM SHALL BE LIMITED IN DURATION TO ONE YEAR. WASTEWATER ALTERNATIVES SHALL NOT BE LIABLE FOR ANY DIRECT OR INDIRECT, SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES. NOR, SHALL WASTEWATER ALTERNATIVE'S LIABILITY UNDER THIS WARRANTY EXCEED THE PRICE PAID BY THE BUYER. PAYMENT Price per visit is $175.00 The price for inspecting the system for the first year: $350.00 This service contract must be renewed October 31, 2007 THIS PRICE IS VALID FOR 60 DAYS FROM THE DATE OF THIS DOCUMENT. DELIVERY WANE will have inspections on an automatic schedule, WANE will call one business day prior to performing inspections to notify the homeowner that we will be coming. THE CLEAN SOLUTION TM An Alternative Septic System 'WASTEWATER ALTERNATIVES ENGLAND, LLC. 27 Kensington Road HAMPTON FALLS, NEW HAMPSHIRE 03844 It is important that WANE be ably to coordinate with the homeowner, so we should be notified of. his/her telephone number. RIGHTS TO DATA AND ACCESS TO THE SYSTEM WANE reserves the right of reasonable access to collect data, modify,maintain and repair THE CLEAN SOLUTION and its subsystems. WANE will retain all data collected and the rights to it. TRADE SECRETS THE CLEAN SOLUTION is the result of the expenditure of much effort and money. The design of the components and operational cycle are the intellectual property of WANE and may not be revealed without written permission. ACCEPTED: BUYER:_ -_ — — _W .. _ James Young 1 14 Street North Andover, MA 01845 2 5 A- Wastewat ffc lte rna NE, LLC.Kensingto Hampt ails, NH 03844 Wesley Brighton, President Date: October 31, 2006 THE CLEAN SOLUTION TM An Alternative Septic System