HomeMy WebLinkAboutHealth Permit # 11/18/2003 '
'
'
- .
�
�
`
�
Commonwealth of Mas'sachusetts Map-Block-Lot
Board Of Health Permit-No------------
Disposal Works Construction Permit
to(Repair)an Individual Sewage Disposal System.
Printed On Nov-1 8-2003 Board Of Health
/
APPLICA'T'ION FOR DISPOSAL WORKS CONSTRUC'T'ION PERMIT
DATE. --N— CURRENT INSTALLER'S LICENSE#
M.p
LOCATION•
LICENSED INSTALL R:
SIGNATURE: TELEPHONE#
CHECK ONE:
REPAIR: � NEW CONSTRUCTION._
IF NEW CONSTRUCTION,PLEASE ATTACH FOUNDATION AS-BUILT.
Administrative Use Only
P-75.00 Fee Attached? Yes No
Foundation As-built? Yes No
Floor plans on file?�, a "" Yes No
A�
Approval .. Date: ,
INSTALLER PROJECT MANAGEMENT OBLIGATIONS
As the North.Andover licensed installer for the construction of the septic system for the
property at t!�-(si-e relative to the application
of i It,i dated �l��� for plans by and
dated ,9.3: � with revisions dated
I understand the following obligations for management of this project:
1. As the installer I am obligated to call for any and all inspections. If homeowner, contracto
project manger, or any other person not associated with my company schedules an inspectio
and the system is not ready then item two shall be applicable.
2. As the installer I am required to have the necessary work completed prior to the applicabl
inspections as indicated below. I understand that requesting an inspection,. withou
completion of the items in accordance with Tile 5 and the Board of Health Regulations mw
result in a$50.00 fine being levied against my company.
a) Bottom of Bed - generally first inspection unless there is a retaining wall which should be don(
first. Installer must request the inspection but does not have to be present.
b) Final inspection — Engineer must first do their inspection for elevations, ties, etc. As-built of
verbal OK from engineer must be submitted to Board of Health, after which installer calls foi
inspection time. Installer must be present for this inspection. With pump system all electrical
work must be ready and able to cause pump to work and alarm to function.
c) Final Grade—Installer must request inspection when all grading is complete. Does not have to be
on site.
3. As the installer I understand that persons or companies not associated with my company may
not perform the work required by my company to complete the installation of the system
identified in the attached application for installation. I further understand that work by others
unlicensed to install septic systems in North Andover can constitute reasons for denial of the
system, and/or revocation or suspension of my license in the Town of North Andover plus
significant fines to all persons involved.
4. As the Installer I understand that I must be on site during the performance of the following
construction steps:
ation of the excavation has been reached.
a) Determination that the proper elev
b) Inspection of the sand and stone to be used.
c) Final inspection by Board of Health staff
um chamber, retaining wall and other
d) Installation of tank; D-box, pipes, stone, vent, p p g
components.
5. As the installer I understand that I am solely responsible for the installation of the system as
per the approved plans. No instructions by the homeowner, general contractor, or any other
persons shall absolve me of this obligation.
Unders' ed Licensed ptic Installer
Date:
Disp sal Works Con tructi Permit#