CERTIFICATE OF COMPLIANCE
DATE OF COMPLIANCE
March 2, 2004
This is to certify that
the individual subsurface disposal system
constructed O repaired (X)
by
John Soucy
at
226 Rea Street
North Andover, MA 01845
has been installed in accordance with the provisions of Title V of the State Sanitary Code and with the
North Andover Board of Health regulations.
The Issuance of this certificate shall not be construed as a guarantee that the system will function
satisfactorily.
'r
Susan Y.Sawyer,REHS/RS
Public Health Director
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
..
F N(f 1 ANAU
s
TOWN'OF NORTH ANDOVER SEWAGE DISPOSAL SYSTEM
INSTALLATION CERTIFICATION
The undersigned hereby certify that the Sewage Disposal System ( )"constructed;
Q0 repaired;
by t7 r e
r
located at : _'2�/
(®;r,�> �
was installed in conformance with the North Andover Board of Health approved plan,
System Design Permit# ,plan dated , with a design flow
of gallons per day. The materials used were in conformance with those specified
on the approved plan; the system was installed in accordance with the provisions of 310
CMR 15.000,Title S and local regulations, and the final grading agrees substantially with
the approved plan. All work is accurately represented on the As-built which has been
submitted to the Board of Health.
Bed inspection date: <: N
Engineer Representative
Final inspection date: � a� °,
Engineer Representative
Installer: Lic.#: Date:
11CH 1) �
v�
Engineer: Date: ''
n
aP
Uw
j Y
Page I of 2
DelleChiaie, Pamela
From: Dan Oftenheimer[info@miliriverconsulfing.com]
Sent: Monday, December 22, 2003 9:56 AM
To: pdellechiaie@townofnorthandover.com
Subject: RE: Final Inspection-226 Rea Street
Pam,
This was taken care of at 7:00 a.m. this morning(12/22).
Dan
p.s. Thanks for the nice picture additions to the e-mails you send.
Have a wonderful holiday with your family if I do not speak with you beforehand,
Daniel Ottenheirner,President
Mill River Consulting
Septic System Management Services
5 Blackburn Center
Gloucester, MA 01930-2259
978-282-0014 or 1-800-377-3044
fax: 978-282-0012
-----Original Message-----
From: Pamela DelleChiaie [mailto:pdellechiaie@townofnorthandover.com]
Sent: Friday, December 19, 2003 3:56 PM
To: Daniel Ottenheimer(E-mail)
Subject: Final Inspection - 226 Rea Street
Importance: High
Hi Dan,
Can you call John Soucy and schedule a final inspection at 226 Rea Street on
Monday? Thanks.
Pam
Flainela DelleChiaie, h1ealth Dept Assistant
1/6/2004
Page 1 of 1
belle hide, Pamela
From: Dan ®ttenheimer[info @milldverconsultiing.com]
Sent: Monday, December 08, 2003 1:16 PM
To: Heidi Griffin; Brian LaGrasse; Pamela Dellechiaie
Subject: 226 Rea Street
I....I it it Brian and P rn,
, Hciched p(c=,ase find the bottorn of bec,I in:)e lion r port for, #226 Rea Skeet AH was
Dan
Daniel Ottenheirner, President
...Ill River Consulting
,Septic,, Systern Manogerrrent Services
Gfc,:ar..)ccm sl r, MA Of (D...225
978-282-0014 or .1--800.; 7 7-:044
fav 978-282-0012
www,rrdHri�verr c)r
12/8/2003
MILL RIVER CONSULTXNG
Septic System Management Services
TOWN OF NORTH ANDOVER
SEPTIC SYSTEM CONSTRUCTION NOTES
ADDRESS: 226 Rea Street MAP: 38 LOT: 131
INSTALLER: Jahn Saucy
DESIGNER: New England Engineering Services
PLAN DATE: 11/12/03
BOH APPROVAL DATE ON PLAN:
DATE OF BED BOTTOM INSPECTION: December 4, 2003
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
SELECT SYSTEM TYPE
GRAVITY DISTRIBUTION
PRESSURE DISTRIBUTION
X PRESSURE DOSING
HOLDING TANK
ADVANCED TREATMENT
OTHER
COMPONENT SUMMARY FROM PLAN
GALLON TANK = 1,500
LOADING OF SEPTIC TANK = H-10
GALLON PUMP CHAMBER = 1,000
LOADING OF PUMP CHAMBER = H-10
TYPE OF SAS = Trenches with Graveless disposal units
DIMENSIONS AND DETAILS OF SAS: 43.75' x 28.5' area
SITE CONDITIONS
Inspections
Existing septic tank properly abandoned
El Internal plumbing all to one building sewer
® Topography not appreciably altered
Comments:
5 Blackburn Center, Gloucester, Massachusetts 01930-2259
toll free 1.800.377.3044 978.282. 0014 J,n tr. O�I r C 1-t J + 4: xa s .:l t i tk d c:om
Page 1 of 4
HILL RIVER CONSULTING
Septic System Management Services
SEPTIC TANK
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ gallon tank has been installed
(H-10 or H-20) (monolithic or 2 piece)
❑ Water tightness of tank has been achieved
(Visual or Vacuum Test or Water held for 24hrs)
❑ Inlet tee installed, over access port
❑ Outlet tee (gas baffle or effluent filter) installed, over
access port
® inch cover to within 6" of final grade installed over
one access port, must be over outlet of tank if effluent
filter is present
❑ Hydraulic cement around inlet & outlet
Comments:
PUMP CHAMBER
ER
❑ Bottom of tank hole has 6" stone base
® Weep hole plugged
gallon Pump Chamber installed
(H-10 or H-20) (monolithic or 2 piece)
❑ Inlet tee installed, over access port
❑ Pump(s) installed on stable base
® Alarm float working
❑ Pump On/Off float working
❑ Drain hole in pressure line
El inch cover to within 6" of final grade installed over
one access port
❑ Water tightness of tank has been achieved
Visual or Vacuum Test or Water held for 24 hrs
❑ Hydraulic cement around inlet & outlet
Comments:
5 Blackburn Center, Gloucester, Massachusetts 01930-2259
toll free 1.800.377.3044 978.282.0014 J n timj.Cr.M
Page 2 of 4
KILL RIVER CONSULTING
Septic System Management Services
Installed on stable stone base
El Inlet tee (if pumped or >0.08'/foot)
❑ Hydraulic cement around inlet & outlets
❑ Observed even distribution
Speed levelers provided (not required)
Comments:
SOIL ABSORPTION SYSTEM
El Bottom of SAS excavated down to C soil layer, as
provided on plan
Size of SAS excavated as per plan
❑ Title 5 sand installed, if specified on plan
❑ 3/4-1 1/z" double washed stone installed
1/8-1/2" (peastone) double washed stone installed
® laterals installed and ends connected to header (and
vented if impervious material above)
❑ Orifices @ 5 & 7 o'clock positions
❑ Gravelless disposal systems: type, number and
location as per plan
❑ Elevations of laterals installed as on approved plan
❑ 40 Mil HDPE barrier installed
❑ Retaining wall (boulder/ concrete /timber/ block)
El Final cover as per plan
Comments:
OONTROLPANEL
❑ Alarm & Pump are on separate circuits
Alarm sounds when float is tripped
❑ Location of control panel:
® Rated for exterior if placed outside
Comments:
5 Blackburn Center, Gloucester, Massachusetts 01930-2259
toll free 1.800.377.3044 978.282. 0014 Err At'+�a>�.; L L r:i�r�.�j�°r°r;,�isw! t,:4ric;1.crone
Page 3 of 4
Septic System Management Services
SYSTEM ELEVATIONS
Benchmark:
Rod at Benchmark:
Height of Instrument:
INVERT ON DESIGN PLAN ELEV 0. TOP OF PIPE INVERT ELEVATION
Building Sewer OUT
Septic Tank IN
Septic Tank OUT
Pump Chamber IN
Pump Chamber OUT
Distribution Sox IN
Distribution Box OUT
Manifold
Lateral 1 HIGH
Lateral 1 LOW
Lateral 2 HIGH
Lateral 2 LOW
Lateral 3 HIGH
Lateral 3 LOW
Lateral 4 HIGH
Lateral 4 LOW
Lateral 5 HIGH
Lateral 5 LOW
5 Blackburn Center, Gloucester, Massachusetts 01930-2259