HomeMy WebLinkAbout1983-12-27December 27, 1983
,Special Meeting
The PLANNING BOARD held a special meeting on Tuesday evening,
December 27, 1983 in the Town Office Meeting Room at 8:30 p.m.
with the following members present and voting: Paul A. Hedstrom,
Chairman, who arrived late; Michael P. Roberts, Vice Chairman;
John A. James, Jr., Clerk; John J. Burke; and Erich W. Nitzsche.
Highway Surveyor William Cyr and Town Planner Karen Pomroy were
also present.
The meeting was called due to the fact that the regular meeting
scheduled for Monday evening, December 19, 1983 was cancelled
for a lack of a quorum.
PRELIMINARY PLAN SUBMITTAL - DOLAN HEIGHTS
Mr. John Callahan, engineer and architect, made the following
presentation:
The locus is approximately 1,400'North from Granville Lane
and 900 feet South from Turtle Lane.
~lr. Dolan lives in the existing house which he has owned for
forty years.
This is a five lot subdivision.
The problems are the grade and the type of soil.
The soil is cohesive but it appears percable. It is imbedded
stone and there is no ledge.
There are large boulders.
In looking at the long piece of land, they swumg the road as
shown on the plan and then swept it to reduce the grade.
In light of the type of soil, if you cut down any more than
is shown on the plan, you would be cutting into the material
that will be necessary to maintain vegetation.
Letters from the following were read and placed on file: Fire
Department (12/19/83); Highwa) Surveyor (12/19/83); Board of
Health (12/12/83); and Conservation Commission (written on the
bottom of our Referral Form).
Mr. Callahan continued with the following:
Parcel B was left the way it is shown because of abutters'
interests. It could be a landlocked piece of land. There
has been discussion of donating it for conservation purposes.
They might extend the lot line and make it a part of an easement
December 27, 1983 -2- Special Meeting
Dolan Heights
to the lots.
continued
It is not needed for square footage~of the other lots.
The developer of Turtle Lane should have made egress into
this parcel.
On the other side, they thought about having access to the
high land.
There are locations in North Andover where the grade exceeds
20%.
Th~S plan shows an 8% to a 16% and then dropping off again.
It is not hazardous.
The trouble with a 50' right-of-way is that there is the
potential of people stacking cars in there.
Where it comes in, we could superimpose ~%, but it would take
away from the vegetation.
For safety purposes, they could come in with a 4% then go to
8% and then go to 16%. They could do it off Salem Street.
The whole road would be dropped. They would still hold the
grades as shown, but it would be a deeper cut in the hill.
You should preserve the aesthetics. When you cut into the
terrain and cut into terrain that is not the material growth,
you have other problems.
16% will not be hazardous to the people living there. It might,
however, be hazardous to plow.
With this parcel of land, you cannot do better and it will be
an asset to the area.
In response to a question from the Board, Mr. Callahan stated that
Parcel A is called "A" and not Parcel 6 because it will probably
be a Form A lot, which will be a economic help to the applicant.
Highway Surveyor Cyr added that this is a private proposal and
there are things that will not be accepted by his department.
This will be a nightmare as far as the Rules and Regs are concerned.
It will open a "Pandora's Box"
No one spoke in favor or against this proposal.
Town Planner Pomroy asked Mr. Callahan to address the leveling
off the grade of the road and the right-of-way width and Parcel B.
December 27, 1983 -3- Spec}al Meeting
Dolan Heights - continued
MOTION: by Mr, Nitzsche to take the plan under advisement for
preparing a decision for January 23~ 1984,
SECOND: by Mr. Burke
VOTE : Unanimous - motion carries.
PLANS NOT REQUIRING APPROVAL
F. Cashman Dale/Winter Streets
Attorney Harold llorley was present.
MOTION: by Mr. Burke to approve the plan of land located in
North Andover, Mass. prepared for Frank Cashman, dated
November 4, 1983 under Subdivision Control Law Not Re-
quired,
SECOND: by Mr. James
VOTE : Unanimous motion carries.
J. McCarthy Brentwood Circle
Lot line change.
MOTION: by Mr, James that the plan of land located in North
Andover, Mass. prepared for John McCarthy, dated July,
1983 and revised November, 1983 be approved under Sub-
division Control Law Not Required.
SECOND: by Mr. Burke
VOTE : Unanimous - motion carries,
G. Farr - Salem Street
Adjust lot line.
MOTION: by I4r. Burke that the p~an of land located in North
Andover, Mass. prepared for George Farr, dated Decem-
ber 19, 1983 be approved under Subdivision Control Law
Not Required.
SECOND: by Mr. Nitzsche
VOTE : Unanimous - motion carries.
Note: Chairman Hedstrom arrived here.
December 27, 1983 -4- Special Meeting
~.OTHER BUSINESS
French Farm Village - bond reduction and release of lots
No request received to date from developer - no action.
Prescott Villa§e - drainage update
A letter from Atty. Timothy Hatch dated December 19, 1983 was
read and placed on file.
Highway Surveyor Cyr added that they are cooperating, but we
need a time limit.
MOTION:
SECOND:
VOTE :
by Mr. Burke to extend the completion date to June 1,
1984 and to release all but $8,500.
by Mr. James
Unanimous motion carries.
Bear Hill bond release and bond amounts
MOTION:
SECOND:
by Mr. Burke to release to Zachary Realty Corporation
$119,067 per the Board of Public Works's recommendation
and $45,000 per the Highway Surveyor's recommendation.
(BPW letter dated 12/16/83 and HWY letter dated 12/5/83).
by Mr. Roberts
VOTE : Unanimous - motion carries.
The bond amounts were not voted on due to inconsistent station
numbers. To be placed on the next agenda.
Fuller Meadow - sign plan
;Ir. Burke abstained.
The covenant was also submitted.
MOTION:
SECOND:
VOTE :
by Mr. Roberts to sign the definitive plan of Fuller
Meadows, consisting of sheets one through five, with
sheets one and two to be recorded, said plan being drawn
for Jayson Realty, Inc. in accordance with the Planning
Board's approval, dated September 27, 1983 with a completion
date of Nove~tber 1, 1985 and approve the covenant,
subject to the addition ~f' the appropriate dates to be
reviewed by the Chairman and Town Planner.
by Mr. James
Unanimous - motion carries.
December 27, 1983 -5- Special Meeting
Fuller Meadow continued
The Board wants the conditions of approval written on the plan or
a certified copy of the recorded document and the covenant should
refer to sheets I th
Lot I
MOTION:
rough 5 with sheets I and 2 being recorded.
- Special Permit Watershed Decision
Dale Street
by Mr. Robe
ment for th
by Mr. Nitz che
Unanimous - motion carries.
rts to take the draft decision under advise-
next meeting.
Special Permit
SECOND:
VOTE :
Lot 3 - Bear Hill Road
Watershed - Decision
MOTION:
SECOND:
by Mr. Roberts to grant a Special
Bear Hill Road, with conditions.
by ,.ir. Nitzsche
Permit for Lot 3,
VOTE : Unanimous - motion carries
The SPecial Permit is hereby made part of these minutes.
Trafalgar Estates updated Letter of Credit
Town Planner Karen Pomroy informed the Board that the Letter of
Credit for $26,000 expired on 12/24/83, but that an updated Letter
of Credit has been submitted, with an expiration date of 12/24/84.
Highway Surveyor Cyr reported that the $26,000 is adequate for com-
pletion.
MOTION:
by ~lr. Burke to accept the Letter of Credit which expires
on 12/24/84 in the amount of $26,000 replacing t~he old
Letter of Credit which expired on 12/24/83, subject to
review of the Chairman.
SECOND: by ~,Ir. Roberts.
VOTE : Unanimous~ - motion carries.
Correspondence - Raymond Ahearn
A letter from Mr Ahearn dated 12/8/83 was read and placed on file.
The Chairman instructed the Town Planner to forward a letter to
Mr. Ahearn stating that it appears that Scott's Pond is in com-
pliance and we need engineering data. ~ighway Surveyor Cyr added
that the outfall pipe is blocked and it'~overflowing the bank. Ben
Osgood has been notified and he said he would wait until it re-
December 27, 1983 -6- Special ~eeting
R. Ahearn continued
ceeded and then remove the pipe and correct-the blockage. Chairman
Hedstrom instructed the Town Planner to forward a letter to Mr.
Osgood also and to place the matter on our next agenda.
Master Plan Update
Town Planner Kamen Pomroy informed the Board that she has been
notified that funds are available to update the Master Plan and
she will write a grant requesting an update and touch upon spe-
cific areas. She spoke to the State and their indication is that
it will not be a full update, but a site one,
I~OTION:
SECOND:
VOTE :
Minutes
MOTION:
SECOND:
VOTE :
by Mr. Roberts to forward an application for the funding.
by Mr. Burke
Unanimous - motion carries.
November 7, 1983
by Mr. Roberts to accept the minutes of 11/7/83 as written.
by Mr. Burke
Unaimous motion carries.
The meeting adjourned at 10:00 p.m.
P~U"I ~. Hedstro ',' Cha~'rman'
Jean E. White, Secretary
'[,.'?:~ "'-~*TOWN.,,, O~F NOI~T~I ANDOYER
?{'2'/".!? '. i'-?'F.:q HASSACHU S ETTS
hy appeal shall be file
.within (20) days after ti
date of filing of this Noti~
in the Office of the Toy
Clerk,
Mr Daniel Long, Town Clef
Town Office Building
North Andover, Mass. 0184
Re: Lot 3 - Road A, Bear
Special Permit - Wate
Dear_Mr. Long:
The North Andover Planning
evening,~September 26, 198
the application of Designe
was'advertised in the Nort
19, 1983 -and a31 abutters-
members were present: ;:MiC
James, Jr., Clerk; Joh'n:-J.
The petitioner-seeks:a spe
the Zoning-By-Law which-re
struction within 100 feet
December 28, 1983
ill Subdivision
rshed District
Board held a public hearing..on Monday
3'-in the*Town Office Meeting Room upon
r Homes by Zachary, Inc. The hea.r_ing
h :Andover-Citizen.on September-.12-and-~
were no%ifi6d by maill- Th6 following
hael -P. '. Ro be nts, ~_V~i ce -:Chai.rma~;-John-A.
;Burk~e-; and-Erich:'W.:-Nitzsche;:
c-iai-Permit undem:Section 4.133(d)-of-:
quires-a Special-~Permi't to all-ow con-
horizontally from_.the~ edge --of all tri~
'-~ck. The proposed construction activity
butaries of Lake Cochiche~ and rea, The~premises.is
is adjacent to but not.wi.~in a wetl a
known as Lot 3 - Road A, ~r Lot 3 Bear Hill ~Subdivision-,-and is
located on the-West 'side ~f Road A, having.a total area~of 47;706
square feet with 1-50 fee~.!of frontage.in the Residential-2
zoning district, m
' m'' the; osed two-story, single family;]wood-'
The *construction :of PlOP
frame dwelling will .have ~he'following dimensions: 75 feet;fron~;
28 feet-deep; 28 feet-hei~ht~ including aSsociated _structures.
At th.e public-hearing, th~
through ;his representative
ski and Associates, .Inc,~
The purpose.for which thi:
application is to permit
cribed single family home
feet of~a wetland tributa~
Jappli6ant, Designer Homes, .testified.-
-~Mr; Joseph.Cushing of Richard Fj'Kamin-
he roi:lowing.
Special Permit is sought :upon ~his_'
he.construction of.~the.previously des-
and associated'stnuctures-~within 100
~to Lake Cochichew~ick, the town's
Lot 3 - Road A, Bear Hil
Special Permit - Watersh~
November 8, 1983
Page 2
water supply. The dotte
denotes the wetland boun
Department of Environmen
Subdivision
District
line shown on the referenced site plan
ary determined by the landowner and the
al Quality Engineering on May 25, 1982.
To the west side of the ~tone wall the rear property line is a
wetland tributary which flows toward Dale Street and the Leland
bog. Although construction will occur within the 100 foot limi-
tation, there will be no mitigating devices within that designated
area. The construction ~s proposed by the applicant.will permit
the utilization of the l~nd in conformance with its main land use
designation with minimal environmental effects. There is no sur-
face water in the area, ~nd the wetland was determined due to the
type of vegetation evident' on the parcel.
Mr. Cushing further stat)d that no siltation or erosion will occur
as a result of on site d)velopment, and haybales will be appro-
) at the northwest corner of the
)d to the southern property line
~eemed-necessary by the Planning
priately placed beginnin
(211 contour) and extend
tour} and-wherever else
The.road and utilities
tion. Only the. work per
dated-'January 26, 1983 .w
All.:other work i.s govern
The,~P1 anni ng-~$-oard:-reque
closers:to :the:-mi'n_imum-~30
of 'land: on _the Ldowns-tope
and~:wetland.-:.This wil;l'
the: parcel ,:to surround
The revised plan .shall-
The- fol lowing :members~- w
1983 Planning Board meet
Paul~ -A.. Hedstr°m,-Chai r~
Jo)inCA. James-;'~Jr., Cl~r
Upon a motion made_~y Mr
the Board voted.to, grant
the following .conditions
1] Only]the-proposedw¢
- Land:~n~bot<3, ~mBear
Kamin~kiyand As~oci~
September.-30~-1983-,
dwelling
(205 con-
Board.
ill be installed prior to.house construc-
~i'tted under the granted SPecial Permit -
ill be allowed in the-rear.of.said parcel.
~d~,by~this Speci,al Permit.
st~d-_~tha-t ~the -a:pp¥icant-:rel ocate :.the. dwelling
'.foot-front-setback to .avoid _disturbance
· ~:side-.of:Fsaid-lot, the site~-of the brook
li.minate Lpotenti-al adver, se_eff-ects ~on-~
g land-owners:,-and:to'Lake~C°chichew~:ck-
flect this request..
,e..present and 'vo~ing at the December-27,
ing when~ the Board rendered its ;.decision:
an;~Michael-P. Ro~erts,~-vice Cha-i~-man;-
k.; ~John .:j. _~B urke; ~ a nd Eri ch~ W. '-~Nitzsche-
:. Rober~ts- and seconded by~-Mr
the'Special Permit reques'ted
.-
rk shown~on :th~ plan entitled
-:Hill".Nor_th~-Andover; Mass.~"
tes,'Inc., dated-September
is allowed under~-th'is Special
, Nitzsche~'-
, subject to
"~Site~lan of
by~ichard~F~-
-1983~-revised-
Permit.
Lot 3 - Road
Special Permit-
November 8, 1983
Page $
A, Bear
Waters
Upon completion of fi
"As Built" plan from
Registered Land Surve
Board for review of (
tification will stat(
plan.
nal =grading and construction, a certified
a Registered Professional Engineer and/or
yor shall be submitted to the Planning
ompliance with said approved plan. Cer-
total'compliance in all respect to said
All haybales shall be in place and the corners of the house
staked and reviewed b~ the Planning Board prior to construction.
_All constructi°n Sha
Order of Conditions,
242-210.
comply with the Conservation Commission's
ssued on October~-13, 1983, DEQE File No.
5. An Approval Not Requ red Plan shall be submitted to the Planning
Board denoting all ea ements located on Lot 3 to be recorded at
the Registry of Deeds
6. A no-cut buffer~zone- hall. exist 25 feet horizontally from the
edge of all tributari ~s in the Watershed, according to Section
4.133, ]Par. 3(c) of the Zoning By Law, unless conditioned upon
the granting of-a variance from-the North Andover Board;of
Appeals, , . .
7. ~ AnY-depa-~tures ~.-frdm~ tlhe ~appr_oved._plans ~'and/or.~condi~t~i ons ~wil 1. :
be:~considered:':due4cauSe for-:the_-reci-Ssion ;of thi_s::permi%igranted'='
In -gran-ting~:the:Spec-i~al_P :rmi't:; ~the;*Planning*Board finds,~:pursuant
to Section_*10:-31, Condi~t:ions-:for--Appr~va-l-of'Special _Permits; that-
the-fol'16wing..conditions-are met.
*Lot
a. The specific site, 3 Bear Hill, on-Road-A is an appro-
priate;~locat-ion for-a single :fam-iiy~:i-esidential :use in:the
Watershed~-*due to th fact that the .engineer and environmental
biologis_t, have ful lemonstrated that.no contamination o'f:the
water :supply:or;~-disru ,tion=of-the Watershed District will :occu.m-~-
from ~s-i te devel.opme
b.' The*~residential use ~rmitted*.:i_n the. R-2 zoning dis:tr-ict will
not adverS'el-y affec surrounding residential neighborhood
or .Watershed~ since he applicant is taking the necessary*pre-
cautions to:minimize any;impact to the wetland and-brook; and-
is a cont.i~nUbtion~-of ts allowed surrounding residential-.use.~
c.~ Asi'a res~]t.:of.the-:i gres-s'/egress being::l]:oCated.-'i:n the south::,-
east corner:of-~the 1 *t,. 'away from the; toop:;intersection~of'
Road A to-the east, o nuisance or serioUs hazard to vehicles
or.pedestrians exists.
d. Adequate;and a'ppropriate:fac*ilities,~:such as-publ-ic water:and-'
Lot 3 Road A, Bear Hill
Special Permit - Watershe
November 8, 1983
Page 4
jw
Subdivision
DiStrict
sewer, will be provided for the proper operation and occupancy
of the proposed resid-~ntial use.
Based on site visits /the public hearing process, and review
and input by appropriate town boards and departments, the
single family use is considered to be in harmony with the
general purpose and intent of the Zoning By Law.
Sincerely,
PLANNING BOARD
Paul A. Heastrom,
Chairman
CC
Applicant
Project 'Engj neet
Hi ghway--Surveyor
Board of Public Works
Board of_Health
Cons-ervat~on-Commi'~si-on .--~
Fire Chief~
Bu~ ldi ng ~I'ns pec{.o.r~-;~-
Parties in Interests;
DEQE -.