No preview available
HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 2005 SALEM STREET 6/22/2013 SUMMARY OF INVERTS BUILDING TIES SEWER 0 FDTN. 147.69 BLDG. CORNER I A I B I C D N TE: THIS PLAN & CERTIFICATION IS NOT SEPTIC TANK IN 147.39 SEPTIC TANK OUT 113.9136.01 - A WARRANTY OF THE SUBSURFACE DISPOSAL SEPTIC TANK OUT 147.02 DIST. BOX 47.7 65.$ - I SYSTEM. IT IS A RECORD OF THE LOCATION DIST. BOX IN 141.07 AND ELEVATION OF THE EXISTING SYSTEM DIST. BOX OUT 140.88 COMPONENTS. INV. IN CHAMBER 140.82 "1 HEREBY CERTIFY THE LOCATIONS, ELEVATIONS, TIES, COVER MATERIAL; BOTT. CHAMBER 140.52 EXPOSED COMPONENT COVERS ETC., SHOWN ON THIS AS-BUILT SUBSTANTIALLY AGREE WITH THE APPROVED PLAN AND HAVE DETERMINED THAT THE BREAK mm OUT ELEVATIONS, IF APPLICABLE, HAVE BEEN MET.- REC EWED APPROVED DESIGNS PLANS. ,)wcz Z;1313 TOVO4 0F rK)Rl ANDOVER SIGNATURE OF DESIGNER D,,(TE /4- ry fir 00 90 a 1 ll�l LQT 6) OR (129,181 S.F.) 14DFSG 005 R CON LIC T.F,-i 51 27' 1500 GAL SEPTIC TANK LEACH FIELD W/INFILTRATOR CHAMBERS INSPECTION PORT T VENT ro PRTVATE DRIVE v"OF MASSq v VUDIMM L NEMCHENOK T T AS BUILT PLAN OF S'u"BSURFACE DISPOSAL SYSTEM LOCATED IN NORTH ANDOVER, MASS./2005 SALEM STREET AS PREPARED FOR TM 108A GEORGE HASELTINE :' DATE: 6-22-13 TL: 2 SCALE: 1"=40' 20 40 80 MERRIMACK ENGINEERING SERVICES 66 PARK STREET ANDOVER, MASSACHUSETTS 01810 r4