HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 2001 SALEM STREET 8/30/2012 SUMMARY OF INVERTS F BUILDING TIES
SEWER 0 FDTN. 142.60 BLDG, CORNER A B C QTE-* THIS PLAN & CERTIFICATION IS NOT
SEPTIC TANK IN 142.09 SEPTIC TANK OUT 25.8 45.0 A WARRANTY OF THE SUBSURFACE DISPOSAL
SEPTIC TANK OUT 141.88 DIST, BOX 67.3 79.5 SYSTEM. IT IS A RECORD OF THE LOCATION
DIST. BOX IN 139.90 AND ELEVATION OF THE EXISTING SYSTEM
DIST, BOX OUT 139.73 COMPONENTS,
INV. IN CRAM. 139.68:�
BOTT. CRAM. 139.40 "1 HEREBY CERTIFY THE LOCATIONS, ELEVATIONS, TIES, COVER MATERIAL;
EXPOSED COMPONENT COVERS ETC., SHOWN ON THIS AS-BUILT SUBSTANTIALLY
AGREE WITH THE APPROVED PLAN AND HAVE DETERMINED THAT THE BREAK
OUT ELEVATIONS, IF APPLICABLE, HAVE BEEN MET."
APPROVED DESIGNS PLANS.
vz4DIAvI OAZ-_llz
SIGNATURE OF DESIGNER WE
SO FNO
WELLO
(220,496&F.)
o Ng
1500 GAL
MONOLITHIC
SEPTIC TAW
41 4
�
D-BOX
LEACH FIELD
INFILTRATOR
INSPECTION 4
PORT
"OF nlgssq
oy
VENT VLADIMIR L
NEMCHENOK
T7 9
AS BUILT PLAN
OF
SUBSURFACE DISPOSAL S`17SSTEM
LOCATED IN
NORTH ANDOVER, MASS.
AS PREPARED FOR
GEORGE HASELTINE TM: 108
DATE: 8-30-12 TL: 2
SCALE: I"=40'
TC1W'4 0I WI)i+l H/qJ00VER 0 20 40 80
MERRIMACK ENGINEERING SERVICES
66 PARK STREET
ANDOVER, MASSACHUSETTS 01810