HomeMy WebLinkAboutCertificate of Compliance - 35 HOLLOW TREE LANE 8/4/2004 Town of North Andover NORTH
Office of the Health Department
Community Development and Services Division
27 Charles Street
North Andover,Massachusetts 01845 4?*D t
Susan Y. Sawyer,REHS/RS 978.688.9540-Phone
Public Health Director 978.688.9542-Fax
CERTI FICATF OE COM1'.GI3XCE
As of:
.August 4, 2004
This is to certify that
the individual su6surface disposal system
repaired Fuf(System
by
James Xeffett
at
35 jh'oCCow Tree Lane
North Andover, WA 01845
has been installed in accordance with the provisions of Title V of the State Sanitary Code and
with the North Andover 0oard of Yfealth regulations.
The issuance of this certificate shall not 6e construed as a guarantee that the system will
function satisfactorily.
'fS n 7 Sawyer, WROTSIR5
Tu6lic-7fealth Director
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
TO OF NO6 TH A M' WER
HEALTH DEPAR
TG OF NORTH ANDOVE R SEWAGE DISPOSAL SYSTEM
INSTALLATION CERTIFICATION
The undersigned hereby certify that the Sewage Disposal System( )constructed;
)repaired;
by D_ 14s, He]
located at .3.1_11>_ L- -, 7/,z e
was installed in conformance with the North Andover Board of Health approved plan,
System Design Permit# ,plan dated , with a design flow
Of gallons per day. The materials.used were in conformance with those specified
on the approved plan; the system was installed in accordance with the provisions of 310
.CMR..15.000,Title S and local regulations, and the final grading agrees substantially with
the approved plan. All work is accurately represented on the As-built which has been
.submitted to the Board of Health.
Bed inspection date: _ `r 12- o /
Engineer Representative
Final inspection date: _ `2 1 s' o 4
Engineer Representative
Installer:
Date:
Engineer Dater`
"~ civil_
NO,45891
�o
Page I of I
Dellechiaie, Pam
From: Pamela DelleChiaie [pdellechiaie@townofnorthandover.com] on behalf of Dellechiaie, Pam
Sent: Monday, July 19, 2004 9:54 AM
To: Sawyer, Susan
Subject: FW: 35 Hollow Tree Lane- Request for Final Grade
Susan,
Can You do a Final Grade on this? Jim Kellett was in looking for the COC due to escrow and getting paid, etc.
I said that this one needs the following:
• As Built
• Installation Certification
• Final Grade
I can then issue the COC from the Health Dept.
Tx,
P
-----Original Message-----
From: Dan Ottenheimer [maiIto:info@miIIriverconsuIting.com]
Sent: Tuesday, July 13, 2004 7:30 PM
To: Susan Sawyer; amcbrearty@millriverconsulting.com; 'Pamela Dellechiaie'
Subject: 35 Hollow Tree Lane
Sue and Pam,
Attached please find final inspection for 35 Hollow Tree Lane. All went well, gave ok to backfill.
Dan
Mill Ri"ver
Consulting
Daniel Ottertheirner, President
Mill River Consulting
Septic System Management Services
2 Blackburn Center
Gloucester, MA 01930-2259
978-282-0014 art-800-377-3044
fax: 978-282-0012
W'"(W,tYlillriv,ercoiisL,�iting.coiii
info(i.r)niiiii-iverconsLilliiig.cotii
7/19/2004
TOW
Office of N SERVICES
11F,A1,1111 10.11"AR"I'M1.�NT'
27 CHARLES STRA"IFT
NORITI ANEXWE'R, MASSACHUSEl"I'S M45
,,�usan Y, Sawyer, REHS/16 1)'79,68,8 95,40 Phone
Public Health Director 978J"M,95,12 VAX
SEPTIC SYSTEM CONSTRUCTION NOTES
ADDRESS: 35 Hollow Tree Lane MAP: 104A LOT: 27
INSTALLER: James Kellett
DESIGNER: Richard Tangard
PLAN DATE: April 29, 2004
BOH APPROVAL DATE ON PLAN: 5/5/04
DATE OF BED BOTTOM INSPECTION: 7/8/04
DATE OF FINAL CONSTRUCTION INSPECTION: 7113/04
DATE OF FINAL GRADE INSPECTION:
SELECT SYSTEM TYPE
GRAVITY DISTRIBUTION
PRESSURE DISTRIBUTION
X PRESSURE DOSING
HOLDING TANK
ADVANCED TREATMENT
OTHER
COMPONENT SUMMARY FROM PLAN
GALLON TANK = 1500
LOADING OF SEPTIC TANK = H-10
GALLON PUMP CHAMBER = 1000
LOADING OF PUMP CHAMBER = H-10
TYPE OF SAS = Infiltrator Trenches
DIMENSIONS AND DETAILS OF SAS: 3 trenches, 7 chambers each 26.5 x 43.75
SITE CONDITIONS
kI4 Existing septic tank properly abandoned
0 Internal plumbing all to one building sewer
Topography not appreciably altered
Comments:
Page 1 of 4
TO"WN 011" NOIV�IH AMDOV�KR
Office ol'COM M U N 1TV DEVE1,01'M ENT' AN 1) SERVICES
YI]FIAL'I'll DEPAR,'FMFT1qT
27 (1 1ARIA"S STREF"T
I
Susan Y Sawvcr, R F"'F1�i/fts 97&6889540 Phone
Pubfic Jleahh Dirator 9786U,95,42 FAX
SEPTIC TANK
X Bottom of tank hole has 6"
stone base
0 Weep hole plugged In use/ not verified
El 1500 gallon tank has been installed
(H-10 or H-20) (monolithic or 2 piece)
El Water tightness of tank has been achieved
(Visual or Vacuum Test or Water held for 24hrs)
Inlet tee installed, under access port
Outlet tee (gas baffle or effluent filter) installed, under
access port
20 inch cover to within 6" of final grade installed over
one access port, must be over outlet of tank if effluent
filter is present
0 Hydraulic cement around inlet & outlet
Comments: Riser over center access port. Water level below seam, could not check
watertightness.
PUMP CHAMBER
Bottom of tank hole has 6" stone base did not see
X Weep hole plugged
1000 gallon Pump Chamber installed
(H-10 or H-20) (monolithic or 2 piece)
Inlet tee installed, under access port
FX1 Pump(s) installed on stable base
0 Alarm float working
El Pump On/Off float working
0 Drain hole in pressure line
20 inch cover to within 6" of final grade installed over
one access port
Water tightness of tank has been achieved
Visual or Vacuum Test or Water held for 24 hrs
Hydraulic cement around inlet & outlet
Comments: Water level in operating zone of tank will remain below seam.
Page 2 of 4
]'OWN OF NORTH ANDOVER
Office SERVICES
11E.A1,111 DE11AR'VN1EN'F
27 CHARLES S'TRIT"T
NORTI I At",H)OVE"R, NIASSACTILSETTS 0 1845
Swon Y. Sawlyer, REHYRS 978,6'88,9540— Phone
Public I k.,ahh Director 978M&9542—FAX
D-BOX
El Installed on stable
stone base
Inlet tee (if pumped or >0.08'/foot)
Hydraulic cement around inlet & outlets
0 Observed even distribution
1:1 Speed levelers provided (not required)
Comments:
SOIL ABSORPTION SYSTEM
Bottom of SAS excavated down to 6" into C soil layer,
as provided on plan
Size of SAS excavated as per plan
Title 5 sand installed, if specified on plan
13 3/4-11/2" double washed stone installed
El 1/8-1/2" (peastone) double washed stone installed
laterals installed and ends connected to header (and
vented if impervious material above)
Orifices @ 5 & 7 o'clock positions
Gravelless disposal systems: type, number and
location as per plan
Elevations of laterals installed as on approved plan
40 Mil HDPE barrier installed
D Retaining wall (boulder/ concrete /timber/ block)
13 Final cover as per plan
Comments: Water line re-routed per plan.
CONTROL PAN EL
Alarm & Pump are on separate circuits
Alarm sounds when float is tripped
El Location of control panel: Basement
Rated for exterior if placed outside
Comments:
Page 3 of 4
TOWN OF NORTH ANDOVI'�,'R
Office (WCOMMUNITY DEVE'LOPMEINTAND SE11VICES
11EAFF14 �DEPART'MEN'1'
27 (TIARL11:11S STR["U"T
NOR'11 [ANI)OVER, 01845
Susan Y. Smy�er, REITSMS 978,6889540 Phom
Public R"q11111 J)6-cdor 978,688,9542 FAX
SYSTEM ELEVATIONS
Benchmark: 100.00
Rod at Benchmark: 3.88
Height of Instrument: 103.88
INVERT ON DESIGN PLAN INVERT ELEVATION
Building Sewer OUT 96-70 97.12
Septic Tank IN 96.50 96.87
Septic Tank OUT 96.25 96.62
Pump Chamber IN 96.20
Pump Chamber OUT 95.95 96.42
Distribution Box IN 99.92
D-Box OUT 99.75
Bottom of Chamber 99-11
Top of Chamber 100.11 100.10
Chamber Inlet Invert 99.65 99.67
Rain at time of inspection, performed limited number of elevation shots to confirm
installation.
Page 4 of 4
TOWN OF NORTH ANDOVE11
Office of(f'OfVINIUNI't'I' I)F,\/El.,O.PM[�,NT AND SERVICES
11EAum DEAR R'FMEN'1'
27 C 11 A R L FS STR FET
-"I-,s 0 18115
NORT'll ANDOVER MASSACHUSE]
SLIS,111 Y. Sawyer, RHIS/RS 978.6W9540 Phone
Public Health Director 978A8.9542 FAX
D-BOX
Installed on stable stone base
Inlet tee (if pumped or >0.08'/foot)
El Hydraulic cement around inlet & outlets
1:1 Observed even distribution
El Speed levelers provided (not required)
Comments:
SOIL ABSORPTION SYSTEM
El Bottom of SAS excavated down to (--`-soil layer, as
provided on plan
Size of SAS excavated as per plan
El Title 5 sand installed, if specified on.plan
0 3/4-1 Y2" double washed stone installed
11 1/8-1/2" (peastone) double washed stone installed
El laterals installed and ends connected to header (and
vented if impervious material above)
Orifices @ 5 & 7 o'clock positions
El Gravelless disposal systems: type, number and
location as per plan
El Elevations of laterals installed as on approved plan
El 40 Mil HDPE barrier installed
Retaining wall (boulder/concrete /timber/ block)
Final cover as per plan
Comments:
PRESSURE DISTRIBUTION
E] inch manifold
laterals installed with end sweeps
size:
material:
El Squirt test ft in height
Equal distribution to all laterals
orifice size inch as per plan ,
Comments:
Page 3 of 4