HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 45 FOREST STREET 7/27/2007 THIS IS TO CERTIFY THAT NEW ENGLAND ENGINEERING
SERVICES,INC.HAS INSPECTED THE SUBSURFACE SEWAGE
DISPOSAL SYSTEM INSTALLED AT 45 FOREST STREET,NORTH
ANDOVER,MA.THE SYSTE M HAS BEEN CONSTRUCTED WITHIN
ALLOWABLE ENGINEERING TOLERANCE OF 310 CIVIR 15.00,THE
APPROVED DESIGN PLANS DATED 8-1-06,AND LOCAL
REQUIREMENTS,EXCEPT AS NOTED HEREIN.
INVERT ELEVATIONS
DESIGN ACTUAL
FOUNDATION 101.00 101.00
TANK IN 100.80 100.82
TANK OUT 100.55 100.64
D-BOX IN 100.44 100.45
D-BOX OUT 10027 100.27
A 100.17 100.14
B 100.17 10013
C 100.17 100.14
TOP OF INFILTRATORS
A 100.50 100.51
B 100.50 100.49
C 100.50 100.50
D 100.50 100.49
E 100.50 100.50
F 100.50 100.50
BOTTOM OF BED 99.50 9942
II
EAD FOUNDATION
SYSTEMUES
1 TO TANK IN 27.2'
2 TO TANK IN 13.5'
1 TO TANK OUT 35.0'
2 TO TANK OUT 16.4'
1 TO D-BOX 49.2'
2 TO D-BOX 281'
1 TO 53.0' 1 TO 96.5'
2TOA 34.0' 2 TO D 742'
1 TO C 52.0' 1 TO F 96.1'
2 TO C 30.4' 2 TO F 727
INSPECTION PORT
I TO X 84.0' 1 TOY 835
2TOX 62.0' 2TOY 60.4'
20' 0 20' 40' 60'
AS-BUILT SEPTIC SYSTEM
45 FOREST STREET
NORTH ANDOVER,MA
ASSESSORS MAP 106A,PARCEL 71
SCALE: I"=2_0' JULY 27,2007
BOWAN&e- NEW ENGLAND ENGINEERING SERVICES,INC.
OSGOOD,A 1600 OSGOOD STREET
CIVIL
NM 0094 BUILDING 20,SUITE 2-64
NORTH ANDOVER,MA 01845
PH:(978)686-1768 FAX:(978)327-6138
PLAN#: DRAWN CH KED
1234SAB-7-27-07 BY: S.G. . By. B.C.O.Jr.
45 FOREST STREET
ASSESSORS MAP 106A,PARCEL 71
31,300±S.F.
40 MIL IMPERVIOUS
BARRIER
TP3
15' 4\
F� ~
\ i N/F COLE
\ a
\
INSPECTION PORT(TYP.) ~\
1
LIMIT OF SAND
PI 39'-"-"
TP1 i
—DISTRIBUTION BOX
"_- 50' "'"•\ 1500 GALLON
SEPTICTANK
,moo
BENCHMARK:TOP RIGHT CORNER OF BI
2 ELEV.102.11(ASSUMED DATUM)
�G
+
5`
w
N/F COOKE
us
W �O1
I
•.
'WEL,L '•••'•'••
GRAVEL
.•DRIVEWAY•.'.•%%-.
FQgE5