Loading...
HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 45 FOREST STREET 7/27/2007 THIS IS TO CERTIFY THAT NEW ENGLAND ENGINEERING SERVICES,INC.HAS INSPECTED THE SUBSURFACE SEWAGE DISPOSAL SYSTEM INSTALLED AT 45 FOREST STREET,NORTH ANDOVER,MA.THE SYSTE M HAS BEEN CONSTRUCTED WITHIN ALLOWABLE ENGINEERING TOLERANCE OF 310 CIVIR 15.00,THE APPROVED DESIGN PLANS DATED 8-1-06,AND LOCAL REQUIREMENTS,EXCEPT AS NOTED HEREIN. INVERT ELEVATIONS DESIGN ACTUAL FOUNDATION 101.00 101.00 TANK IN 100.80 100.82 TANK OUT 100.55 100.64 D-BOX IN 100.44 100.45 D-BOX OUT 10027 100.27 A 100.17 100.14 B 100.17 10013 C 100.17 100.14 TOP OF INFILTRATORS A 100.50 100.51 B 100.50 100.49 C 100.50 100.50 D 100.50 100.49 E 100.50 100.50 F 100.50 100.50 BOTTOM OF BED 99.50 9942 II EAD FOUNDATION SYSTEMUES 1 TO TANK IN 27.2' 2 TO TANK IN 13.5' 1 TO TANK OUT 35.0' 2 TO TANK OUT 16.4' 1 TO D-BOX 49.2' 2 TO D-BOX 281' 1 TO 53.0' 1 TO 96.5' 2TOA 34.0' 2 TO D 742' 1 TO C 52.0' 1 TO F 96.1' 2 TO C 30.4' 2 TO F 727 INSPECTION PORT I TO X 84.0' 1 TOY 835 2TOX 62.0' 2TOY 60.4' 20' 0 20' 40' 60' AS-BUILT SEPTIC SYSTEM 45 FOREST STREET NORTH ANDOVER,MA ASSESSORS MAP 106A,PARCEL 71 SCALE: I"=2_0' JULY 27,2007 BOWAN&e- NEW ENGLAND ENGINEERING SERVICES,INC. OSGOOD,A 1600 OSGOOD STREET CIVIL NM 0094 BUILDING 20,SUITE 2-64 NORTH ANDOVER,MA 01845 PH:(978)686-1768 FAX:(978)327-6138 PLAN#: DRAWN CH KED 1234SAB-7-27-07 BY: S.G. . By. B.C.O.Jr. 45 FOREST STREET ASSESSORS MAP 106A,PARCEL 71 31,300±S.F. 40 MIL IMPERVIOUS BARRIER TP3 15' 4\ F� ~ \ i N/F COLE \ a \ INSPECTION PORT(TYP.) ~\ 1 LIMIT OF SAND PI 39'-"-" TP1 i —DISTRIBUTION BOX "_- 50' "'"•\ 1500 GALLON SEPTICTANK ,moo BENCHMARK:TOP RIGHT CORNER OF BI 2 ELEV.102.11(ASSUMED DATUM) �G + 5` w N/F COOKE us W �O1 I •. 'WEL,L '•••'•'•• GRAVEL .•DRIVEWAY•.'.•%%-. FQgE5