Loading...
HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 45 FOREST STREET 7/27/2007 (2) 45 FOREST STREET ASSESSORS MAP 106A,PARCEL 71 31,300±S.F. 40 MIL IMPERVIOUS BARRIER TP3 TP2/PT1 16. \ i N/F COI \ INSPECTION PORT(TYP.) TI �\ y LIMIT OF SAND PI 39' 0 � DISTRIBUTION BOX 50' 1 S GALLON SEPTIC TANK 33• ^g BENCHMARK:TOP RI( ELEV.102.71(ASSUME �A, 9� w N/F COOKE W i GRAVEL •DRIVEWAY•.•.•.'.•.'. FpgES THIS IS TO CERTIFY THAT NEW ENGLAND ENGINEERING SERVICES,INC.HAS INSPECTED THE SUBSURFACE SEWAGE DISPOSAL SYSTEM INSTALLED AT 45 FOREST STREET,NORTH ANDOVER,MA.THE SYSTEM HAS BEEN CONSTRUCTED WITHIN ALLOWABLE ENGINEERING TOLERANCE OF 310 CMR 15.00,THE APPROVED DESIGN PLANS DATED 8-1-M AND LOCAL REQUIREMENTS,EXCEPT AS-NOTED HEREIN. INVERT ELEVATIONS DESIGN ACTUAL FOUNDATION 101.00 101.00 TANK IN 100.80 100.82 TANK OUT 100.55 100.64 D-BOX IN 100.44 100.45 D-BOX OUT 100.27 100.27 A 100.17 100.14 B 100.17 100.13 C 100.17 100.14 TOP OF INFILTRATORS A 100.50 100.51 B 100.50 100.49 C 100.50 100.50 D 100.50 100.49 E 100.50 100.50 F 100.50 100.50 BOTTOM OF BED 99.50 99.42 IEAD FOUNDATION SYSTEM TIES 1 TO TANK IN 27.2' 2 TO TANK IN 13.5' 1 TO TANK OUT 35.0' 2 TO TANK OUT 164 1 TO D-BOX 49.2' 2 TO D•BOX 28.1' 1 TO A 53.0' 1 TO D 96.5' 2 TO A 34.0' 2 TO D 74.2' 1 TO C 52.0' 1 TO F 96.1' 2 TO C 30.4' 2 TO F 72.7' INSPECTION PORT 1 TO X 84.0' 1 TOY 835 2 TO X 62.0' 2 TO Y 60.4' _ 20' 0 20' 40' 60' ,00�'�ji AS-BUILT SEPTIC SYSTEM ^`�_-� 45 FOREST STREET NORTH ANDOVER,MA ASSESSORS MAP 106A,PARCEL 71 SCALE: 1"=20' JULY 27,2007 BENJAMIN 0, NEW ENGLAND ENGINEERING SERVICES,INC. 030000,A a 1600 OSGOOD STREET �w�eso1 BUILDING 20,SUI'T'E 2-64 Far R� NORTH ANDOVER,MA 01845 8roN D� PH:(978)686-1768 FAX:(978)327-6138 PLAN#` 1234SAB-7-27-07 nxnw"S.G.B, I B" c'B.C.O.Tr.