HomeMy WebLinkAboutAs-Built Plan / Installation Certificate Form - 45 FOREST STREET 7/27/2007 (2) 45 FOREST STREET
ASSESSORS MAP 106A,PARCEL 71
31,300±S.F.
40 MIL IMPERVIOUS
BARRIER
TP3
TP2/PT1
16. \
i N/F COI
\
INSPECTION PORT(TYP.) TI �\
y
LIMIT OF SAND
PI 39'
0 �
DISTRIBUTION BOX
50' 1 S GALLON
SEPTIC TANK
33•
^g
BENCHMARK:TOP RI(
ELEV.102.71(ASSUME
�A,
9�
w
N/F COOKE
W
i
GRAVEL
•DRIVEWAY•.•.•.'.•.'.
FpgES
THIS IS TO CERTIFY THAT NEW ENGLAND ENGINEERING
SERVICES,INC.HAS INSPECTED THE SUBSURFACE SEWAGE
DISPOSAL SYSTEM INSTALLED AT 45 FOREST STREET,NORTH
ANDOVER,MA.THE SYSTEM HAS BEEN CONSTRUCTED WITHIN
ALLOWABLE ENGINEERING TOLERANCE OF 310 CMR 15.00,THE
APPROVED DESIGN PLANS DATED 8-1-M AND LOCAL
REQUIREMENTS,EXCEPT AS-NOTED HEREIN.
INVERT ELEVATIONS
DESIGN ACTUAL
FOUNDATION 101.00 101.00
TANK IN 100.80 100.82
TANK OUT 100.55 100.64
D-BOX IN 100.44 100.45
D-BOX OUT 100.27 100.27
A 100.17 100.14
B 100.17 100.13
C 100.17 100.14
TOP OF INFILTRATORS
A 100.50 100.51
B 100.50 100.49
C 100.50 100.50
D 100.50 100.49
E 100.50 100.50
F 100.50 100.50
BOTTOM OF BED 99.50 99.42
IEAD FOUNDATION
SYSTEM TIES
1 TO TANK IN 27.2'
2 TO TANK IN 13.5'
1 TO TANK OUT 35.0'
2 TO TANK OUT 164
1 TO D-BOX 49.2'
2 TO D•BOX 28.1'
1 TO A 53.0' 1 TO D 96.5'
2 TO A 34.0' 2 TO D 74.2'
1 TO C 52.0' 1 TO F 96.1'
2 TO C 30.4' 2 TO F 72.7'
INSPECTION PORT
1 TO X 84.0' 1 TOY 835
2 TO X 62.0' 2 TO Y 60.4'
_ 20' 0 20' 40' 60'
,00�'�ji AS-BUILT SEPTIC SYSTEM
^`�_-� 45 FOREST STREET
NORTH ANDOVER,MA
ASSESSORS MAP 106A,PARCEL 71
SCALE: 1"=20' JULY 27,2007
BENJAMIN 0, NEW ENGLAND ENGINEERING SERVICES,INC.
030000,A a 1600 OSGOOD STREET
�w�eso1 BUILDING 20,SUI'T'E 2-64
Far R� NORTH ANDOVER,MA 01845
8roN D� PH:(978)686-1768 FAX:(978)327-6138
PLAN#` 1234SAB-7-27-07 nxnw"S.G.B, I B" c'B.C.O.Tr.