Loading...
HomeMy WebLinkAboutStormwater Report - 100 DALE STREET 6/18/2013 (2) TEST PIT RESULTS Date of Test: January 31, 2014 Soil Evaluator: Daniel O'Connell, SE#1771, Christiansen&Sergi, Inc. Test Pit#1 0"-5" A 10YR3/2 Fine Sandy Loam Granular,Very Friable 5"-22" Bw 10YR5/4 Gravelly Fine Sandy Loam Massive, Friable 22"-52" C1 2.5Y5/4 Gravelly Loamy Sand Massive, Fraible to Firm in Place Roots to 36" ESHWT @ 38"(Mottling) No Weeping or Standing Water No Refusal TEST PIT PIT RESULTS FOR 100 DALE STREET, NORTH ANDOVER, MASS. DATE: JANUARY 31, 2014 DWG. NO.: 11032009 CHRISTIANSEN PROFESSIONAL ENGINEERS, �E RG LAND SURVEYORS 160 SUMMER STREET PH:978-373-0310 HAVERHILL,MASS.01830 FAX:978-372-3960 LIMIT WORK —180 \ LOT /1 I 1 \ ago ® A F ARAl9O,6o6R .F.F DR WELL INFILTRAT R ,L� = 9 TEST PI #1 TP R 8 66�' PbSED 2 a IN = 176.0) L 1 °SE° 1100 s 660 / DRI EWA Y liyll o 2 m � O 700 PLAN SHOWING TEST PIT LOCATION AT 100 DALE STREET, NORTH ANDOVER, MASS. DATE: JANUARY 31, 2014 DWG. NO.: 11032009 0 z CHRISTIANSEN PROFESSIONAL ENGINEERS;.� �E�� LAND SURVEYORS Scale. 1 '� O� 160 SUMMER STREET PH:978-373-0310 HAVERHILL,MASS.01830 �+� FAX:978-372-3960 STORMWATER OPERATION AND MAINTENANCE ROOF RUNOFF INFILTRATION CHAMBER MAINTENANCE 1. INSPECT CHAMBERS AFTER EVERY MAJOR STORM FOR THE FIRST FEW MONTHS AFTER INSTALLATION TO INSURE PROPER STABILIZATION AND FUNCTION. 2. INSPECT THE CHAMBERS 72 HR AFTER STORMS QUARTERLY FOR THE FIRST YEAR TO DETERMINE THAT ALL OF THE WATER HAS DRAINED FROM THE CHAMBER 3. INSPECT THE CHAMBERS ANNUALLY 72 HOURS AFTER A STORM TO DETERMINE IF THE WATER HAS DRAINED, 4. IF THE INSPECTON REVEALS THE CHAMBERS ARE NOT FUNCTIONING PROPERLY, CONTACT A STORMWATER PROFESSIONAL TO DETERMINE WHAT ACTIONS ARE NECESSARY. DRIVEWAY RUNOFF TREATMENT STRIP MAINTENANCE 1. INSPECT RUNOFF TRETMENT STRIP AFTER EVERY MAJOR STORM FOR THE FIRST FEW MONTHS AFTER INSTALLATION TO INSURE PROPER STABILIZATION AND FUNCTION. 2. INSPECT THE RUNOFF TREATMENT STRIP 72 HR AFTER STORMS QUARTERLY FOR THE FIRST YEAR TO DETERMINE THAT ALL OF THE WATER HAS DRAINED FROM THE STONE. 3. INSPECT THE RUNOFF TREATMENT STRIP ANNUALLY 72 HOURS AFTER A STORM TO DETERMINE IF THE WATER HAS DRAINED, 4. CLEAN DEBRIS FROM STONE AS NECESSARY. 6. REPLACE SURFACE STONE IF IT APPEARS TO BE FILLED WITH SEDIMENT. 6. IF IT APPEARS THE STRIP IS NOT FUNCTIONING PROPERLY, CONSTACT A STORMWATER PROFESSIOAL TO DETERINE WHAT ACTIONS ARE NECESSARY.