Loading...
HomeMy WebLinkAboutCorrespondence - 1211 OSGOOD STREET 6/11/2003 Page 1 of 1 Brian Pendleton From: Brian Pendleton Sent: Wednesday, June 11, 2003 6:00 PM To: ' Cc: Mitchell Kearny Subject: RE: McLay's letter Dan/Jimmy, Attached is the latest version with table and information added that I was able to verify to date. We still need a brief HISTORY, existing PARKING count and verification of Endicott Plaza permitting (I need to check with FST, VAI only did the Traffic Impact and Access Study, evidently FST was finalizing the design). We will prepare the Locus Plan and Access Permit for an "on time"delivery once the schedule is finalized (I have not been focusing on this as a top priority; but will move it up as schedule dictates). Thanks, BTP -----Original Message----- From: _ Sent: Wednesday,June 11, 2003 9:22 AM To: Brian Pendleton; James D'Angelo Cc: Mitchell Kearny Subject: McLay's letter Gentlemen— What's up with the letter? I was expecting to wrap it up once the Table was inserted. Where are we? Come in, Rangoon... Don't make me come up there... Jimmy—I have traded messages with Dicky F, baby. He got a kick out of the call. I will hook up with him and get some times. Sounds like he works part time at Epsilon so his sched appears flexible. Feel free to call me any time your navigation system goes down. I felt like Burt Lancaster in "Airport"... or was that Lloyd Bridges in "Airplane"??? 6/11/2003 T-0064 May 28, 2003 Mr. Michael Formichella District 4 Permit Engineer MassHighway—District 4 519 Appleton Street Arlington, MA 02476 Re: Proposed McLay's Redevelopment 1121 Osgood Street(Route 125) North Andover, MA Dear Mr. Formichella: Attached please find the permit application for the alteration of the existing curb cut on Route 125 in North Andover, MA. As you know we have reviewed the existing and proposed access in the field with the District Traffic Engineer on May--. At his suggestion, I am providing you a brief traffic and access assessment of the proposal to assist in your final evaluation of the reconfigured access on to Route 125. This letter also serves as the traffic impact and access requirement for local planning board approval. Proposal The owner, Frank Terranova,proposes to redevelop the existing McLay's Florist from its current use as a flower, garden and home improvement center to a small retail center. Mr. Terranova has owned and operated McLay's ,<histaryy Presently the 1.2 acre site includes a 2500 square foot shop and over an acre of outdoor sales area and storage integrated with the cHow many,existing parking spaces. He proposes to redevelop the site as a 10,365 square foot retail center. The new retail center will include McLay's Florists as well as a number of other smaller retail tenants. Parking for 52 vehicles will be provided as well as a dedicated loading area for deliveries. The proposed plan does not include outdoor storage, display or sales areas. Existing Traffic and Access Conditions The site is located on Route 125 (Osgood Street), a state highway, at its intersection with Barker Street. The triangular site forms the northeast corner of the intersection (see attached locus plan)which is STOP sign controlled on the Barker Street approach. Route 125 is a four-lane,undivided highway which links downtown North Andover with Haverhill and I-495. According to automatic traffic recorder counts performed just south of Barker Street, Route 125 carries approximately 19,200 vehicles per day during a typical weekday and approximately 12,800 on Saturday. Peak hour volumes during the weekday evening commuter peak and the Saturday midday peak generally represent approximately 9 percent and 8 percent, respectively. Access to the existing McLay's Florist is provided from Route 125 and Barker Street. The existing driveway on to Route 125 is a wide,median-divided that allows left and right turns into and out off the site. Access along Barker Street consists of one driveway accessing the front parking area and one drive in the rear accessing the delivery and storage area. The posted speed along Route 125 in the vicinity of the site is 40 miles per hour. Sight distance to and from the existing driveway is greater than 500 feet in either direction. The North Andover Police Department indicated that there are no significant safety deficiencies near the site. This is consistent with the findings of other recent Traffic Impact and Access Studies in the areal. Area Projects The only significant planned project in the area is the Endicott Plaza retail center now under construction. As part of their project, the proponents of this retail center are planning to install a traffic signal at the intersection of Route 125 and Barker Road. Left turn lanes along the Route 125 approaches are also planned. MassHighway has not.apprpved the design plans for this intersection at this vvrtirig. Trip Generation In order to estimate the traffic generation of the proposed use,Trip Generation, 6`'edition compiled and published by the Institute of Transportation Engineers (ITE) was employed. Using Land Use Code (LUC) 820/Shopping Center, the vehicle trip generation of the proposed center was estimated. The trip generation for the proposed retail center is compared to the existing 2500 square foot building using the same LUC in the table below. EXISTING PROPOSED' NET CHANGE WEEKDAY Daily(VTPD)4 635 1585 950 Evening Peak Hourr VTPH ' 55 140 85 SATURDAY Daily (VTPD) 900 2200 1300 Evening Peak Hourr VTPH 80 200 120 The comparison above was used because the existing zoning of the property allows for a more intense retail use of the premises than the existing use. Furthermore,trip generation examples of the existing use are limited in ITE. The one use that is applicable(LUC 817 Nursery(Garden Center)) is based on small sample resulting in widely skewed data points with no discernable correlation. 'For Forgetta Development,LLC Endicott Plaza prepared by Vanasse and Associates,Inc.;dated Dec 2000 'For Vincent Grasso,Car Wash prepared b y Dermot j.Kelley Assoc.,Inc.;dated Feb 2003 2 2,500 square foot retail building based on ITE Trip Generation 6'Edition LUC 820—Shopping Center. Excludes sales/storage area. 3 10,395 square foot retail building based on ITE Trip Generation 6`i'Edition LUC 820—Shopping Center. 4 vehicle trips per day 5 vehicle trips per hour Recommended Access Design Based on these findings and in consultation with the proponent,his site engineer and MassHighway, TEC recommends reconfiguring the existing driveway on Route 125 to a right-in/right-out driveway. This change will change will eliminate the left-turn demand at the driveway, relocating and consolidating that demand to Barker Street. Once the planned improvements are implemented by the Endicott Plaza project, these left turns will occur more safely in protected left turn lanes under signal control. Access points on Barker Street will be defined to promote safer more efficient traffic flow around the site. Access to the loading area for the proposed building will be segregated from customer traffic with a separate entrance/exit on to Barker Street. Minimum stopping sight distance is exceeded at all driveway locations. In conclusion, while the redevelopment of the McLay's Florist site on Route 125 will result in additional vehicle trips to and from the site, the implementation of right-in/right-out access will improve overall safety and efficiency. Accordingly, I respectfully ask that you review the attached application and approve the revised driveway design. Please call me with any questions you may have. Very truly yours, TRANSPORTATION ENGINEERING AND CONSTRUCTION, INC. James D'Angelo,P.E. Principal cc. Frank Terranova, McLay's Page lof2 to-��� Brian Pendleton From: JemoeDY\nAe|o Sent: Friday, June 13. 2OU311:O1 /\[W To: Brian Pendleton Subject: RE: N1oLoy/e |etter Brion, Please finalize the memo and get the permit plan prepared. 1.At this location since 1998 when he relocated McLay's Garden Center from 757 Turnpike street where it had been en established North Andover business since 1984. 2. ... 13 spaces located in front of the building and 0 spaces to the rear. 3. The plans are currently at 7596 and in review at the Department. Those pens accommodate the existing Flower Shop drive by providing a short, separate left turn lane in advance of the left turn lane at the proposed signal for Barker and Osgood Street. We met on site with Traffic Engineering to discuss an ooceoe to the redeveloped site flower shop site and agreed that the short left turn lane in advance of the left turn for the signal would not be appropriate. We have therefore, agreed and have prepared as part of this memo a revised access indicating right turn in and out only on Osgood Street with all left turn movements coming at the Barker Street/Osgood Street intersection. ^ -----Original - From: Brian Pendleton Sent: Wednesday, June 11, 20036:OOPM To Cc: Mitchell Kearny � Subject: RE: letter � � � Dan/Jimmy, Attached isthe latest version with table and information added that I was ableto verify to date. We still need e brief HISTORY, existing PARKING count and verification of Endicott Plaza permitting (I need Lo � check with FST, VA| only did the Traffic Impact and Access Study. evidently FSTwoa finalizing the | design). � We will prepare the Locus Plan and Access Permit for an "on time"delivery once the schedule is finalized (| have not been focusing on this as a top priority; but will move it up as schedule dichabae). Thanks, 0TP � -----Original Message----- From: DanC|arey Sent: Wednesday, June 11, 2003 9:22 AM To: Brian Pendleton; James D'Anga|o Cc: Mitchell Kearny Subject: McLay'sletter Gentlemen — 6/l3/2A03 r -T T-0064 r�11J_ U+ May 28, 20 3 */2 <Name , 0 X-3 Permits Engi er MassHighw y—District ict <Address Arlington, MA<ZIP> Re: Proposed McLay's Redevelopment 1121 Osgood Strpet (Route 125) o c us North Andove-, MA Dear<Name Attached please find the permit application for the alteration of the existing curb cut on Route 125 in North Andover, MA. As you know we have reviewed the existing and proposed access in the field with the District Traffic Engineer on May --. At his suggestion, I am providing you a brief traffic and access assessment of the proposal to assist in your final evaluation of the reconfigured access on to Route 125. This letter also serves as the traffic impact and access requirement for local planning board approval. Proposal The own -an rranova, proposes to redevelop the existing McLay's Florist from its current use as a The 0 n 'a n flower, rden and h e improvement center to a small retail center. Mr. Terranova has owned and operated h es I cc y McL 's <histor Presently the 1.2 acre)sI5'-:1��he,, 2500 square foot shop and over an acre of outdoor a r sal s area and rage integrated with th �0"Wmany> xisting parking spaces. He proposes to redevelop the 0 sit as raI5 square foot retail cente . The new r center will include McLay's Florists as well as a nurn -of other smaller retail tenants. Parki or r 52 vehicles will be provided as well as a dedicated loading area for deliveries. The proposed plan oes not include outdoor storage, display or sales areas. Existing Traffic and Access Conditions The site is located on Route 125 (Osgood Street), a state highway, at its intersection with Barker Street. The triangular site forms the northeast comer of the intersection (see attached locus plan) which is STOP sign controlled on the Barker Street approach. Route 125 is a four-lane, undivided highway which links downtown North Andover with Haverhill and 1-495. According to automatic traffic recorder counts performed just south of Barker Street, Route 125 carries approximately 19,200 vehicles per day during a typical weekday and approximately 12,800 on Saturday. Peak hour volumes during the weekday evening commuter peak and the Saturday midday peak generally represent approximately 9 percent and 8 percent, respectively. Access to the existing McLay's Florist is provided from Route 125 and Barker Street. The existing driveway on to Route 125 is a wide, median-divided that allows left and right turns into and out off the site. Access along Barker Street consists of one driveway accessing the front parking area and one drive in the rear accessing the delivery and storage area. The posted speed along Route 125 in the vicinity of the site is 40 miles per hour. Sight distance to an ro m the existing driveway is greater than 500 feet in either direction. The North Andover Police Departme indicated that there are no significant safety deficiencies near the site. This is consistent with the fin to of other recent studies in the area. T—, ov s 't- to�al sraak�_[ Area Projects The only significant planned project in the area is the Endicott Plaza retail center now under construction. As part of their project, the proponents of this retail center are planning to install a traffic signal at the intersection of Route 125 and Barker Road. Left turn lanes along the Route a c its-are a lanned. Route MassHighway has not approved the design plans for this intersection at t s writs g. te s a w r' e a g %3V compiled on om Trip Generation In order to estimate the traffic generation of the proposed use, Trip G eration, 6" 'on compiled and published by the Inpitute of Transportation Engineers (ITE) was employed. s*ng Land Use Code (LUC) 820/Shopping Ce0er, the vehicle trip generation of the proposed center was estimated. The trip generation for the proposed ret I center is compared to the existing 2500 square foot building using the same LUC in the table below. Add Taby f The comparison above was used because the existing zoning of the property allows for a more intense retail use of the premises than the existing use. Furthermore, trip generation examples of the existing use are limited in ITE. The one use that is applicable (LUC 817 Nursery (Garden Center)) is based on small sample resulting in widely skewed data points with no discernable con-elation. Recommended Access Design Based on these findings and in consultation with the proponent, his site engineer and MassHighway, TEC recommends reconfiguring the existing driveway on Route 125 to a right-in/right-out driveway. This change will change will eliminate the left-turn demand at the driveway, relocating and consolidating that demand to Barker Street. Once the planned improvements are implemented by the Endicott Plaza project, these left turns will occur more safely in protected left turn lanes under signal control. Access points on Barker Street will be defined to promote safer more efficient traffic flow around the site. Access to the loading area for the proposed building will be segregated from customer traffic with a separate entrance/exit on to Barker Street. Minimum stopping sight distance is exceeded at all driveway locations. In conclusion, while the redevelopment of the McLay's Florist site on Route 125 will result in additional vehicle trips to and from the site, the implementation of right-in/right-out access will improve overall safety and efficiency. Accordingly, I respectfully ask that you review the attached application and approve the revised driveway design. Please call me with any questions you may have. Very truly yours, TRANSPORTATION ENGINEERING AND CONSTRUCTION, INC. James D'Angelo, P.E. Principal A' re `� f 3 FILE No.027 06/05 '03 15:31 ID:THE GUTIERREZ COMPANY FAX:7R12723130 PAGE 2/ 2 trvN P � 3 �„;P°) 3 S'w 1 S- s- 9�a �✓� 1 L- 6v-(Pp) � °D a a ` / 30-0 o V 7 p r) 15D Sc��c�v-z o�� fc��c • �i�. �� ��ctia� ca. ATfl� L�.�fn�►�- 2 l f- 7r / �..c✓.,� (/-` ICU II TEN NEW ENGLAND BUSINESS CENTER DRIVE TRANS PO RTAT I ON SUITE 107 • ANDOVER, MA 01 B 10 TEL 97 8.794.1792 • FAX 978.794.1793 ENGINEERIN0+CONSTRUCTION TO: Mario Perrone FROM: Brian Pendleton COMPANY: TDC DATE: 5/12/03 ADDRESS: PROJECT NO.: T0064 RE: ATR's on Osgood Street in No. Andover ® FACSIMILE TRANSMITTING: Fj TRANSMITTAL Copies Date Description FACSIMILE: ® FAX#(508)651- 1229 ® NO. PAGES: 2(INCL. COVER) ORIGINAL WILL NOT BE SENT ® ORIGINAL WILL BE SENT ON REQUEST ❑ URGENT TRANSMITTING: COMMENTS: ❑ SHOP DRAWINGS Mario, ❑ REPORT'_ We have a new project where traffic data collection will be required ❑ PLANS and I was hoping you would be able to assist us in these efforts. SPECIFICATIONS The site we are working with is located at the intersection of Barker ❑ OTHER Street and Osgood Street in No. Andover.. We are looking to get a 48 hour traffic count(ATR) on Osgood Street, approximately 200' south of the intersection. FYI ❑ FOR APPROVAL Please take a look at the attached sketch and let me know if this is El FOR YOUR USE something you will be able to assist with; possible time frame and AS REQUESTED associated cost. FOR REVIEW ❑ FOR COMMENT Thanks, ❑APPROVED Brian Fj REVISE x127 ❑ RESUBMIT RETURN OF PRINTS ON LOAN El CC: P:\P0006\OsgoodFax-Trans.doe 5/12/03 12:47 PM Page 1 of 1 ' F ARRWOOD \ ��PjI,F 125 HAVERHILL HOLT ROAD r F- � w O O �PRcX. �AO� SoJ'�r1 ��C/ ePRK�R y� LAWRENCE MUNICIPAL AIRPORT \ X00 GREAT POND OS ROAD 133 0 0 NORTH ANDOVER SAKE Q� )A%CA 5-W�C 125 ��- 133 O-j z ■ Not To Scale 2' Z TRANSMISSION JOURNAL TIME MAY-13-2003 07:25AM TEL NUMBER 978-794-1793 NAME TRANSPORTATION ENGINEERING & CONSTRUCTIO SCAN COUNT 5083 (000013DB) PRINT COUNT: 6250 (0000186A) DRUM COUNT 62500 (OOOOF424) NBR FILE NBR DATE TIME DURATION PGS TO DEPT NBR ACCOUNT MODE STATUS 288 543 APR-30 04:OOPM 00/47 002 19783524813 EC 302 OK 289 548 MAY-01 10:52AM 01/30 003 16036680608 EC 302 OK 290 554 MAY-02 08:13AM 04/23 013 16174219509 EC 502 OK 291 556 MAY-02 09:49AM 02/02 005 19782510509 G3 501 OK 292 560 MAY-02 01:35PM 02/07 005 19782510509 G3 501 OK 293 561 MAY-05 06:06AM 00/56 003 15084298699 EC 503 OK 294 562 MAY-05 06:46AM 00/43 001 16178849359 EC 503 OK 295 564 MAY-05 09:42AM 00/59 003 17819356312 EC 502 OK 296 571 MAY-06 09:47AM 00/50 002 19782446696 EC 502 OK 297 573 MAY-06 11:41AM 00/40 002 17816465115 EC 503 OK 298 575 MAY-06 01:16PM 00/44 002 19789758811 EC 502 OK 299 581 MAY-07 07:02AM 00/28 001 16173286888 EC 503 OK 300 582 MAY-07 07:03AM 00/29 001 16174727248 EC 502 OK 301 583 MAY-07 07:28AM O1/01 004 16033823492 EX 503 OK 302 586 MAY-07 07:57AM 00/38 002 19784740478 EC 502 OK 303 589 MAY-07 09:22AM 00/27 001 14017395304 EC 503 OK 304 594 MAY-07 02:50PM 01/36 006 16177287782 EC 502 OK 305 595 MAY-07 02:54PM 01/59 006 15082264937 EC 302 OK 306 596 MAY-07 02:56PM 01/24 006 15084298699 EC 503 OK 307 597 MAY-07 03:08PM 00/41 002 17817620844 EC 502 OK 308 599 MAY-07 03:22PM 00/42 002 01135317037194 EC 503 OK 309 601 MAY-07 03:45PM 00/28 001 12155161035 EC 503 OK 310 605 MAY-08 07:52AM 00/42 002 01135317037194 EC 503 OK 311 612 MAY-08 01:34PM 00/39 001 9786837715 EC 300 OK 312 613 MAY-08 0IAI PM 00141 002 16032242507 EC 503 OK 313 614 MAY-08 01:43PM 00/54 002 16036680608 EC 302 OK 314 617 MAY-09 06:57AM 01/07 003 17816829793 EC 502 OK 315 618 MAY-09 07:02AM 01/24 004 19783929696 EC 503 OK 316 628 MAY-12 06:21AM 00141 002 16179242286 EC 503 OK 317 629 MAY-12 06:56AM 01/02 002 19786857127 EC 300 OK 318 630 MAY-12 07:34AM 00/38 002 14103792801 EC 502 OK 319 631 MAY-12 07:37AM 01/27 005 19782510509 EC 503 OK 320 632 MAY-12 09:14AM 00/34 001 13126705403 EC 503 OK 321 633 MAY-12 10:09AM 00/46 002 01135317037194 EC 503 OK 322 634 MAY-12 10:15AM 00/41 002 17819356312 EC 502 OK 323 635 MAY-12 12:48PM 01/30 001 15086511229 G3 300 NG DO 324 636 MAY-12 12:57PM O1/01 000 15086511229 NG BO 325 635 MAY-12 01:OOPM O1/01 000 15086511229 NG BO 326 639 MAY-12 03:28PM 00/54 003 01135317037194 EC 503 OK 327 640 MAY-13 06:31AM 01/03 002 15086511229 EC 300 OK 1( 1j TEN NEW ENGLAND BUSINESS CENTER DRIVE T RA N SRO RTAT I ON SUITE 107 - ANDOVER, MA 01810 TEL 978.794.1 792 • FAX 97B.794.1793 ENGI NEERI N G+CONSTRU CTION TO: Bob Daley FROM: Jimmy D'Angelo COMPANY: Merrimack Engineering Services, Inc. DATE: May 22, 2003 ADDRESS: 66 Park Street PROJECT NO.: T0064 Andover, MA 01810 RE: Offsite Improvements-Endicott Plaza, North Andover, MA ❑ FACSIMILE TRANSMITTING: ® TRANSMITTAL Copies Date Description 1 5/22/2003 Offsite Improvement Plan-Endicott Plaza FACSIMILE: ❑ FAX# ❑ NO. PAGES: (INCL. COVER) ❑ ORIGINAL WILL NOT BE SENT ❑ ORIGINAL WILL BE SENT ON ❑ URGENT TRANSMITTING: COMMENTS: ❑ SHOP DRAWINGS Attached is Bill Barrett's Offsite Improvement Plan as approved by ❑ REPORT MassHighway. ® PLANS Please call if you have any questions or require additional ❑ SPECIFICATIONS information. ❑ OTHER ® FYI ❑ FOR APPROVAL ❑ FOR YOUR USE ❑AS REQUESTED ❑ FOR REVIEW ❑ FOR COMMENT ❑APPROVED ❑ REVISE ❑ RESUBMIT ❑ RETURN OF PRINTS ON LOAN ❑ CC: T:\T0064\Docs\Memos&Trans\trans_bda1ey_052203.doc 5/22/03 3:16 PM Page I of I LA INNOVATORS' I INNOVATORS IN TRANSPORTATION PROJECT DELIVERY T0064 July 22, 2003 Mr. Michael Formichella District 4 Permit Engineer MassHighway—District 4 519 Appleton Street Arlington, MA 02476 Re: Proposed McLay's Redevelopment 1121 Osgood Street(Route 125) North Andover,MA Dear Mr. Formichella: Attached please find the permit application for the alteration of the existing curb cut on Route 125 in North Andover, MA. As you may know, we have reviewed the existing and proposed access in the field with the District Traffic Engineer on May 15, 2003. At his suggestion, I am providing you a brief traffic and access assessment of the proposal to assist in your final evaluation of the reconfigured access on to Route 125. This letter also serves as the traffic impact and access requirement for local planning board approval. Pro osal The owner, Frank Terranova, proposes to redevelop the existing McLay's Florist from its current use as a flower, garden and home improvement center to a small retail center. Mr. Terranova has owned and operated McLay's at this location since 1998, when he relocated McLay's Garden Center from 757 Turnpike street where it had been an established North Andover business since 1964. Presently the 1.2 acre site includes a 2500 square foot shop and over an acre of outdoor sales area and storage integrated with the 20 existing parking spaces, comprised of 15 spaces out front and 5 spaces at the rear of the store. He proposes to redevelop the site as a 9,900 square foot retail center. The new retail center will include McLay's Florists as well as a number of other smaller retail tenants. Parking for 52 vehicles will be provided as well as a dedicated loading area for deliveries. The proposed plan does not include outdoor storage, display or sales areas. Existing Traffic and Access Conditions The site is located on Route 125 (Osgood Street), a state highway, at its intersection with Barker Street. The triangular site forms the northeast corner of the intersection(see attached locus plan) which is STOP sign controlled on the Barker Street approach. Route 125 is a four-lane, undivided highway which links downtown North Andover with Haverhill and I-495. According to automatic traffic recorder counts performed just south of Barker Street, Route 125 carries approximately 19,200 vehicles per day during a typical weekday and approximately 12,800 on Saturday. Peak hour volumes during the weekday evening commuter peak and the Saturday midday peak generally represent approximately 9 percent and 8 percent, respectively TEN NEW ENGLAND BUSINESS CENTER DRIVE TRANS P O R TAT I O N SUITE 301 • ANDOVER, MA 0 1510 TEL 97B.794.1 792 • FAX 978.794.1 793 EN 13INEERING+C0NSTRUCTI0 N Mr. Michael Forrnichella Page 2of3 July 22, 2003 n Access to the existing McLay's Florist is provided from Route 125 and Barker Street. The existing driveway onto Route 125 is wide and median-divided, allowing left and right turns into and out of the site. Access along Barker Street consists of one driveway accessing the front parking area and one drive in the rear accessing the delivery and storage area. The posted speed along Route 125 in the vicinity of the site is 40 miles per hour. Sight distance to and from the existing driveway is greater than 500 feet in either direction. The North Andover Police Department indicated that there are no significant safety deficiencies near the site. This is consistent with the findings of other recent Traffic Impact and Access Studies in the area'. Area Projects The only significant planned project in the area is the Endicott Plaza retail center now under construction. As part of their project, the proponents of this retail center are planning to install a traffic signal at the intersection of Route 125 and Barker Road. Left turn lanes along the Route 125 approaches are also planned. These off site improvements plans are currently at the 75% design stage and are under review at the MassHighway Department. The proposed plans accommodate the existing Flower Shop drive by providing a short, separate left turn lane in advance of the left turn lane at the proposed signal for Barker and Osgood Street. We met on site with Traffic Engineering to discuss an access to the redeveloped flower shop site and agreed that the short left turn lane in advance of the left turn for the signal would not be appropriate. We have therefore agreed and have prepared as part of this memo a revised access,indicating right turn in and out only, on Osgood Street with all left turn movements coming at the Barker Street/Osgood Street intersection. Trip Generation In order to estimate the traffic generation of the proposed use, Trip Generation, 6'h edition compiled and published by the Institute of Transportation Engineers (ITE) was employed. Using Land Use Code (LUC) 820/Shopping Center, the vehicle trip generation of the proposed center was estimated. The trip generation for the proposed retail center is compared to the existing 2500 square foot building using the same LUC in the table below. EXISTIN6Z PROPOSED NET CHANGE WEEKDA Y Daily(VTPD)4 635 1540 905 Evening Peak Hourr (VTPH)5 55 135 80 SATURDAY Daily(VTPD) 900 2140 1240 Evening Peak Hourr(VTPH) 80 190 110 ' For Forgetta Development,LLC Endicott Plaza prepared by Vanasse and Associates,Inc.;dated Dec 2000 ' For Vincent Grasso,Car Wash prepared by Dermot J.Kelley Assoc.,Inc.;dated Feb 2003 2 2,500 square foot retail building based on ITE Trip Generation 6'Edition LUC 820—Shopping Center. Excludes outdoor sales/storage area. 9,900 square foot retail building based on ITE Trip Generation 6'Edition LUC 820—Shopping Center. 4 vehicle trips per day 5 vehicle trips per hour T:\T0064\Docs\LettersNassHighway.doc Mr. Michael Formichella Page 3 of 3 July 22, 2003 The comparison above was used because the existing zoning of the property allows for a more intense retail use of the premises than the current use. Furthermore, trip generation examples of the existing use are limited in ITE. The one use that is applicable (LUC 817 Nursery(Garden Center))is based on small sample resulting in widely skewed data points with no discernable correlation. Recommended Access Design Based on these findings and in consultation with the proponent,his site engineer and MassHighway, TEC recommends reconfiguring the existing driveway on Route 125 to a right-in/right-out driveway. This change will eliminate the left-turn demand at the driveway, relocating and consolidating that demand to Barker Street. Once the planned improvements are implemented by the Endicott Plaza project, these left turns will occur more safely in protected left turn lanes under signal control. Access points on Barker Street will be defined to promote safer more efficient traffic flow around the site. Access to the loading area for the proposed building will be segregated from customer traffic with a separate entrance/exit on to Barker Street. Minimum stopping sight distance is exceeded at all driveway locations. In conclusion, while the redevelopment of the McLay's Florist site on Route 125 will result in additional vehicle trips to and from the site the implementation of right-in/right-out access will improve overall safety and efficiency. Accordingly, I respectfully ask that you review the attached application and approve the revised driveway design. Please call me with any questions you may have. Very truly yours, TRANSPORTATION ENGINEERING AND CONSTRUCTION, INC. IJ es D'Ang o P.E. rincipal Cc: Frank Terranova, McLay's Michael Karas, MassHighway-Dist. 4 T:\T0064\Does\Letters\MassHighway.doc rnV Massachusetts Highway Department Application for to Access State Highway To be completed by the applicant. See reverse for instructions. 1. Town/City Town of North Andover Massachusetts 2. State Highway route number and/or name Route 125 (Osgood Street) 3. Description of property and/or facility for which access is sought (attach additional sheets if necessary). See Attachment 4. Description of work to be performed within State Highway Layout(attach additional sheets if necessary). See Attachment 5. Dig Safe number: (To be submitted) 6. Applicant Information 7. Property Owner Name Frank Terranova Name (SAME) Mailing address 1211 Osgood Street Mailing address North Andover, MA 01845 Telephone number (978)683-3164 Telephone number Signature Signature Date Date Return completed application to District Highway Engineer for your Town/City. Refer to reverse side for appropriate address. For office use only ■. not write below this line. 1. Application number 5. Section 61 finding 2. Date received 6. Mass historic action 3. Fee amount 7. Plans returned 4. MEPA required Revision submitted ENF-EOEA Cert. 8. Application complete EIR-EOEA Cert. 9. Permit issued Other-EOEA Cert. 10. Permit denied T:\T0064\Docs\Various\T0064 mhd accesspermit.doc Massachusetts Highway Department Application for Permit to Access State Highway Attachments Town of North Andover Route 925 (Osgood Street) Attachment for Item 3. - Description of Property Presently the 1.2 acre site includes a 2,500 square foot shop and over an acre of outdoor sales area and storage integrated with the 20 existing parking spaces, comprised of 15 spaces out front and 5 spaces at the rear of the store. The redevelopment plan for this site consists of a 9,900 square foot retail center. The new retail center will include McLay's Florists as well as a number of other smaller retail tenants. Parking for 52 vehicles will be provided as well as a dedicated loading area for deliveries. The proposed plan does not include outdoor storage, display or sales areas. Attachment for Item 4. - Description of Work The work to be performed within State Highway Layout, under this permit, pertains to the reconfiguration of the existing site access drive from Route 125, for the property described above. The driveway will be altered from its current condition, operating as a wide, median divided, full service entrance/exit to a"right in/right out" only configuration. Under the proposed condition, all left-turn movements into the site will utilize the Osgood Street at Barker Street intersection and enter at the Barker Street driveway. Included in this work is sawcutting, unclassified excavation, removing and resetting of curb, paving, and all incidental landscaping, signing, and striping. T:\T0064\Docs\Various\T0064_mhd accesspermit.doe , 1 4 � ♦t}_♦ ]J !r��SR p � ; 1�;; ..tip•\ `'�-. - 71 l /r•�f � .'� r��t-" _ ILL IN ��" rl �f�••;. '.��' °'':' - � %t ♦tip � �� � - r f •� low WA LAWRENCE 41CIPAL AIR tt S h (y — r j 8 A tv t m pi P J �1 RO CT �OCATI ON ' Al"i- - t FowAs fx- igh dh - )gyp .�'-_ `�,? _ � �1 _ ---��;�sti• ',, �,• ' Locus MAP M C LAY'S FLORIST ' 0 750 1500 FEET ROUTE 1 2S ( OSGOOD ST. ) NORTH AND OVER, MA TD Transportation Data Corporation P.O.Box 734 Nah .,MA 01760 Office:508-651-1610 Fax:508-651-1229 Osgood Street(Route 125) Site Code:T0064 south of Barker Street 02515A City,State:North Andover,MA Client:TEC/B.Pendleton NB SB Combined 29-May- Start Time A.M. P.M. A.M. P.M. A.M. P.M. Thu 12:00 13 123 12 186 25 309 12:15 11 145 5 191 16 336 12:30 7 131 3 166 10 297 12:45 6 37 147 546 4 24 178 721 10 61 325 1267 01:00 5 148 2 146 7 294 01:15 6 127 2 157 8 284 01:30 2 118 3 180 5 298 01:45 2 15 133 526 1 8 168 651 3 23 301 1177 02:00 4 136 2 148 6 284 02:15 2 158 2 163 4 321 02:30 3 128 2 172 5 300 02:45 2 11 160 582 2 8 173 656 4 19 333 1238 03:00 3 156 7 165 10 321 03:15 1 178 3 152 4 330 03:30 4 202 8 193 12 395 03:45 0 8 215 751 1 19 132 642 1 27 347 1393 04:00 2 250 3 114 5 364 04:15 3 212 7 145 10 357 04:30 10 245 8 164 18 409 04:45 9 24 280 987 12 30 110 533 21 54 390 1520 05:00 7 292 39 142 46 434 05:15 16 304 36 126 52 430 05:30 23 284 55 164 78 448 05:45 32 78 254 1134 56 186 128 560 88 264 382 1694 06:00 28 200 89 120 117 320 06:15 47 202 114 100 161 302 06:30 80 176 166 132 246 308 06:45 76 231 155 733 180 549 106 458 256 780 261 1191 07:00 52 113 246 114 298 227 07:15 98 113 303 90 401 203 07:30 90 116 284 94 374 210 07:45 112 352 92 434 304 1137 58 356 416 1489 150 790 08:00 101 89 277 66 378 155 08:15 78 106 285 56 363 162 08:30 108 78 233 72 341 150 08:45 90 377 77 350 226 1021 44 238 316 1398 121 588 09:00 97 56 146 40 243 96 09:15 95 45 142 29 237 74 09:30 80 53 140 36 220 89 09:45 74 346 48 202 154 582 41 146 228 928 89 348 10:00 106 54 134 29 240 83 10:15 117 34 143 26 260 60 10:30 116 26 142 26 258 52 10:45 116 455 44 158 157 576 32 113 273 1031 76 271 11:00 106 26 156 14 262 40 11:15 112 32 174 22 286 54 11:30 128 19 194 20 322 39 11:45 125 471 21 98 174 698 10 66 299 1169 31 i64 Total 2405 6501 4838 5140 7243 11641 Percent 33.2% 55.8% 66.8% 44.2% Day 8906 9978 18884 Total Peak 11:00 04:45 07:15 12:00 07:15 04:45 Volume 471 1160 1168 721 1569 1702 P.H.F. 0.920 0.954 0.961 0.934 0.943 0.950 Page 1 MOMMOM Ific Transportation Data Corporation P.O.Box 734 Natick,MA 01760 Office:508-651-1610 Fax:508-651-1229 Osgood Street(Route 125) Site Code:T0064 south of Barker Street 02515A City,State:North Andover,MA Client:TEC/B.Pendleton Start NB SB Combined 30-May- 03 Time A.M. P.M. A.M. P.M. A.M. P.M. Fri 12:00 15 143 19 208 34 351 12:15 18 142 10 190 28 332 12:30 13 144 10 176 23 320 12:45 22 68 188 617 14 53 166 740 36 121 354 1357 01:00 14 147 8 171 22 318 01:15 4 158 2 210 6 368 01:30 4 156 6 134 10 290 01:45 7 29 141 602 3 19 196 711 10 48 337 1313 02:00 1 145 6 151 7 296 02:15 4 150 4 184 8 334 02:30 6 140 2 206 8 346 02:45 4 15 148 583 6 18 146 687 10 33 294 1270 03:00 2 192 4 180 6 372 03:15 1 217 3 126 4 343 03:30 2 262 10 116 12 378 03:45 1 6 250 921 4 21 118 540 5 27 368 1461 04:00 2 264 5 123 7 387 04:15 4 270 5 138 9 408 04:30 6 302 7 134 13 436 04:45 14 26 304 1140 16 33 107 502 30 59 411 1642 05:00 16 326 28 158 44 484 05:15 18 326 38 124 56 450 05:30 26 292 52 126 78 418 05:45 32 92 273 1217 54 172 134 542 86 264 407 1759 06:00 31 236 96 109 127 345 06:15 43 214 108 106 151 320 06:30 88 178 148 122 236 300 06:45 83 245 160 788 162 514 102 439 245 759 262 1227 07:00 60 140 234 148 294 288 07:15 90 119 254 80 344 199 07:30 94 94 302 92 396 186 07:45 119 363 101 454 254 1044 77 397 373 1407 178 851 08:00 96 90 262 70 358 160 08:15 101 98 250 52 351 150 08:30 80 62 221 56 301 118 08:45 128 405 56 306 221 954 48 226 349 1359 104 532 09:00 104 60 174 64 278 124 09:15 100 60 146 63 246 123 09:30 81 54 150 50 231 104 09:45 80 365 60 234 142 612 27 204 222 977 87 438 10:00 86 63 137 31 223 94 10:15 96 49 146 37 242 86 10:30 102 59 139 40 241 99 10:45 98 382 37 208 152 574 32 140 250 956 69 348 11:00 108 39 147 27 255 66 11:15 112 36 146 26 258 62 11:30 121 38 165 16 286 54 11:45 130 471 32 145 198 656 24 93 328 1127 56 238 Total 2467 7215 4670 5221 7137 12436 Percent 34B% 58.0% 65.4% 42.0% Day 9682 9891 19573 Total Peak 11:00 04:30 07:15 12:00 07:30 04:30 Volume 471 1258 1072 740 1478 1781 P.H.F. 0.906 0.965 0.887 0.881 0.933 0.920 Page 2 AIWWAMMhC Transportation Data Corporation P.O.Box 734 Natick,MA 01760 Office:508-651-1610 Fax:508-651-1229 Osgood Street(Route 125) Site Code:T0064 south of Barker Street 02515A City,State:North Andover,MA Client:TEC/B.Pendleton Start NB SB Combined 31-May- 03 Time A.M. P.M. A.M. P.M. A.M. P.M. Sat 12:00 20 138 19 123 39 261 12:15 18 125 6 104 24 229 12:30 23 126 20 120 43 246 12:45 13 74 126 515 10 55 112 459 23 129 238 974 01:00 7 133 8 110 15 243 01:15 15 130 10 93 25 223 01:30 9 146 2 116 11 262 01:45 6 37 140 549 6 26 122 441 12 63 262 990 02:00 8 109 6 110 14 219 02:15 5 110 4 107 9 217 02:30 3 101 2 111 5 212 02:45 4 20 124 444 4 16 103 431 8 36 227 875 03:00 1 118 4 113 5 231 03:15 4 115 4 108 8 223 03:30 4 132 5 118 9 250 03:45 0 9 105 470 8 21 198 537 8 30 303 1007 04:00 4 122 3 138 7 260 04:15 3 133 3 124 6 257 04:30 8 116 8 130 16 246 04:45 8 23 106 477 14 28 94 486 22 51 200 963 05:00 10 106 8 107 18 213 05:15 12 101 10 126 22 227 05:30 19 107 14 88 33 195 05:45 16 57 87 401 18 50 76 397 34 107 163 798 06:00 17 88 30 90 47 178 06:15 29 96 46 94 75 190 06:30 46 78 64 82 110 160 06:45 50 142 87 349 48 188 81 347 98 330 168 696 07:00 31 83 70 114 101 197 07:15 37 72 73 59 110 131 07:30 44 65 58 53 102 118 07:45 64 176 58 278 76 277 59 285 140 453 117 563 08:00 65 62 82 58 147 120 08:15 70 55 82 58 152 113 08:30 72 44 90 49 162 93 08:45 95 302 62 223 102 356 49 214 197 658 111 437 09:00 83 60 88 48 171 108 09:15 98 42 101 42 199 84 09:30 102 38 110 42 212 80 09:45 132 415 45 185 128 427 31 163 260 842 76 348 10:00 110 56 101 30 211 86 10:15 124 44 116 22 240 66 10:30 120 38 134 16 254 54 10:45 142 496 37 175 126 477 28 96 268 973 65 271 11:00 120 27 136 25 256 52 11:15 123 36 142 20 265 56 11:30 138 24 112 18 250 42 11:45 142 523 21 108 137 527 17 80 279 1050 38 188 Total 2274 4174 2448 3936 4722 8110 Percent 48.2% 51.5% 51.8% 48.5% Day 6448 6384 12832 Total Peak 10:45 01:00 10:30 03:45 11:00 03:30 Volume 523 549 538 590 1050 1070 P.H.F. 0.921 0.940 0.947 0.745 0.941 0.883 Page 3 t a - i � a INNOVATORS IN TRANSPORTATION PROJECT DELIVERY T0064 August 11, 2003 Mr. Michael Formichella District 4 Permit Engineer MassHighway—District 4 519 Appleton Street Arlington, MA 02476 Re: Proposed McLay's Redevelopment 1211 Osgood Street(Route 125) North Andover, MA Dear Mr. Formichella: Attached please find the permit application for the alteration of the existing curb cut on Route 125 in North Andover, MA. As you may know, we have reviewed the existing and proposed access in the field with the District Traffic Engineer on May 15, 2003. At his suggestion, I am providing you a brief traffic and access assessment of the proposal to assist in your final evaluation of the reconfigured access on to Route 125. This letter also serves as the traffic impact and access requirement for local planning board approval. Proposal The owner, Frank Terranova,proposes to redevelop the existing McLay's Florist from its current use as a flower, garden and home improvement center to a small retail center. Mr. Terranova has owned and operated McLay's at this location since 1998, when he relocated McLay's Garden Center from 757 Turnpike street where it had been an established North Andover business since 1964. Presently the 1.2 acre site includes a 2500 square foot shop and over an acre of outdoor sales area and storage integrated with the 20 existing parking spaces, comprised of 15 spaces out front and 5 spaces at the rear of the store. He proposes to redevelop the site as a 9,900 square foot retail center. The new retail center will include McLay's Florists as well as a number of other smaller retail tenants. Parking for 52 vehicles will be provided as well as a dedicated loading area for deliveries. The proposed plan does not include outdoor storage, display or sales areas. Existing Traffic and Access Conditions The site is located on Route 125 (Osgood Street), a state highway, at its intersection with Barker Street. The triangular site fomis the northeast corner of the intersection (see attached locus plan) ,which is STOP sign controlled on the Barker Street approach. Route 125 is a four-lane, undivided highway which links downtown North Andover with Haverhill and I-495. According to automatic traffic recorder counts performed just south of Barker Street, Route 125 carries approximately 19,200 vehicles per day during a typical weekday and approximately 12,800 on Saturday. Peak hour volumes during the weekday evening commuter peak and the Saturday midday peak generally represent approximately 9 percent and 8 percent, respectively TEN NEW ENGLAND BUSINESS CENTER DRIVE T R A N S P O RTAT I O N SUITE 301 • ANDOVER, MA 01810 '. TEL 978.794.1792 • FAX 97B.794.1793 ENS IN EERI NG+CO NSTR U CTI ON '.. Mr. Michael Formichella Page 2 of 3 August 11, 2003 Access to the existing McLay's Florist is provided from Route 125 and Barker Street. The existing driveway onto Route 125 is wide and median-divided, allowing left and right turns into and out of the site. Access along Barker Street consists of one driveway accessing the front parking area and one drive in the rear accessing the delivery and storage area. The posted speed along Route 125 in the vicinity of the site is 40 miles per hour. Sight distance to and from the existing driveway is greater than 500 feet in either direction. The North Andover Police Department indicated that there are no significant safety deficiencies near the site. This is consistent with the findings of other recent Traffic Impact and Access Studies in the areal. Area Projects The only significant planned project in the area is the Endicott Plaza retail center now under construction. As part of their project, the proponents of this retail center are planning to install a traffic signal at the intersection of Route 125 and Barker Road. Left turn lanes along the Route 125 approaches are also planned. These off site improvements plans are currently at the 75% design stage and are under review at the MassHighway Department. The proposed plans accommodate the existing Flower Shop drive by providing a short, separate left turn lane in advance of the left turn lane at the proposed signal for Barker and Osgood Street. We met on site with Traffic Engineering to discuss an access to the redeveloped flower shop site and agreed that the short left turn lane in advance of the left turn for the signal would not be appropriate. We have therefore agreed and have prepared as part of this memo a revised access, indicating right turn in and out only, on Osgood Street with all left turn movements coming at the Barker Street/Osgood Street intersection. Trip Generation In order to estimate the traffic generation of the proposed use, Trip Generation, 6th edition compiled and published by the Institute of Transportation Engineers (ITE) was employed. Using Land Use Code (LUC) 820/Shopping Center, the vehicle trip generation of the proposed center was estimated. The trip generation for the proposed retail center is compared to the existing 2500 square foot building using the same LUC in the table below. EXISTING' PROPOSED' NET CHANGE IYEEKDA Y Daily(VTPD)4 635 1540 905 Evening Peak Hourr(VTPH)5 55 135 s0 SA TURDA Y Daily(VTPD) 900 2140 1240 Evening Peak Hourr(VTPH) 80 190 110 ' For Forgetta Development,LLC Endicott Plaza prepared by Vanasse and Associates,Inc.; dated Dec 2000 ' For Vincent Grasso,Car Wash prepared by Dermot J.Kelley Assoc.,Inc.;dated Feb 2003 2,500 square foot retail building based on ITE Trip Generation 6"Edition LUC 820—Shopping Center. Excludes outdoor sales/storage area. '9,900 square foot retail building based on ITE Trip Generation 6°i Edition LUC 820—Shopping Center. 4 vehicle trips per day 5 vehicle trips per hour TAT0064\Docs\Letters\Mass High way.doe Mr. Michael Formichella Page 3 of 3 ` August 11, 2003 The comparison above was used because the existing zoning of the property allows for a more intense retail use of the premises than the current use. Furthermore, trip generation examples of the existing use are limited in ITE. The one use that is applicable (LUC 817 Nursery(Garden Center)) is based on small sample resulting in widely skewed data points with no discernable correlation. Recommended Access Design Based on these findings and in consultation with the proponent, his site engineer and MassHighway, TEC recommends reconfiguring the existing driveway on Route 125 to a right-inlright-out driveway. This change will eliminate the left-turn demand at the driveway, relocating and consolidating that demand to Barker Street. Once the planned improvements are implemented by the Endicott Plaza project, these left turns will occur more safely in protected left turn lanes under signal control. Access points on Barker Street will be defined to promote safer more efficient traffic flow around the site. Access to the loading area for the proposed building will be segregated from customer traffic with a separate entrance/exit on to Barker Street. Minimum stopping sight distance is exceeded at all driveway locations. In conclusion, while the redevelopment of the McLay's Florist site on Route 125 will result in additional vehicle trips to and from the site, the implementation of right-in/right-out access will improve overall safety and efficiency. Accordingly, I respectfully ask that you review the attached application and approve the revised driveway design. Please call me with any questions you may have. Very truly yours, TRANSPORTATION ENGINEERING AND CONSTRUCTION, INC. 40� James D'Angelo, P.E. Principal Cc: Frank Terranova, McLay's Michael Karas, MassHighway-Dist. 4 T:\T0064Mocs\Letters\A4assHighway.d oc L �a f HKGGH WA r Massachusetts Highway Department Application for o Access State Highway To be completed by the applicant. See reverse for instructions. 1. Town/City Town of North Andover, Massachusetts 2. State Highway route number and/or name Route 125 (Osgood Street)- Sta. 30+44 to Sta. 33+28 3. Description of property and/or facility for which access is sought(attach additional sheets if necessary). See Attachment 4. Description of work to be performed within State Highway Layout(attach additional sheets if necessary). See Attachment 5. Dig Safe number: (To be submitted) 6. Applicant Information 7. Property Owner Name Frank Terranova Name (SAME) Mailing address 1211 Osgood Street Mailing address North Andover MA 01845 Telephone number (978) 6p83-3164 Telephone number Signature I 1 Signature Ps c�6Ea�( F4 i? Date i�►�G 1% ., Z003 Date Return completed application to District Highway Engineer for your Town/City. Refer to reverse side for appropriate address. For office use only D. not write below 1. Application number 5. Section 61 finding 2. Date received 6. Mass historic action 3. Fee amount 7. Plans returned 4. MEPA required Revision submitted ENF-EOEA Cert. 8. Application complete EIR-EOEA Cert. 9. Permit issued Other-EOEA Cert. 10. Permit denied T:\T0064\Doc s\Various\T0064_n-lid_accesspernut.doc Massachusetts Highway Department Application for Permit to Access State Highway Attachments Town of North Andover Route 125 (Osgood Street) —Sta. 30+44 to Sta. 33+28 Attachment for Item 3. - Description of Property Presently the 1.2 acre site includes a 2,500 square foot shop and over an acre of outdoor sales area and storage integrated with the 20 existing parking spaces, comprised of 15 spaces out front and 5 spaces at the rear of the store. The redevelopment plan for this site consists of a 9,900 square foot retail center. The new retail center will include McLay's Florists as well as a number of other smaller retail tenants. Parking for 52 vehicles will be provided as well as a dedicated loading area for deliveries. The proposed plan does not include outdoor storage, display or sales areas. Attachment for Item 4. - Description of Work The work to be performed within State Highway Layout, under this permit, pertains to the reconfiguration of the existing site access drive from Route 125, for the property described above. The driveway will be altered from its current condition, operating as a wide, median divided, full service entrance/exit to a "right in/right out" only configuration. Under the proposed condition, all left-turn movements into the site will utilize the Osgood Street at Barker Street intersection and enter at the Barker Street driveway. Included in this work is sawcutting, unclassified excavation, removing and resetting of curb, paving, and all incidental landscaping, signing, and striping. T:\TO064\Docs\Various\TO064—mhd—accesspem-iit.doc —r^ — F "✓ +.� �W.� � mmF ( JF d� . �"S i y" k f T L A W " ✓ r° b u 4 Y .m 1 II' 1`xO�} r � 0 - a r wate Z q mgr,,... a C s mw e �d"'..1L'" .W F, 110PAL A1811' RN Vl l a , / M % R mr'" '" w. w M a TMI.. ,.✓1 " Sim LOCATIO T All y K Mo;w L .. a 4 reu p o- "o a'v, X k4 h V LOCUS MAP r v: MCLAY'S FLORIST ❑ 75❑ 1 5❑❑ FEET ROUTE 1 2S ( CISG®OD ST. ) ; '' � �, NORTH ANDOVER, MA FA LOCATION LINE OF MARCH 14, 1961 ST. HWY. ALT. (L.0. #5078) — E PROP CONVERT-EXIST. ` .-..CB 'k-TO DMH ..#6 RIM=1,59.5 INV=155,3 (PROP. 12°) INV=155:1, (EX. 12"") OSGOOD S 7-REE7 IYOU TE 725) PUBLIC-='VARI B _.. ABLE WIDTH PROP. 14 L F,.. 12 RCP DRAI`N, ,,. ,- - , PROP VERTICAL GRANITE OR -BEGIN _PROP- CURB S 0.014'4 Co ' ' PRECAST CEMENT CONCRETE CUR _._ _. ...:: STA 30+44f PROP. CB #6 R1 -1 - - B (TYP)' END PROP CURB. (MEET EXIST) RIM=159.2 STA 33+28f 30""x30"" SAWCUT.. PROP FULL DEPTH INV=154 5 — — — PAVEMENT (MEET EXIST) ` — — — _.._ - , " 1f , INY 1997 STATE HIGHWAY ,. . . ;` 2.73" P(C,KET FENCE 3p LAYOUT ALTERATION -- - ! E " (L.0. #7196) ❑ ❑ t; - — Aj r. m� O LOCATION `LINE OFs MARCH 14, 31 1961 ST. HWY. ALT. /° v: R4-7 28.06` 4 -x3=0 _ (L.O. #5078) R=6 � -._._- E .- � E Q - __ - 32 -- t RTURN.. . s _. X910 E - ONLY f • _ STAT HIGH - R3 26 =`wA�fBASELWE ` 3 1 30"x30, 3 _i PROP FULL-�DEP,TH - ;: PAVEMENT - PROP. SIGN _ '°... ❑ _ _._ OS000D STREET (ROUTE 125) ,o NORTH N ANDOVER, MASSACHUSETTS t 00 ��`= APPLICATION FOR PERMIT ��0. _ �o° TO ACCESS STATE HIGHWAY <"OC'q Transportation Engineering + - 1 Constructio n n96 Q Ten New England ac enter Drive 6 / E Suite 10 7 Andover, MA 0187O f /^\ `" •, � (978)79 4-779 Fox(978) 794-1793 2 , I www.tecmaee.eom A DESIGNED BY DATE J.. RD SCALE BY TRD _ ... CHECKED B EE OF JOB C Y SHEET J N0. BTP 1 1 T0064