Transmittal No. 115
Date: 7/15/2005 From: Brant Ballantyne
To: Lincoln Daley
Town of North Andover Fax: 978-688-9542
Community Development & Pages: RECEIVED
Services
400 Osgood Street JUL 18 2005
N. Andover, MA ,q . .; )VER
01845 P1.,6=Ni,(w4,,0 -�L r'ARTMENT
Re: Construction Monitor Reports
Type: TRANSMITTAL Status: FYI
Transmittina:
No Copies Date Description
1 7/1512005 iTEC Weekly Report#107111105-7/15/05
-------- -- ---------- —
1 7/15/2005 TEC Weekly Report#9 7/04/05-7/08/05
1 7/15/2005 JTK Weekly Report#8 6/27/05-7/01/05
Comments:
Per the PB Decision for the development,the enclosed reports are submitted as part of the Construction
Monitor services performed by TEC.
CC: Additional
J. D'Angelo,Owner
J. Sullivan, NA DPW
T. Willet, NA DPW
Page 1 of 1
WEEKLY REPORT
TRANSPORTATION 1211
EN GIN EERING+CON STRUCTION �y
TEN NEW ENGLAND BUSINESS CENTER DRIVE Osgood Street
SUITE 107 - ANDOVER, MA 01810 Retail Center
TEL 978.794.1 792 - FAX 978.794.1 793
Weekly Report No.: 1 8— �
Week of: 6/27/05-7/1/05
Report by: Brant Ballantyne
General:
-Steel columns are in place.
-The rest of the steel is delivered.
-Wood framing is on going for the interior shear walls and perimeter walls along the eastern end of building.
-The color shake is approved for the tenant#4 slab.
-TEC requests as-built site plans from Torphy
-Wood framing is extended along the front building wall.
Work Progress:
-The Bi-weekly meeting time is held on Tuesday(6/28).
-A Pre-truss erection safety meeting has been held.
-Specified color shake for the tenant#4 slab is not expected until after 7/11.
Inspection Items:
None at this time.
Circulation: Additional
J. D'Angelo,Owner
L. Daley, NA Planning
J. Sullivan, NA DPW
T.Willet, NA DPW
Circulation Date: 711512005
Page 1 of 1
WEEKLY REPORT
TRANSPORTAT113N 1211
ENS INEERING+CON STRUCTi0IN
TEN NEW ENGLAND BUSINESS CENTER DRIVE Osgood Street
SUITE 107 - ANDOVER, MA 01 BI D Retail Center
TEL 978.794.1 792 - FAX 978.794.1 793
Weekly Report No.: 9 s1
Week of: 7/4/05-7/8/05
Report by: Brant Ballantyne
General:
-Wood framing is completed around the perimeter of the building.
-Plywood is installed on all walls.
- Site work below grade is within one week of completion.
-Truss delivery is scheduled for Monday(7/11)and a crane is scheduled for Tuesday(7/12).
-Placement of the Tenant#slab is postponed until Monday(7/11)due to rain.
Work Progress:
- Site work below grade remaining includes:installation of CB#6,electrical connections to islands and any work
associated with the street opening needed to make the water connection in Barker Street. This work will be
suspended for approximately 2 weeks while the trusses are erected and work continues on the building.
Inspection Items:
None at this time.
Circulation: Additional
J. D'Angelo, Owner
T.Willet, NA DPW
L. Daley, NA Planning
J.Sullivan, NA DPW
Circulation Date: 711512005
Page 1 of 1
WEEKLY REPORT
TRANSPORTATION 1211
EN GIN EERING+CON STRUCTION
TEN NEW ENGLAND BUSINESS CENTER DRIVE Osgood Street
SUITE 107 - ANDOVER, MA 01 al O Retail Center
TEL 978.794.1 792 - FAX 978.794.1 793
Weekly Report No.: 1 10
Week of: 7/11/05 - 7/15/05
Report by: Brant Ballantyne
General:
-The concrete slab is placed in tenant#4 space and the color shake is applied. It continues to be wet cured with
burlap and hoses throughout the week.
-The trusses arrive on-site on 7/11. They are stockpiled in various areas on-site.
-Erection of the trusses begin on 7/12 and continues throughout the week. (A Pre-erection safety meeting was
held previously.)
Work Progress:
-A Bi-weekly meeting is held on-site on 7/12.
- Site work is suspended until truss erection is complete and the crane is removed.
-Roof sheathing commenced on 7/14.
-The hurricane clips are installed at the north end of building.
-23 trusses are erected this week.
Inspection Items:
None at this time.
Circulation: Additional
J. D'Angelo, Owner
L. Daley, NA Planning
T.Willet, NA DPW
J. Sullivan, NA DPW
Circulation Date: 719512005