HomeMy WebLinkAboutApplication - 1211 OSGOOD STREET 9/12/2003 RECEIVED
5EP 1 2 7003
NORTH WOVER_
PL ANNIN®DEpAHTMENT
I
OSGOOD CROSSING
SPECIAL PERMIT APPLICATION
TAIL FACILITY
1211 OSGOOD STREET
NORTH ANDOVER, MA
APPLICANT/OWNER:
i Fero REALTY TRUST
SEPTEMBER, 2003
SERVICES,MERRIMACK ENGINEERING Inc.
66 Park Street
Andover, Massachusetts 01810
planners 40 engineers 40 surveyors
See Section 8.3 of the North Andover Zoning Bylaw for more detailed information
Town of North Andover Planning Board
A p lication for Site Plan Special Permit
p
Please type or print clearly:
1. Petitioner: F.K. Realty Trust
Address: 1211 Osgood Street, North Andover, MA 01845
Telephone Number: 978-683-3164
2. owners of the Land: Frank and Kathleen Terranova
Address: 1211 Os ood Street North Andover MA 01845
Telephone Number: - -
Number of years ownership: 6 years
If applicant is not the owner, please state interest in property: -
3. Request for a Special Permit under Section 8. 3 of the North Andover
Zoning Bylaw to construct a 9, 900 square foot multi-tenant
retail facility with 51 parking spaces within the GB -
General Business Zoning.
4. Location of Property. 1 21 1 Osgood Street (Route 1 25)
Zoning District: GB - General Business
Assessors: Map: 35 Lot# 8
Registry of Deeds: Book#: 4841 Page # 2 3 2
5. Existing Lot: 5 2, 3 0 2 Building Height: 271
Lot Area (Sq. Ft): 4 7 , 7 4 ' /4 6. 9 4 '
Street Frontage; 893 . 15 Side Setbacks: -
Font Setback: Rear Setback:
Floor Area Ration: 189 : 1 Lot Coverage:
6. Proposed Lot(if applicable): N/A
Lot Area (Sq.Ft.): Building Height:
Street Frontage: Side Setback:
Front Setback: Rear Setback:
Floor Area Ratio: Lot Coverage: -
7. Required Lot (as required by Zoning Bylaw);
Lot Area (Sq.Ft.): 25, 000 Building Height: 45 '
Street Frontage: 125 Side Setback: 40 ' *
Front Setback: 5 Rear Setback: 501*
Floor Area Ratio: 0. 30: 1 Lot Coverage: 30%
*when adjacent to a residential
8. Existing Building (if applicable): district
Ground Floor (Sq.Ft.) ev Q o #of Floors f
Total Sq. Ft.; 2 C) Height:
Use: 0- 'fig aHty l�rs,�%4y Type of Construction: W,1 ,J F✓uw e
9. Proposed Building:
Ground Floor (Sq.Ft.) 9, 900 # of Floors 1
Total Sq. Ft.; 9, 900 Height: 27
Use: Retail Type of Construction: Wood Frame
X9,4150 s-p. ;;1oa- Avr
10. Has there been a previous application for a Special Permit from the Planning
Board on these premises? Yes If so,when and for what type of
construction? August, 1997 - Construction of a one ( 1 )
story 2, 500 square foot building.
11. Petitioner and Landowner signature(s):
Every application for a Special Permit shall be made on this form which is
the official form of the Planning Board. Every application shall be filed with
the Town Clerk's Office. It shall be the responsibility of the petitioner to
furnish all supporting documentation with this application. The dated copy
of this application received by the Town Clerk or Planning Office does not
absolve the applicant from this responsibility. The petitioner shall be
responsible for all expenses for filing and legal notification. Failure to
comply with application requirements, as cited herein and in the Planning
Board Rules and Regulations may result in a dismissal by the Planning
Board of this application as incomplete.
Petitioner's Signature:
Print or type name here: V���
a! d
, l
Owner's Signature: J
Print or type name here:
l/ iEi `hush ar.5 h
.Sch
0 \\ Ub
Tree \
Ward,I
' �� ravel � - _ �,� �_ =_ e� •
T HANGE
q ` fA.11 f 1 _ \
Gglf,
' / i�/...- I •r'\� \ J /j��- �\� Purse
QVateT
s NgLT e 5 \ \
�\
LAWRENC
U ICIPAL
yI �{,i 'CIS-�0.�` _ � - ,cJ1 loo `1 �\. �\. \ ✓�'�i �_�� �I YI r i/9
{ • 0.11
e iBM o to _ O iy
z J
t3 _
piny Daube-deck/ .- ♦� Z °< �: Fou�Aprtsl s ,r/ , `' Rus§ell
8Igt
55.0
IS
m
S
RAP
t- aels
. _ _ _.
y S igh
a
MAN E ' s
34.5
l
id& \1 QHII 1 Curlse l .
\ F \
f LU g 37.4 Qp + ,,_II♦�
; ta
� L
Sandi Sch •\ sT •\ `�/,\, G� Q
Town of North Andover, Zonipy,Board of Appeals
Parties of Interest/Abutters
REQUIREMENT: MGL 40A, Section 11 states in part "Parties in Interest as used in this
chapter shall mean the petitioner, abutters, owners of land directly opposite on any public or
private street or way, and abutters to abutters within three hundred (300) feet of the
property line of the petitioner as they appear on'the most recent applicable tax list,
notwithstanding that the land of any such owner is located in another city or town, the
planning board of the city or town, and the planning board of every abut7 tl a sty or
town."
--,'�`V)
NO 'I
"1,
Applicant's property, list by map, parcel, name and address (please print clearly
and use black ink.)
MAP PARCEL NAME ADDRESS
CL in
f -V�,-X VY L C-E�j V
ABUTTERS PROPERTIES
MAP PARCEL NAME ADDRESS
(o (0
IL 0 L
C,
Vic,L k)3 (J-\ A 7
C C1 L q)
THIS INFORMATION WAS OBTAL14ED AT THE ASSESSORS OFFICE AND
CERTIFIED BY THE ASSESSORS OFFICE BY:
DATE
SIGNA PAGE OF
03
0@61fied Da*
orth Andover
Bo')qardAssek T
Town of North Andover, Zoning Board of Appeals
Parties of Interest/Abutters Listing
REQUIREMENT: MGL 40A, Section 11 states in part "Parties in Interest as used in this
chapter shall mean the petitioner, abutters, owners of land directly opposite on any public or
private street or way, and abutters to abutters within three hundred (300) feet of the
property line of the petitioner as they appear on the most recent applicable tax list,
notwithstanding that the land of any such owner is located in another city or town, the
planning board of the city or town, and the planning board of every abutting city or
town."
Applicant's property, list by map, parcel, name and address (please print clearly
and use black ink.)
MAP PARCEL NAME ADDRESS
�P1"\! t\L 4�-T l-\t l'i'i'.,� �Lei l�`�.of�.,,h- h..��`� i-v�r�✓v��i� ,;,.•.,,.,_
ABUTTERS PROPERTIES
MAP PARCEL NAME ADDRESS
, G
� So Q 7 G o o;
Ooff\Ct a4fl C>5Goc*%)
THIS INFORMATION WAS OBTAINED AT THE ASSESSORS OFFICE AND
CERTIFIED BY THE ASSESSORS OFFICE BY:
DATE
NATURE PAGE Z OF Z
Owtifie Date 9y �
Board f As sor orth Andover
INNOVATORS IN TRANSPORTATION PROJECT DELIVERY
T0064
August 11, 2003
Mr. Michael Formichella
District 4 Permit Engineer
MassEighway—District 4
519 Appleton Street
Arlington, MA 02476
Re: Proposed McLay's Redevelopment
1211 Osgood Street (Route 125)
North Andover, MA
Dear Mr. Formichella:
Attached please find the permit application for the alteration of the existing curb cut on Route 125 in
North Andover,MA. As you may know, we have reviewed the existing and proposed access in the
field with the District Traffic Engineer on May 15, 2003. At his suggestion, I am providing you a
brief traffic and access assessment of the proposal to assist in your final evaluation of the
reconfigured access on to Route 125. This letter also serves as the traffic impact and access
requirement for local planning board approval.
Proposal
The owner, Frank Terranova,proposes to redevelop the existing McLay's Florist from its current use
as a,flower, garden and home improvement center to a small retail center. Mr. Terranova has owned
and operated McLay's at this location since 1998, when he relocated McLay's Garden Center from
757 Turnpike street where it had been an established North Andover business since 1964. Presently
the 1.2 acre site includes a 2500 square foot shop and over an acre of outdoor sales area and storage
integrated with the 20 existing parking spaces, comprised of 15 spaces out front and 5 spaces at the
rear of the store. He proposes to redevelop the site as a 9,900 square foot retail center. The new
retail center will include McLay's Florists as well as a number of other smaller retail tenants. Parking
for 52 vehicles will be provided as well as a dedicated loading area for deliveries. The proposed plan
does not include outdoor storage, display or sales areas.
Existing Traffic and Access Conditions
The site is located on Route 125 (Osgood Street), a state highway, at its intersection with Barker
Street. The trianaular site forms the northeast corner of the intersection (see attached locus plan)
which is STOP sign controlled on the Barker Street approach. Route 125 is a four-lane, undivided
highway which links downtown North Andover with Haverhill and I-495. According to automatic
traffic recorder counts performed just south of Barker Street, Route 125 carries approximately 19,200
vehicles per day during a typical weekday and approximately 12,800 on Saturday. Peak hour
volumes during the weekday evening commuter peak and the Saturday midday peak generally
represent approximately 9 percent and 8 percent, respectively
TEN NEW ENGLAND BUSINESS CENTER DRIVE /
SUITE 301 - ANDOVER, MA O1B10 I TRANS PO R TAT I ON
TEL 97S.794.1792 - FAX 978.794.1793 EN GIN E E R I N G+r.n N c;-r P I 1 rrT I n NI
Mr. Michael Formichella
Page 2 of 3
A August 11, 200'
to the existing McLay's Florist is provided from Route 125 and Barker Street. The existing
driveway onto Route 125 is wide and median-divided, allowing left and right turns into and out of the
site. Access along Barker Street consists of one driveway accessing the front parking area and one
drive in the rear accessing the delivery and storage area. The posted speed along Route 125 in the
vicinity of the site is 40 miles per hour. Sight distance to and from the existing driveway is greater
than 500 feet in either direction. The North Andover Police Department indicated that there are no
significant safety deficiencies near the site. This is consistent with the findings of other recent Traffic
Impact and Access Studies in the areal.
Area Projects
The only significant planned project in the area is the Endicott Plaza retail center now under
construction. As part of their project, the proponents of this retail center are planning to install a
traffic signal at the intersection of Route 125 and Barker Road. Left turn lanes along the Route 125
approaches are also planned. These off site improvements plans are currently at the 75%design stage
and are under review at the MassHighway Department. The proposed plans accommodate the
existing Flower Shop drive by providing a short, separate left turn lane in advance of the left tum lane
at the proposed signal for Barker and Osgood Street. We met on site with Traffic Engineering to
discuss an access to the redeveloped flower shop site and agreed that the short left turn lane in
advance of the left turn for the signal would not be appropriate. We have therefore agreed and have
prepared as part of this memo a revised access, indicating right turn in and out only, on Osgood Street
with all left turn movements coming at the Barker Street/Osgood Street intersection.
Trip Generation
In order to estimate the traffic generation of the proposed use, Trip Generation, 6th edition compiled
( and published by the Institute of Transportation Engineers(ITE) was employed. Using Land Use
{ Code (LUC) 820/Shopping Center, the vehicle trip generation of the proposed center was estimated.
The trip generation for the proposed retail center is compared to the existing 2500 square foot
building using the same LUC in the table below.
EXISTING' PROPOSED NET CHANGE
IVEEKDA Y
Daily(VTPD)a 635 1540 905
Evening Peak Hourr(VTPH)5 55 135 80
SATLRDAY
Daily (VTPD) 900 2140 1240
Evening Peak Hourr(VTPH) 80 190 110
' For Forgerta Development,LLC Endicott Plaza prepared by Vanasse and Associates,Inc.;dated Dec 2000
For Vincent Grasso,Car Wash prepared by Dermot J.Kelley Assoc.,Inc.;dated Feb 2003
2. 00 square foot retail building based on ITE Trip Generation 6'Edition LUC 820—Shopping Center. Excludes
outdoor sales/storage area.
9,900 square foot retail building based on ITE Trip Generation 6`''Edition LUC 820—Shopping Center.
` vehicle trips per day
s vehicle trips per hour
TAT0064\Does\Letters\Mass__H77i=hway.doc
,!h
Mr. Michael Formichella
m
Page 3 of 3
August 11, 2003
The comparison above was used because the existing zoning of the property allows for a more intense
retail use of the premises than the current use. Furthennore, trip generation examples of the existing
use are limited in ITE. The one use that is applicable (LUC 817 Nursery(Garden Center)) is based
on small sample resulting in widely skewed data points with no discernable correlation.
Recommended Access Desi n
Based on these findings and in consultation with the proponent, his site engineer and MassHighway,
TEC recommends reconfiguring the existing driveway on Route 125 to a right-in/right-out driveway.
This change will eliminate the left-turn demand at the driveway, relocating and consolidating that
demand to Barker Street. Once the planned improvements are implemented by the Endicott Plaza
project, these left turns will occur more safely in protected left turn lanes under signal control.
Access points on Barker Street will be defined to promote safer more efficient traffic flow around the
site. Access to the loading area for the proposed building will be segregated from customer traffic
with a separate entrance/exit on to Barker Street. Minimum stopping sight distance is exceeded at all
driveway locations.
In conclusion,while the redevelopment of the McLay's Florist site on Route 125 will result in
additional vehicle trips to and from the site, the implementation of right-in/right-out access will
improve overall safety and efficiency. Accordingly, I respectfully ask that you review the attached
application and approve the revised driveway design. Please call me with any questions you may
have.
Very truly yours,
TRANSPORTATION ENGTNEERFNG
AND CONSTRUCTION, INC.
Foy
James D'Angelo, P.E.
Principal
Cc: Frank Terranova, McLay's
Michael Karas, MassHighway-Dist. 4
T:1T0D6-4\Docs',Le11ers\1assH ighwa y.doc
FISCAL IMPACT
McLay's Florist currently is located on the 1.2+/- acre parcel in the Southeast quadrant of
the intersection of Barker Street and Osgood Street (Route 125). The property is assessed
at $237,300.00 comprised of$129,300.00 in land value and $108,000.00 in building value.
The parcel generates $3,500.00 dollars in property taxes. The current facility is supplied by
Town water and sewer. Usage charges average $700.00 per year for water and sewer. The
proposed facility would result in the replacement of the current no-conforming existing use
with a new 9,990 s.f. building which would conform to set back requirements in this zone.
The cost of the structure is estimated at $1.2M which along with the parking lighting and
infrastructure improvements would result in an expected valuation of$1.5M and generate
upwards of$20,000.00 annually in property taxes to the town while not generating any
school costs or increase in public safety costs over those associated with the current site.
The building will be constructed with sprinkler system. In summary, the proposal will
result in an increase in revenue for the town with little increase in demand for services and
will be consistent and harmonious with the other uses along the Route 125 corridor in this
vicinity.
COMMUNITY IMPACT
The property is located at the corner of Baker Street and Route 125 Osgood Street. It abuts
commercial and general business uses to the south and adjacent to an active agricultural use
to the north. Across Barker Street from the site is residential property of single family
homes with the R-1 zone. An attempt has been made to locate the building and shield
operations from the residential side while showing an enhanced frontage to the Osgood
Street frontage. A hop roof with dormers accents softens the building block to be more
harmonious with the existing uses and consistent with the approved retail use project across
Osgood Street.
DRAINAGE REPORT
OSGOOD CROSSING
NORTH ANDOVER, MA
SEPTEMBER, 2003
INN
cwh
TABLE OF CONTENTS
• Site Drainage System Design Narrative
• Pre and Post Development Drainage Analysis and Summary
• Comparison of Stormwater Runoff Rates for Pre and Post Development
Conditions
• Roof Drainage Recharge Facility Design
• Rational Method Drainage Design
• Charts and Tables
SITE DRAINAGE SYSTEM DESIGN NARRATIVE
The proposed commercial/retail facility is a redevelopment of the parcel which currently is
occupied by McLay's Florist. The existing site conditions are comprised of a building which
contains the flower display and products, a greenhousee structure, several storage sheds, a
holding area for ground cover materials, a paved parking area with two access and egress
driveways. These site features are illustrated on Sheet 2—Existing Conditions. The
remainder of the parcel is generally vegetated with grass and scrub growth.
The stormwater runoff from the site is currently untreated upon discharge into the existing
drainage system which runs through the parcel. This is the old(pre-1960) drainage system
for Osgood Street (Route 125)prior to the realignment of this road which was done in the
1960's. This system, however, is still active and functional. No problems have been
recorded or reported to the North Andover Department of Public Works. A separate drainage
system was added within Route 125 when the realignment of the roadway was constructed
approximately 40 years ago.
The proposed drainage system is designed to mitigate the increase in the rate of surface
stormwater runoff for the 2, 10 and 100 year storm events. All of the roof drainage will be
directed to a proposed subsurface stormwater recharge facility to be constructed on the site.
This facility can retain at least 850 cubic feet of stormwater, while recharging a flow rate of
0.07 cfs to the groundwater. A total detention volume of 1750 cubic feet is available.
During the peak of the 100 year storm event a detained volume of 1588 cubic feet of
stormwater from the roof will be realized,while the 6" outlet pipe (for overflow volume) is
discharging 0.66 cfs into the on-site runoff storage system for an additional detention time
period. The proposed on-site storage system is comprised of oversized concrete (24" & 30")
pipes for detention(temporary storage) during the peak runoff periods of the larger storm
events. To achieve maximum storage capacity, a pair of 6"pipes are proposed at the
downstream end of the site drainage system prior to the proposed oil and grit separator. This
pair of undersized pipes will be the controlling measure to ensure that the outflow to the
existing drainage system is reduced to less than the current peak flow rate under similar
storm event conditions, for comparative purposes.
Each drainage catch basin (CB) will have a four(4) foot deep sump and a gas trap secured to
the outlet pipe. These measures will serve to remove any pollutants (gas, oil, grease and grit
matter) in the surface runoff from the parking areas. Secondarily, an oil and grit separator is
proposed which will provide further treatment of the runoff by providing separate
compartments within the structure for settling and suspending pollutant matter removal prior
to discharge into the drainage system (which extends into the Mass Highway Drainage
System within their 80' wide Highway Layout Right of Way.
The proposed recharge facility for the roof runoff water will provide ample recharge volume
and peak flow attenuation. There will be 32 precast concrete leaching pits assembled in a
rectangular layout measuring 37.4' by 32', with at least 1 foot of stone placed around the
outer perimeter of the leaching pit arrangement. These pits or dry wells are rated for H-20
loading as they will be installed under pavement within the proposed parking area, as shown
on the plans and details.
PRE AND POST DEVELOPMENT
DRAINAGE ANALYSIS
AND SUMMARY
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL=6.40 IN(100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5.11 000899 (c) 1986-1999 Applied Microcomputer Systems
WATERSHED ROUTING
5 O
3 O
2 GO Adgww
� 3 0
O L2] 4 D 5
�Z
❑
OSUBCATCHMENT ❑ REACH A POND I I LINK
SUBCATCHMENT 1 = Area Along Barker's Property on North Side -> REACH 1
SUBCATCHMENT 2 = Area Contributing to CB near Florist Shop -> REACH 2
SUBCATCHMENT 3 = Area Contributing to CB near Island @ 125 -> REACH 2
SUBCATCHMENT 4 = Area to CB'A' -MaHwy Drain System @ Rte 125 -> REACH 6
SUBCATCHMENT 5 = Paved Parking Area & Lawn-to low Pt.@ DP#4 -> REACH 4
SUBCATCHMENT 6 = Barker Street (Paved) & Road Shoulder Area -> REACH 5
SUBCATCHMENT 7 = Paved & Grass Areas at Road Intersection -> REACH 5
REACH 1 = Flow From Subcat #1 --to--> Design Pt #1 -> REACH 6
REACH 2 = Flow From Subcat #2 --to--> Design Pt.#2 -> REACH 6
REACH 4 = Flow From Subcat #5 --to--> Design Pt. #4 -> REACH 6
REACH 5 = Flows From Subcats #6 & 7 to Design Pt.#5 -> REACH 6
REACH 6 = Summation of Flow from PRE-DEV Conditions ->
„ CROSSING" in North Andover,MA-'PRE-DEV. '
Data for OSGOOD r Storm) 25 Aug 03
TYPE III 24-HOUR RAINFALL=6.40 IN(100 y
Prepared by
Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 A lied Microcom uter S s ems
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 6.40 IN, SCS U-H-
RUNOFF SPAN = 10-20 HRS, dt= .10 HRS, 101 POINTS
WGT'D PEAK Tpeak VOL
_GROUND COVERS %C N -- CN
C CFS (HRS) AF
SUBCAT AREA Tc
NUMBER ACRE MIN
75 - .91 12 .07 .07
'7 .4 6%98 94%74
86 -
2.70 12 .07 .20
2 58 7 •g 50%98 50%74
83 -
1.16 12 .10 • 09
3 .27 10 .5 37%98 63%74
84 -
1.24 12 .02 .08
4 .25 5 .0 42%98 58%74
92 -
1.41 12 .02 .10
5 .25 5.0 77%98 23%74 --
1.76 12 .02 .12
6 .32 5 .0 65%98 35%74 90
7 .10 5,0 70%98 30%74
91 - .56 12.02 .04
REACH ROUTING BY STOR-IND+TRANS METHOD
PEAK TRAVEL PEAK
BOTTOM SIDE TIME Qout
REACH n LENGTH SLOPE VEL• CFS
NO. DIAM WIDTH DEPTH SLOPES FT FT FT (FPS MIN
IN FT FT) (FT/F
10 .10 .010 1 .0100
3 .1 0 .0 .91
1 _ 20 .0 1.0
20 .0 1.0 .10 .10 .010 1 .0100
3 .1 0 .0 3 .84
2 1.41
20 .0 1.0 .10 .10 .010 1 .0100 3 .1 0 .0
4 2 .31
20.0 1.0 .10 .10 .010 1 .0100 3 .1 0 .0
5 9.27
6 -
20 .0 1.0 .10 .10 .010 1 .0100 3 .6 0 .0
Data for "OSGOOD CROSSING" in North Andover,MA-'PRE-DEV. 'r Storm) 100
TYPE III 24-HOUR RAINFALL=6.40 IN(100y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied microcomputer S stems
SUBCATCHMENT 1 Area Along Barker's Property on North Side
PEAK= .91 CFS @ 12.07 HRS, VOLUME= .07 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
6 .00 98 Impervious RAINFALL= 6 .40 IN
94.00 74 Lawn/ Landscaped 25 AC SPAN= 10-20 HRS, dt=.1 HRS
1pp .00 75 TOTAL AREA =
Tc min
Method Comment
Over Grasses & Mulched Surfaces 6.3
TR-55 SHEET FLOW
Grass: Dense n=.24 L=50' P2=3 .1 in s=.04 1.1
H
SALLOW CONCENTRATED/UPLAND FLOW Over Grass & Mulch to Exist. CB
Grassed Waterway Kv=15 L=200 ' s=.04 ' / ' V=3 fps -- -
Total Length= 250 ft Total Tc=
7.4
SUBCATCHMENT 1 RUNOFF
Area Along Barker' s Property on North Side
.90
85 AREA= .25 AC
.80 Tc= 7.4 MIN
75 CN= 75
.70
.65 SCS TR-20 METHOD
.60 TYPE III 24-HOUR
55 RAINFALL= 6.40 IN
50
•45 PEAK= .91 CFS
3 •40 @ 12.07 HRS
O .35 VOLUME= .07 AF
Li- .25
.20
. 15
. 10
.05
0.ON) N r1 v to u7 r w m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL=6.40 IN(100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999. Applied Microcomputer Systems
REACH 1 Flow From Subcat #1 --to--> Design Pt #1
Qin = .91 CFS @ 12 .07 HRS, VOLUME= .07 AF
Qout= .91 CFS @ 12 .07 HRS, VOLUME= .07 AF, ATTEN= Oo, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 20' x 1' CHANNEL STOR-IND+TRANS METHOD
PEAK DEPTH= .01 FT
0 .00 0 .00 0.00 SIDE SLOPE= •1 �/ PEAK VELOCITY= 3 .1 FPS
.10 2 .10 6.52 n= .O1 TRAVEL TIME = 0 .0 MIN
.20 4 .40 21.09 LENGTH= 1 FT SPAN= 10-20 HRS, dt=.1 HRS
.30 6 .90 42.31 SLOPE= .Ol FT/FT
.43 10 .45 79.27
.60 15 .60 143 .41
.80 22 .40 242.25
1.00 30 .00 367 .39
REACH 1 INFLOW & OUTFLOW
Flout From Subcot #1 --to--> Design Pt # 1
.90
.85 20' x i ' CHANNEL
.80 LND . 1 /.75 ' S=.01.70.65 METHOD.60 3. 1 FPS
50 = 0 MIN
.45 .91 CFS
� .40 .91 CFS
o :30 = 0 MIN
tL .25
.20
. 15
. 10
.05
0.00m N v in r CC) 0) m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. 'r Storm)
TYPE III 24-HOUR RAINFALL=6.40 IN(100 y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD S . 000899 c 1986-1999 A lied Microcomputer Systems
SUBCATCHMENT 2 Area Contributing to CB near Florist Shop
PEAK= 2 .70 CFS @ 12 .07 HRS, VOLUME= .20 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
50.00 98 Shop Rcof & Paved Areas RAINFALL= 6 .40 IN
50 .00 74 Lawn & Landscaped Are�ass SPAN= 10-20 HRS, dt=.l HRS
100.00 86 TOTAL AREA =
Tc min AC
Method SHEET FLOW Comment 6 .5
Method From Northeast Corner of Lot
P2=3 .1 in s=.037
Grass: Dense n=.24 L=50' Shop the CB 1.4
SHALLOW CONCENTRATED/UPLAND FLOW From Rear of Shop
Grassed Waterway Kv=15 L=250' s=.037 ' /' V-2 .89 ps -
Total Length= 300 ft Total Tc= 7 .9
SUBCATCHMENT 2 RUNOFF
Area Contributing to CB near Florist Shop
2.6 AREA= .58 AC
2.4 Tc= 7.9 MIN
2.2 CN= 86
2.0 SCS TR-20 METHOD
1 .8 TYPE III 24-HOUR
c, 1 .6 RAINFALL= 6.40 IN
1 .4
PEAK= 2.70 CF5
1 .2 @ 12.07 HR5
0 1 .0 UOLUME= .20 AF
-i 8
LL-
6
.4
2
0.0m CV Q ll1 1,0 r co rn m
TIME (hours)
Data for ,OSGOOD CROSSING" in North Andover,MA-'PRE-DEV. 'r Storm)
TYPE III 24-HOUR RAINFALL=6.40 IN(100y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc
H droCAD 5.11 000899 c 1986-1999 APPlied microcomputer Systems
SUBCATCHMENT 3 Area Contributing to CB near Island @ 125
PEAK= 1.16 CFS @ 12 .10 HRS, VOLUME= .09 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
37 .00 98 Greenhouse Roof & Pavement RAINFALL= 6 .40 IN
63 .00 74 Lawn & Landscaped A2eass SPAN= 10-20 HRS, dt=.1 HRS
100.00 83 TOTAL AREA =
Tc min
Method SHEET FLOW Comment 9 6
Method Over Grass and Mulch Surfaces
Grass: Dense n=.24 L=50' P2=3 .1 in s=.014 9
SHALLOW CONCENTRATED/UPLAND FLOW Over Grass & Paved Surfaces
Grassed Waterway Kv=15 L=100' s=.014 ' /' V=1.77 fps
Total Length= 150 ft Total Tc= 10 .5'
SUBCATCHMENT 3 RUNOFF
Area Contributing to CB near Island @ 125
1 . 1 AREA= .27 AC
1 0 Tc= 10.5 MIN
CN= 83
.9
8 SCS TR-20 METHOD
TYPE III 24-HOUR
.7 RAINFALL= 6.40 IN
U .6
PEAK= 1 . 16 CFS
3 .5 @ 12. 1 HRS
O 4 UOLUME= .09 AF
J
Ll-- .3
2
. 1
0.Om N T7 Q In n W 0) m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL=6.40 IN(100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 000899 c 1986-1999 Applied Microcomputer Systems
REACH 2 Flow From Subcat #2 --to--> Design Pt.#2
Qin = 3 .84 CFS @ 12 .08 HRS, VOLUME= .29 AF
Qout= 3 . 84 CFS @ 12 .08 HRS, VOLUME= .29 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
STOR-IND+TRANS METHOD
(FT) (SQ-FT) (CFS) 20 x 1 CHANNEL ' PEAK DEPTH= .06 FT
0 .00 0 .00 0.00 SIDE SLOPE= •1 / PEAK VELOCITY- 3 .1 FPS
.10 2 .10 6.52 n= .01
TRAVEL TIME = 0 .0 MIN
.20 4 .40 21.09 LENGTH= 1 FT SPAN=
10-20 HRS, dt=.1 HRS
.30 6 .90 42.31 SLOPE= .01 FT/FT
.43 10 .45 79.27
.60 15.60 143 .41
.80 22 .40 242.25
1.00 30 .00 367.39
REACH 2 INFLOW & OUTFLOW
Flow From Subcot #2 --to--> Design Pt . #2
3.
3.6 6 20' x 1 ' CHANNEL
3.4 SIDE SLOPE= . 1 '/'
3.2 n=.01 L=1 ' S=.01
3.0
2.8 STOR-IND+TRANS METHOD
2.6 UELOCITY= 3. 1 FPS
2.4 TRAVEL= 0 MIN
2.2
" .0
1 .8 Qin= 3.84 CFS
1
3 1 .6 Qout= 3.84 CFS
O 1 .4 LAG= 0 MIN
J 1 .2
1 .0
.8
.6
.4
.2
0.0m N Ln "n r m rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL=6.40 IN(100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 4 Area to CB'A' -MaHwy Drain System @ Rte 125
PEAK= 1.24 CFS @ 12 .02 HRS, VOLUME= .08 AF
PERCENT CN SCS TR-20 METHOD
42 .00 98 Paved Surface Areas TYPE III 24-HOUR
58 .00 74 Grass & Mulch Surfaces RAINFALL= 6.40 IN
100 -00 84 TOTAL AREA = .25 AC SPAN= 10-20 HRS, dt= .l HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Paved Surfaces .8
Smooth surfaces n=.011 L=50 ' P2=3 .1 in s=.017 '/ '
SHALLOW CONCENTRATED/UPLAND FLOW From Pavement onto Grassed Area .9
Grassed Waterway Kv=15 L=80 ' s=.01 '/' V=1.5 fps
DIRECT ENTRY Obtain 5 minute Tt 3 .3
Total Length= 130 ft Total Tc= 5.0-
SUBCATCHMENT 4 RUNOFF
Area to CB'A'-MoHwy Drain System @ Rte 125
1 .2
1 i AREA= .25 AC
Tc= 5 MIN
1 .0 CN= 84
.9
SCS TR-20 METHOD
.8 TYPE III 24-HOUR
`'- 7 RAINFALL= 6.40 IN
U
v .6 PEAK= 1 .24 CFS
:3 5 @ 12.02 HRS
.4 UOLUME= .08 AF
IL 3
2
I
0.0m N M IT in � r m m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL=6.40 IN(100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 (c) .3.986-1999 Applied Microcom uter Systems
SUBCATCHMENT 5 Paved Parking Area & Lawn-to low Pt.@ DP#4
PEAK= 1.41 CFS @ 12.02 HRS, VOLUME= .10 AF
SCS TR-20 METHOD
PERCENT CN
TYPE III 24-HOUR
77 .00 98 Paved Surface Area RAINFALL= 6.40 IN
23 .00 74 Grass & Mulch Surface Area SPAN= 10-20 HRS, dt=.l HRS
100 .00 92 TOTAL AREA = .25 AC
Comment Tr (min)
Method 8
TR-55 SHEET FLOW Over Paved Surface Area
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.015 ' 1.6
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved & Grassed d Areas
Grassed Waterway Kv=15 L=180 ' s=.015 '/' V=1.84 fps 2 .6
DIRECT ENTRY Obtain 5 minute Tt
----------
Total Length= 230 ft Total Tc= 5 .0
SUBCATCHMENT 5 RUNOFF
Paved Parking Area 8 Lawn-to low Pt . @ DP#4
1 .4
1 .3 - AREA= .25 AC
Tc= 5 MIN
1 .2 CN= 92
1 . 1
1 .0 SCS TR-20 METHOD
.g TYPE III 24-HOUR
4- 8 RAINFALL= 6.40 IN
U
.7 PEAK= 1 .41 CFS
3 •6 @ 12.02 HRS
O .5 UOLUME= . 10 AF
J
.4
.3
.2
. 1
0.0m N M IT U) ao rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
MA-'PRE-DEV. '
TYPE III 24-HOUR RAINFALL=6.40 IN(100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999. ApiDlied Microcomputer S stems
REACH 4 Flow From Subcat #5 --to--> Design Pt. #4
Qin = 1.41 CFS @ 12 .02 HRS, VOLUME= .10 AF
VOLUME= .10 AF, ATTEN= 0%, LAG=
Qout= 1.41 CFS @ 12.02 HRS, 0 .0 MIN
DEPTH END AREA DISCH STOR-IND+TRANS METHOD
(FT) (SO-FT) (CFS) 20 x 1 CHANNEL 1 PEAK DEPTH= 02
6 FT
0.00 0 .00 .00 SIDE SLOPE= •1 / PEAK VELOCITY= 3 .1 FPS
.10 2 .10 6.52 n= .O1
TRAVEL TIME = 0 .0 MIN
•20 4 .40 21.09 LENGTH= 1 FT SPAN= 10-20 HRS, dt=.1 HRS
.30 6 .90 42 .31 SLOPE= .01 FT/FT
.43 10 .45 79.27
.60 15.60 143 .41
.80 22 .40 242.25
1.00 30 .00 367 .39
REACH 4 INFLOW & OUTFLOW
Flow From Subcat #5 --to--> Design Pt . #4
1 .4 20' x 1 ' CHANNEL
1 .3 SIDE SLOPE= . 1 '/'
1 .2 n=.01 L=1 ' S=.01
1 . 1
1 .0 STOR-IND+TRANS METHOD
� 9 UELOCITY= 3. 1 FPS
+ 9 TRAUEL= 0 MIN
U
•7 Din= 1 .41 CFS
3 .6 Dout= 1 .41 CFS
O 5 LAG= 0 MIN
L_ .4
.3
.2
. 1
0.0m N r7 v to r w m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL=6.40 IN(100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD S .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 6 Barker Street (Paved) & Road Shoulder Area
PEAK= 1.76 CFS @ 12 .02 HRS, VOLUME= .12 AF
PERCENT CN SCS TR-20 METHOD
65 .00 98 Paved Road & Driveway Areas TYPE III 24-HOUR
35 .00 74 Vegetated & Mulched Areas RAINFALL= 6.40 IN
100 .00 90 TOTAL AREA = .32 AC SPAN= 10-20 HRS, dt=.l HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Paved Surface .7
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.02 '/ '
SHALLOW CONCENTRATED/UPLAND FLOW Along Gutter in Barker Street 2 .9
Paved Kv=20.3282 L=500 ' s=.02 '/' V=2 .87 fps
DIRECT ENTRY Obtain 5 minute Tt 1.4
Total Length= 550 ft Total Tc= 5 .0
SUBCATCHMENT 6 RUNOFF
Barker Street (Paved) & Road Shoulder Area
1 .7
1 .6 AREA= .32 AC
1 .5 Tc= 5 MIN
1 .4 CN= 90
1 .3
1 .2 SCS TR-20 METHOD
LO 1 . 1 TYPE III 24-HOUR
1 .0 RAINFALL= 6.40 IN
9
B PEAK= 1 .76 CFS
3 7 @ 12.02 HRS
.6 VOLUME= . 12 AF
.5
.4
.3
.2
. 1
M V In W h OD m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL=6.40 IN(100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer S stems
SUBCATCHMENT 7 Paved & Grass Areas at Road Intersection
PEAK= 56 CFS @ 12 .02 HRS, VOLUME= .04 AF
SCS TR-20 METHOD
PERCENT CN III 24-HOUR
70 .00 98 Paved Roadway Surface TYPE TYPE III 6.40 IN
30.00 74 Grass Surface Area Spy= 10-20 HRS, dt=.1 HRS
100 .00 91 TOTAL AREA = .10 AC
Comment Tr (min)
Method 9
TR-55 SHEET FLOW Along Gutterline at Intersection
' P2=3 .1 in s=.01
Smooth surfaces n=.011 L=50 ' /'
1.1
SHALLOW CONCENTRATED/UPLAND FLOW From Gutter to Grass Area to CB
Grassed Waterway Kv=15 L=100' s=.01 '/ ' V=1.5 fps 3 .0
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 150 ft Total Tc= 5 .0
SUBCATCHMENT 7 RUNOFF
Paved & Gross Areas at Road Intersection
.55
AREA= . 1 AC
.50 Tc= 5 MIN
.45 CN= 91
•40 SCS TR-20 METHOD
1 35 TYPE III 24-HOUR
c, RAINFALL= 6.40 IN
U .30
25 PEAK= .56 CFS
3 @ 12.02 HR5
O .20 UOLUME= .04 AF
J
LL 15
. 10
.05
0.00m N v in D r O m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover.MA- 'PRE-DEV. 'r Storm)
TYPE III 24-HOUR RAINFALL=6.40 IN(100 y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 5 Flows From Subcats #6 & 7 to Design Pt.#5
Qin = 2 .31 CFS @ 12 .02 HRS, VOLUME= .16 AF
Qout= 2 .31 CFS @ 12 .02 HRS, VOLUME= .16 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH STOR-IND+TRANS METHOD
(FT) (SQ-FT) (CFS). 20 x 1 CHANNEL PEAK DEPTH= .04 FT
0.00 0 .00 0.00 SIDE SLOPE= •1 / PEAK VELOCITY= 3 .1 FPS
.10 2 .10 6.52 n= .01
TRAVEL TIME = 0 .0 MIN
.20 4 .40 21.09 LENGTH= 1 FT SPAN= 10-20 HRS, dt=.1 HRS
.30 6 .90 42 .31 SLOPE= .01 FT/FT
.43 10 .45 79.27
.60 15 .60 143 .41
. 80 22 .40 242.25
1.00 30 .00 367 .39
REACH 5 INFLOW & OUTFLOW
Flows From Subcots #6 & 7 to Design Pt . #5
2.2 LMI;T 20' x 1 ' CHANNEL
2.0 DE SLOPE= . 1 '/'
n=.01 L=1 ' S=.01
1 .8
1 .6 -IND+TRANS METHOD
VELOCITY= 3. 1 FPS
4- 1 .4 TRAVEL= 0 MIN
1 .2
Qin= 2.31 CFS
3 1 . Qout= 2.31 CFS
O LAG= 0 MIN
J
L'- .6
.
.
0. m r oo rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL=6.40 IN(100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 11 000899 (c)_ 1986-1999 Applied Microcomputer Systems
REACH 6 Summation of Flow from PRE-DEV Conditions
Qin = 9.27 CFS @ 12 .04 HRS, VOLUME= .70 AF
Qout= 9.27 CFS @ 12.04 HRS, VOLUME= .70 AF, ATTEN= Oo, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 20' x 1' CHANNEL STOR-IND+TRANS METHOD
0_ .00 0 .00 0 .00 SIDE SLOPE= .1 '/' PEAK DEPTH= .12 FT
.10 2 .10 6 .52 n= .01 PEAK VELOCITY= 3 .6 FPS
.20 4.40 21.09 LENGTH= 1 FT TRAVEL TIME = 0 .0 MIN
.30 6.90 42 .31 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=.1 HRS
.43 10.45 79.27
.60 15.60 143 .41
.80 22 .40 242 .25
1.00 30.00 367 .39
REACH 6 INFLOW & OUTFLOW
Summation of Flout from PRE-DEU Conditions
9'0 20' x 1 ' CHANNEL
8.5
8.0 SIDE SLOPE= . 1 '/'
7.5 n=.01 L=1 ' S=.01
7.0
6.5 STOR-IND+TRANS METHOD
j 6.0 UELOCITY= 3.6 FPS
4- 5.5 TRAVEL= 0 MIN
U 5.0
4.5 Qin= 9.27 CFS
3 4.0 Gout= 9.27 CFS
0 3.5 LAG= 0 MIN
J 3.0
Li- 2.5
2.0
1 .5
1 .0
5
0.0m N M v in �0 CD 0) CS)
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA-
'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03 10
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5.11 000899 c 1986-1999 Applied microcomputer Systems
SUBCATCHMENT 1 Area Along Barker's Property on North Side
PEAK= 51 CFS @ 12 .08 HRS, VOLUME= .04 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
6 .00 98 Impervious RAINFALL= 4.50 IN
94.00 74 Lawn/ Landscaped 25 AC SPAN= 10-20 HRS, dt=.l HRS
1_00 .00 75 TOTAL AREA =
Comment Tr min
Method 6.3
TR-55 SHEET FLOW Over Grasses & Mulched Surfaces
Grass: Dense n=.24 L=50' P2=3.1 in s=.04 ' /'
SHALLOW CONCENTRATED/UPLAND FLOW Over Grass & Mulch to Exist. CB 1.1
Grassed Waterway Kv=15 L=200' s=.04 ' /' V-3 fps --------7-
Total Length= 250 ft Total Tc= 7.4
SUBCATCHMENT 1 RUNOFF
Area Along Barker' s Property on North Side
.50 AREA= .25 AC
.45 Tc= 7.4 MIN
CN= 75
.40
.35 SCS TR-20 METHOD
TYPE III 24-HOUR
4 .30 RAINFALL= 4.50 IN
U
.25 PEAK= .51 CFS
@ 12.08 HRS
O .20 UOLUME= .04 AF
15
10
.05
0.0 M v to r CD m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
H droCAD 5 .11 000899 c 1986-1999 AP lied Microcomputer S stems
REACH 1 Flow From Subcat #1 --to--> Design Pt #1
Qin = .51 CFS @ 12 .08 HRS, VOLUME= .04 AF
Qout= .51 CFS @ 12. 08 HRS, VOLUME= .04 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SO-FT) (CFS) 20' x 1' CHANNEL STOR-IND+TRANS METHOD
0.00 0 .00 0 .00 SIDE SLOPE= .1 '/ ' PEAK DEPTH= .01 FT
.10 2.10 6 .52 n= .01 PEAK VELOCITY= 3 .1 FPS
.20 4.40 21.09 LENGTH= 1 FT TRAVEL TIME = 0 .0 MIN
.30 6.90 42 .31 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=.1 HRS
.43 10.45 79.27
.60 15.60 143 .41
.80 22.40 242 .25
1.00 30.00 367.39
REACH 1 INFLOW & OUTFLOW
Flow From Subcot #1 --to--> Design Pt #1
.50
20' x 1 ' CHANNEL
.45 SIDE SLOPE= . 1 '/'
40 n=.01 L=1 ' S=.01
35 STOR-IND+TRANS METHOD
to UELOCITY= 3. 1 FPS
4- .30 TRAUEL= 0 MIN
U
.25 Din= .51 CFS
3 20 Qout= .51 CFS
O LAG= 0 MIN
� 15
10
.05
0.00m N v in ,o m m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,_MA-_'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 2 Area Contributing to CB near Florist Shop
PEAK= 1.73 CFS @ 12.08 HRS, VOLUME= .13 AF
PERCENT CN SCS TR-20 METHOD
50 .00 98 Shop Roof & Paved Areas TYPE III 24-HOUR
50 .00 74 Lawn & Landscaped Areas RAINFALL= 4.50 IN
100 .00 86 TOTAL AREA = .58 AC SPAN= 10-20 HRS, dt=.l HRS
Method Comment Tc (min)
TR-55 SHEET FLOW From Northeast Corner of Lot 6 .5
Grass: Dense n=.24 L=50' P2=3 .1 in s=.037 '/'
SHALLOW CONCENTRATED/UPLAND FLOW From Rear of Shop to the CB 1.4
Grassed Waterway Kv=1S L=250 ' s=.037 '/' V=2 .89 fps
Total Length= 300 ft Total Tc= 7.9
SUBCATCHMENT 2 RUNOFF
Area Contributing to CB near Florist Shop
1 .7
1 .6 AREA= .58 AC
1 .5 Tc= 7.9 MIN
1 .4 CN= 86
1 .3
1 .2 SCS TR-20 METHOD
1 . 1 TYPE III 24-HOUR
U 1 .0 RAINFALL= 4.50 IN
•9
.8 PEAK= 1 .73 CFS
O '7 @ 12.08 HRS
L i: 5 VOLUME= . 1 3 AF
.4
.3
.2
. 1
0.0m r i r1 v in I r` 00 m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5.11 000899 c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 3 Area Contributing to CB near Island @ 125
PEAK= .72 CFS @ 12 .11 HRS, VOLUME= .06 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
37.00 98 Greenhouse Roof & Pavement RAINFALL= 4 .50 IN
63 .00 74 Lawn & Landscaped Areas SPAN= 10-20 HRS, dt=.1 HRS
100 .00 83 TOTAL AREA = .27 AC
Comment Tr (min)
Method 9 6
TR-55 SHEET FLOW Over Grass and Mulch Surfaces
Grass: Dense n=.24 L=50' P2=3 .1 in s=.014 ' / ' 9
SHALLOW CONCENTRATED/UPLAND FLOW Over Grass & Paved Surfaces
Grassed Waterway Kv=15 L=100' s=.014 '/ ' V=1.77 fps - --
Total Length= 150 ft Total Tc= 10 .5`'
SUBCATCHMENT 3 RUNOFF
Area Contributing to CB near Island @ 125
'70 AREA= .27 AC
65 Tc= 10.5 MIN
60 CN= 83
.55
50 SCS TR-20 METHOD
J 45 TYPE III 24-HOUR
- 40 RAINFALL= 4 .50 IN
P,
.35 PEAK= .72 CFS
::3 .30 @ 12. 11 HRS ;„
O .25 UOLUME= .06 AF
J
LL .20
. 15
. 10
.05
0.00m N M v to r M rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
MA-'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD 5.11 000899 (,) .1986-1999 Applied Microcomputer Systems
REACH 2 Flow From Subcat #2 --to--> Design Pt.#2
Qin = 2 .43 CFS @ 12 .09 HRS, VOLUME= .19 AF
Qout= 2 .43 CFS @ 12 .09 HRS, VOLUME= .19 AF, ATTEN= Oo, LAG= 0 .0 MIN
DEPTH END AREA DISCH
STOR-IND+TRANS METHOD
(FT) (SQ-FT) (CFS) 20 x 1 CHANNEL ' PEAK DEPTH= .04 FT
0 .00 0 .00 0.00 SIDE SLOPE= •1 / PEAK VELOCITY= 3 .1 FPS
.10 2 .10 6.52 n= .01 TRAVEL TIME = 0 .0 MIN
.20 4 .40 21.09 LENGTH= 1 FT SPAN= 10-20 HRS, dt=.1 HRS
.30 6 .90 42.31 SLOPE= .01 FT/FT
.43 10 .45 79.27
.60 15 .60 143 .41
.80 22 .40 242 .25
1.00 30 .00 367.39
REACH 2 INFLOW & OUTFLOW
Flow From Subcat #2 --to--> Design Pt . #2
2.4
20' x 1 ' CHANNEL
2.2 SIDE SLOPE= . 1 '/'
2.0 n=.01 L=1 ' S=.01
1 .8
STOR-IND+TRANS METHOD
1 .6 VELOCITY= 3. 1 FPS
U
1 4 TRAUEL= 0 MIN
1 .2 Qin= 2.43 CFS
3 1 .0 Qout= 2.43 CFS
O 8 LAG= 0 MIN
LL_ 6
.4
.2
0.0m N M v Ln r W rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. 'r Storm)
TYPE III 24-HOUR RAINFALL= 4.50 IN In0 Y 25 Aug 03
Prepared by Merrimack Engineering Services,
Hy roCAD 5 .11 000899 (c 1986-1999 A lied Microcom uter Systems
SUBCATCHMENT 4 Area to CB'A' -MaHwy Drain System @ Rte 125
PEAK= .77 CFS @ 12 .02 HRS, VOLUME= .05 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
42 .00 98 Paved Surface Areas RAINFALL= 4 .50 IN
58 .00 74 Grass & Mulch Surfaces
AC SPAN= 10-20 HRS, dt=.1 HRS
100 .00 84 TOTAL AREA =
Tc min
Method Comment 8
TR-55 SHEET FLOW Over Paved Surfaces
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.017 '/ ' 9
SHALLOW CONCENTRATED/UPLAND FLOW From Pavement onto Grassed Area
Grassed Waterway Kv=15 L=80' s=.01 '/ ' V=1.5 fps 3 .3
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 130 ft Total Tc= 5.0-
SUBCATCHMENT 4 RUNOFF
Area to CB'A' -MaHwy Drain System @ Rte 125
75 AREA= .25 AC
70 Tc= 5 MIN
65 CN= 84
.60
.55 SCS TR-20 METHOD
L 50 TYPE III 24-HOUR
C+- 45 RAINFALL= 4.50 IN
U 40
35 PEAK= .77 CFS
12.02 HRS
00 .30 VOLUME= .05 AF
J .25
LL .20
. 15
. 10
.05
0.00m N Y1 v to r w 0 mN
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA-'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 4.50 IN In0 Y r Storm) 25 Aug 03
Prepared by Merrimack Engineering Services,
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer S stems
SUBCATCHMENT 5 Paved Parking Area & Lawn-to low Pt.@ DP#4
PEAK= .95 CFS @ 12 .02 HRS, VOLUME= .07 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
77 .00 98 Paved Surface Area RAINFALL= 4.50 IN
23 .00 74 Grass & Mulch Surface Area SPAN= 10-20 HRS, dt=.1 HRS
100 .00 92 TOTAL AREA =
Tc min
Method Comment 8
Method
SHEET FLOW Over Paved Surface Area
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.015 ' 1.6
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved & Grassed d Areas
Grassed Waterway Kv=15 L=180' s=.015 '/' V=1.84 fps
2.6
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 230 ft Total Tc= 5.0---
SUBCATCHMENT 5 RUNOFF
Paved Parking Area & Lawn-to low Pt . @ DP#4
.95
90 AREA= .25 AC
.85 Tc= 5 MIN
.80 CN= 92
.75
•70 SCS TR-20 METHOD
.65 TYPE III 24-HOUR
to .60 RAINFALL= 4.50 IN
ti .55
.50
.45 PEAK= .95 CFS
3 ,40 @ 12.02 HRS
O .35 UOLUME= .07 OF
J .30
L- .25
.20
. 15
10
.05
m
0.00m N m v in m m N
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
H droCAD S-11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 4 Flow From Subcat #5 --to--> Design Pt. #4
Qin = .95 CFS @ 12 .02 HRS, VOLUME= .07 AF
Qout= .95 CFS @ 12 .02 HRS, VOLUME= .07 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 20' x 1' CHANNEL STOR-IND+TRANS METHOD
0 .00 0.00 0 .00 SIDE SLOPE= .1 '/' PEAK DEPTH= .01 FT
.10 2.10 6.52 n= .01 PEAK VELOCITY= 3 .1 FPS
.20 4.40 21.09 LENGTH= 1 FT TRAVEL TIME = 0 .0 MIN
.30 6.90 42.31 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=.1 HRS
.43 10 .45 79.27
.60 15.60 143 .41
.80 22 .40 242 .25
1.00 30.00 367.39
REACH 4 INFLOW & OUTFLOW
Flow From Subcot #5 --to--> Design Pt . #4
.95
•90 20' x 1 ' CHANNEL
.85 SIDE SLOPE= . 1
.80
.75 n=.01 L=1 ' S=.01
.70
.65 STOR-IND+TRANS METHOD
.60 VELOCITY= 3. 1 FPS
`+- .55 TRAVEL= 0 MIN
U .50
.45 Qin= .95 CFS
O .35 Qout= .95 CFS
-J .30 LAG= 8 MIN
V_ .25
.20
. 15
. 10
.05
0.00m _ N M v in W r co m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover.MA° 'PRE-'PRE TYPE III 24-HOUR RAINFALL= 4.50 IN (10 y r Storm) 25 Aug 03
Engineering n ineerin Services, Inc.
Prepared by 9 g
H droCAD 5.11 000899 c 1986-1999 Applied Microcomputer S stems
SUBCATCHMENT 6 Barker Street (Paved) & Road Shoulder Area
PEAK= 1.16 CFS @ 12 .02 HRS, VOLUME= .08 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
65 .00 98 Paved Road & Driveway Areas RAINFALL= 4 .50 IN
35 .00 74 Vegetated & Mulched 32reeas SPAN= 10-20 HRS, dt=.l HRS
100 ,00 90 TOTAL AREA =
Comment Tc min
Method .7
TR-55 SHEET FLOW Over Paved Surface
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.02 '/ '
in Barker Street 2 . 9
SHALLOW CONCENTRATED/UPLAND FLOW Along Gutter
.
Paved Kv=20.3282 L=500' s=.02 I/' V52 .87 fps Tt 1.4
DIRECT ENTRY ----------
Total Length= 550 ft Total Tc= 5.0-
SUBCATCHMENT 6 RUNOFF
Barker Street (Paved) & Road Shoulder Area
1 , 1 AREA= .32 AC
Tc= 5 MIN
1 0 CN= 90
.9
8 SCS TR-20 METHOD
TYPE III 24-HOUR
4. .7 RAINFALL= 4.50 IN
U 6
PEAK= 1 . 16 CFS
3 .5 @ 12.02 HRS
O 4 UOLUME= .08 AF
J
.3
2
. 1
0.00 N M v in 01) rn mN
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
Hip,- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 7 Paved & Grass Areas at Road Intersection
PEAK= .37 CFS @ 12 .02 HRS, VOLUME= .03 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
70 .00 98 Paved Roadway Surface RAINFALL= 4 .50 IN
30 .00 74 Grass Surface Area SPAN= 10-20 HRS, dt=.1 HRS
1_00 .00 91 TOTAL AREA = .10 AC
Comment Tc (min)
Method 9
TR-55 SHEET FLOW Along Gutterline at Intersection
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.01 ' s s Area to CB 1.1
SHALLOW CONCENTRATED/UPLAND FLOW From Gutter to Gras
Grassed Waterway Kv=15 L=100' s=.01 ' /' V=1.5 fps 3 .0
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 150 ft Total Tc= 5.0--
SUBCATCHMENT 7 RUNOFF
Paved & Gross Areas at Road Intersection
36 AREA= . 1 AC
34 Tc= 5 MIN
.32 CN= 91
.30
.28
.26 SCS TR-20 METHOD
LO .24 TYPE III 24-HOUR
ti .22 RAINFALL= 4.50 IN
U .20
. 18 PEAK= .37 CFS
3 . 16 e 12.02 HRS
of . 14 VOLUME= .03 AF
LL- 10
.08
.06
.04
.02
0.00m N v in r m rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover.MA- 'PRE-DEV. 'r Storm)
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5.11 000899 c 1986-1999 Applied Microcomputer Systems
REACH 5 Flows From Subcats #6 & 7 to Design Pt.#5
Qin = 1.54 CFS @ 12 .02 HRS, VOLUME= .11 AF LAG= 0 .0 MIN
Qout= 1.54 CFS @ 12 .02 HRS, VOLUME= .11 AF, ATTEN= 0%,
DEPTH END AREA DISCH
STOR-IND+TRANS METHOD
(FT) (SQ-FT) (CFS) 20 x 1 CHANNEL t PEAK DEPTH= .02 FT
0 .00 0 .00 0 .00 SIDE SLOPE= •1 / PEAK VELOCITY= 3 .1 FPS
.10 2 .10 6.52 n= .01
TRAVEL TIME = 0 .0 MIN
.20 4 .40 21.09 LENGTH= 1 FT SPAN= 10-20 HRS, dt=.1 HRS
.30 6 .90 42.31 SLOPE= .01 FT/FT
.43 10 .45 79.27
.60 15 .60 143 .41
.80 22 .40 242 .25
1.00 30 .00 367.39
REACH 5 INFLOW 8 OUTFLOW
Flows From Subcats #6 & 7 to Design Pt . #5
1 .5 20' x 1 ' CHANNEL
1 .4 SIDE SLOPE= . 1
1 .3 n=.01 L=1 ' S=.01
1 .2
1 . 1 STOR-IND+TRANS METHOD
LO 1 .0 VELOCITY= 3. 1 FPS
C+ 9 TRAVEL= 0 MIN
U 8
7 Din= 1 .54 CFS
Qout= 1 .54 CFS
0O .6 LAG= 0 MIN
J .5
.4
.3
.2
. 1
0.0m N M v in L r m rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD 5 11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 6 Summation of Flow from PRE-DEV Conditions
Qin = 5 .91 CFS @ 12.04 HRS, VOLUME= .45 AF
Qout= 5.90 CFS @ 12 .04 HRS, VOLUME= .45 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
STOR-IND+TRANS METHOD
(FT) (SQ-FT)
(CFS) 20 ' x L CHANNEL PEAK DEPTH= .09 FT
0 .00 0 .00 0 .00 SIDE SLOPE= •1 / PEAK VELOCITY= 3 .1 FPS
.10 2 .10 6 .52 n= .01
TRAVEL TIME = 0 .0 MIN
.20 4 .40 21.09 LENGTH= 1 FT SPAN= 10-20 HRS, dt= .1 HRS
.30 6 .90 42 .31 SLOPE= .01 FT/FT
.43 10 .45 79.27
.60 15 .60 143 .41
.80 22 .40 242 .25
1.00 30 .00 367 .39
REACH 6 INFLOW & OUTFLOW
Summation of Flow from PRE-DEU Conditions
5.5 20' x I ' CHANNEL
SIDE SLOPE= . 1 '/'
5.0 n=.01 L=1 ' S=.01
4.5
r. 4.0 STOR-IND+TRANS METHOD
VELOCITY= 3. 1 FPS
4- 3.5 TRAVEL= 0 MIN
0 3.0 Qin= 5.91 CFS
3 2.5 Qout= 5.90 CFS
O 2.0 LAG= 0 MIN
LL- 1 .5
1 .0
.5
0.0CS) N Ln lD r OD 0-) m
TIME (hours)
AM
Data for "OSGOOD CROSSING" in North Andover,MA-'PRE-DEV. ' 4
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 1 Area Along Barker's Property on North Side
PEAK= .25 CFS @ 12 .09 HRS, VOLUME= .02 AF
SCS TR-20 METHOD
PERCENT CN
TYPE III 24-HOUR
6 .00 98 Impervious RAINFALL= 3 .10 IN
94 .00 74 Lawn/ Landscaped SPAN= 10-20 HRS, dt=.1 HRS
100 .00 75 TOTAL AREA = .25 AC
Method
Comment Tc (min)
TR-55 SHEET FLOW Over Grasses & Mulched Surfaces 6.3
Grass: Dense n=.24 L=50' P2=3 .1 in s=.04 ' /`
SHALLOW CONCENTRATED/UPLAND FLOW Over Grass & Mulch to Exist. CB 1.1
Grassed Waterway Kv=15 L=200 ' s=.04 ' /' V=3 fps
Total Length= 250 ft Total Tc= 7.4
SUBCATCHMENT 1 RUNOFF
Area Along Barker' s Property on North Side
.24 AREA= .25 AC
.22 Tc= 7.4 MIN
.20 CN= 75
. 18 SCS TR-20 METHOD
j . 16 TYPE III 24-HOUR
4 14 RAINFALL= 3. 10 IN
u -
. 12 PEAK= .25 CFS
3 . 10 0 12.09 HRS
OJ 08 VOLUME= .02 AF
06
.04
02
0.00m N M v in �D r ao m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA2'Pr tormESD )
TYPE III 24-HOUR RAINFALL= 3.10 IN ( Y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
REACH 1 Flow From Subcat #1 --to--> Design Pt #1
Qin = .25 CFS @ 12 .09 HRS, VOLUME= .02 AF
Qout= .25 CFS @ 12 .09 HRS, VOLUME= .02 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (S!2-FT) (CFS) 20' x 1' CHANNEL STOR-IND+TRANS METHOD
0 .00 0 .00 0.00 SIDE SLOPE= .l ' /' PEAK DEPTH= 0 .00 FT
PEAK VELOCITY= 3 .1 FPS
.10 2 .10 6.52 n= .01 TRAVEL TIME = 0 .0 MIN
.20 4.40 21.09 LENGTH= 1 FT SPAN= 10-20 HRS, dt=.1 HRS
.30 6.90 42.31 SLOPE= .01 FT/FT
.43 10.45 79.27
.60 15.60 143.41
.80 22 .40 242.25
1.00 30 .00 367.39
REACH 1 INFLOW & OUTFLOW
Flow From Subcot #1 --to--> Design Pt #1
.24 20' x I ' CHANNEL
.22 SIDE SLOPE= . 1 '/'
.20 n=.01 L=1 ' S=.01
18 STOR-IND+TRANS METHOD
LO 16 VELOCITY= 3. 1 FPS
4- 14 TRAUEL= 0 MIN
U
. 12 Din= .25 CFS
: 10 Qout= .25 CFS
0 08 LAG= 0 MIN
06
.04
02
0.00m N v in In r ao m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA°'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 Y r Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 2 Area Contributing to CB near Florist Shop
PEAK= 1.02 CFS @ 12.08 HRS, VOLUME= .08 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
50 .00 98 Shop Roof & Paved Areas RAINFALL= 3 .10 IN
50 .00 74 Lawn & Landscaped Areas SPAN= 10-20 HRS, dt=.l HRS
100 .00 86 TOTAL AREA = .58 AC
Comment Tr. min
Method 6.5
TR-55 SHEET FLOW From Northeast Corner of Lot
Grass: Dense n=.24 L=50 ' P2=3 .1 in s=.037 '/ '
SHALLOW CONCENTRATED/UPLAND FLOW
From Rear of Shop to the CB 1.4
Grassed Waterway Kv=15 L=250' s=.037 '/' V=2 .89 fps
Total Length= 300 ft Total Tc= 7 . 9,.
SUBCATCHMENT 2 RUNOFF
Area Contributing to CB near Florist Shop
1 .0
AREA= .58 AC
.9 Tc= 7.9 MIN
CN= 86
.8
7 SCS TR-20 METHOD
LO TYPE III 24-HOUR
ti-- .6 RAINFALL= 3. 10 IN
U
`J 5 PEAK= 1 .02 CFS
C 12.08 HRS
O 4 UOLUME= .08 AF
J 3
L
.2
. 1
0.0m N M �D m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. 'r Storm)
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 Y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 3 Area Contributing to CB near Island @ 125
PEAK= .40 CFS @ 12 .11 HRS, VOLUME= .03 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
37 .00 98 Greenhouse Roof & Pavement .10 IN
3
=
63 .00 74 Lawn & Landscaped Areas SPAN=RAINFALL=
HRS, dt=.1 HRS
100 .00 83 TOTAL AREA = .27 AC
Comment Tr- (min)
Method 9.6
T Over Grass and Mu
R-55 SHEET FLOW lch Surfaces
Grass: Dense n=.24 L=50' P2=3 .1 in s=.014 '/' 9
SHALLOW CONCENTRATED/UPLAND FLOW Over Grass & Paved Surfaces
Grassed Waterway Kv=15 L=100' s=.014 ' /' V=1.77 fps
Total Length= 150 ft Total Tc= 10.5`
SUBCATCHMENT 3 RUNOFF
Area Contributing to CB near Island @ 125
.40
AREA= .27 AC
.35 Tc= 10.5 MIN
CN= 83
.30
SCS TR-20 METHOD
LO 25 TYPE III 24-HOUR
c} RAINFALL= 3. 10 IN
U
.20 PEAK= .40 CFS
@ 12. 11 HRS
O . 15 UOLUME= .03 AF
J
LL- . 1 0
05
0.000 N v in r ao rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5.11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 2 Flow From Subcat #2 --to--> Design Pt.#2
Qin = 1.41 CFS @ 12 .09 HRS, VOLUME= .11 AF
Qout= 1.41 CFS @ 12 .09 HRS, VOLUME= .11 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 20' x 1' CHANNEL STOR-IND+TRANS METHOD
0 .00 0.00 0.00 SIDE SLOPE= .1 '/ ' PEAK DEPTH= . 02 FT
.10 2 .10 6.52 n= .01 PEAK VELOCITY= 3 .1 FPS
.20 4 .40 21.09 LENGTH= 1 FT TRAVEL TIME = 0 .0 MIN
.30 6.90 42.31 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=.1 HRS
.43 10 .45 79.27
.60 15.60 143 .41
.80 22 .40 242 .25
1.00 30 .00 367.39
REACH 2 INFLOW & OUTFLOW
Flow From Sulocat #2 --to--> Design Pt . #2
1 .4
1 .3 20' x 1 ' CHANNEL
1 .2 SIDE SLOPE= . 1 '/'
1 . 1 n=.01 L=1 ' S=.01
r 1 .0 STOR-IND+TRANS METHOD
to .9 VELOCITY= 3. 1 FPS
`'-
u .8 TRAVEL= 0 MIN
7
3 6 Qin= 1 .41 CFS
Dout= 1 .41 CFS
1 5 LAG= 0 MIN
Ii .4
.3
.2
. 1
0.0m - N m v in w r-
m m m
TIME (hours)
Data for 'OSGOOD CROSSING" in North Andover,MA- 'Pr Storm)TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 Y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD 5 11 000899 (c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 4 Area to CB'A' -MaHwy Drain System @ Rte 125
PEAK= 44 CFS @ 12 .02 HRS, VOLUME= 03 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
42 .00 98 Paved Surface Areas RAINFALL= 3 .10 IN
58 .00 74 Grass & Mulch Surfaces SPAN= 10-20 HRS, dt=.1 HRS
100 .00 84 TOTAL AREA = .25 AC
Comment Tc (min)
Method 8
TR-55 SHEET FLOW Over Paved Surfaces
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.017 'G rassed Area 9
SHALLOW CONCENTRATED/UPLAND FLOW From Pavement onto G
Grassed Waterway Kv=15 L=80' S=.01 /5 5 fps
minute 3 .3
DIRECT ENTRY ----------
Total Length= 130 ft Total Tc= 5 .0
SUBCATCHMENT 4 RUNOFF
Area to CB'A'-MaHwy Drain System @ Rte 125
40 AREA= .25 AC
Tc= 5 MIN
.35 CN= 84
.30 SCS TR-20 METHOD
LO TYPE III 24-HOUR
ci 25 RAINFALL= 3. 10 IN
U
20 PEAK= .44 CFS
3 C� 12.02 HRS
O 15 UOLUME= .03 OF
J
V_
10
05
0.000 N LO m U, N
TIME (hours)
Data for ,OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD 5.11 000899 c 1986-1999 A lied Microcomputer Systems
REACH 4 Flow From Subcat #5 --to--> Design Pt. #4
Qin = 61 CFS @ 12.02 HRS, VOLUME= 04 AF
Qout= .61 CFS @ 12 .02 HRS, VOLUME= .04 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
STOR-IND+TRANS METHOD
(FT) (SO-FT) (CFS) 2U x 1 CHANNEL f PEAK DEPTH= .01 FT
0 .00 0 .00 0 .00 SIDE SLOPE= •1 / PEAK VELOCITY= 3 .1 FPS
.10 2 .10 6 .52 n= .01 TRAVEL TIME = 0.0 MIN
.20 4 .40 21.09 LENGTH= 1 FT SPAN= 10-20 HRS, dt=.l HRS
.30 6 .90 42 .31 SLOPE= .01 FT/FT
.43 10 .45 79.27
.60 15.60 143 .41
.80 22 .40 242.25
1.00 30.00 367.39
REACH 4 INFLOW & OUTFLOW
Flow From Subcat #5 --to--> Design Pt . #4
.60
20' x 1 ' CHANNEL
.55 SIDE SLOPE= . 1 '/'
.50 n=.01 L=1 ' S=.01
.45 STOR-IND+TRANS METHOD
.40 UELOCITY= 3. 1 FPS
do
4-- .35 TRAUEL= 0 MIN
u
.30 Din= .61 CFS
3 .25 Gout= .61 CFS
0 20 LAG= 0 MIN
L` . 1 5
. 10
.05
0.00m N M r- co 0, m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD S .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 6 Barker Street (Paved) & Road Shoulder Area
PEAK= .72 CFS @ 12 .02 HRS, VOLUME= .05 AF
PERCENT CN SCS TR-20 METHOD
65.00 98 Paved Road & Driveway Areas TYPE III 24-HOUR
35.00 74 Vegetated & Mulched Areas RAINFALL= 3 .10 IN
100. 00 90 TOTAL AREA = .32 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Paved Surface •7
Smooth surfaces n=.011 L=50 ' P2=3 .1 in s=.02 ' /'
SHALLOW CONCENTRATED/UPLAND FLOW Along Gutter in Barker Street 2.9
Paved Kv=20.3282 L=500' s=.02 '/ ' V=2 .87 fps
DIRECT ENTRY Obtain 5 minute Tt 1.4
Total Length= 550 ft Total Tc= 5 .0
SUBCATCHMENT 6 RUNOFF
Barker Street (Paved) & Road Shoulder Area
.70
.65 AREA= .32 AC
.60 Tc= 5 MIN
CN= 90
.55
r .50 SCS TR-20 METHOD
JJ .45 TYPE III 24-HOUR
U 40 RAINFALL= 3. 10 IN
35 PEAK= .72 CFS
:3 .30 @ 12.02 HRS
0 25 J UOLUME= .05 AF
LL- .20
. 15
. 10
.05
0.00 m N M v in �D r m m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 7 Paved & Grass Areas at Road Intersection
PEAK= .24 CFS @ 12 .02 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
70 .00 98 Paved Roadway Surface TYPE III 24-HOUR
30 .00 74 Grass Surface Area RAINFALL= 3.10 IN
100 .00 91 TOTAL AREA = >10 AC SPAN= 10-20 HRS, dt=.1 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Along Gutterline at Intersection .9
Smooth surfaces n=.011 L=50 ' P2=3.1 in S=.01 '/'
SHALLOW CONCENTRATED/UPLAND FLOW From Gutter to Grass Area to CB 1.1
Grassed Waterway Kv=15 L=100' s=.01 '/ ' V=1.5 fps
DIRECT ENTRY Obtain 5 minute Tt 3 . 0
Total Length= 150 ft Total Tc= 5 .0 -
SUBCATCHMENT 7 RUNOFF
Paved & Gross Areas at Road Intersection
.22 AREA= . I AC
.20 Tc= 5 MIN
. 18 CN= 91
. 16 SCS TR-20 METHOD
�
14 TYPE III 24-HOUR
U RAINFALL= 3. 10 IN
. 12
3 10 PEAK= .24 CFS
@ 12.02 HRS
08 UOLUME= .02 OF
06
.04
.02
e.e0m N M IT Ln W m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5.11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 5 Flows From Subcats #6 & 7 to Design Pt.#5
Qin = .96 CFS @ 12.02 HRS, VOLUME= .07 AF
Qout= . 96 CFS @ 12 .02 HRS, VOLUME= .07 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 20' x 1' CHANNEL STOR-IND+TRANS METHOD
0.00 0.00 0.00 SIDE SLOPE= .1 '/' PEAK DEPTH= .01 FT
.10 2.10 6.52 n= .01 PEAK VELOCITY= 3 .1 FPS
.20 4.40 21.09 LENGTH= 1 FT TRAVEL TIME = 0.0 MIN
.30 6.90 42 .31 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=.1 HRS
.43 10.45 79.27
.60 15.60 143 .41
.80 22.40 242 .25
1.00 30.00 367 .39
REACH 5 INFLOW & OUTFLOW
Flows From Subcats #6 & 7 to Design Pt . #5
.95
'90 20' x 1 ' CHANNEL
.85 SIDE SLOPE= . 1
.80
.75 n=.01 L=1 ' S=.01
.70
.65 STOR-IND+TRANS METHOD
.60 VELOCITY= 3. 1 FPS
U .55 TRAUEL= 0 MIN
50
45 Din= .96 CFS
O .30 Gout= .96 CFS
J .30 LAG= 0 MIN
L- .25
.20
. 15
. 10
.05
0.00m - ry v u) �0 r, co rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'PRE-DEV. '
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5.11 000899 (c)_1986-1999 Applied Microcomputer Systems
REACH 6 Summation of Flow from PRE-DEV Conditions
Qin = 3 .48 CFS @ 12 .04 HRS, VOLUME= .27 AF
Qout= 3 .48 CFS @ 12 .05 HRS, VOLUME= .27 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 20 ' x 1' CHANNEL STOR-IND+TRANS METHOD
0 .00 0 .00 0.00 SIDE SLOPE= .1 '/' PEAK DEPTH= 05 FT
.10 2 .10 6 .52 n= .01 PEAK VELOCITY= 3 .1 FPS
.20 4 .40 21.09 LENGTH= 1 FT TRAVEL TIME = 0. 0 MIN
.30 6.90 42 .31 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=.l HRS
.43 10.45 79.27
.60 15.60 143 .41
.80 22 .40 242 .25
1.00 30.00 367.39
REACH 6 INFLOW & OUTFLOW
Summation of Flow from PRE-DEU Conditions
3.4
3.2 20' x I ' CHANNEL
3.0 SIDE SLOPE= . I '/'
2.8 n=.01 L=1 ' S=.81
2.6
r 2.4 STOR-IND+TRANS METHOD
Lo 2.2 VELOCITY= 3. 1 FPS
z.8 TRAUEL= 0 MIN
1 .6 Din= 3.48 CFS
3 1 . Qout= 3.48 CFS
� 1 .2 2 LAG= 0 MIN
LL 1 .0 -
.8
.6
.4
2
cv M v in �n ro M m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
WATERSHED ROUTING
OF 2 O
�
� O / o
D F'
O � �
L./ 15
12
9
� 11 rz
bt
OSUBCATCHMENT ❑ REACH A POND I I LINK
SUBCATCHMENT 1 = Parking Area in Front of Building -> REACH 3
SUBCATCHMENT 2 = Parking Area on North Side of Building -> REACH 2
SUBCATCHMENT 3 = Delivery / Service Area Behind Building -> POND 1
SUBCATCHMENT 4 = Parking Area at Southerly Side of Building -> POND 1
SUBCATCHMENT 5 = Paved Area Between Building and Main Entry -> POND 1
SUBCATCHMENT 6 = Area Along Rte 125 in Front of Building -> POND 1
SUBCATCHMENT 7 = Building Roof Area-Drain to Recharge Basin -> POND 2
SUBCATCHMENT 8 = Barker Street (Paved) & Road Shoulder -> REACH 15
SUBCATCHMENT 9 = Area Along Barker's Property on North Side -> REACH 11
SUBCATCHMENT 10 = Paved and Grass Area at Road Intersection -> REACH 15
REACH 2 = 24" RCP Pipe From CB##2 -- to --> DMH#1 -> REACH 3
REACH 3 = From DMH#1 --- to ---> DMH #3 -> POND 1
REACH 7 = From Recharge Facility to ---> Groundwater ->
REACH 11 = Flow From <9> -- to --> Design Point ##1 -> REACH 16
REACH 12 = Flow through Oil / Grit Separator to DMH#5 -> REACH 16
REACH 15 = Flow to Exist.CB in Grass Area @ Barker St -> REACH 16
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000 899 �c) ,1986-1999 .Applied Microcomputer Systems
REACH 16 = Summary of Flow to Design Points #1, 2, 3 &4 ->
POND 1 = Concrete Pipe System for Runoff Storage -> REACH 12
POND 1 secondary = Concrete Pipe System for Runoff Storage
-> REACH 7
POND 2 = Prop. Subsurface Recharge Facility
-> POND 1
POND 2 secondary = Prop. Subsurface Recharge Facility
-> REACH 7
RUNOFF BY SCS TR-20 METHOD: TYPE III 24-HOUR RAINFALL= 6.40 IN, SCS U.H.
RUNOFF SPAN = 10-20 HRS, dt= .05 HRS, 201 POINTS
WGT'D PEAK Tpeak VOL
SUBCAT AREA Tc - CN C CFS HRS AF
NUMBER ACRE MIN --GROUND COVERS %CN -
95 - 2.00 12 .05 .13
1 .32 5 .0 87%98 13%74
2 .23 5 .0 59%98 41%74
88 - 1.32 12 .05 .08
3 13 6 .8 85%98 15%74
94 - .76 12 .07 .05
4 15 5.0 95%98 5%74
97 - .95 12 .05 .06
97 - .95 12 .05 .06
5 .15 5.0 96%98 4%74
90 - 1.60 12 .05 .10
6 .27 5.0 65%98 35%74
98 - 1.66 12.05 .11
7 .26 5.0 100%98
8 .35 5.0 60%98 40%74
88 - 2 .01 12 .05 .13
77 - .47 12 .07 .03'
9 .11 6.7 14%98 86%74
10 .08 5 .0 77%98 23%74
92 _ .49 12 .05 .03
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
H droCAD 5 .11 000899 c 1986-1999. APplied Microcomputer Systems
REACH ROUTING BY STOR-IND+TRANS METHOD
REACH BOTTOM SIDE PEAK TRAVEL PEAK
NO. DIAM WIDTH DEPTH SLOPES n LENGTH SLOPE VEL. TIME Qout
(IN) (FT) (FT) (FT/FT) (FT) (FT/FT) (FPS) (MIN) CFS
2 24 .0 - - - - .013 170 .0059 3 .3 .9 1.24
3 30 .0 - - -
.013 100 .0040 3 .6 .5 3 .14
7 - 20 .0 1.0 .50 .50 .500 2 .5000 .4 .1 .37
11 48 .0 - - - - .010 4 .1000 18.9 0.0 .47
12 12 .0 - - - - .013 4 .0200 7.2 0.0 4 .13
15 48 .0 - - - - .013 4 .5000 32 .4 0.0 2 .50
16 - 10.0 1.0 .10 .10 .010 1 .0100 4 .0 0 .0 6.90
POND ROUTING BY STOR-IND METHOD
POND START FLOOD PEAK PEAK ------ PEAK FLOW ------- ---Qout---
NO. ELEV. ELEV. ELEV. STORAGE Qin Qout Qpri Qsec ATTEN. LAG
(FT) (FT) (FT) (AF) (CFS) (CFS) (CFS) (CFS) (o) (MIN)
1 154 .9 160.0 159.9 .07 7 .82 4.43 4.13 .30 43 8.9
2 158 .4 160 .2 160 .0 .04 1.66 .73 .66 .07 56 10.2
lab
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV' 41 111W
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 (c).. 1986-1999 Applied Microcomputer S stems
SUBCATCHMENT 1 Parking Area in Front of Building
PEAK= 2 .00 CFS @ 12 .05 HRS, VOLUME= .13 AF
SCS TR-20 METHOD
PERCENT CN
TYPE III 24-HOUR
87.00 98 Pavement Surface Area RAINFALL= 6 .40 IN
13 .00 74 Lawn / Landscaped Areas SPAN= 10-20 HRS, dt=.05 HRS
100 .00 95 TOTAL AREA = .32 AC
Comment Tc (min)
Method 1 0
TR-55 SHEET FLOW Over Paved Parking Area
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.008
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Parking Area to CB#1 •9
Paved Kv=20 .3282 L=100 ' s=.008 '/ ' V=1.82 fps
CIRCULAR CHANNEL Flow From CB#1 --to--> DMH#1 1
12" Diameter a=.79 sq-ft Pw=3.1' r=.25'
s=.015 / ' n=.013 V=5 .56 fps L=34' Capacity=4 .4 cfs
DIRECT ENTRY
Obtain 5 minute Tt 3 .0
Total Length= 184 ft Total Tc= 5 .0
SUBCATCHMENT 1 RUNOFF
Parking Area in Front of Building
2.0
AREA= .32 AC
1 .8 Tc= 5 MIN
1 .6 CN= 95
1 .4 SCS TR-20 METHOD
TYPE III 24-HOUR
4 1 .2 RAINFALL= 6.40 IN
U
1 .0 PEAK= 2.00 CFS
3 .g @ 12.05 HRS
0 UOLUME= . 13 AF
J 6
4
.2
0.0m N r v in m rn m
TIME "'hours)
Data for ,,OSGOOD CROSSING" in North Andover,MA-'POST-DEV'
TYPE III 24-HOUR RAINFALL= 6.40 IN Inc. 28 Aug 03
Prepared by Merrimack Engineering Services,
ied Microcomputer Systems
H droCAD 5.11 000899
Prop. Subsurface Recharge Facility
POND 2
Qin = 1.66 CFS @ 12 .05 HRS, VOLUME= .11 AF
78 CFS @ 12 .20 HRS, VOLUME= .09 AF, ATTEN= 53%, LAG= 9.1 MIN
Qout= .07 AF
Qpri= .76 CFS @ 12.20 HRS, VOLUME= .p2 AF
Qsec= .02 CFS @ 10.50 HRS, VOLUME=
STOR-IND METHOD
ELEVATION AREA INC.STOR CUM.STOR PEAK. STORAGE = 1749 CF
(FT) (SF) (CF) (CF)
0 0 PEAK ELEVATION= 160 .2 FT
158.4 0 FLOOD ELEVATION= 160 .6 FT
50 50
1000
158 .5 850 START ELEVATION= 158 .4 FT
159.3 1000 800
2150 SPAN= 10-20 HRS, dt=.05 HR
1300
160 .6 1000 Tdet= 89.6 MIN ( .09 AF)
$$ ROUTE INVERT OUTLET DEVICES
1 S 158.5' EXFILTRATION
Q= .02 CFS at and above 158.6 '
2 P 159.3' 6" CULVERT Cd= 6
n=.013 L=45' 5=.0733 '/' Ke=.5 Cc=.9
Primary Discharge
I-2=Culvert
Secondary Discharge
I-1=Exfiltration
POND 2 INFLOW & OUTFLOW
Prop . Subsurface Recharge Facility
1 .6 STOR-IND METHOD
1 .5 PEAK STOR= 1749 CF
1 .4 PEAK ELEU= 160.2 FT
1 .3
1 .2 Qin= 1 .66 CFS
1 , 1 Gout= .76 CFS
0 1 .0 Qpri-- .76 CFS
.9 Qsec= .02 CFS
g a LAG= 9. 1 MIN
3 .7 1 \
o .6 I \
u- 4 1 \\
I \
3 1 t\
.2 I `
00
m m
0.00
N
TIME (hours)
Data for ,,OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering
Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 3 Delivery / Service Area Behind Building
PEAK= .76 CFS @ 12 .07 HRS, VOLUME= .05 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
85 .00 98 Paved Surface AreaAreas RAINFALL= 6.40 IN
15.00 74 Lawn / 13 s SPAN= 10-20 HRS, dt=.05 HRS
100 .00 94 TOTAL AREA =
Tc min
Comment 5 .4
Method Over Landscaped Surface Area
TR-55 SHEET FLOW
Grass : Dense n=.24 L=50' P2=3 .1 in s=.06 ' / ' 7
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Surface Areas
V=2 .32 fps 7
Paved Kv=20 .3282 L=100' s=.013 / '
12 RCP Drain From CB#3 to DMH#3
CIRCULAR CHANNEL ft Pw=3 .1' r=.25'
12" Diameter -a=.79 sV=3 8 fps L=170' Capacity=3 cfs
n-.013 - P -
s=.007 � / � ---------
Total Length= 320 ft Total Tc=
6 .8
SUBCATCHMENT 3 RUNOFF
Delivery / Service Area Behind Building
.75 AREA= . 13 AC
70 Tc= 6.8 MIN
.65 CN= 94
.60
.55 SCS TR-20 METHOD
•50 TYPE III 24-HOUR
4- .45 RAINFALL= 6.40 IN
U .40
v .35 PEAK= .76 CFS
12.07 HRS
J .25 VOLUME= .05 AF
21
15
. 10
.05
0.00m _ m
N �'] V N
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HvdroCAD 5 .11 000899 (c) 1_986-1999 Applied .Microcomputer Systems
SUBCATCHMENT 4 Parking Area at Southerly Side of Building
PEAK= 95 CFS @ 12 .05 HRS, VOLUME= 06 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
95 .00 98 Paved Parking Areas .40 IN
6
=
5 .00 74 Lawn / Landscaped Areas SPAN=RAINFALL= 6 HRS, dt=.05 HRS
100 .00 97 TOTAL AREA = 15 AC
Comment Tc (min)
Method 8
TR-55 SHEET FLOW Over Paved Surface Areas
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.015 '/' 3
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved P9 k Parking Areas
Paved Kv=20 .3282 L=50' s=.015 '/' 4 3 .9
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 100 ft Total Tc= 5.0-
SUBCATCHMENT 4 RUNOFF
Parking Area at Southerly Side of Building
.95
.90 AREA= . 15 AC
.85 Tc= 5 MIN
.80 CN= 97
.75
.70 SCS TR-20 METHOD
.65 TYPE III 24-HOUR
4- 55
4- .60 RAINFALL= 6.40 IN
.50
.45 PEAK= .95 CFS
3 .40 @ 12.05 HRS
O .35 VOLUME= .06 AF
-i 30
L- .25
.20
. 15
. 10
.05
0.00m N �, �D O m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD 5 11 000899 (c) 1.986-1999 A lied Microcomputer Systems
SUBCATCHMENT 5 Paved Area Between Building and Main Entry
PEAK= .95 CFS @ 12 .05 HRS, VOLUME= .06 AF
SCS TR-20 METHOD
PERCENT CN
96.00 98 Paved Driveway & Sidewalk Areas TYPE III 24-HOUR
Landscaped Areas RAINFALL= 6 .40 IN
4.00 74 Lawn / P .15 AC SPAN= 10-20 HRS, dt=.05 HRS
100.00 97 TOTAL AREA =
Tc min
Comment 7
Method Over Impervious Surfaces
TR-55 SHEET FLOW
Smooth surfaces n=.011 L=50' P2=3 .1 in s=•02 ' /t 5
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Surfaces Areas
Paved Kv=20.3282 L=80 ' s=.02 ' /' V=2 .87 fps 3 .8
Obtain 5 minute Tt
DIRECT ENTRY
Total Length= 130 ft Total Tc=
5.0
SUBCATCHMENT 5 RUNOFF
Paved Area Between Building and Main Entry
.95
90 AREA= . 15 AC
.85 Tc= 5 MIN
.80 CN= 97
.75
•70 SCS TR-20 METHOD
.65 TYPE III 24-HOUR
J1 .60
4- .55 RAINFALL= 6.40 IN
50 PEAK= .95 CFS
3 40 e 12.05 HRS
o .35 VOLUME= .06 AF
J .30
L'- .25
.20
. 15
. 10
.05
m
0.000 m v to � r -
ao
N N
TIME (hours)
Data for "OSGOOD CROSSING" in North pmdover,MA-
'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 6 Area Along Rte 125 in Front of Building
PEAK= 1.60 CFS @ 12.05 HRS, VOLUME= .10 AF
SCS TR-20 METHOD
PERCENT CN
65 .00 98 Road Widening & Driveway Pavem't RAINFALL=24 HOUR
35 .00 74 Lawn / Landscaped Areas RAIN= 10-20 HRS, dt=.05 HRS
100 .00 90 TOTAL AREA = .27 AC
Comment Tc min
Method .7
TR-55 SHEET FLOW Over Paved Road Surfaces
Smooth surfaces n=.011 L=50' P2=3 .1 in s= .02 ' / ' 2
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Surfaces
Paved Kv=20 .3282 L=30 ' s=.01 'A, V=2 .03 fps CB#6 1.3
CHANNEL FLOW
a=.4 sq-ft Pw=6.4 ' r=.063 ' L=180' Capacity=l cfs
s=.015 ' / ' n=.012 V=2 .39 fps 1
CIRCULAR CHANNEL 12" RCP Drain From CB#6 to DMH#4
12" Diameter a=.79 sq-ft Pw=3.1' r=.25'
S=.01 ' /, n=.013 V=4 .54 fps L=24' Capacity=3 .6 cfs 2 .7
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 284 ft Total Tc= 5 .0
SUBCATCHMENT 6 RUNOFF
Area Along Rte 125 in Front of Building
1 .6
1 .5 AREA= .27 AC
1 .4 Tc= 5 MIN
1 .3 CN= 90
1 .2 SCS TR-20 METHOD
1 . 1 TYPE III 24-HOUR
4- 19 RAINFALL= 6.40 IN
U .
•8 PEAK= 1 .60 CFS
3 .7 C 12.05 HRS
O .6 UOLUME= . 10 AF
J 5
� 4
.3
.2
. 1
0.0m m
N v in t^ ° m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 6.40 IN 28 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5.11 000899 c 1986-1999 Applied microcomputer S stems
POND 1 Concrete Pipe System for Runoff Storage
Qin = 7 .98 CFS @ 12 .06 HRS, VOLUME= .56 AF LAG= 9 .8 MIN
Qout= 4 .27 CFS @ 12.22 HRS, VOLUME= .56 AF, ATTEN= 470,
Qpri= 4 .15 CFS @ 12 .22 HRS, VOLUME= .56 AF
Qsec= .12 CFS @ 12 .22 HRS, VOLUME= 0 .00 AF
STOR-IND METHOD
ELEVATION AREA INC F) CUM(CFF)) PEAK STORAGE = 3082 CF
(FT) (SF) (CFj
0 0 PEAK ELEVATION= 160 .0 FT
154 .9 0
15 15 100 FLOOD ELEVATION= 160 .1 FT
155 .2 105 START ELEVATION= 154 .9 FT
155 .8 200 90
450 555 SPAN= 10-20 HRS, dt=.05 HRS
156 .8 700 Tdet= 4 .7 MIN ( .56 AF)
157 .8
700 700 1255 158 .5 300 350 1605
158 .8 120 63 1668 _
159.3 120 60 1728
159.9 3500 1086 2814
160 .1
5000 850 3664
# ROUTE INVERT OUTLET DEVICES
1 P 154.9' 6" CULVERT X 2
n=.013 L=4' S=.025'/' Ke=.5 Cc=.9 Cd=.6
2 S 159.9' 175 DEG V-NOTCH WEIR
Q=2 .46 TAN(Theta/2) H^2.5
Primary Discharge
I 1=Culvert
Secondary Discharge
I -2=V-Notch/Trap Weir
POND 1 INFLOW & OUTFLOW
Concrete Pipe System for Runoff Storage
8.0 STOR-IND METHOD
7.5 L AK STOR= 3082 CF
7.0 EAK ELEV= 160 FT
6.5
6.0 Qin= 7.98 CFS
5.5 Qout= 4.27 CFS
5.0 Qpri= 4. 15 CFS
U 4.5 Qsec= 12 CFS
4.0 LAG= 9.8 MIN
3 3.5
0 3.0-J 2.5 V_ 2.0 1 .5 1 .0
.5
0.0m N r v to r ao rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 6.40 IN 28 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer S stems
REACH 12 Flow through Oil / Grit Separator to DMH#5
Qin = 4 .15 CFS @ 12 .22 HRS, VOLUME= 56 AF
Qout= 4 .15 CFS @ 12 .22 HRS, VOLUME= 56 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) CFS) 12" PIPE STOR-IND+TRANS METHOD
PEAK DEPTH= .69 FT
0 .00 0 .00 0.00
.013 PEAK VELOCITY= 7 .2 FPS
.10 .04 .11 n=
0 .0 MIN
20 .11 .44 LENGTH= 4 FT TRAVEL TIME =
0 20 .99 SLOPE= .02 FT/FT
SPAN= 10-20 HRS, dt=.05 HRS
.3
.70 .59 4.22
.80 .67 4.93
j .90 .74 5.37
i . 94 .77 5.42
.97 .78 5 .37
1 1.00 .79 5 .04
REACH 12 INFLOW & OUTFLOW
Flow through Oil / Grit Separator to DMH#5
4.0 12" PIPE
3.5 n=.013 L=4' S=.02
STOR-IND+TRANS METHOD
3.0 UELOCITY= 7.2 FPS
TRAUEL= 0 MIN
c� 2.5
U Qin= 4. 15 CFS
2.0 Gout= 4. 15 CFS
:3 LAG= 0 MIN
0 1 .5 -
J
LL I .0
.5
0.00 �, r v in m rn 0
TIME (hours)
f
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 9 Area Along Barker's Property on North Side
PEAK= .47 CFS @ 12.07 HRS, VOLUME= .03 AF
PERCENT CN SCS TR-20 METHOD
14 .00 98 Paved Roadway Surface TYPE III 24-HOUR
86 .00 74 Lawn / Landscaped Areas RAINFALL= 6.40 IN
100 . 00 77 TOTAL AREA = .11 AC SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Grassed & Mulched Surfaces 6.3
Grass: Dense n=.24 L=50 ' P2=3 .1 in s=.04 '/ '
SHALLOW CONCENTRATED/UPLAND FLOW Over Grass & Mulch to Exist. CB .4
Grassed Waterway Kv=15 L=70' s=.04 '/' V=3 fps
Total Length= 120 ft Total Tc= 6.7
SUBCATCHMENT 9 RUNOFF
Area Along Barker's Property on North Side
.45
AREA= . 11 AC
.40 Tc= 6.7 MIN
CN= 77
.35
SCS TR-20 METHOD
.30 TYPE III 24-HOUR
- 25 RAINFALL= 6.40 IN
3 20 PEAK= .47 CFS
o @ 12.07 HRS
—1 . 15 VOLUME= .03 AF
10
.05
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services,
Inc.
H dro CAD 5 .11 000899 c 1986-1999 A lied Microcom uter Systems
REACH 11
Flow From 49> -- to --> Design Point #1
CFS @ 12.07 HRS, VOLUME= .03 AF
Qin = 47 .03 AF, ATTEN= Oo, LAG= 0 .0 MIN
Qout= .47 CFS @ 12 .07 HRS, VOLUME=
DEPTH END AREA DISCH STOR-IND+TRANS METHOD
(FT) (SO-.FT) (CFS) 48" PIPE PEAK DEPTH= .01 FT
0 .00 0 .00 0.00 PEAK VELOCITY= 18 .9 FPS
.40 .65 12 .33 n= .01 TRAVEL TIME = 0 .0 MIN
.80 1.79 51.71 LENGTH= 4 FT
SPAN= 10-20 HRS, dt=.05 HRS
1.20 3 .17 115 .64 SLOPE= .1 FT/FT
2.80 9.40 494.40
3 .20 10 .78 577 .21
3 .60 11.91 629.37
3 .76 12.26 635.20
3 .88 12 .46 629.34
4.00 12 .57 590 .51
REACH 11 INFLOW 8 OUTFLOW
Flow From <9> -- to --> Design Point #1
.45 48" PIPE
n= .01 L=4' S=• 1
.40
35 STOR-IND+TRANS METHOD
VELOCITY= 18.9 FPS
i 30 TRAUEL= 0 MIN
4-
U .25 Din= .47 CFS
Qout= .47 CFS
20 LAG= 0 MIN
0
J . 15
LL-
10
.05
0.00m _ N ri v in n r m m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 8 Barker Street (Paved) & Road Shoulder
PEAK= 2 .01 CFS @ 12.05 HRS, VOLUME= .13 AF
PERCENT CN SCS TR-20 METHOD
60.00 98 Paved Surface Area TYPE III 24-HOUR
40.00 74 Lawn / Landscaped Areas RAINFALL= 6.40 IN
100.00 88 TOTAL AREA = .35 AC SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Paved Surfaces .7
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.02 '/'
SHALLOW CONCENTRATED/UPLAND FLOW Along Gutter in Barker Street 2 .9
Paved Kv=20.3282 L=500 ' s=.02 '/ ' V=2 .87 fps
DIRECT ENTRY Obtain 5 minute Tt 1.4
Total Length= 550 ft Total Tc= 5.0
SUBCATCHMENT 8 RUNOFF
Barker Street (Paved) & Road Shoulder
2.0
1 .8 - AREA= .35 AC
Tc= 5 MIN
1 .6 CN= 88
1 .4 SCS TR-20 METHOD
c� 12 TYPE III 24-HOUR
U RAINFALL= 6.40 IN
8 PEAK= 2.01 CFS
O e 12.05 HRS
J 6 VOLUME= . 13 AF
LL
4
.2
0.0m N M �r in W ao m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 10 Paved and Grass Area at Road Intersection
PEAK= .49 CFS @ 12 .05 HRS, VOLUME= .03 AF
PERCENT CN SCS TR-20 METHOD
77. 00 98 Paved Roadway Surface TYPE III 24-HOUR
23 .00 74 Lawn / Landscaped Areas RAINFALL= 6.40 IN
100 . 00 92 TOTAL AREA _ .08 AC SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Paved Roadway Surface .9
Smooth surfaces n=.011 L=50 ' P2=3.1 in s=.01 '/'
SHALLOW CONCENTRATED/UPLAND FLOW From Gutter to Grass Area to CB 1.1
Grassed Waterway Kv=15 L=100' s=.01 '/, V=1.5 fps
DIRECT ENTRY Obtain 5 minute Tt 3 .0
Total Length= 150 ft Total Tc= 5.0 -
SUBCATCHMENT 10 RUNOFF
Paved and Grass Area at Road Intersection
.45 AREA= .08 AC
.40 Tc= 5 MIN
CN= 92
_ 35 SCS TR-20 METHOD
4- .30 TYPE III 24-HOUR
U 25 RAINFALL= 6.40 IN
:3 .28 PEAK= .49 CFS
O @ 12.05 HRS
J 15 VOLUME= .03 AF
LL
10
.05
0.00m N M, v W r- oo m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL=6.40 IN (100 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 15 Flow to Exist.CB in Grass Area @ Barker St
Qin = 2 .50 CFS @ 12 .05 HRS, VOLUME= .16 AF
Qout= 2 .50 CFS @ 12 .05 HRS, VOLUME= .16 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 48" PIPE STOR-IND+TRANS METHOD
0 .00 0.00 0.00 PEAK DEPTH= .05 FT
.40 .65 21.21 n= .013 PEAK VELOCITY= 32 .4 FPS
.80 1.79 88.95 LENGTH= 4 FT TRAVEL TIME = 0 .0 MIN
1.20 3 .17 198.91 SLOPE= .5 FT/FT SPAN= 10-20 HRS, dt=.05 HRS
2 .80 9.40 850.39
3 .20 10 .78 992 .82
3 .60 11.91 1082.54
3 .76 12.26 1092.58
3 .88 12 .46 1082 .49
4 .00 12.57 1015.71
REACH 15 INFLOW & OUTFLOW
Flow to Exist . CB in Grass Area @ Barker St
2.4
2.2 48'' PIPE
n=.013 L=4' S=.5
2.0
1 8 STOR-IND+TRANS METHOD
VELOCITY= 32.4 FPS
n 1 .6 TRAVEL= 0 MIN
U 1 .4
12 Gin= 2.50 CFS
Gout= 2.50 CFS
0 1 0 LAG= 0 MIN
J 8
LL
6
4
.2
0.0m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 6.40 IN
Prepared by Merrimack Engineering Services, Inc. 28 Aug 03
HydroCAD 5.11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 16 Summary of Flow to Design Points #1,2,3 &4
Qin = 6. 93 CFS @ 12 .07 HRS, VOLUME= .75 AF
Qout= 6.93 CFS @ 12.07 HRS, VOLUME= .75 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 10' x 1' CHANNEL STOR-IND+TRANS METHOD
0 .00 0.00 0 .00 SIDE SLOPE= .1 1/ 1 PEAK_ DEPTH= .15 FT
.10 1.10 3 .32 n= .01 PEAK VELOCITY= 4 .0 FPS
.20 2 .40 11.00 LENGTH= 1 FT TRAVEL TIME = 0 .0 MIN
.30 3 .90 22 .59 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=. 05 HRS
.43 6.15 43 .62
.60 9.60 81.92
.80 14.40 144 .02
1 .00 20.00 226.30
REACH 16 INFLOW & OUTFLOW --
Summary of Flow to Design Points #1 , 2, 3 &4
6.5 10' x 1 ' CHANNEL
6.0 SIDE SLOPE= . 1 '/'
5.5 n=.01 L=1 ' S=.01
5.0 :I
j 4.5 STOR-IND+TRANS METHOD
VELOCITY= 4 FPS
u 4.8 3.5 TRAVEL= 0 MIN
3 3.0 Qin= 6.93 CFS
0 2.5 - Qout= 6.93 CFS
L� 2.0
LAG= 0 MIN
1 .5
I .0
.5
0.0m ry m rn m
N
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV' 0
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5.11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 1 Parking Area in Front of Building
PEAK= 1.38 CFS @ 12.05 HRS, VOLUME= .09 AF
PERCENT CN SCS TR-20 METHOD
87.00 98 Pavement Surface Area TYPE III 24-HOUR
13 .00 74 Lawn / Landscaped Areas RAINFALL= 4.50 IN
100 .00 95 TOTAL AREA = .32 AC SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Paved Parking Area 1. 0
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.008 ' / '
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Parking Area to CB#1 . 9
Paved Kv=20.3282 L=100' s=.008 '/' V=1.82 fps
CIRCULAR CHANNEL Flow From CB#1 --to--> DMH#1 .1
12" Diameter a=.79 sq-ft Pw=3 .1' r=.25'
s=.015 '/ ' n=.013 V=5.56 fps L=34 ' Capacity=4 .4 cfs
DIRECT ENTRY Obtain 5 minute Tt 3. 0
Total Length= 184 ft Total Tc= 5. 0
SUBCATCHMENT 1 RUNOFF
Parking Area in Front of Building
1 .3 AREA= .32 AC
1 .2 Tc= 5 MIN
I . 1 CN= 95
1 .0
9 SCS TR-20 METHOD
TYPE III 24-HOUR --
8 RAINFALL= 4.50 IN
.7
:3 .6 PEAK= 1 .38 CFS
CD .5 C 12.05 HRS
� 4 UOLUME= .09 AF
.3
.2
. 1
cv M v in W r m m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HjdroCAD 5 11 000899 (c). 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 2 Parking Area on North Side of Building
PEAK= .86 CFS @ 12 .05 HRS, VOLUME= .05 AF
PERCENT CN SCS TR-20 METHOD
59 .00 98 Paved Parking Area TYPE III 24-HOUR
41.00 74 Lawn / Landscaped Areas RAINFALL= 4 .50 IN
100 .00 88 TOTAL AREA = .23 AC SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Paved Surface Area •5
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.042 '/'
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Surface Area •4
Paved Kv=20 .3282 L=100' s=.042 '/' V=4.17 fps
DIRECT ENTRY Obtain 5 minute Tt 4. 1
Total Length= 150 ft Total Tc= 5.0
SUBCATCHMENT 2 RUNOFF
Parking Area on North Side of Building
.85
.80 LR AREA= .23 AC
.75 Tc= 5 MIN
.70 CN= 88
.65
.60 TR-20 METHOD
n .55 E III 24-HOUR
.50 FALL= 4.50 IN
.45
.40 - PEAK= .86 CFS
3 .35 @ 12.05 HRS
.30 OLUME= .05 AF
L 25
20
. 15
. 10
.05
0.00m N r� v in �o r co M m -
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD S -11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 2 24" RCP Pipe From CB#2 -- to --> DMH#1
Qin = .86 CFS @ 12 .05 HRS, VOLUME= .05 AF
Qout= . 81 CFS @ 12 .08 HRS, VOLUME= 05 AF, ATTEN= 60, LAG= 1.7 MIN
DEPTH END AREA DISCH
(FT) (SQ FT) (CFS)_ 24" PIPE STOR-IND+TRANS METHOD
PEAK DEPTH= 28 FT
0 .00 0 .00 0 .00
.20 .16 .36 n= .013 PEAK VELOCITY= 3 .0 FPS
.40 .45 1.52 LENGTH= 170 FT TRAVEL TIME = .9 MIN
.60 .79 3 .40 SLOPE= .0059 FT/FT SPAN= 10-20 HRS, dt= .OS HRS
1.40 2.35 14.55
1.60 2 .69 16.99
1.80 2 .98 18.52
1.88 3 .06 18.69
1.94 3 .11 18.52
2 .00 3 .14 17.38
REACH 2 INFLOW & OUTFLOW
24" RCP Pipe From CB#2 -- to --> DMH# 1
.85
.80 24" PIPE
.75 n=.013 L=17O' S=.0059
.70
.65 STOR-IND+TRANS METHOD
.60 UELOCITY= 3 FPS
,n .55 TRAVEL= .9 MIN
`- .50
U .45 Qin= .86 CFS
40 Qout= .81 CFS
: 35 LAG= 1 .7 MIN
0 .30
25
20
. 15
. 10
.05
0.00m LO �D r m m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
REACH 3 From DMH#1 --- to ---> DMH #3
Qin = 2 .17 CFS @ 12 .06 HRS, VOLUME= .14 AF
Qout= 2.09 CFS @ 12 .07 HRS, VOLUME= .14 AF, ATTEN= 30, LAG= 1 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 30" PIPE STOR-IND+TRANS METHOD
PEAK DEPTH= 48 FT
0 .00 0.00 0.00
25 .26 .54 n= .013 PEAK VELOCITY= 3 .2 FPS
.50 .70 2.27 LENGTH= 100 FT TRAVEL TIME = .5 MIN
.75 1.24 5.08 SLOPE= .004 FT/FT SPAN= 10-20 HRS, dt=.05 HRS
1.75 3 .67 21.72
2 .00 4.21 25.36
2 .25 4 .65 27.65
2 .35 4.79 27.90
2 .43 4.87 27.65
2 .50 4 .91 25.94
REACH 3 INFLOW & OUTFLOW
From DMH#1 --- to ---> DMH #3
2.0 30" PIPE
n=.013 L=100' 5=.004
1 .8
1 .6 STOR-IND+TRANS METHOD
UELOCITY= 3.2 FPS
LO 1 .4 TRAUEL= .5 MIN
4-
U 1 .2 Qin= 2. 17 CFS
1 ,0 Qout= 2.09 CFS
3 LAG= I MIN
O .8
J
V- 6
.4
.2
0.0 N r v Lo r m rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 7 Building Roof Area-Drain to Recharge Basin
PEAK= 1.16 CFS @ 12.05 HRS, VOLUME= .07 AF
PERCENT CN SCS TR-20 METHOD
100 .00 98 Roof Surface Area TYPE III 24-HOUR
TOTAL AREA = .26 AC RAINFALL= 4.50 IN
SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW From Roof Surface .2
Smooth surfaces n=.011 L=50 ' P2=3 .1 in s=.33
SHALLOW CONCENTRATED/UPLAND FLOW From Roof to Gutters & Leaders .1
Paved Kv=20 .3282 L=60' s=.33 '/' V=11.68 fps
CIRCULAR CHANNEL Roof Runoff to Below Grade Drain .8
12" Diameter a=.79 sq-ft Pw=3 .1' r=.25'
s=.006 '/' n=.011 V=4.15 fps L=200 ' Capacity=3 .3 cfs -
DIRECT ENTRY Obtain 5 minute Tt 3 .9
Total Length= 310 ft Total Tc= 5 .0
SUBCATCHMENT 7 RUNOFF
Building Roof Area-Drain to Recharge Basin
1 ' 1 AREA= .26 AC
1 .0 Tc= 5 MIN
.9 CN= 98
r, .8 SCS TR-20 METHOD 1
LO 7 TYPE III 24-HOUR -
U RAINFALL= 4 .50 IN
U 6
v
5 PEAK= 1 . 16 CFS
30 G 12.05 HRS
I '4 VOLUME= .07 AF
Ll- 3
.2
. 1
0.0m - cv M, v in oo m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,14A- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN 28 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
POND 2 Prop. Subsurface Recharge Facility
Qin = 1.16 CFS @ 12 .05 HRS, VOLUME= .07 AF
Qout= .51 CFS @ 12 .22 HRS, VOLUME= .06 AF, ATTEN= 560, LAG= 10.3 MIN
Qpri= .49 CFS @ 12 .22 HRS, VOLUME= .04 AF
Qsec= .02 CFS @ 10 .75 HRS, VOLUME= .02 AF
STOR-IND METHOD
ELEVATION AREA INC.STOR CUM.STOR PEAK STORAGE = 1368 CF
(FT) (SF) (CF) (Cr) 0 PEAK ELEVATION= 159 .8 FT
158.4 0 0
158.5 1000 50 50 FLOOD ELEVATION= 160 .6 FT
START ELEVATION= 158 .4 FT
159.3 1000 800 850 SPAN= 10-20 HRS, dt=.05 HRS
160 .6 1000 1300 2150 Tdet= 109. 8 MIN ( .06 AF)
# ROUTE INVERT OUTLET DEVICES
1 S 158.5 ' EXFILTRATION
Q= .02 CFS at and above 158.6'
2 P 159.3 ' 6" CULVERT
n=.013 L=45' S=.07331 /' Ke=.S Cc=.9 Cd=.6
Primary Discharge
I-2=Culvert
Secondary Discharge
L--1=Exfiltration
POND 2 INFLOW & OUTFLOW
Prop . Subsurface Recharge Facility
t . i STOR-IND METHOD
1 0 PEAK STOR= 1368 CF
PEAK ELEV= 159.8 FT
.9
8
Gin= 1 . 16 CFS
Gout= .51 CFS
4 7 Qpri= .49 CFS
U 6 Qsec= .02 CFS
LAG= 10.3 MIN
3 •5
0 4 �1
J
3 1
.2 i
ON M LO 00 Q
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
H droCAD 5.11 000899 c 1986-1999 Applied Microcomputer Systems._
REACH 7 From Recharge Facility to ---> Groundwater
Qin = .07 CFS @ 10 .80 HRS, VOLUME= .06 AF
Qout= .07 CFS @ 10 .85 HRS, VOLUME= .06 AF, ATTEN= 0%, LAG= 3 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 20 ' x 1' CHANNEL STOR-IND+TRANS METHOD
0 .00 0 .00 0.00 SIDE SLOPE= .5 PEAK DEPTH= Ol FT
.10 2 .02 .91 n= .5 PEAK VELOCITY= .4 FPS
.20 4 .08 2 .89 LENGTH= 2 FT TRAVEL TIME = .1 MIN
.30 6 .18 5.68 SLOPE= .5 FT/FT SPAN= 10-20 HRS, dt=.05 HRS
.43 8 .97 10.39
.60 12 .72 18.18
.80 17 .28 29.52
1.00 22 .00 43 .06
REACH 7 INFLOW & OUTFLOW
From Recharge Facility to ---> Groundwater
.070
.065 20' x 1 ' CHANN L
.060 SIDE SLOPE= .5 '/'
055 n=.5 L=2' S=.
.050 STOR-IND+TRANS METHO
045 VELOCITY= .4 FP
.040 TRAVEL= . 1 MI
U
035 Din= .07 CF
3 .030 Gout= .07 CFS
CD •025 LAG= 3 MIN
� .020
.015
.010
.005
0.00 N r l v Ln �'o r- m rn m
TIME (hours)
Data for ,OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5.11 000899 (c) . 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 3 Delivery / Service Area Behind Building
PEAK= .52 CFS @ 12 .07 HRS, VOLUME= .04 AF
SCS TR-20 METHOD
PERCENT CN
TYPE III 24-HOUR
85.00 98 Paved Surface Areas RAINFALL= 4.50 IN
15 .00 74 Lawn / Landscaped Areas SPAN= 10-20 HRS, dt=.05 HRS
100 .00 94 TOTAL AREA = .13 AC
Comment Tr- (min)
Method 5 4
TR-55 SHEET FLOW Over Landscaped Surface Area
P2=3 .1 in s=.06 '/ '
Grass: Dense n=.24 L=50' 7
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Surface Areas
Paved Kv=20 .3282 L=100' s=.013 '/' V=2.32 fps
CIRCULAR CHANNEL
12" RCP Drain From CB#3 to DMH#3 •7
12" Diameter a=.79 sq-ft Pw=3 .1' r=.25'
s=.007 ' / ' n=.013 V=3 .8 fps L=170' Capacity=3 cfs
Total Length= 320 ft Total Tc= 6.8
SUBCATCHMENT 3 RUNOFF
Delivery / Service Area Behind Building
.50 AREA= . 13 AC
45 Tc= 6.8 MIN
CN= 94
.40 "
.35 SCS TR-20 METHOD
LO TYPE III 24-HOUR
`+- .30 RAINFALL= 4.50 IN
u
.25 PEAK= .52 CFS
� 20 e 12.07 HRS
J VOLUME= .04 AF
15
. 10
.05
0.00 N v in �D r m m m
TIME (hours)
Data for 'OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H -droCAD 5 11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 4 Parking Area at southerly Side of Building
PEAK= .66 CFS @ 12 .05 HRS, VOLUME= .04 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
95.00 98 Paved Parking Areas RAINFALL= 4.50 IN
5.00 74 Lawn / Landscaped Areas SPAN= 10-20 HRS, dt=.05 HRS
100 .00 97 TOTAL AREA =
Tc min
Comment 8
Method Over Paved Surface Areas
TR-55 SHEET FLOW P2=3 .1 in s=.015 ' / '
Smooth surfaces n=.011 L=50' .3
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved P9arkking Areas fps
Paved KV=20.3282 L=50 ' s=.015 ' / ' 4 3 .9
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 100 ft Total Tc= 5 .0 -
SUBCATCHMENT 4 RUNOFF
Parking Area at Southerly Side of Building
65 AREA= . 15 AC
60 Tc= 5 MIN
55 CN= 97
.50 SCS TR-20 METHOD
r .45 TYPE III 24-HOUR
ti-
40 35 RAINFALL= 4.50 IN
30 PEAK= .66 CFS
:3 . C' 12.05 HRS
O 25 UOLUME= .04 AF
LL- 20
. 15
. 10
.05
0.00m N rn v to �D r ao m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA-'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5.11 000899 c 1986-1999 A lied Microcomputer Systems ..
SUBCATCHMENT 5 Paved Area Between Building and Main Entry
PEAK= .66 CFS @ 12 .05 HRS, VOLUME= .04 AF
SCS TR-20 METHOD
PERCENT CN
96 .00 98 Paved Driveway & Sidewalk Areas RAINFALL= .SO HOUR
4 .00 74 Lawn / Landscaped Areas SPAN= 10-20 HRS, dt=.05 HRS
100 .00 97 TOTAL AREA =
Tc min
Method SHEET FLOW Comment 7 -
Method Over Impervious Surfaces
smooth surfaces n=.011 L=50' P2=3.1 in s=.02 S
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Surfaces Areas
Paved Kv=20 .3282 L=80' s=.02 ' /' V=2.87 fps 3 .8
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 130 ft Total Tc= 5 .0
SUBCATCHMENT 5 RUNOFF
Paved Area Between Building and Main Entry
65 AREA= . 15 AC
60 Lr Tc= 5 MIN
.55 CN= 97
.50
SCS TR-20 METHOD
r .45 TYPE III 24=HOUR
4-
.40 AINFALL= 4.50 IN
U 35
30 PEAK= .66 CFS
e 12.05 HRS
O 25 VOLUME= .04 AF
� 20
. 15
. 10
.05
0.00m N v OD m mN
TIME (hours)
Data for "OSGOOD CROSSING" in North An over'MA-'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN 28 Aug 03
Prepared by Merrimack Engineering Services, Inc.
899 (c; 3.986-1999 A lied Microcomputer Systems
txVaroCAD 5 11 000
REACH 12
Flow through Oil / Grit Separator to DMH#5
Qin = 3 .34 CFS @ 12.19 HRS, VOLUME= .37 AF
Qout= 3 .34 CFS @ 12 .19 HRS, VOLUME= .37 AF, ATTEN= 0%, LAG= 0.0 MIN
DEPTH END AREA DISCH " STOR-IND+TRANS METHOD
(FT) (S -FT) (CFS) 12 PIPE PEAK DEPTH= .59 FT
0.00 0 .00 0 .00 PEAK VELOCITY= 6.9 FPS
.10 .04 .11 n= .013 TRAVEL TIME = 0 .0 MIN
.20 .11 .44 LENGTH= 4 FT
. SPAN= 10-20 HRS, dt=.05 HRS
30 .20 .99 SLOPE= .02 FT/FT
.70 .59 4.22
.80 .67 4.93
.90 .74 5.37
.94 .77 5.42
.97 .78 5 .37
1.00 .79 5.04
REACH 12 INFLOW & OUTFLOW
Flow through Oil / Grit Separator to DMH#5
3.2 12'' PIPE
3.0 n=.013 L=4' 5=.02
2.8
2.6 STOR-IND+TRANS METHOD
2.4 UELOCITY= 6.9 FPS
2.2 TRAUEL= 0 MIN
c� 2
1 ..0 Qin= 3.34 CFS
8
U
1 .6 Oout= 3.34 CFS
3 1 q LAG= 0 MIN
0 1 .2
lJi 1 .0
8
.6
.4
.2
0.0 N v in n r CC) m
CS)
TIME (hours)
"OSGOOD CROSSING" in North Andover,MA-'POST-DEV'
Data for r Storm)
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
D 5.11 000899 (c) 1986-1999 A lied Microcomputer Systems
H drOCA
SUBCATCHMENT 9
Area Along Barker's Property on North Side
PEAK= .27 CFS @ 12.08 HRS, VOLUME= .02 AF
SCS TR-20 METHOD
PERCENT CN Surface TYPE III 24-HOUR
14.00 98 Paved Roadway RAINFALL= 4 .50 IN
86 .00 74 Lawn / Landscap ed Areas SPAN= 10-20 HRS, dt=.05 HRS
100 .00 77 TOTAL AREA = .11 AC
Tc min
Comment 6 .3
Method Over Grassed & Mulched Surfaces
TR-55 SHEET FLOW
Grass: Dense n=.24 L=50' P2=3 .1 in Grass ass '/ '& Mulch to Exist. CB 4
SHALLOW CONCENTRATED/UPLAND FLOW Over
04 ' ' V=3 fps
Grassed Waterway
Kv=15 L=70' s-. / ---- 6 .7--
Total Length= 120 ft Total Tc=
SUBCATCHMENT 9 RUNOFF
Area Along Barker' s Property on North Side
.26 AREA= . 11 AC
.24 Tc= 6.7 MIN
.22 CN= 77
.20 SCS TR-20 METHOD
18 TYPE III 24-HOUR
c} 16 RAINFALL= 4.50 IN
U 14
PEAK= .27 CFS
12 12.08 HRS
p . 10 UOLUME= .02 AF
—j .08
LL
.06
.04
.02
0.00m N r v U r m rn mN
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA-'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 A lied Microcomputer Systems
REACH 11 Flow From <9> -- to --> Design Point #1
Qin = .27 CFS @ 12 .08 HRS, VOLUME= .02 AF
Qout= .27 CFS @ 12.08 HRS, VOLUME= .02 AF, ATTEN= 0%, LAG= 0 . 0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 48" PIPE STOR-IND+TRANS METHOD
PEAK DEPTH= 01 FT
0 .00 0 .00 0.00
.40 .65 12.33 n= .01 PEAK VELOCITY= 18.9 FPS
.80 1.79 51.71 LENGTH= 4 FT TRAVEL TIME = 0 .0 MIN
1.20 3 .17 115.64 SLOPE= .1 FT/FT SPAN= 10-20 HRS, dt= .05 HRS
2 .80 9 .40 494.40
3 .20 10 .78 577.21
3 .60 11.91 629.37
3 .76 12 .26 635.20
3 .88 12 .46 629.34
4.00 12 .57 590.51
REACH 11 INFLOW & OUTFLOW
Flow From <9> -- to --> Design Point #1
.26 48" PIPE
24 n= .01 L=4' S=. 1
.22
20 STOR-IND+TRANS METHOD
r, 16 VELOCITY= 18.9 FPS
TRAVEL= 0 MIN
4- 16
U 14 Din= .27 CFS
12 Gout= .27 CFS
O 10 LAG= 0 MIN
�
08
06
04
.02
0.00m N f9 00 M m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV,
TYPE III 24-HOUR RAINFALL= 4.50 IN (10 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 15 Flow to Exist.CB in Grass Area @ Barker St
Qin = 1.64 CFS @ 12 .05 HRS, VOLUME= .10 AF
Qout= 1.64 CFS @ 12.05 HRS, VOLUME= .10 AF, ATTEN= 0%, LAG= 0 . 0 MIN
DEPTH END AREA DISCH
(FT) (SO-FT) (CFS) 48" PIPE STOR-IND+TRANS METHOD
0.00 0.00 0 .00 PEAK DEPTH= .03 FT
.40 .65 21.21 n= .013 PEAK VELOCITY= 32 .4 FPS
.80 1.79 88 .95 LENGTH= 4 FT TRAVEL TIME = 0 . 0 MIN
1.20 3 .17 198.91 SLOPE= .5 FT/FT SPAN= 10-20 HRS, dt=.05 HRS
2.80 9.40 850.39
3 .20 10.78 992 .82
3 .60 11.91 1082 .54
3 .76 12.26 1092.58
3 .88 12 .46 1082 .49
4.00 12.57 1015.71 -
REACH 15 INFLOW & OUTFLOW
Flow to Exist . CB in Grass Area @ Barker St
1 .6
1 .5 48" PIPE
1 .4 n=.013 L=4' S=.5
1 .3
1 .2 STOR-IND+TRANS METHOD
1 . 1 UELOCITY= 32.4 FPS
Cf- 1 .0 TRAVEL= 0 MIN
U .9
.8 Qin= 1 .64 CFS
3 .7 Qout= 1 .64 CFS
O .6 LAG= 0 MIN
J 5
LL .4
.3
.2
. 1
0.0m N M v in �D r Co M m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 4.50 IN 28 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD 5 .11 000899 (c).1986-1999.. Applied Microcomputer Systems
REACH 16 Summary of Flow to Design Points #1,2,3 &4
Qin = 4.71 CFS @ 12 .09 HRS, VOLUME= .49 AF
Qout= 4 .71 CFS @ 12 .09 HRS, VOLUME= .49 AF, ATTEN= Oo, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SQ-FT) (CFS) 10' x 1' CHANNEL STOR-IND+TRANS METHOD
0.00 0.00 0.00 SIDE SLOPE= .1 ' /' PEAK DEPTH= .12 FT
PEAK VELOCITY= 3 .5 FPS
.10 1.10 3 .32 n= .Ol TRAVEL TIME = 0 .0 MIN
.20 2 .40 11.00 LENGTH= 1 FT SPAN= 10-20 HRS, dt=.05 HRS
.30 3 .90 22 .59 SLOPE= .01 FT/FT
.43 6.15 43.62
.60 9.60 81.92
.80 14.40 144.02
1.00 20 .00 226.30
REACH 16 INFLOW & OUTFLOW
Summary of Flow to Design Points # 1 , 2, 3 &4
4.5 10' x 1 ' CHANNEL
4.0 SIDE SLOPE= . 1 '/'
n=.01 L=1 ' S=.01
3.5
_ STOR-IND+TRANS METHOD
m 3.0 UELOCITY= 3.5 FPS
c+- TRAUEL= 0 MIN
U 2.5
Gin= 4.71 CFS
3 2.0 Gout= 4.71 CFS
0 LAG= 0 MIN
-J 1 .5
L_
1 .0
.5
0.00 CV M V U rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 1 Parking Area in Front of Building
PEAK= . 92 CFS @ 12 .05 HRS, VOLUME= .06 AF
PERCENT CN SCS TR-20 METHOD
87 .00 98 Pavement Surface Area TYPE III 24-HOUR
13 .00 74 Lawn / Landscaped Areas RAINFALL= 3 .10 IN
100 .00 95 TOTAL AREA = .32 AC SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Paved Parking Area 1 .0
Smooth surfaces n=.011 L=50 ' P2=3 .1 in s=.008 '/ '
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Parking Area to CB#1 .9
Paved Kv=20 .3282 L=100' s=.008 ' /' V=1.82 fps
CIRCULAR CHANNEL Flow From CB#1 --to--> DMH#1 .1
12" Diameter a=.79 sq-ft Pw=3 .1' r=.25'
s=.015 /' n=.013 V=5 .56 fps L=34' Capacity=4.4 cfs --
DIRECT ENTRY Obtain 5 minute Tt 3 .0
Total Length= 184 ft Total Tc= 5.0
SUBCATCHMENT 1 RUNOFF
Parking Area in Front of Building
.90
.85 AREA= .32 AC
.80 Tc= 5 MIN
.75 CN= 95
.70
65 SCS TR-20 METHOD
j .60 TYPE III 24-HOUR
c,_ .55
u .50 RAINFALL= 3. 10 IN
.45
3 •40 PEAK= .92 CFS
p .35 e 12.05 HRS
J .30 UOLUME= .06 AF
ll- .25
.20
15
. 10
.05
0.00" N M V' In �D 00 M C9 -
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'r Storm)
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 Y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcom uter Systems
SUBCATCHMENT 2
Parking Area on North Side of Building
PEAK= .52 CFS @ 12 .05 HRS, VOLUME= .03 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
59 .00 98 Paved Parking Area RAINFALL= 3 .10 IN
41.00 74 Lawn / Landscaped A2eass SPAN= 10-20 HRS, dt=.05 HRS
100 .00 88 TOTAL AREA =
Comment Tr-
Method min
5
TR-55 SHEET FLOW Over Paved Surface Area
Smooth surfaces n=.011 L=50' P2=3.1 in s=.042 '/' 4
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Surface Area
Paved Kv=20 .3282 L=100' s=.042 '/ ' V=4.17 fps
Obtain 5 minute Tt 4.1
DIRECT ENTRY ----------
Total Length= 150 ft Total Tc= 5 .0 -
SUBCATCHMENT 2 RUNOFF
Parking Area on North Side of Building
.50 AREA= .23 AC
45 Tc= 5 MIN
CN= 88
.40
SCS TR-20 METHOD
.35 TYPE III 24-HOUR
`} 30 RAINFALL= 3. 10 IN
u
.25 PEAK= .52 CFS
12.05 HRS
o .20 VOLUME= .03 AF
� . 15
. 10
.05
0.000 N m v in -n rn 0
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5.11 000899 c 1986-1999 Applied Microcomputer Systems
REACH 2 24" RCP Pipe From CB#2 -- to --> DMH#1
Qin = 52 CFS @ 12.05 HRS, VOLUME= .03 AF
Qout= .49 CFS @ 12 .09 HRS, VOLUME= .03 AF, ATTEN= 6%, LAG= 2 .1 MIN
DEPTH END AREA DISCH STOR-IND+TRANS METHOD
(FT) (SQ-FT) (CFS) 24 ' PIPE PEAK DEPTH= .23 FT
0.00 0 .00 0 .00 PEAK VELOCITY= 2 .6 FPS
.20 .16 .36 n= .013
1.52 LENGTH= 170 FT TRAVEL TIME = 1.1 MIN
.40 •45 SPAN=
10-20 HRS, dt=.05 HRS
.60 .79 3 .40 SLOPE= .0059 FT/FT
1.40 2 .35 14.55
1.60 2 .69 16.99
1. 80 2 .98 18.52
1.88 3 .06 18 .69
1.94 3 .11 18.52 ---
2 .00 3 .14 17.38
REACH 2 INFLOW & OUTFLOW
24'' RCP Pipe From CB#2 -- to --> DMH# 1
.50 24'' PIPE
45 n=.013 L=170' S=.0059
.40 STOR-IND+TRANS METHOD
UELOCITY= 2.6 FPS
.35 TRAUEL= 1 . 1 MIN
t
ti-- .30
U Din= .52 CFS
J .25 Gout= .49 CFS
20 LAG= 2. 1 MIN
. 15
. i0
.05
0.00m N i v in -,D r w m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'r Storm)
TYPE III 24-HOUR RAINFALL= 3.10 IN Inc y 25 Aug 03
Prepared by Merrimack Engineering Services,
H droCAD 5.11 000899 c 1986-1999 Applied Microcomputer Systems
REACH 3 From DMH#1 --- to ---> DMH #3
Qin = 1.39 CFS @ 12.06 HRS, VOLUME= .09 AF
Qout= 1.33 CFS @ 12 .08 HRS, VOLUME= .09 AF, ATTEN= 40, LAG= 1.1 MIN
DEPTH END AREA DISCH STOR-IND+TRANS METHOD
(FT) (SQ-FT) (CFS) 30" PIPE PEAK DEPTH= .37 FT
0 .00 0 .00 0.00
54 n= .013 PEAK VELOCITY= 2 .9 FPS
•25 •26
.50 .70 2 .27 LENGTH= 100 FT TRAVEL TIME _ .6 MIN
.75 1.24 5.08 SLOPE= .004 FT/FT SPAN= 10-20 HRS, dt=.05 HRS
1.75 3 .67 21.72
2.00 4 .21 25.36
2 .25 4 .65 27 .65
2.35 4 .79 27.90
2.43 4 .87 27 .65
2.50 4.91 25.94
REACH 3 INFLOW & OUTFLOW
From DMH# 1 --- to ---> DMH #3
1 .3 30'' PIPE
1 .2 n=.013 L=100' 5=.004
1 . 1 STOR-IND+TRANS METHOD
1 .0 VELOCITY= 2.9 FPS
9 TRAVEL= .6 MIN
�+- .8
U 7 Qin= 1 .39 CFS
Qout= 1 .33 CFS
3 •6 LAG= 1 . 1 MIN
o .5
J 4
L�
.3
.2
. 1
0.. N r v to r m rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD S .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 7 Building Roof Area-Drain to Recharge Basin
PEAK= .79 CFS @ 12 .05 HRS, VOLUME= .05 AF
PERCENT CN SCS TR-20 METHOD
100 .00 98 Roof Surface Area TYPE III 24-HOUR
TOTAL AREA = .26 AC RAINFALL= 3 .10 IN
SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW From Roof Surface •2
Smooth surfaces n=.011 L=50 ' P2=3.1 in s=.33
SHALLOW CONCENTRATED/UPLAND FLOW From Roof to Gutters & Leaders .1
Paved Kv=20 .3282 L=60 ' s=.33 1/1 V=11.68 fps
CIRCULAR CHANNEL Roof Runoff to Below Grade Drain .8
12" Diameter a=.79 sq-ft Pw=3 .1' r=.25'
s=.006 ' /' n=.011 V=4.15 fps L=200' Capacity=3 .3 cfs
DIRECT ENTRY Obtain 5 minute Tt 3 .9
Total Length= 310 ft Total Tc= 5.0
SUBCATCHMENT 7 RUNOFF
Building Roof Area-Drain to Recharge Basin
.75 AREA= .26 AC
.70 Tc= 5 MIN
65 CN= 98
.60
.55 SCS TR-20 METHOD
LO .50 TYPE III 24-HOUR
`-'- .45 RAINFALL= 3. 10 IN
U
.40
35 PEAK= .79 CF5
0 30 C 12.05 HRS
-J 25 UOLUME= .05 AF
Ll-
.20
. 15
. 10
.05
0.00m M v in �0 r CD M m
n1
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN
Prepared by Merrimack Engineering Services, Inc. 28 Aug 03
HydroCAD 5 11 000899 (c) 1986-1999 Applied Microcomputer Systems
POND 2 Prop. Subsurface Recharge Facility
Qin = .79 CFS @ 12 .05 HRS, VOLUME= .05 AF
Qout= .21 CFS @ 12.39 HRS, VOLUME= .03 AF, ATTEN= 73%, LAG= 20.6 MIN
Qpri= .19 CFS @ 12.39 HRS, VOLUME= .02 AF
Qsec= .02 CFS @ 11.05 HRS, VOLUME= .02 AF
ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD
(FT) (SF) (CF) (CF) PEAK STORAGE = 1118 CF
158 .4 0 0 0 PEAK ELEVATION= 159.6 FT
158 .5 1000 50 50 FLOOD ELEVATION= 160.6 FT
159.3 1000 800 850 START ELEVATION= 158.4 FT
160.6 1000 1300 2150 SPAN= 10-20 HRS, dt=.05 HRS
Tdet= 147 .7 MIN ( .03 AF)
# ROUTE INVERT OUTLET DEVICES
1 S 158.5' EXFILTRATION
Q= .02 CFS at and above 158.6'
2 P 159.3 ' 6" CULVERT
n=.013 L=45' S=.07331/' Ke=.5 Cc=.9 Cd=.6
Primary Discharge
�-2=Culvert
Secondary Discharge
�1=Exfiltration
POND 2 INFLOW & OUTFLOW
Prop , Subsurface Recharge Facility
.75 STOR-IND METHOD
.70 PEAK STOR= 1118 CF
.65 PEAK ELEU= 159.6 FT
.68
.55 Qin= .79 CFS
LO .50 Qout= .21 CFS
U
.45 Qpri= . 19 CFS
.40 Qsec= .02 CFS
.35 LAG= 20.6 MIN
o .30
J .25
LL
20
I5
0 -
-
.05 ;- -- ---
m N M V' to w r of m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5.11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 7 From Recharge Facility to ---> Groundwater
Qin = .07 CFS @ 11.45 HRS, VOLUME= 05 AF
Qout= .07 CFS @ 11.55 HRS, VOLUME= .05 AF, ATTEN= 0%, LAG= 6.1 MIN
DEPTH END AREA DISCH
(FT) Q-FT) (CFS) 20 ' x 1' CHANNEL STOR-IND+TRANS METHOD
0 .00 0 .00 0. 00 SIDE SLOPE= .5 '/' PEAK DEPTH= . 01 FT
.10 2 .02 .91 n= .5 PEAK VELOCITY= .4 FPS
.20 4 .08 2.89 LENGTH= 2 FT TRAVEL TIME = .1 MIN
.30 6.18 5.68 SLOPE= .5 FT/FT SPAN= 10-20 HRS, dt=.05 HRS
.43 8.97 10.39
.60 12.72 18.18
.80 17.28 29.52
1.00 22 .00 43.06
REACH 7 INFLOW 8 OUTFLOW
From Recharge Facility to ---> Groundwater
.070
.065
.060 20' x I 't L
SIDE SLOPE '
.055 n=.5 L5
_ .050
.045 STOR-IND+TRAND
040 VELOCITYS
TRAVELN
.035
� .030 Din= S 1 .025 Gout=L .020 LAG=
.015
.010
.005
0.000
Ln tD h N Q)
- � N
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 3 Delivery / Service Area Behind Building
PEAK= .34 CFS @ 12 .07 HRS, VOLUME= .02 AF
PERCENT CN SCS TR-20 METHOD
85 .00 98 Paved Surface Areas TYPE III 24-HOUR
15 .00 74 Lawn / Landscaped Areas RAINFALL= 3 .10 IN
100 .00 94 TOTAL AREA = .13 AC SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc (min)
TR-55 SHEET FLOW Over Landscaped Surface Area 5.4
Grass: Dense n=.24 L=50' P2=3 .1 in s=.06 '/ '
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Surface Areas .7
Paved Kv=20.3282 L=7.00' s=.013 '/ ' V=2 .32 fps
CIRCULAR CHANNEL 12" RCP Drain From CB#3 to DMH#3 .7
12" Diameter a=.79 sq-ft Pw=3 .1' r=.25'
s=.007 '/' n=.013 V=3 .8 fps L=170' Capacity=3 cfs ---
Total Length= 320 ft Total Tc= 6.8
SUBCATCHMENT 3 RUNOFF
Delivery / Service Area Behind Building
.34
.32 AREA= . 13 AC
.30 Tc= 6.8 MIN
.28
.26 CN= 94
_ .24 SCS TR-20 METHOD
o .22 TYPE III 24-HOUR
u .28 RAINFALL= 3. 10 IN -
. 16 PEAK= .34 CFS
0 . 12 @ 12.07 HRS
Li- 10 VOLUME= .02 AF
08
.06
.04
.02
0.00m cv r� v in � m rn m
N
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 4 Parking Area at Southerly Side of Building
PEAK= .45 CFS @ 12.05 HRS, VOLUME= .03 AF
PERCENT CN SCS TR-20 METHOD
95. 00 98 Paved Parking Areas TYPE III 24-HOUR
5. 00 74 Lawn / Landscaped Areas RAINFALL= 3 .10 IN
100.00 97 TOTAL AREA = .15 AC SPAN= 10-20 HRS, dt=.05 HRS
Method Comment Tc min
TR-55 SHEET FLOW Over Paved Surface Areas .8
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.015 '/'
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Parking Areas 3
Paved Kv=20.3282 L=50' s=.015 '/' V=2 .49 fps
DIRECT ENTRY Obtain 5 minute Tt
3 .9
Total Length= 100 ft Total Tc= 5.0
SUBCATCHMENT 4 RUNOFF
Parking Area at Southerly Side of Building
.45
.40 AREA= . 15 AC
Tc= 5 MIN
.35 CN= 97
LO
.30 SCS TR-20 METHOD
U 25 TYPE III 24-HOUR
RAINFALL= 3. 10 IN
3 '20 PEAK= .45 CFS
Jo 15 @ 12.05 HRS -
LL VOLUME= .03 AF
. 10
.05
0.00m _ �, v
cc) m m Ln
N
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 :Applied Microcomputer Systems
SUBCATCHMENT 5 Paved Area Between Building and Main Entry
PEAK= .45 CFS @ 12 .05 HRS, VOLUME= .03 AF
SCS TR-20 METHOD
PERCENT CN
96 .00 98 Paved Driveway & Sidewalk Areas RAINFALL=24 3 .10-HOUIN
4 .00 74 Lawn / Landscaped Areas SPAN= 10-20 HRS, dt=.05 HRS
100.00 97 TOTAL AREA =
15 AC
Comment Tc min
Method .7
TR-55 SHEET FLOW Over Impervious Surfaces
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.02 ' s Areas 5
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Sufaces
Paved Kv=20.3282 L=80 ' s=.02 '/' V=2 .87 fps 3 .8
DIRECT ENTRY Obtain 5 minute Tt
--------=-
Total Length= 130 ft Total Tc= 5 .0-
SUBCATCHMENT 5 RUNOFF
Paved Area Between Building and Main Entry
.45
AREA= . 15 AC
.40 Tc= 5 MIN
CN= 97
.35
SCS TR-20 METHOD
LO .30 TYPE III 24-HOUR
25 RAINFALL= 3. 10 IN
20 PEAK= .45 CFS
3 @ 12.05 HRS
0 15 VOLUME= .03 AF
It
. 10
.05
0.00m N rn V in -,D r 0D m CD
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA-'POST-DEV'r Storm)
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 Y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
-1999 A lied Microcom
H droCAD 5 .11 000899 c 1986
uter Systems
SUBCATCHMENT 6 Area Along Rte 125 in Front of Building
PEAK= .66 CFS @ 12 .05 HRS, VOLUME= .04 AF
SCS TR-20 METHOD
PERCENT CN
65 .00 98 Road Widening & Driveway Pavem't RAINFALL=23 .l0UIN
35 .00 74 Lawn / Landscaped Areas SPAN- 10_20 HRS, dt=.05 HRS
100 .00 90 TOTAL AREA =
Tc min
Method Comment 7
TR-55 SHEET FLOW Over Paved Road Surfaces
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.02 ' /' 2
SHALLOW CONCENTRATED/UPLAND FLOW Over Paved Surfaces
Paved Kv=20 .3282 L=30' s=.01 ' /' V=2 .03 fps 1.3
CHANNEL FLOW Along Gutter Toard CB#6
a=.4 sq-ft Pw=6.4' r=.063'
s=.015 ' /' n=.012 V=2 .39 fps L=180' Capacity=l cfs 1
CIRCULAR CHANNEL 12" RCP Drain From CB#6 to DMH#4
12" Diameter a=.79 sq-ft Pw=3 .1' r=.25'
S=.01 '/ ' n=.013 V=4 .54 fps L=24' Capacity=3 .6 cfs 2 .7
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 284 ft Total Tc= 5.0
SUBCATCHMENT 6 RUNOFF
Area Along Rte 125 in Front of Building
.65 AREA= .27 AC
.60 Tc= 5 MIN
.55 CN= 90
.50
45 SCS TR-20 METHOD
TYPE III 24-HOUR
C+_ 40 RAINFALL= 3. 10 IN
35
30 PEAK= .66 CFS
12.05 HRS
O .25 VOLUME= .04 AF
-J
LL 20
15
10
.05
0.000 - N f*1 Q In OD D) N
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN
Prepared by Merrimack Engineering Services, Inc. 28 Aug 03
HydroCAD 5 .11 000899 (c) 1986-1999 Applied Microcomputer Systems
POND 1 Concrete Pipe System for Runoff Storage
Qin = 3 .21 CFS @ 12 .06 HRS, VOLUME= .23 AF
Qout= 2 .42 CFS @ 12 .15 HRS, VOLUME= .23 AF, ATTEN= 25%, LAG= 5 .0 MIN
Qpri= 2.42 CFS @ 12.15 HRS, VOLUME= .23 AF
Qsec= 0.00 CFS @ 0.00 HRS, VOLUME= 0.00 AF
ELEVATION AREA INC.STOR CUM.STOR STOR-IND METHOD
(FT) (SF) (CF) (CF) PEAK STORAGE = 550 CF
154 .9 0 0 0 PEAK ELEVATION= 156.8 FT
155.2 100 15 15 FLOOD ELEVATION= 160.1 FT
155 .8 200 90 105 START ELEVATION= 154.9 FT
156.8 700 450 555 SPAN= 10-20 HRS, dt=.05 HRS
157.8 700 700 1255 Tdet= 1.5 MIN ( .23 AF)
158 .5 300 350 1605
158.8 120 63 1668
159.3 120 60 1728
159.9 3500 1086 2814
160 .1 5000 8S0 3664
# ROUTE INVERT OUTLET DEVICES
1 P 154.9' 6" CULVERT X 2
n=.013 L=4 ' S=.0251/ ' Ke=.5 Cc=.9 Cd=.6
2 S 159.9' 175 DEG V-NOTCH WEIR
Q=2 .46 TAN(Theta/2) H^2 .5
Primary Discharge
1-1=Culvert
Secondary Discharge
�-2=V-Notch/Trap Weir
POND 1 INFLOW & OUTFLOW
Concrete Pipe System for Runoff Storage
3.2
3.0 STOR-IND METHOD
2.8 PEAK STOR= 550 CF
2.6 PEAK ELEU= 156.8 FT
2.4
2.2 Qin= 3.21 CFS
2.0 Qout= 2.42 CFS -
U 1 .8 Qpri= 2.42 CFS
1 .6 Qsec= 0.00 CF5
3 1 .4 i LAG= 5 MIN
O 1 .2 i
-j 1 .0
8
.6
.4
2
0.0C N M V Ln M Q) m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA-'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN 28 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD S-11 000899 (c) 1986-1999 Lipplied Microcomputer Systems
REACH 12 Flow through Oil / Grit Separator to DMH#5
Qin = 2 .42 CFS @ 12 .15 HRS, VOLUME= .23 AF
Qout= 2 .42 CFS @ 12 .15 HRS, VOLUME= .23 AF, ATTEN= 0%, LAG= 0 .0 MIN
DEPTH END AREA DISCH
(FT) (SO-FT) (CFS) 12" PIPE STOR-IND+TRANS METHOD
0 .00 0 .00 0 .00 PEAK DEPTH= .48 FT
PEAK VELOCITY= 6 .5 FPS
10 .04 .11 n= .013
20 .11 .44 LENGTH= 4 FT TRAVEL TIME = 0.0 MIN
.30 .20 .99 SLOPE= .02 FT/FT SPAN= 10-20 HRS, dt=.05 HRS
.70 .59 4.22
.80 .67 4 .93
.90 .74 5 .37
.94 .77 5.42
.97 .78 5.37
1.00 .79 5.04
REACH 12 INFLOW & OUTFLOW
Flow through Oil / Grit Separator to DMH#5
2.4
12" PIPE
2.2 n=.013 L=4' S=.02
2.0
1 8 STOR-IND+TRANS METHOD
VELOCITY= 6.5 FPS
1 .6 TRAVEL= 0 MIN
U 1 .4 Gin= 2.42 CFS
1 .2 Qout= 2.42 CFS
:3 1 .0 LAG= 0 MIN
O 8
.6
4
.2
0.0m N m v in n r oo rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5.11 000899 c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 9 Area Along Barker's Property on North Side
PEAK= .14 CFS @ 12 .08 HRS, VOLUME= .01 AF
PERCENT CN SCS TR-20 METHOD
14 .00 98 Paved Roadway Surface TYPE III 24-HOUR
RAINFALL= 3 .10 IN
86 .00 74 Lawn / Landscaped Areas SPAN= 10-20 HRS, dt=.05 HRS
100 .00 77 TOTAL AREA = .11 AC
Method
Comment Tc (min)
TR-55 SHEET FLOW Over Grassed & Mulched Surfaces 6.3
Grass: Dense n=.24 L=50' P2=3.1 in s=.04 ' / ' 4
SHALLOW CONCENTRATED/UPLAND FLOW Over Grass & Mulch to Exist. CB
Grassed Waterway Kv=15 L=70' s=.04 '/' V=3 fps
Total Length= 120 ft Total Tc= 6 .7
SUBCATCHMENT 9 RUNOFF
Area Along Barker' s Property on North Side
. 13 AREA= . 11 AC
. 12 Tc= 6.7 MIN
. 11 CN= 77
. 10
SCS TR-20 METHOD
LO .09 TYPE III 24-HOUR
C, 08 RAINFALL= 3. 10 IN
e7
v PEAK= . 14 CFS
0 05 C� 12.08 HRS
J U0 UME= .01 AF
04
03
.02
.01
0.00m cv v to co m m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm)
Prepared by Merrimack Engineering Services, Inc. 25 Aug 03
HydroCAD 5 11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 11 Flow From <9> -- to --> Design Point #1
Qin = .14 CFS @ 12.08 HRS, VOLUME= .01 AF
Qout= .14 CFS @ 12.08 HRS, VOLUME= .01 AF, ATTEN= 0%, LAG= 0.0 MIN
DEPTH END AREA DISCH
(FT) (S -FT) (CFS) 48" PIPE STOR-IND+TRANS METHOD
0 .00 0.00 0.00 PEAK DEPTH= 0 . 00 FT
.40 .65 12 .33 n= .01 PEAK VELOCITY= 18 .9 FPS
.80 1.79 51.71 LENGTH= 4 FT TRAVEL TIME = 0 .0 MIN
1.20 3.17 115.64 SLOPE= .1 FT/FT SPAN= 10-20 HRS, dt=.05 HRS
2 .80 9.40 494.40
3 .20 10.78 577.21
3 .60 11.91 629.37
3 .76 12.26 635.20
3 .88 12.46 629.34
4.00 12.57 590.51
REACH 11 INFLOW & OUTFLOW
Flow From <9> -- to --> Design Point # 1
. 13
12 46" PIPE
n=.01 L=4' S=. 1
. 11
. 10 STOR-IND+TRANS METHOD
UELOCITY= 18.9 FPS
.98 TRAUEL= 0 MIN
U 07 Din= . 14 CFS
U
.06 Qout= . 14 CFS
3
0 05 LAG= 0 MIN
� 04
.03
.02
.01
0.00m N M IT in ID r m m m
N
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'r Storm)
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 Y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5.11 000899 c 1986-1999 Applied Microcomputer Systems.
SUBCATCHMENT 8 Barker Street (Paved) & Road Shoulder
PEAK= .80 CFS @ 12 .05 HRS, VOLUME= .05 AF
SCS TR-20 METHOD
PERCENT CN TYPE III 24-HOUR
60.00 98 Paved Surface Area .10 IN
3
=
40.00 74 Lawn / Landscaped Areas SPAN=RAINFALL= 3 HRS, dt=.05 HRS
100.00 88 TOTAL AREA = .35 AC
Comment
Tr (min)
Method 7
TR-55 SHEET FLOW Over Paved Surfaces
Smooth surfaces n=.011 L=50 ' P2=3 .1 in s=.02 ' / ' 2 9
SHALLOW CONCENTRATED/UPLAND FLOW Along Gutter in Barker Street
Paved Kv=20 .3282 L=500' s=.02 1 / ' V 5 2.87 fn Tt s 1.4
DIRECT ENTRY ----------
Total Length= 550 ft Total Tc= 5.0 -
SUBCATCHMENT 8 RUNOFF
Barker Street (Paved) & Road Shoulder
.80
75 AREA= .35 AC
70 Tc= 5 MIN
.65 CN= 88
.60
55 SCS TR-20 METHOD
.50 TYPE III 24-HOUR
C4- 45 RAINFALL= 3. 10 IN
.40
`J PEAK= .80 CFS !?__
.35 C 12.05 HRS
CD .30 VOLUME= .05 AF
.J .25
LL- .20
, 15
. 10
.05
Ln ,D r m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,MA- 'POSStorm)
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 Y 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
H droCAD 5 .11 000899 c 1986-1999 Applied Microcomputer Systems
SUBCATCHMENT 10 Paved and Grass Area at Road Intersection
PEAK= .21 CFS @ 12 .05 HRS, VOLUME= .01 AF
SCS TR-20 METHOD
PERCENT CN
77.00 98 Paved Roadway Surface TYPE III 24-HOUR
.10 IN
3
=
23 .00 74 Lawn / Landscaped Areas SPAN=RAINFALL= 3 HRS, dt= .05 HRS
100 .00 92 TOTAL AREA = .08 AC
Comment Tc (min)
Method 9
TR-55 SHEET FLOW Over Paved Roadway Surface
Smooth surfaces n=.011 L=50' P2=3 .1 in s=.01
SHALLOW CONCENTRATED/UPLAND FLOW From Gutter toGrassArea to CB 1.1
Grassed Waterway Kv=15 L=100' s=.01 ' /' l fps 3 .0
DIRECT ENTRY Obtain 5 minute Tt
Total Length= 150 ft Total Tc= 5 .0
SUBCATCHMENT 10 RUNOFF
Paved and Grass Area at Road Intersection
20 AREA= .08 AC
18 Tc= 5 MIN
CN= 92
. 16
SCS TR-20 METHOD
14 TYPE III 24-HOUR
4 12 RAINFALL= 3. 10 IN
U
. 10 PEAK= .21 CFS
0 08 @ 12.05 HRS
UOLUME= .01 AF
06
.04
.02
0.00m N m v in �n 0D rn m
TIME (hours)
Data for ,OSGOOD CROSSING" in North Andover,MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN ( 2 yr Storm) 25 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD 5 11 000899 (c) 1986-1999 Applied Microcomputer Systems
REACH 15 Flow to Exist.CB in Grass Area @ Barker St
Qin = 1.01 CFS @ 12 .05 HRS, VOLUME= .06 AF
Qout= 1.01 CFS @ 12 .05 HRS, VOLUME= .06 AF, ATTEN= 00, LAG= 0 .0 MIN
DEPTH END AREA DISCH
„ STOR-IND+TRANS METHOD
(FT) (SO-FT) (CFS) 48 PIPE PEAK DEPTH= .02 FT
0 .00 0 .00 0.00
PEAK VELOCITY= 32 .4 FPS
.40 .65 21.21 n= .013 TRAVEL TIME = 0.0 MIN
.80 1.79 88.95 LENGTH= 4 FT SPAN= 10-20 HRS, dt=.05 HRS
1.20 3 .17 198 .91 SLOPE= .5 FT/FT
2 .80 9 .40 850 .39
3 .20 10 .78 992 .82
3 .60 11.91 1082 .54
3 .76 12 .26 1092 .58
3 .88 12 .46 1082 .49
4.00 12 .57 1015 .71
REACH 15 INFLOW & OUTFLOW
Flow to Exist . CB in Grass Area @ Barker St
1 .0
48'' PIPE
9 n=.013 L=4' S=.5
.8 STOR-IND+TRANS METHOD
r, .7 VELOCITY= 32.4 FPS
TRAVEL= 0 MIN
c_. .6
U Gin= 1 .01 CFS
•5 Qout= 1 .01 CFS
3 4 LAG= 0 MIN
O
J 3
Ll- 2
I
0.0m N r t v �n r Co rn m
TIME (hours)
Data for "OSGOOD CROSSING" in North Andover,
MA- 'POST-DEV'
TYPE III 24-HOUR RAINFALL= 3.10 IN 28 Aug 03
Prepared by Merrimack Engineering Services, Inc.
HydroCAD 5 .11 000899 (c) 1986-1999 Applied microcomputer Systems
REACH 16 Summary of Flow to Design Points #1,2,3 &4
Qin = 3 .33 CFS @ 12.09 HRS, VOLUME= .31 AF, ATTEN= 0%, LAG= 0 .0 MIN
Qout= 3 .33 CFS @ 12 .09 HRS, VOLUME=
DEPTH END AREA DISCH STOR-IND+TRANS METHOD
(FT) (SQ-FT) (CFS) 10' x 1' CHANNEL 1 PEAK DEPTH=
.10 FT
0 .00 0 .00 0 .00 SIDE SLOPE=
� / �
3 .32 n= .01 PEAK VELOCITY= 3 .0 FPS
.10 1.10 TRAVEL TIME = 0 .0 MIN
20 2 .40 11.00 LENGTH= 1 FT
.30 3 .90 22 .59 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=.05 HRS
.43 6 .15 43 .62
.60 9 .60 81.92
.80 14 .40 144 .02
1.00 20 .00 226.30
REACH 16 INFLOW & OUTFLOW
Summary of Flow to Design Points #1 , 2 , 3 &4
3.2 10' x 1 ' CHANNEL
3.0 SIDE SLOPE= . 1 '/'
2.6 n=.01 L=1 ' S=.01
2.6
2.4 STOR-IND+TRANS METHOD
2.2 VELOCITY= 3 FPS
to
L4- 2.0 TRAVEL= 0 MIN
U 1 .8
J 1 .6 Qin= 3.33 CFS
3 1 .4 Qout= 3.33 CFS
0 1 2 LAG= 0 MIN
� 1 .0 ,
.8 .
.6
.4
.2
0.0m N v in �n r ao rn mN
TIME (hours)
COMPARISON OF T ORN DEVELOPMENT CONDITIONS
OR PRE AND P
The site drainage system for the redevelopment of the parcel with a 9.950+/- square foot
building is designed to have no negative impact upon the capacity of the existing State
Highway drainage system. Typically,when a site development plan of this magnitude is is
proposed which will result in an increase in the impervious surface area on the site,
generally corresponding increase in the peak rate of runoff. However, the resultant increase
rate of runoff from the contributing subc concrete pipe proposed
orage systempThist
will be largely detained within the propo sed subsurface
system is labeled `Pond 1' in the Post-Development drainage analysis.
This `Pond' is the key functional element of the concatenation which results in the overall
decrease in runoff to the `old' highway drainage system, indicated as Reach#12 in the Post-
Development Analysis, and referred to as Design Point#2. Also, the runoff to Design Point
#3, at the CB'A' on Route 125 (`new' highway drainage system),has been eliminated, i.e. no
flow,under Post-Development design implementation.
Design Point#4 is similarly routed into the detention facility in Post-Development,thus
resulting in no flow,by comparison.
Therefore, it is emphasized that the peak flow rates of Reach 12 (Post-D) shall be compared
to the summation of peak flows to Design Points 2, 3 and 4 (Pre-D) for comparative
evaluation of runoff rates at exiting points• There realized resulted n the achievement of the
and peak flow attenuation in pond 1,prior to Reach 12, a
necessary reduction and mitigation of peak runoff on �t10, 00 the chart 'Summary of under Pre and Post
Flows"Peak Rates for comparison of each
Development conditions.
�® N 0) ti
J O (D In 4 M Id: cl
M
U-
ce) l!) LO (O a O IL Cl) ® N N e- r p r-
J
Q � UL
r r- Lf)
w V �� p�j o) (0 (O qt
W � �- r- O OO 00
Cl) LLI
Q =
co Q M
N uj 4k N (00 It 0
wQ
�
U � 0 O O
CL 0 W O
w 0 0 U.
W (n Z 0 N r N
Q CO , d; M �t d;
_ M 4 N M N
� H
a O g
0 Z
O d; LO N
W 0.
w 0 O O 0 0 0 0
IL
w Q
ow U) y- LLI U) }, w U)
T- T- CL CL N a 0-
ROOF DRAINAGE RECHARGE FACILITY DESIGN
INTRODUCTION
The storm runoff from the roof area of the proposed reThefacility pipe(s)willl discharge into a
system of gutters, downspouts, and subsurface pipes.
subsurface recharge facility to be constructed 37 feet from the building.
required-
The capacity of the recharge facility is based on the so 1 rates,roof material, and,elevation of
recharge volume,temporary detention volume requirements,
groundwater table. The soil types at this location were obtained
s to tes pits performed Maps ed by ahe
Natural Resources Conservation Service and from actual
State Certified Soil Evaluator.
ANALYSIS AND DESIGN
Soil Types: Wnb +PaB
(Woodbridge—HSG"C" and
Paxton—HSG"C", both of
which are"Coarse—loamy, mixed
Mesic Typic Fragiochropts", or otherwise
classifiable as fine sandy loam, as
verified in several locations.
Moderately well-drained, loamy soil in
compact glacial till.
Recharge Volume Requirement is based on " s from current Condit n to post-
o.
added or increased due to the proposed redevelopment,
development design condition.
Based on Soil Group "C" soils at the site, the recharge volume required is computed, using
a net increase in impervious area of 22,830 sq. ft..
V = 0.10"x 22,830 sq. ft.
= 190 cubic feet
PROPOSED RECHARGE FACILITY CAPACITY
Using a 32 leaching pit configuration, a recharge cubic feet for detained roof runoff during the
available,with an additional volume of 738 c
peak runoff period during a 100 year storm event.
Using a permeability rate of 0.6 in/hr for the parent soil e steps ad over the horizontal
and sidewall contact areas, the overall exfiltration or recharge
[34' x394' + 2 (34+ 394)x81x0.6 in/hr= 0.02cfs
12 x 3600
the
use 0.02 cubic feet per second (cfs) fof on of this facility
proposed recharge facility. Refer to P ond#2 for performance results
and Test Pit data for existing soil evaluation results.
In the post-development drainage analysis, the roof area is entirely contained in Subcat#7,
including roof overhangs and canopies as shown ion of the Architectural
eakcrunoff volume during the significant amount of facility r torm vas welll as the 10 year and 2 year storm events.
100 years ,
SOIL TEST DATA @ MCLAY'S FLORIST
#1211 OSGOOD SUED ON MARCHZ
TEST PITS COND 26,2003
By WILLIAM F.DUFRESNE, CERTIFIED
SERVICES EVALUATOR
MERRIMACK ENGINEERING
TP-1
Elev= 160.5
019- 1871 Asphalt and Gravel Base
18"—35" Apb/l Oyr 4/2
35"—4299 B/F.S.L. — 10yr 5/8
42"— 118" C/Gr.L.S.—2.5y 5/4
Weep @ 80",E1= 153.8
E.S.W•T• @ 55", EL= 156.0
TP-2
Elev= 160.6 *Set bottom of recharge
051- 1219 Asphalt and Gravel Base
facility at E1= 158.5,
1215- 1991 Apb/F.S.L. — 10yr 2/2
19"—33„
Bwb/F.S.L. — l0yr 4/6 to allow for minimum 2'
separation
3391-9211 92" C/Gr.L.S. —2.5y/M &F
"
Weep @ 52",El= 156.3
E.S.W.T• @ 50",E1= 156.5*
TP-3
Elev= 159.5
0"— 12" Asphalt and Gravel Base
1295-9091 C/Gr.L.S. —2.5y 5/4/M&F
Weep @ 47", El= 155.6
E.S.W.T• @ 46", El= 155.7
GENERAL NOTES
From the Soils Map,this location has"Woodbridge" soil,
Hydrologic Soil Group "C";
permeability of 0.6-6.0 inches/hour, fine to gravelly sandy loam.
SYMBOLS
F.S.S. Fine Sandy Loam
Gr.L.S. Gravelly Loamy Sand
E.S.W.T• Estimated Seasonal Water Table
M &F Massive and Friable
PROJECT: PROPOSED RETAIL FACILITY AT MCLAY'S FLORIST
APPLICANT: F.K.REALTY TRUST
DATE: SEPTEMBER 3, 2003
SITE DRAINAGE CALCULATIONS USING RATIONAL METHOD
Determine peak flow rates to each catch basin;use 10 year storm, time of concentration
of 5 minutes,rainfall intensity of 5.3 inchesih ur
RATIONAL METHOD:
Q= CiA
Q=Peak Flow Rate(in cubic feet per second)
C=Runoff Coefficient 0.9
Impervious: 0.3
Lawn/Landscaped: 0.1
Wooded/Vegetated:
i=Rainfall Intensity(in/hr)
A=Drainage Area(acres)
PIPE FLOW CHARACTERISTICS:
n= 0.015, for RCP
0.013, for C.I.
0.011, for PVC
V=Velocity, in feet per second
d=depth of flow in pipe, in feet
REFER TO SHEET 4 OF THE PLAN SET WITHIN THIS DRAINAGE REPORT
DRAINAGE PLAN"WHICH IS INCLUDED
AREA 5 (CB #5 TO DMH#3)
C = 96% @0.9 +4% @0.3 =0.88
A= 0.15 Ac,.
Q= 0.70 cfs
Use 12"RCP @ S = 0.01 1/1, V = 3.52 fps, d=0.30 feet
DMH#3 TO DMH#4
Q= 3.34 cfs (see below)
Use 12"RCP @ S =0.007 1/1,which will flow full (under submerged condition
at times)based on Post-Development design for detention and attenuation of peak
flow through this pipe.
AREA 6 (CB #6 TO DMH#4)
C = 65% @0.9 + 35% @0.3 =0.69
A=0.27 Ac.
Q=0.99 cfs
Use 12"RCP @5 =0.0101/1, V=3.88 fps, D=0.36 feet
*Refer to Post-Development Analysis for outflow rates and ponding conditions within
the oversized drain pipe system, where DMH#4 is the principal outlet control structure
with 2-6" outlet pipes. Through these two (2)pipes a peak flow rate of 3.34 cfs is
conceivable and attainable during the 10 year storm. The maximum velocity in the 12"
RCP pipe between DMH#3 and DMH#4 will be 7 fps. The purpose of the oversized
drainage pipes is to provide ample storage volume in a detainable manner during peak
flow periods when the outflow rate is being reduced through the two (2) intentionally and
purposefully undersized 6" outlet pipes.
CHARTS AND TABLES
. \Oush lI 4 1. j e;
to
eacanjNalley � / _ __
•• p _ �, l °a 51.5
Tree i <
®� •.Ward•hI'
-
_•� "ravel S,
�• � it \ _
_ T HANGS °� t \ _ d \ m,
Golf '
- / r// ° j j •I� � %� �1��\ purse.°; ,° L
_ � � •� .� ��� � '` / �SIG Q ����\ `` .-�
LAWRENC
3 u ICIPAL AlRP
u i'•.
a BM j to 5 p =
V5, {
133
Doup eddy] . ��.
Billy / Z M d:f,_ FPuLAPr s ' Rffr K
St, 9i
--45
• -/ ....: O .. o'er "/ -
m
G R A P la C t 4�.6 .
ch
T HAN E vS 'pA 5 5 � r b \ _-- • °—Y , •i , _ –
34.5
id le ` \\\......\\ .Course 1
_ S h
AN
tkii
/mow/A.
\ Sand ch A , 11
S 3� �. sr I i
11 t
Q �o � p �' ESSEX COUNTY, MASSACHUSETTS, NORTHERN
loo 0()o FFFT Q= ya �c PbC PaB �.
rB
CmB c �y WrB RrC �e �1F ee PbD PaB �e0
W A WnB O PbB UD ! Wnc 125 r, 3 A O v PaC PaC
� PcE PaB
PbD\ 6
/ '• 4n� AIDEN PaC F
PaB ILL
De G UD Se ur o
Se
: e8 WnC •' WnC.
NMI Wp r
Wr
WeA / A � S
/ /� De i
2r` ABA m De WnD i Wn8 W�_
De WnA v Q Ha PaD
� � -� l��� t
i/
De Pe
x Y4° N, De 1 — ---- PaE'
WnC PbB
peN Wr6\
/. ue WSB
HfB Q UD PaC\ PbD M
�c P MoC `PaC \ YMA 0
WnA u; tt Ur PaB PcE
WnC Y/ De
SuB
Q.. wnc
PaD StB '• j MCy/
WnB
\ �d �/•
o WnB 3 o WnC �C, Y 9 c.c t Cr8
Ha 5 )t PgP lZ \3 PaC RIB
WnB 1z Y WnB De PaB \
/ ge tt \NrC ly PaD
N �6 PbD\,
w WnD IX PaB d� q
v / PbD
N C6C WrB PaB �9
De
Du UD \ 5e d� �� �toRdB<' d0 I)
p lZlWrB CbB WnB pb SrC� mci
>( \ Q
Qo RIB \ wr R ER. l
PbB i.
J PaB WrB PcE Pa8 LL Pbb, PbC ° Se
o m
1
c 6�cT
w M
I e°'
I ..a
�� r r , u. rB PaB
Ur W
WrB PbD d� LeA 1{
WrB Ws8
A
l RdA SSe WrB _
m_ PbC De PaC •.
° StB
n Pe PcE R
UD N O R T H PaB D De
•Se Ur PaDPb(" LeA f LeA
WrB / yk
cmc )f PbD Wg j
Ur w PaB X1
WrB tt WrB WrC
LAWRENCE- 13 wsB PbD PbC StB m �c CrC
MUNICIPAL AIRPORT WrB WrB
'PaB \ ,
RIB SuB SfB\
CbB srA
�.:
Ur Ur SrA WsB WaA CmB StB,
M ��0 Coc m
LAKE
WrB UD X1 PaC WrC
y v .SuB 7I
n COCHICHEWICK LeB
P m
�a PaB 3
133 i ( PbD
WrC. �� PaD P8B
WrE3. 'O G0.6D
-HI 4;,..
Ur W °F
Wr6
Sutton PaD, PaC ''
Pond WrB Wep
LOCATION LINE OF MARCH 14, 1961 ST. HWY. ALT. (L.O. #5078) —
s
CONVERT..EXIST.
RIM 159.5
INV=155\3 (PROP. 12"") c -�- p / / T
INV=155.1 EX. 12 S / REL - 1 OV l 125
( ) OSGOOD
(PUBLIC VAR A E YVIDT
PROP. 14 L.`F
12° RCP DRA1N- o PROP VERTICAL GRANITE OR
S=0.014 f, 00 1 PRECAST CEMENT CONCRETE :t
CIJRBz:U,.; ti .______-___ �__� ___.-._._-..CURg f TY�'_):: ... _ _ _._.____-_._.._._,. END PROP CORY
STA 30+44f PROP. CB #6 R1-1 STA 33+28f
(MEET EXIST) RIM_159.2 30"x30"' SAWCUTz r PROP FULL DEPTH (MEET EXIST) tj
INV-154.5 PAVEMENT
r _
_ I
a
r
u,
f
-r 2.73"
�
4 r w Jr)1997 STATE HIGHWAY
- _
PICKET FENCE
0 'i LAYOUT ALTERATION-----
(L.0. #719 6) /_— ❑ S� p i p o p
l
LOCATION `LINE OF -M-ARCH 14, 1 ;� _ 28.06" � - -
1 X61 ST. H1NY. ALT. - . . } ._ = r,is r�F,
�}•_.x. .
0. #508 _ ______- -___ _ -_ \=6"
.v
RIGH7._
IU(Yi
_ 32 .
_...
3
ONLY
TE
- R 26 ASELINE
v p _._._., - — 30 x30" T i t` f
I PROP FULL° �-
YLlrrs PAVEMENT F,
I PROP SfGN y _ - -
•t, _ _.} ,_._ - �� tt� f - -. _ __ •.�-. .- . (ROUTE 12 5)
rt OSGOOD STREET
o NORTH ANDOVER, MASSACHUSETTS
?. v, APPLICATION FOR PERMIT
' r`.- io /o° TO ACCESS STATE HIGHWAY
�' p - r
t
Transportation Engineering +
.,`QC = t O Construction
T/ .. r Ten N"England Business Center Drive
S.Ite 107
lg
g�
N / -:.
/0-,._.`. A 018
• 0
_.... - wN E Q 94-1793
to
/ www tecmoes com 7
,Q n'' t 7B)791—,
0( f' !1 / DESIGNED BY DATE
TRD 811 X20
DRAWN BY SCALE -i"__20'
\
TRD
B
->-.,
CHECKED BY EE �
CH Y SH T JO N0.
BTP 1 1 T0064
,]ox
a
ea„
,1r].sa
z�
x
8 mwtx �
8
53673
,Z r
k
,8118
164e0
Ie436 �
0 •'�O 16301 CW
n Q,ear m r `big
fe,
i6{.w SS
LOT AREA 1 34836' o
6a2s x q
O =6,192 S.F. 1Y� feze6
y66 s =0.14
tT te2.46 ,
qq9Q,,,, frr e't @ r r am
s P4 I- P fezaa \ ,euv
g�q f66m �A'] Y
A=25,282 S.F. ,m.a at
r Mi
161.41 /81.65 6,A0
qQ e1� ie131
m7a
6ZD
aAss 2 I 16tu4 �S'
06,+ x tezta an
� a c HIA4 _ g
Ik—' fm ,r
162 16114 I=12 _t l_
x fe134 i x WAS 1T.(IO 3 17412
16,3] 160.x6 r h"4 \
T AREA LOT AREA 2 5
,666.
_ I
1.2 02C_ w 17,019 S.F ° Cs
a.
=0 1 AC. ar
IIgpy , °%41e6 ,50.11 [ ,50. •� \
A=11 , 5 S.F. 160.78 8Ep 1M70 159.eo 5
tS 16154 ,enx 1B3A8 VN 1142
0 4 ten37 ��( �
A=10,622 S.F. ��,� ,56m
I Q4
N A=11 ,828 S.F. a ,e6 ,enb - 7 a Sae] 1566 12.45 �n s162
,w - -
ww,svw
v 9
]PP1ty<iLCJ.IIW a ,5a'a"
4
Dm.T 01 IYAEla11➢I
(T(1 BE PBMIMED (n
fJ1 151061' 164.88 IeE-1`Ab5
156.74
/ O 3 tsar - .. _ fenw DESIGN • g44T� 6� fse.6:
o° 'ft POINT #2 u4xnw, ,`A3i
, ,,,,, `• ,� i��te0 150.70 1 78 iSlu A=10,9 6 S.F. 1ba°` °�� PRE—DEVELOPMENT
x�_ �,
DESIGN — x, i � mo x ;X 132.39 o" 66,5 7 DRAINAGE PLAN
—N34'25.24"E annhs sa3e 1 =20'
169.17
X'61
5624E
o I 8664 151.10 6'tw Slfa c
feue - -� ,»n
.
1R
A=A 4,131 S.F.17 e•n o----i o c m a c 20 0 10 20 40 80
� HT.Wia PAIOIF)if 1F�F �\
Y_f_
e-le mac ,.p RIM=1 9.5 e'1p mac ? 1 inch = 20 ft.
(PUBLIC-V ® INV=155.3 (PRO
P. 12")
__ INV=155.1 (EX. 12")
GRAPHIC SCAM
RIM74 MO m.7e M79
r
3 a 15670 15a61 , cot ',...
1x61 Ira a I
4 I81FI882N 1318
S 166 BtI�,527E 15].19
15739 15]35 IW I'AM(247
15135
z
...- OAR CO,
.,
c/
s
6 pq tOgGR�p�FgB�Cf
a
9,988
3ppH�T_ o
00, CF.. czy, sAOp
?11 j ti Ce gREq �pP ce#3 t . V ` RFOUjR� RCyh��?dC Tp
/NV! /g/.S _ - z _ - _ PR pP..�•,_ M,gY.SF{1gR- Q
SU B
o
3S�
_ A _3 A/HA
Z -A?",
A-11 ;`' 1 - ----_._ - _- -« _ Rpp D 8k4RfOHA�R
� N )R ¢' Q �oShpyaSF o'IV/Sly 94S0 ReTB � pR�; H' f A p t
ASS
-s RO
3 I _
jq
PROP. 170± LF ��� ,: �.\` ,160,1
24"RCP CLV r - -
DRAIN S=0.0059 BE.REM
OF STIR CTUR '
OP. WATER AND n-.
UTILITIES EASEMENT r
PROP. 4" CLDI Ale. PROP DMH #1 PROP- i]MHf(
PROP. 4" CLDI (WATER SERVICE & ' __ _ _,_ � ,; _
_WATERMAMF --- --FIRE-PRDTE0110Nj 'P. 4± I NV.= 5.80- 2-12")- -- ___ -' __ P 10tLF `iNYM=,551 - -
PROP. HYD. W/ ,., -.-? .s_ _ ! _ _ SLOE.t2'xt2'xa'iM@tRC - _ 2 vl--- -R C•- -_-:- 0 --r. fY-RC-P--DRAIN £.I INV=155.1 - 6� ___ -- -' POST— DEVELOPMENT
y^ -- stff�AND a'GATE vpcve_ .,i r'-#� i _ PROP REM VE
12°X1YX6° TAPPING TO�%B�udVm-" - ff.Ot f-C� - -i - -- -
Y i- 1/' - '' INV=156.0 __
SLEEVE AND 6" GATE V VE =- ,- g P O - POR N _ OP ±LF ._ . re� INV=155.1 s ..
i --�..P Db1H #3
PROP. CB - -._-INV=154.9 -6) - - --
GP=' B(1 - S _DRS NAGE } :s RIM=,59.6 _1'-"-BCP V DRAINAGE P LAN
6 - -
fi1 `�145 . V=155 t�{3P. CB -
.85
S F. 0 AP ORDMULTI
-- -- .__
- `- - . DMH ]5 .. ._
., M ARTMENT OIL-
PROP
RIM=160.6p "' RITPSEPARATOR = - 20 0 10 20
/ 10
APPROX. 650 FEET -- E1as7. JRA€>1�JJS L 40 80
. 'REM"'
7b'`- X30-.-.RCP.�LV_DRAIF7-----INY S4.3(1�'2' - - ---- M=159.9 1 8 11 25'4
TO "HIGH POINT' IN S=0.oD4
.- __. _ £ _ BE REMOVED - INV 153,9± V=154.5 (12)
OSGOOD STREET - _— pRpP _
1 inch = 20 ft.P. 274
(RTE 125) ' A=11 ,812 S.F. S-D 00'/ DRAIN; 12"RCP CI V) DRAIN RIM=59. A-3 S08 S.F. GRAPHIC SCALE
- ' S=0.010' INV-155.34
PROP. CONVERT EXIST::'
TO DMH #6
- - —
-----4S�OflD-- - -- -----�TRE�'T-.. -- --- -- -�ROt7fif----1��} - -------- --
- ,
3_