HomeMy WebLinkAbout1985-03-25March 25, 1985
Special Meeting
The PLANNING BOARD held a special meeting on Monday evening, March
25, 1985 at 7:45 p.m. in the North Andover Senior Center with the
following members present and voting: Michael P. Roberts,
Chairman; Paul A. Hedstrom, Esq., Vice Chairman; John A. James,
Jr., Clerk; and John J. Burke.
Town Planner Karen Nelson and Building Inspector Charles Foster
were present.
PUBLIC ~ARINGS - Rezoning and Amendments to Zoning By Law
Articles for 1985 Annual Town Meeting
Holmes, Francis - Turnpike Street - R-4 to B-4
The Clerk read the legal notice.
Attorney John J. Willis, Jr., representing the petitioner, made
the following presenation:
The parcel is at the corner of Turnpike Street and Peters
Street.
Mr. and Mrs. Holmes have lived in the house for many years.
Mrs. Holmes has a real estate license and wanted to set up a
home occupation in the dwelling.
It is at the intersection of two busy roads and is not a good
location for a residential zone.
A large shopping mall is across the street and the
neighborhood consists of many business zoned parcels. The
rezoning will put them in the same zone as what surrounds it.
- It is the best zone for the property.
Access will probably be on Peters Street. This will enable
them to have the insurance/real estate office for themselves.
They are asking for a favorable recommendation from the
Planning Board.
Mr. Joseph D'Angelo of the Mass. DPW asked how big the parcel is
and Atty. Willis said it is 18,220 square feet.
Mr. D'Angelo stated that the state has no objection to the
rezoning but asked that the non access on Route 114 be maintained.
The access should be kept off Peters Street.
Mrs. Ann Royal, an abutter, stated that they would like to keep
their property residential. She asked what assurances they will
have regarding lighting, etc. She thinks they will need a
variances(s) from the Board of Appeals.
Chairman Roberts told Mrs. Royal that the Board of Appeals would
address her concerns.
Building Inspector Foster added that only structural changes will
require a variance from the Board of Appeals. Any expansion or
enlargement would.
MOTION: by Mr. James to close the public hearing and take the
matter under advisement.
SECOND: by Mr. Burke
VOTE : Unanimous - motion carries
Donovan - Peters Street - R-4 to B-4
The Clerk read the legal notice.
No petitioner or representative present.
MOTION: by Mr. James to table the Donovan petition.
SECOND: by Mr. Burke
VOTE : Unanimous - motion carries
Barker, George - Osgood Street - R-2 to I-1
The Clerk read the legal notice.
Mr. Barker was present and made the following presentation:
- This is an extension of the present zone, easterly off Osgood
Street (Route 125) for 225 feet. It is approximately 6.7
acres.
- It is a natural extension of the industrial zone into the hill
with a buffer on the hills.
- The lot is not wide enough to put in a road.
- It is better to have more small industrial buildings than one
or two large ones.
- This would permit a longer road with two acre lots.
- It is located between Aziz and Arlitt.
Mr. Bill Hansen, abutter, asked how much land is already zoned
industrial and how much is residential.
Mr. Barker responded that 12 acres of his land is industrial and
50+ acres is residential.
Mr. Joe D'Angelo of the Mass. DPW asked if the lots would be on
sewer and Mr. Barker said NO.
Mr. Hansen stated that if this is approved, it will set a pre-
cedent. This particular pience piece of land abuts a large
tract of residential land. It is near the people on Bradford
Street. This could cause more rezonings around them. By
approving this, the Planning Board is putting a shaft of indus-
trial land between residential land. It opens a Pandora's Box.
Mr. Chory of Bradford Street agreed with Mr. Hansen. He said he
is scared that a precedent will be set. They will be isolated
on Bradford Street.
Mr. Arthur Lentz added that they went through this five or six
years ago. The industrial zone was only 500 feet and now it is
1,000 feet. The Planning Board and the Barkers agreed on what is
there now.
Mr. Barker said he would not call it a shaft of residential land
but rather a sliver. On the new homes, it would be 800 feet from
the industrial zone. He would not consider going before the
Planning Board to rezone areas in back oF everybody. He has
tried to keep this the same distance from the homes as it is now.
MOTION: by Mr. Burke to take the matter under advisement.
SECOND: by Mr. James
VOTE : Unanimous - motion carries
Laudani and Philbin - Turnpike Street - R-2 to I-1
The Clerk read the legal notice.
Mr. James Gordon, 104 Milk Street, made the following presenta-
tion:
- He is here for Forbes Realty.
Note: Mr. Gordon presented a summary sheet and sketch of the
proposed buildings to the Board members.
Attorney Russel Bodnar and Engineer Phillip Christiansen are
also present tonight to answer any questions.
He proposes to amend the article as written. There were minor
errors in the notice. It is a change of 150 feet.
Note: Planner Nelson said she will check to see if the warrant
has gone to print.
The land in question is located on Route 114 directly across
from the Mass. Electric building.
- It is approximately 13 acres with frontage of 1,370 feet on
Route 114.
- They propose to rezone it form R-2 to I-1.
It would be an extension of the industrial line which runs
down the road.
They plan to construct on the site approximately 70,000 square
feet of office space in four buildings.
- The buildings would be 12% of the total area.
Three of the buildings would be 18,000 square feet and the
fourth would be 16,000.
- They are 3-story brick colonial style.
The traffic situation will be addressed. They have not yet
consulted with a traffic consultant.
They would like to locate the main entrance somewhere where
the present traffic lights are located.
Mr. Robert Mansour, 1001 Johnson Street, stated that the upper
corner of the property is one lot away from his. The area used
to be industrial. This proposal will take away from the resi-
dences on the side of the street. It was changed from industrial
to residential. One of his concerns is a curb cut.
Mr. Joe D'Angelo of the State DPW stated that the rendering as
shown with one entrance opposite Mass. Electric with proper
decelleration lanes would be proper. A center lane would have
to be made into a left hand turn lane into the facility.
Mr. Gordon added that all the requirements of the Zoning By Law
would be met regarding setbacks. The side buffer would be in
excess of what is required. They are also concerned with the
traffic and have met with Mass. Electric to discuss the entire
area and what can be done. There might be another entrance.
They want to attract users of the office space.
Member James asked how many feet the buildings will be from the
back lot line and Mr. Gordon said they will be 150 to 200 feet
away.
Member James asked why the buildings are located as shown on the
sketch and Mr. Gordon said they are there because of wetlands on
the parcel. They would have liked to place them further back.
Mr. Bill Brush of 939 Johnson Street asked if they have met with
the State on ingress/egress and future upgrading of Route 114.
Mr. Gordon replied that the traffic engineer will be involved
in this type of dialogue.
Mr. Brush said they will run out of room to replace the wetlands.
He added that there are many questions which have not been
answered for the Board to make a proper decision.
Mr. Gordon added that they might have to encroach on the wetlands.
They are not ignoring the issues. They will have to solve the
problems if Town Meeting votes to rezone the parcel.
Tom Lightburn, 1015 Johnson Street, asked about the buffer zone.
Town Planner Nelson replied that if it is rezoned, the 100 feet
could not be used for anything. It must be kept green.
Building Inspector Foster interjected and said only the first 50
feet must be left open and the setbacks are taken from property
lines.
Planner Nelson asked why the back portion of the lot is included.
Mr. Gordon replied it is because the lot line runs in a certain
way.
Phil Christiansen added that there is no need to separate them.
They originally thought there was more development potential but
because of the wetlands there is not.
Member Hedstrom added that maybe some restrictive covenants can
be drawn up.
Mr. Mansour asked what is to prevent the abutter from changing to
industrial. The people in the area are concerned about it. They
live in the area. He asked what would happen if it remained R-2.
Mr. Gordon said that 14 to 15 houses could be put there.
Member Burke recommended that the abutters get together with the
petitioners.
Mr. Lentz said the discussion tonight is on the type of building.
At Town Meeting, all you vote on is the rezoning.
Mr. Shaker of 1029 Johnson Street asked what protection they have
about what type of industry can go in.
Member Hedstrom said it should be a contract rezoning.
MOTION: by Mr. James to close the public hearing and take the
matter under advisement.
SECOND: by Mr. Burke
VOTE : Unanimous - motion carries
Gowans - Turnpike Street - R-2 and B-4 to B-2
The Clerk read the legal notice.
Mr. Joseph Cushing made the following presentation:
The zoning line is drawn in the middle of the property.
The parcel is on Route 114. It is west of Sullivan Street and
across the street from the parcel which was used for
stockpiling woodchips. That parcel is GB.
Across the street is zoned business.
As a result of rezoning done by Brown, neither the B-4 nor the
R-2 can be developed as required by the Zoning By Law.
The residential area does not have the required frontage. The
1.46 acres does not meet the area requirement for development
in a B-4 zone.
On the setback requirments on Route 114 and the setback from
the residential zone, the only area availabe for development
is the area shown in white on the plan.
They are asking to have the entire 2.54 acres zoned for
business use.
MOTION: by Mr. Burke to take the matter under advisement.
SECOND: by Mr. James
VOTE : Unanimous - motion carries
Donovan - ?abled earlier
MOTION: by Mr. Burke to postpone the public hearing to 4/10/85.
SECOND: by Mr. James
VOTE : Unanimous - motion carries
Amendments to Zoning By Law
Town Planner Nelson said these were discussed with the Board at
the last meeting.
Building Inspector Charles Foster asked to address a couple of the
proposed changes.
On Site Plan Review, he thinks the present by law is sufficient.
By subjecting applicants to a Special Permit process as proposed
under the amendment, you are also subjecting them to an appeal in
court. It is different from the Board of Appeals appeals because
it does away with a local step. He is against the Special Permit
process. He does not think the Planning Board should be able to
force an applicant to do something. The Special Permit granting
authority by law already has enough in it.
Fire Chief William Dolan disagreed with Mr. Foster. He said it is
fair to various Boards that they be made aware of what is going
on. It is fair to the developer because he will know up front
what problems there will be.
Mr. Foster added that the problems will be solved by other
procedures. The regulations should be changed. The plan
preparation part should be changed. An architect cannot sign
them.
He also addressed proposed additions to Section 10.31 of the
Zoning By Law and said the proposed additions are already in the
by law.
Town Planner Nelson said they are meant for Site Plan Review and
they can be moved to that section.
Mr. Foster added that lighting is already addressed in the by law
and the proposed change is not needed.
Mr. Foster also addressed the proposed addition of "public way"
regarding the access to industrial sites. He questioned who
designates what a public way is under zoning. They control
private ways. He asked how they can control where a public way
goes. He added that when a public way is built by the State, does
the town have the right to step in and tell them they cannot put
their road there.
Vice Chairman Hedstrom stated that the town does not have the
authority to tell the State but they can on town roads.
Mr. Foster added that almost any residential street eventually
leads to an industrial site. He does not think this proposed by
law can be enforced.
Mr. Hedstrom said other towns do it.
Mr. Foster then addressed an amendment regarding "similar uses".
Ms. Nelson said she might change it.
MOTION: by Mr. James to close the public hearings and take the
proposed changes under advisement.
SECOND: by Mr. Burke
VOTE : Unanimous - motion carries
DECISION
Campion Hall - Definitive Plan
MOTION: by Mr. James to approve the definitive plan entitled
"Campion Hall" prepared by Cyr Engineering Services, Inc.,
dated November 16, 1984 with conditions.
SECOND: by Mr. Burke
, /
· ' ~_PL,AN OF LAND
By: CYR ENGINEERING SERVICES, INC., . da%~l November
P ~
~d~N. HALL
~ 1~84
The North Andover Planning Board has voted to APPROVE said pla~t subject to the
following conditional
conform to the govern.'L~ rules and reguxa%~ons
x xxxxxxxxxxxxxxxxxxxxxxxx,x,
~. ~her co~ti~=
a. All Planning Board Orders of Condition are to be placed on the recorded de~itive
b. Prior to si~ing the definitive p~ns all deeds of easements sh~ll be sub~tted to the
Planning Board and held ~ escrow until completion. At the ti~ of ~mpletton, the
developer or o~er shall execute such d~uments for the Town.
c. A certified as-bu~t plan shall besubmitted showing the ~ati~ of ~ ut~ties(,
water,sewer,telephone) prior to b~der eoa~ application-.
d. Final as-built plans shall be submitted to the Plann~g B~r~ p~or t~.[~al release ~
security. . ' ' '
e.' ~i~ant/owner/developer shall be aware.of the fac' that appro~ of this , .'~ '-~
subdi~sion under the Plann~g Board's R~es and Re~{t~ns'w~ not ~Beve ~id .
r s onsibilitv to other ~rooert~ owners u},on whose ~nd.may ~ aff~ed
artie of the p o~m ~ateP,Uiscnarg~.
- - g,, m~rect or ~rect deve~Sp~t ~t _ ,~,___ .__ ~ ~
~ the ev~ ~ ,v ~ ...... .,~__=. pl~4ne ,~ ~
..... ~-=- ~4. ~et.O_ ~O NO~ ~uvv~
there~er e~orse i~e fo~ ap~ u~, --- ~--
************************** eee*ee~,
Date~
N PION HALL DEFINITIVE PI,AN - DECISION
DITfONAL APPROVAL
MARCH 25, 1985
4.
RECEIVEO
TOWN CLERK
NORTH ANOOVER
A Notice of Intent shall be filed wLth
Conservation Commzssion as required under Ch. 131, Wetlands
Protection Act and the local Conservation Commission's
regulations and any changes required may be caus~..for
reconsideration of the subdivision under Ch. 41.
In accordance with the Fire. Department's recommendations:
a. No open burning is to be permittted;
b. All underground fuel storage shall comply with the Fire
Departments' requirements for the Watershed District;
c. A new fire· alarm box, for use at the intersection of
Great Pond Road and the entrance to this development, shall
9e provided to the Fire Department;
d. AL1 hydrants shall De placed within 50( feet of ~ach
other.
Prior to razing any'structures on the si:e, the Planning
Board shall be'notified in writing as to the dates removal
snail take place. Ail permits,, both local anl state shall
be obtained to ensure proper compliance.
Ail requirements of the subdivision control Law pertaining
to 'street trees' shall be enforced. Security in the amount
of $15,000. shall be retained for this purpose.
in accordance with the Board of Pubtic Works
~eco:nmendat ions:
a. The water main on the proposed roads shall be 8" class
52 ductile iron cement Lined water pipe installed 1~ feet
from the property line with 5 feet of cover below ~he finish
qrade of the street:
D. 8" MuekLer oc equal gate valves (open left) shal~ be
prov:ded on baseline B at sta.5+54 and 15+, and at Bonny
bane;
c. Eddf breakfkange hydrants to Nort] Andover
specifications are to be installed at sta.~+50, 9+66,and
~+S3 on Baseline A and at 6+50 on Baseline
d. All hydran{ branches shall be provided ';ith 6" Mueller
o~ equal gate valves (open Left);
e. ~1 [ gate vLaves shall comply with AWWA specifications
~500 52F and wil~:ue supplied with 100 LP ~[iding type gate
boxes marked -'~ WATEI{:
f. The 8" water main sha[L be installed straight through
the proposed 'cul-de-sac on Baseline A;
g. All water mains shall pass leakage and pressure tests
performed Ln accGrdance with Section 13 of AWWA C600 and
shall be chlorinated in accordance with AWWA C601 Standard
P£oceduce for Disinfecting Water Mains:
h. All sewer mains within the subdivision shall be 8"
vitrified clay pipe installed in the centecline of the
street; :
i. A 6" vertical separation shall be maintained between 8"
V.C. sewer and the 12" R.C..P. cross drain at sra.0%82+?9 on
Baseline B;
j. A sewer lift station shall be provid¢~ ~n the existing
utility easement at the end of BOnny La,e %n order to
provide sewer service to lots 9,10, and ll; Profile ,and
calculations to be provided to the Planning Board ~d, Board
of Public Works 'for apprOval prior to construction~
k. A plan and profile of the proposed gravity sewer on
Great Pond Road from the existing sewer lift station to the
proposed roads shall be submitted in detail;
t. Pcecast manholes shall conform to ASTM designation C478
and shall meet the following additional requirements:
the wall thickness shall not be less than 5#,
sections have tongue and groove joints with a bitumastic
gasket.
pipe connections shall be of the rubber boot with
stainless steel band type or approved equal.
manhole frames and covers shall be cast iron lettered
'SEWER' and be a minimum of 6" high.
m. Alt sewers must pass low pressure air t~3ts with maximum
a].[owable lea~age cate of 0.0015 cubic feet/minute/square
foot of internal pipe surface.
A waivef sequest shall be submitted in wri.ing
length of a dead end street (Sec=II.B.B&IV...4.)
signing the definitive plans.
regarding
pr~or to
The following shall, be placed on the ~estzic~ive covenant:
The ~artles agree that the app£oval of the ~efiniti%e
subdivision plan is a condition in the coveeant. It is
contemplated that such approval as may be issued by the
North Andove~ Planning Board will contain covenants,
conditlons and v.~u~ous requirements as a .~art thereof,
inc].udlng such as m~]~ be stipulated :)y applicant (Seller)
and said Board as a condition of said final approval. SUch'
aay include, but not by way of limitation, installation and
construction of roa~s, utilities, road imp$ovements, sewer
[nstaktation and connections, wate$ lines, sewer pumps or
[[(t stations, relegation pond and areas, siltation ]~Dlding
areas, drainage systems and improvements and erosion control
,Jevclopment.
Connecting drainage to G~eat Pond Road fro~ C.ochlchewxck
Dr~vc shat[ be incorpor.~ted into Great Pond Road and be
~c.~irected from Lake C~>chichewick to Rea's Rend. The
culvert to bake Cochichcwlck shall be blocke~ or removed per
the Highway Department's recommendations. I~provements such
.as pipe size, shall be ~pproved Dy the High· ay Department.
Drainage calculations ? ~a[l be provided to the Highway
De[)artment and Planning ~{oard for review ~or concurrence.
roadway cross-section shall be ~eviscd t~ comply with
13.
15.
17.
[8.
19.
20,
21.
22.
the Planning Board's Rules and Regulations.
Where the water service is located adjacen~ to and or
crosses the sewer line, a minimum 18" separation shall be
maintained, specifically at sra.0+82 and
The 20 foot wide Lake Cochichewick access easement shall be
noted as 'public' and limited to 'pedestrian acceS~'~.~
The Planning Board has made the determination that the
proposed subdivision roads and services are adequate only
for single family use.
Note: TO BE PLACED ON THE RESTRICPIVE COVENANT
If the proposed structures designated for demolition are not
razed, lot line changes shall be made to bring,the lots into
conformance with the North Andov~r Zoning Bylaw.
In accordance with the Highway Department's recommendations:
a. Two additional catch basins shall be placed at sta.6+O0
and two at sta.13+18;
b. All catch basins shall have 4 foot sumps:
c. Inspection Fo~m s iai[ be used for all Phases of
construction.
A 'concrete sedimentation detention basin' c' grease and oil
trap' shall be constructed in accordance ~ich the plans
p~ovided Dy the Hi~wa~ Department. Ca]~ulmtions and a
final detailed plan shall be submitted tc ch.~ Planming Board
and Highway Department fo~ review anfd appro'{'al prior to
construction. ~
A 5,000 square foot retention area shall be provided along
the property lines of bet 9 and 10, with a 25 foot w~ide
access easement deeded to the Town.
The sedimentation and c.~osion control program shall be in
place prior to construction to include, but not be limited
to ma~afi fabric, double row staked haybales and check dams.
Phis p$ogram shall be c)ntinuously maintained throughout the
duration of all construction (roadway, utility instalkation
and .hOuse construction~ and may be modified as deemed
necessary by the Plann ng Board. Security in the amount
$30,000. shall ~: reta~ ~ed. A separate ero£lon control plan
to be provided prior t~ construction.
Note: 'Phis provision ~pplies to both onsite and offsite
construction
No construction shall ake place within 250 feet of Lake
~och[ chewick. -
The submitted Constru.'tlon Schedule de ai,.ing Phase
I,II,III,IV, and V sh,,[[ be fully adheked to and no
construction activity shall occur on any new phase u~til
substantial completion of the then current phase. The
Planning Board, togethe~ with the. other Tow:~ Boards, shall
issue a written consent prior to commencemeD: of a new phase
upon a finding after [ield inspection of substantial
completion of the then current phase. It is the Board's
intent to minimize the amount of,open con truction activity
at any oen time in o~der to control result'irt construction
runoffs into the Lake. ConstructiOn by appli~ant"~hin each~;'
phase a.s more specific,,[ly set forth in thc applicant's
proposal shall take p~ace in the sequence se{ forth in said
proposal.
23. In accordance with Section 4.~33,(2)a. there will be NO
dumping of stumps in the subdivision.
24. Any drainage from cc[la,,~ o~ lot developmegt shall be tied
into the designed ~ai~,~qe system to be shown on the
definitive plan, an~ a~,' roved by ~he Planning Board and
Highway Department.
25. A].[ aspects of construc~ion in this development wil'l be
_ ~bject to ins[~uct~on and review by the respective
]epartments of the Town of North Andover.
CC
Highway Surveyor
Board of PubLic Works
Tree Warden
Police Chief
Fire Chief
Building Inspector
Conservation Commission
Board of Hea~th
Assessor
FiLe
Applicant
Engineer
,_%