HomeMy WebLinkAboutMiscellaneous - 1211 OSGOOD STREET 11/10/2003 DRAINAGE FACILITIES OPERATIONAL AND MAINTENANCE PLAN NOVEMBER 10, 2003 "OSGOOD CROSSING" 1211 OSGOOD STREET NORTH ANDOVER,MASSACHUSETTS OWNER: F.K. REALTY TRUST 1211 OSGOOD STREET NORTH ANDOVER,MA 01845 PARTY RESPONSIBLE FOR O &M: F.K. REALTY TURST 1211 OSGOOD STREET NORTH ANDOVER,MA 01845 (978) 683-3164 A. SHORT TERM MAINTENANCE PROGRAM DURING CONSTRUCTION 1. A site inspection shall be performed by a P.E. during the construction of the grading and drainage facilities and associated improvements shown on the Site Development Plans. These inspections shall be done at least once every week during the applicable construction period. Inspections shall not be required during periods of inactivity of construction of these facilities. A report shall be generated and forwarded to the North Andover Planning Department after each inspection. 2. Care shall be taken at all times to control erosion and sediment movement by compaction of disturbed areas and by the use and maintenance of hay bales at each drainage structure and at limits of work as shown on the Site Plans. 3. The contractor shall ensure that all runoff is collected in the appropriate structures as they are constructed and that uncontrolled runoff is kept to a minimum. The contractor shall exercise diligence to protect the safety of the personnel on site by installing grates or covers on each drainage structure when it is built. 4. Upon substantial completion of the drainage facilities an inspection shall be performed by the P.E. and a report issued to the North Andover Planning Department. 5. Upon completion of and the successful establishment and stabilization of the site and the landscaped areas, an inspection shall be performed by the P.E. with an agent of the North Andover Planning Department. At the appropriate time, a report indicating that the construction, establishment, and stabilization of these areas are in substantial conformance to the plans and Conditions of Approval shall be presented to the North Andover Planning Department. LONG TERM MAINTENANCE PROGRAM 1. On or about every May 1 and November 1 of each year a site inspection shall be performed by a registered professional engineer(P.E.) of the Commonwealth of Massachusetts which will report on the status of the drainage facilities. The engineer will schedule the inspection with the responsible parties 48 hours prior to the inspection so arrangements can be made to access all drainage system components, including if necessary,roping off of the immediate areas within the site to assure appropriate and safe access. This report shall include the name, address and telephone number of the owner of the drainage facilities; the names, address and telephone numbers of parties responsible for the operation and maintenance of the drainage facilities; and an outline of remaining funds in the line item of the budget for drainage maintenance. The inspection shall include a visual inspection of each drainage structure including the catch basins,manholes, oil-grit separator, flood storage facilities, landscaping planting,BMP's and any other structure or condition relating tot he long term operation of the drainage facilities. The report shall outline any observed pollution, if any. 2. On or about November 15 of each year a landscape Contractor shall perform the service of cleaning out of any debris in the areas where there is landscaping. He shall prepare a short written report of the work performed and submit to the inspector(P.E.) for inclusion in his report. He will inspect the landscaped area as well as the plantings in the rear of the site and replant any dead vegetation. He shall report the status of the replanting to the P.E. 3. Once every year from the date of commencement, on or about November 15, the catch basins, and oil/grit separator shall be thoroughly cleaned by mechanical and/or manual means to remove any debris and sediment: Periodic power sweeping of the parking areas and driveways may be increased or decreased, as a result of fine particulate accumulation quantities observed. 4. Once every year from the date of commencement, usually in th spring, a Landscape Contractor shall reseed or stabilize any areas which lave eroded or developed sediment or which have developed conditions not shown on the plans. A written report of such activities shall be presented to the inspector for inclusion in his report. 5. If the inspector reports that work needs to be done to maintain any facility then the work must be completed within the next 12 weeks, unless otherwise specified, and the condition of which shall be reported in the inspector's next report. ANTI-FLOTATION CALCULATION F.K. REALTY TRUST NORTH ANDOVER,MA NOVEMBER 10,2003 The weight of the 1500 Gallon Sediment and Oil Separator is 22,500 lbs. (empty of fluid contents). The weight of the Cast Iron Frames and Covers(3 of each)is 440 lbs each, or 1,320 lbs. The weight of the remaining material over the structure is 2.7' x 6.16' x 11.0' x 1301bs/cu. ft. (including sand, gravel, and bituminous pavement)or 23,780 lbs. TOTAL WEIGHT=47, 600 lbs Within the seasonal high water table (SHWT)the volume and weight of displaced water is computed: 6.16' x 11.0 x (156.5— 150.5)x 62.4 lbs/cu. ft. =25,792 lbs, the total weight of displaced volume of water. Therefore, since the proposed weight total is greater than the effective water displaced,there will be adequate and ample anti-flotation provided. SECTION III Standards � IL rncl E 41 [L w 'v O m J •0 c a.c X 1A o V r ® N cu O N •� 1' O - N cm •C �cu c � o o C J Or cc w " caS v/ V a tl oZ H • � � o. Q o J m 0 via 0 � o • • laaLls)ijoM uo-ijeln-ale-0 ID IsnouaaN SS I j DEP Stormwater Management Workshop 111-12