Loading...
HomeMy WebLinkAboutStormwater Report - 47 PETERS STREET 8/17/1993 Bv: GPF Date: 8/17/93 Sub.iect: First United Methodist Sheet No: 1 of 1 CHKD by RFK Date: Church b Peters St. North Drainage Calculations USE RATIONAL METHOD Q = C X i X a C = COEFFICIENT OF RUNOFF i = RAINFALL CRITERIA = 15 YR STORM PROPOSED CONDITIONS C = 0. 90 PAVED Tc = 310 Ft - 4 Ft/Sec = 77 .5 Sec ( <5 Min. ) i15 = 6 .0 a = 0.20 AC. GIs = 0. 90 X 6 .0 X 0.20 AC. 1 .08 cfs VOLUME OF RUNOFF Vol . = Tb/2 X Q, Tb = 2.67 X Tc, Tc = 77 Sec. Vol . = 77 X 2.67 X 1 .08 Cfs 2 Vol . = 111 Cubic Ft. Q50 = 0.90 X 7 . 2 X 0. 20 AC = 1 . 30 cf s V0150 = 77 X 2. 67 X 1 .30 2 Vol 50 = 534 Cubic Ft. TOTAL VOLUME OF RETENTION AREA = 5,606 CUBIC FEET Bv: GPF Date: 8/17193 Subject: First United Methodist Sheet No: 1 of 1 CHKD by RFK Date: Church 6 Peters St. North Drainage Calculations USE RATIONAL METHOD O = C X i X a C = COEFFICIENT OF RUNOFF i m RAINFALL CRITERIA = 15 YR STORM PROPOSED CONDITIONS C = 0.90 PAVED Tc = 310 Ft - 4 Ft/Sec = 77 .5 Sec ( <5 Min. ) i 1 = 6 .0 a = 0.20 AC. 015 = 0.90 X 6.0 X 0.20 AC. 1 .08 cfs VOLUME OF RUNOFF Vol . = Tb/2 X O, Tb = 2.67 X Tc, Tc = 77 Sec. Vol . = 77 X 2. 67 X 1 .08 cfs 2 Vol . = 111 Cubic Ft. 050 = 0.90 X 7 . 2 X 0 .20 AC = 1 .30 cfs V0150 = 77 X 2 .67 X 1 .30 2 V0150 = 534 Cubic Ft. TOTAL VOLUME OF RETENTION AREA = 51606 CUBIC FEET Bv: GPF Date: 8/17/93 9ub.iect: First United Methodist Sheet No: 1 of 1 CHKD by RFK Date: Church & Peters St. North Drainage Calculations USE RATIONAL METHOD O = C X i X a C = COEFFICIENT OF RUNOFF i = RAINFALL CRITERIA = 15 YR STORM PROPOSED CONDITIONS C = 0.90 PAVED Tc = 310 Ft - 4 Ft/Sec = 77 .5 Sec ( <5 Min. ) i15 = 6 .0 a = 0.20 AC. G15 = 0.90 X 6 .0 X 0.20 AC. = 1 .08 cfs VOLUME OF RUNOFF Vol . = Tb/2 X Q, Tb = 2.67 X Tc, Tc = 77 Sec. Vol . = 77 X 2.67 X 1 .08 cfs 2 Vol . = 111 Cubic Ft. 050 = 0. 90 X 7.2 X 0.20 AC = 1 . 30 cfs V0150 = 77 X 2. 67 X 1 .30 2 V0150 = 534 Cubic Ft. TOTAL VOLUME OF RETENTION AREA = 5. 606 CUBIC FEET