Loading...
HomeMy WebLinkAboutMiscellaneous - 102 PETERS STREET 9/26/2013 Enright, Jean From: Dermot 1Kelly Sent: Thursday, September 26i20I34j9PK4 To: Tvmor\]udy; Cc: Enright, Jean; Subject: RE: Next VVeeKsMeeting Attachments: 822'K4enmI0 T8Svvmppendix.pdf TO AU. 8U8Ch8d please find report detailing the Traffic SiOlU|8tiDD Study that was COOdUCt8d for 102 Peters Street in North ADdOVe[. MA. If anyone has any questions and/or comments please don't hesitate to contact 0G8t any time including this Saturday O[ Sunday. GiOQ8ne|y, DERM0T J. KELLY ASSOCIATES INC. Dermot J. KeUy, PE, PTOE President [}JKAsSDCi8teS' Inc. 8 Cameron Road Andover, K8AO181O Office: 878-684-2205 8OO8i|: � mww.DJKINC.clom CONFIDENTIALITY STATEMENT: This electronic DleSS@ge contains information from the firm OfOJR AsSOCiGhe9' Inc. and is confidential Or privileged. The iDfO0O8tiOD is intended SO|e|y for the use of the individual(s) 0[e[t|tV/ieS\ D@Dled above. If you are not the intended recipient, be 8VV8Fe that any di8C|0GUFe. copying, distribution, Or use of the cOO[8Ot8 of this DleSS8Qe is prohibited. If you have FeC8iV8d this e-mail in e[[o[. please notify US iDlDl8di8t8|y by telephone at 978-684-2205 Orhve-mail reply and then immediately delete this message. Thank you. � From: Tvnnon, Judy Sent: Thursday, September 26, 2O13 3:57 PM TO: Cc: Enright, Jean Subject: Next Week's Meeting Jeff and Dermot, | will not hein the office tomorrow. Dermot, please send your report directly tn Jeff and to Jean Enright here inthe Planning Office ao that she can send itto the Board. Thanks Judy Judith M.Tymmon 'Town Planner Town of North Andover 12Q Main Street North Andover,MA01845 Phone 978.608.9535 Fax�� Email Web 10 Please,note the Vlassachus0s Secretary of Stale's office has determined that most emails to and ffom rnunicipal offjc(as and officials are public iecords. Fol more information please efe/to: Please consider the onvinnmomuexe printing this email. 2 Dermot J. Ka�Associates, Inc. ����= � Traffic Engineering/Transportation Planning 0Ca0eron Road Andover, K8AO1O1U 978'664-2205 ' MEMORANDUM TO: Judith M. Tvn)on. A|CP FROM: Dermot J. Kelly, PE, PTOE Planning Department [UK Associates, Inc. 1600 Osgood Street OCamaron Road North Andover, ;WAD1845 Andover, MAO181O SUBJECT: 102 Peters Street REF: 822-W1enn10-TGG North Andover, MA Traffic Simulation Study DATE: September 20. 2013 Traffic Simulation Study (TTS) In order to respond to the C0DCerDo of the Planning Board regarding the Simulation of Traffic in the parking lot of the proposed Daycare facility, Precision Data Industries, LLC (P[}|) was commissioned to oOnnp|ote a Traffic SinnU|8dOO Study (T88) of the parking |cd for the proposed � Daycare facility under the pnOpO8ad operating conditions. To oorDp|8[e this study, several � drivers were hired to drive into the parking lot and simulate the dropping-off ofo young child at � the Daycare facility between 7 and QAM. This Study was completed oD Wednesday September 25, 2013. All drivers were instructed to arrive/depart tnAfrOno the site in a pattern that would � � mirror 5vehicle arrivals every 15 minutes. The five vehicle arrival rate was chosen to match the � recommendation from the town's Traffic Pee[ Review Consultant, Vonaaee & Aoaooiotes. Inc. (VA|). VA|'a letter dated September 10. 2013 noted "Implementing an acbveorop~offlb/cb~up � management plan such that no more than five (5) children arrive in n 15-minute pa/imm/ would 0rn/t the traffic and parking demands to a /eve/ that is oonnxnmnmurmte with the available parking supply afforded by the Project site and allow sufficient timmfmrveh/n/es to emit in the context of queuing at the Turnpike StregLVPetmms Street intersection." The proponent is willing to accept this condition as part of an overall approval of the proposed project. For the purpose of this study, we have interpreted the 5 children per 15-minute arrival � rate to rDeeD five vehicles per 15-minutes since the study assumes no carpooling and no siblings arriving in one vehicle. The five vehicle arrival rate was developed such that vehicles #1 fk #2 would arrive at approximately 7:00 AK8` vehicles #3 & #4 would arrive at approximately � 7:05 AM and vehicle #5would arrive at approximately 7:1O AM, creating pattern of 2, 2 and 1 � vehicle arrivals every 5 minutes starting ot7:OUAM. Ais'2^2`0dA~Ve' hide'­dfr|Ve| pattern was repeated every 15 minutes starting et. 7:15 AM' 7:30"AK8,^7:45' 7\M. etc. The actual Traffic Simulation Study arrival schedule, Table 1' Traffic Simulation Study Instructions, is reproduced in the appendix of this Memorandum. DernnoiJ. K�k/Aseuc�tem Inc. ~- ~- � � Traffic Engineering/Transportation Planning Judith [N. Tvnnon. A|CP September 20. 3O13 Page The Traffic Simulation Study drivers were given three different routes to approach and depart the site to simulate the projected traffic vO|UnneS at the site driveway and parking lot. The project traffic Vo|unnen are similar tothe OJKAaeociatea. Inc. K88Uno/anduno dated AVgUSL 14, 2013. The aotU8i projected traffic volumes are ShVvvn in Figure 1 2013 Existing Plus Site Generated Peak Hour Traffic Vo|Uno8s in the appendix of this Memorandum. Note the existing traffic volumes shown on Figure 1 are from the August 14, 2013 OJK Associates, Inc Memorandum and not from the T[eOiC Simulation Study. The three different approach/departure routes are described below and they are consistent with the North Andover Police Department recommendation that the exit drive be signed for RIGHT TURNS ONLY: �= Red Route - Vehicle/Driver #1 was assigned to enter the site from east of the G@|e0 Turnpike/Peters Street intersection and travel westbound along Peters Gt[mat and turn left into the Site. The departure route was e right turn out of the Site Drive and eastbound through the Peters Street/Salem Turnpike intersection. �+ Blue Route-Vehicle/Drivers#2 & #4 were assigned to enter the site from Peters Street eastbound and [U[n right into the site. The departure route was a right turn out of the site drive and a right turn at the Peters Street/Salem Turnpike intersection. Green Route - Vehicle Driver #3 was assigned to enter the site from Salem Turnpike northbound, turn left etthe signalized inta[s8CU0D and then turn left into the site (i.e. double lefts). The departure route was n right out of the Site Drive and a right turn 8tthe � Peters Street/Salem Turnpike intersection. Traff lG Simulation Study Video The TSSwas recorded by m Video Recorder camera located immediately west of the site and it recorded the entire parking lot between Y and SA[W. VV8dDeSdoy` September 25, 2013. The Traffic Simulation Study Video was conducted without the benefit of the proposed [)O NOT BLOCK INTERSECTION sign (MUTCO reference # R10-7) placed along Peters Street in advance of the Site Drive and the proposed [)O NOT BLOCK pavement markings on Peters Street in the eastbound lane adjacent to the Site Drive. The video files have been separated into two files with one file "212593_h264 O.nnp4" showing the 7to 8 A time period and the other file, "212593_h264_1.nxp4" showing the 8 to 3 8M time period. In order to view the fi|es, follow the instructions below: 1. Go to 2. Enter email login as 3. Enter password as "k8iO2013TOO"; � 4. Click"List Vievv''; 5. Check the check box on the left under#and double left click "I 33533A"� . � 0. Choose either file "212593 h2O4 O.n0o4" for the 9/25/13 7:00 to 7:50 AM video or file � "212593 h2O4 1�mp4"for�heQ/25/13O�ODtoD��SA�Wvideo� � _ _ � � ' 9/26o3; oo[r 882-mem10w+Appondix Dermot J. Kelly Aosoo�tes. Inc. ~�~ ~— � � TraffioEngineahng/Tmnaportoion Planning Judith PW. Tvmon. A|CP September 2O. 2O13 Page If there are any problems viewing the fi|ee, please do not hesitate to contact OJK Associates, Inc. ParkLingAccumulati The Parking Accumulation Study was derived from the TSS Video so that one could observe the nnox|mu0 on-site parking demand during 8 specific time period as opposed to observing the entire 2 hour video. Table 2' Traffic Simulation/Parking AnCU[nU|aUon Study as reproduced in the appendix of this Memorandum presents the FeSU|ka of the Study in Tabular format. The Average Parking Duration for all 30 Parent Vehicles was nearly 2 minutes /1:47>. Please note that the 39 parent vehicles include no oerpon|ing, no siblings in one vehicle, full 8UBDdoDce and no all arrivals OCoU[[ing after 8AM. The on-site peak parking demand varied according to the number Of staff vehicles parked on-aibe. For example, when there was one staff vehicle parked OD-site. the peak parking demand was 3 vehicles, 1 staff vehicle plus 2 parent vehicles. When there were two staff vehicles parked on-site, the peak parking demand was 4 vehicles, 2 staff vehicles plus 2 parents' vehicles. When there were three staff vehicles parked on-sihe, the peak parking d8Dl8Dd was 5 vehicles, 3 staff vehicles plus 2 parent vehicles. When there were four staff vehicles parked on-site, the peak parking demand was O vehicles, 4 staff vehicles p|US 2 parents' vehicles. The reserved parking supply during each time period would vary from 8. 7. 0 and 5 ap8C8S' respectively. These reserved spaces could be used if parent arrives early or late h] the Oayoanefaoi|itv ' � The peak parking demand first occurred at 8:30:15 AM and occurred three other times for short � durations up to 8:52:12 AM. To review the peak parking d8nooDd go the video file "212593 h2O4_1.Vno4" 8ndnlVv8thetin0ee|ide[ to@[0UDd3O:0O. A review ofa portion ofthis � time period VvoU|d provide an indication of how the site would operate during peak parking demand periods. During this p8[iod, there is a reserve capacity of spaces (including 1 HP � space). on: Mr. Jeffrey G. [}i[h. \A\| Mr. Jeffrey Sheehy, Dundee Properties, LLC yN[ Mark Johnson, Johnson & Bonanetein LLC Ms. Kerry FoDtmSie, BU||diDQ Blocks Preschool W1[ VWUiern MacLeod, Andover Consultants, Inc. omm1o; 3 m7 DJKDermot J. Kelly Associates, Inc. Traffic Engineering/Transportation Planning Judith M. Tymon, AICP September 26, 2013 Page 4 APPENDIX A. Table I — Traffic Simulation Study Instructions. B. Figure 1: Existing Plus Site Generated Peak Hour Traffic Volumes C. Table 2— Traffic Simulation/Parking Accumulation Study 9/26/13; 4 of 7 882-Mem10 w-Appendix Table 1 - Traffic Simulation Study Instructions 102 Peters Street, North Andover, MA Projected PDI/Parent/C Arrival aregiver Red Green Blue 15 Minute Time Departure Route Route Route Time Period Totals 7:00 AM 6:58 AM Veh. 1 7:00 AM 6:59 AM Veh. 2 7:05 AM 7:03 AM Veh. 3 7:05 AM 7:04 AM Veh. 4 7:10 AM 7:08 AM Veh. 1 7:00 -7:14 AM 5 7:15 AM 7:14 AM Veh. 2 7:15 AM 7:13 AM Veh. 3 7:20 AM 7:19 AM Veh. 4 7:20 AM 7:18 AM Veh. 1 7:25 AM 7:24 AM Veh. 2 7:15 -7:29 AM 5 7:30 AM 7:28 AM Veh. 3 7:30 AM 7:29 AM Veh. 4 7:35 AM 7:33 AM Veh. 1 7:35 AM 7:34 AM Veh. 2 7:40 AM 7:38 AM Veh. 3 7:30 -7:44 AM 5 7:45 AM 7:44 AM Veh. 4 7:45 AM 7:43 AM Veh. 1 7:50 AM 7:49 AM Veh. 2 7:50 AM 7:48 AM Veh. 3 7:55 AM 7:54 AM Veh. 4 7:45 -7:59 AM 5 8:00 AM 7:58 AM Veh. 1 8:00 AM 7:59 AM Veh. 2 8:05 AM 8:03 AM Veh. 3 8:05 AM 8:04 AM Veh. 4 8:10 AM 8:08 AM Veh. 1 8:00 -8:14 AM 5 8:15 AM 8:14 AM Veh. 2 8:15 AM 8:13 AM Veh. 3 8:20 AM 8:19 AM Veh. 4 8:20 AM 8:18 AM Veh. 1 8:25 AM 8:24 AM Veh. 2 8:15 -8:29 AM 5 8:30 AM 8:28 AM Veh. 3 8:30 AM 8:29 AM Veh. 4 8:35 AM 8:33 AM Veh. 1 8:35 AM 8:34 AM Veh. 2 8:40 AM 8:38 AM Veh. 3 8:30 -8:44 AM 5 8:45 AM 8:44 AM Veh. 4 8:45 AM 8:43 AM Veh. 1 8:50 AM 8:49 AM Veh. 2 8:50 AM 8:48 AM Veh. 3 8:45 -8:59 AM 4 Total 10 10 19 39 Staff Arrival 1 Prior to 7:00:00 AM Staff Arrival 2 7:25 AM Staff Arrival 3 7:55 AM Staff Arrival 4 8:25 AM C:\AII DJK Flles\Active Jobs\Job Word\822 Dundee,North Andover,MA\Average Weekly Temporal Sign-in-6.xlsk 920�:9t 7 882-Mem10 w-Appendix Figure 1: 2013 Existing Plus Site Generated Peak Hour Traffic Volumes Weekday Morning Peak Hour v Z5 0 r- (o co R`94 ,--477 C'4 n Lo 4---225(6) Peters Street X11(11) X44 (Route 133) 392—► 38 I 10(10) 175(5)— d 198(14) =b r- r- rn � r (4 Q) S Q 4) Q) � SI TE i In 21 v Out 19 Total 40 Weekday Evening Peak Hour or 0 0)r`-,-m 4_177 +-375 cv� � a-161(3) Peters Street v 6(6) 1 4 X53 (Route 133) 593— 64 7(7) 295(4) I r-rn 249(11)- 0) u7 rn v 5 Q w v Q S1 TJ28 In o v ut Legend: Total xx Total Vehicle Trips (xx) Site Generated Trips Only Schematic DJKDermot J. Kelly Associates, Inc. Traffic Engineering/Transportation Planning 9/26/13; 6 of 7 Copyright @ 2010 By DJK.All rights reserved. 882-Meml d W-AppenQ(2-NO3a Table 2 ~Traffic Simulation/Parking AccW|Q00atioO Study (a) Time Vehicle Time Vehicle Parking Total To— al PDI/Parent Entered Exited Duration Vehicles In Projected Project &Staff Parking Parking For Parent Lot Vehilce Arrival Arrivals Vehicle Space Space Vehicles (Parents+ Parked In Time Per 15 Arrivals (Min:Sec) (Min:Sec) (Min:Sec) Staff) Space# Period 1 7:01:53 AM 7:03:01 AM 01:08 2 2 2 7:02:27 AM 7:04:22 AM 01:55 3 3 3 7:03:30 AM 7:04:45 AM 0115 3 2 4 7:05:03 AM 7:07:18 AM 0215 2 2 5 7:09:59 AM 7:11:28 AM 01:29 2 2 7:00-7:14 5 7 7:15:12 AM 7:16:48 AM 01:36 3 3 B 7:20:05 AM 7:23:06 AM 03:01 2 2 Q 7:20:16 AM 7:21:59 AM 01:43 3 3 10 7:24:26 AM 7:25:46 AM 01:20 2 2 Staff'#2 7:24:4 K8 OA 3 5 715-7:20 5 12 7:29:42 AM 7:32:12 AM 02:30 4, 2 13 7:34:23 AM 7:36:24 AM 02:01 3 2 14 7:34:29 AM 7:35:50 AM 01:21 4 3 15 7:3011 AM 7:40:41 AM 01:30 3 1 7:30 -7:44 5 17 7:44:56 AM 7:47:09 AM 0213 4 3 18 7:48:53 AM 7:50:03 AM 0110 3 1 19 7:50:03 AM 7:51:33 AM 01:30 4 3 Staff'#3 7:52:20 AM 3 11 20 7:56:15 AM 7:58:32 AM 0217 4 2 7:45-7:5S 5 22 8:00:31 AM 8:02:10 AM 01:39 5 3 23 8:04:40 AM 8:07:19 AM 02:39 4 3 24 8:05:23 AM 8:07:00 AM 01:37 5 1 25 8:10:13 AM 8:12:05 AM 01:52 4 3 8:00-8:14 5 27 8:15:26 AM 8:16:48 AM 01:22 6 1 28 8:20:16 AM 8:22:30 AM 0214 4 1 29 8:20:20 AM 8:2211 AM 01:51 5 3 Staff-#4 8:23:57 AM 4 10 30 8:25:16 AM 8:26:25 AM 01:09 S 2 815'82Q 5 32 8:30:15 AM 8:32:31 AM 0216 6 3 33 8:34:21 AM 8:36:37 AM 0216 5 2 34 8:34:29 AM 8:35:45 AM 0116 6 1 35 8:39:44 AM 8:42:08 AM 02:24 S 1 8:30-8:44 5 37 8:45:02 AM 8:47:32 AM 02:30 6 3 38 8:49:04 AM 8:51:20 AM 0216 5 1 39 8:50:06/M 8:5212/M 02:06 G 3 O:45-8:59 4 xn O:581,7A�N 8.51:38AK8 01:01 T 2 Not ToBeIncluded In xx 8,52 32AN1 5 4 TGG Average Parking Duration For Parent Vehin|ee (K0|n:Sec) 01:47 (a)The Parking Acculumation Study was derived from the Traffic Simulation Study which was conducted between 7-9 AM on Wednesday September 25, 3013 at 102 Peters Street, North Andoverr, MA. C:\A11 DJK Flies\Active Jobs\Job Word\822 Dundee,North Andover,MA\PDRTSS\822-TTS-1 33553-North An%T-M9RN*-'�$VAAX