Loading...
HomeMy WebLinkAboutHealth Permit # 4/30/2003 7Noo.3 MISS Town of North Andover, Massa777Form BOARD OF HEALTH NORTH o F 7J DISPOSAL WORKS CONSTRUCTION PERMIT 1SSACHUSEt Applicant ADDRESS TELEPHONE NAME Site Location L2 Permission is hereby granted to Construct ( ) or Repair (,-ran Individual Soil Absorption Sewage Disposal System as shown on the Design Approval S.S. No. CHAIRMA H EALTH Fee . D.W.C. No. APPLICATION FOR DISPOSAL WORKS CONSTRUCTION PERMIT DATE: w CURRENT INSTALLER'S LICENSE# LOCATION: Fn w .. LICI:NSrD INSTALLER: SIGNATURE: �� � �� TELEPHONE# CHECK ONE: REPAIR: NEW CONSTRUCTION: IF NEW CONSTRUCTION, PLEASE ATTACH FOUNDATION AS-BUILT. Administrative Use Only " $175.00 Fee Attached? Yes . No Foundation As-built? Yes No Floor plans on file? Yes No Approval Date: INSTALLER PROJECT MANAGEMIE NT OBLIGATIONS As the North Andover licensed installer for the construction of the septic system for the property at ° � �. �, � relative to the application of ��„� dated i �t 'w _ for plans by ��e,. a i� „� �a�. and dated with revisions dated I understand the following obligations for management of this project: 1. As the installer I am obligated to obtain all permits and Board of Health approved plans prior to performing any work on a site. I must have the approved plans and the permit on site when any work is being done. 2. As the installer I must call for any and all inspections. If homeowner, contractor, project manger, or any other person not associated with my company schedules an inspection and the system is not ready then item three shall be applicable. 3. As the installer I am required to have the necessary work completed prior to the applicable inspections as indicated below. I understand that requesting an inspection, without completion of the items in accordance with Tile 5 and the Board of Health Regulations may result in a $50.00 fine being levied against my company. a) Bottom of Bed - generally first inspection unless there is a retaining wall which should be done first. Installer must request the inspection but does not have to be present. b) Final inspection — Engineer must first do their inspection for elevations, ties, etc. As-built or verbal OK from engineer must be submitted to Board of Health, after which installer calls for inspection time. Installer must be present for this inspection. With pump system all electrical work must be ready and able to cause pump to work and alarm to function. c) Final Grade=Installer must request inspection when all grading is complete. Does not have to be on site. 4. As the installer I understand that only I may perform the work (other than simple excavation) required to complete the installation of the system identified in the attached application for installation. I further understand that work by others unlicensed to install septic systems in North Andover can constitute reasons for denial of the system, and/or revocation or suspension of my license to operate in the Town of North Andover; significant fines to all persons involved are also possible. 5. As the Installer I understand that I must be on site during the performance of the following construction steps: a) Determination that the proper elevation of the excavation has been reached. b) Inspection of the sand and stone to be used. c) Final inspection by Board of Health staff or consultant. d) Installation of tank, D-box, pipes, stone, vent, pump chamber, retaining wall and other components. 6. As the installer I understand that I am solely responsible for the installation of the system as per the approved plans. No instructions by the homeowner, general contractor, or any other persons shall absolve me of this obligation. Undersigned Licensed Septic Installer Date: .M. Disposal Works Construction P"rmit 4 /G ''