HomeMy WebLinkAboutHealth Permit # 11/10/2005 . .. . z . . . . . > .
-
. � �.
. , : .
\\� �
». . . «.
\> � �
. � .
. «. Z
;
:«�`
. . . . . . � �, .
, �
-� -� —
_. - t� �'r
or
° TODAY'S DATE
�a n ructi Permit .— TOWN _ .
M'
�w.-$ 250mm:40, Full Repairµ,,.
Component
Important: Application is hereby made for a permit to:
When filling out ❑ Construct a new on-site sewage disposal system*
forms on the
computer, use Repair or replace an existing on-site sewage disposal system*
only the tab key
to move your ❑ Repair or replace an existing system component
cursor-do not
use the return
key. A. Facility Information
Address or Lot#
p __. - — —
_ /za
eNm C ity/Town -
2.- *TYPE OF SEPTIC SYSTEM*:
❑ Pump ❑ Gravity (choose one)
***If pump system, attach copy of electrical permit to application***
❑ Conventional System (pipe and stone system)
❑ Infiltrator or Biodiffuser(Gravel-Less) (Attach a copy of your certification to install this type of system.
❑ Pressure Distribution S.A.S. (No D-Box) (Attach Draft Maintenance Agreement)
❑ Pressure Dosed (D-Box Present) S.A.S.
2. Owner Information
w� �..
G °.
Name
Address(if different from above)
........ _ .___.--- ------- _....— — -
City/Town State Zip Code
Telephone Number
3. Installer Information,
1 c"P Name f p
Name -- -- Com an
Address I
_t--( -------
City/Town + State Zip Code
Te ephone umber(Cell Phone#if possible' p please)
4. designer Information
` ' E
. of° ) amr Name of Comp$ " 4
Name an y
Address
City/Town , , State Zip Code
Telephone Number(Best#to Reach)
Application for Disposal System Construction Permit.Page 1 of 2
Z 10 Z abed.aiu.uad uoponilsuoO uaals(S jesodsia aoj uoi}eoijddd
ON —SdA :(A'luo uo!;onajsuoo mou)z suvl r coolI •s
(uvld paZO.sddv sv ajpas atUVS)
ON �: S A uoa uog onj suoo mou in uo!jv uno
a'
ON SdA Monad jvO�slaaj� o oo c�av1�16'`os jj Ewa s S utn� -�
ON SdA zpdgovj V ituoj uoi�v�zjgO ca9vuvji�IaaCojd
ON SdA �payapl,V dal .l
Juq esn 55,116 ao-A
:suoseea 6UIMOIIOI auj JOI panoiddesla uoijeoilddy
ale(] MeN
( y Wl/ N.� p 8,
ani�e�uasaada ea a ae'�o ) :AS panaaddy uoijeOilddy
axed "
:w ,.
WWOH Jo paeoa SIIgj Aq pops s s►ueeq
seW ooueydwoo jo a;eoy!p9O a Igun uopeaado ut wajsAs oqj weld of jou pue `aanopud W,UoN
jo umol ey;aoj suopeinBad/esodst(7 ooeunsgng jeao-j aW; se item se `opo j le)uoWuoaInu3
eqj jo 5 opU jo suoistnoid eq; q;!m aauepaoaae ut we;sAs/esodstp 96emes ops°ua
paguosep°aaoje eq;jo eoueuejtgew pue uogona.;suoo ey; aansue o;seeibe pain ivepun ey.L
juaweei6v -8
IeiOa9uauaaOE1 as 6ui118nna 1eiIuepise ulp�!n Io o
....penurluoo uoi emiolul �Pe j
Z :1 Judd
r�yntt�vss
auauodmoo- 00'SZL$
aledoN Iln_A–00'05Z $ M10 ,,X,� 'x
—
IIWJGd u ilmilsu v a y
31Ha SIAV(JOl a �
•.. .,_, -_ 11 lesoasid I J u p
INS'T'ALLER PROJECT MANAGEMENT OBLIGATIONS
As the North Andover licensed installer for the construction of the septic system for the
property at 1-Z .� o'),std ��� t ,,.....r.. relative to the application
for plans bye ` . —and
dated .1....,/ 3 � with revisions dated ,q,,
I understand the following obligations for management of this project:
1. As the installer I a►n obligated to obtain all permits and Board of Health approved plans prior
to performing any work on a site. I must have the approved plans and the permit on site
when any work is being done.
2. As the installer I must call for any and all inspections. If homeowner, contractor, project
manger, or any other person not associated with ►ny company schedules an inspection and the
system is not ready then item three shall be applicable.
3. As the installer I am required to have the necessary work completed prior to the applicable
inspections as indicated below. I understand that requesting an inspection, without
completion of the items in accordance with Tile 5 and the Board of Health Regulations may
result in a $50.00 fine being levied against my company.
a) Bottom of Bed - generally first inspection unless there is a retaining wall which should be done
first. Installer must request the inspection but does not have to be present.
b) Final inspection — Engineer must first do their inspection for elevations, ties, etc. As-built or
verbal OK from engineer must be submitted to Board of Health, after which installer calls for
inspection time. Installer must be present for this inspection. With pump system all electrical
work must be ready and able to cause pump to work and alarm to function.
c) Final Grade-- Installer must request inspection when all grading is complete. Does not have to be
on site.
4. As the installer I understand that only I may perform the work (other than simple excavation)
required to complete the installation of the system identified in the attached application for
installation. I further understand that work by others unlicensed to install septic systerns in
North Andover can constitute reasons for denial of the system, and/or revocation or
suspension of my license to operate in the Town of North Andover; significant fines to all
persons involved are also possible.
5. As the Installer I understand that I must be on site during the performance of the following
construction steps:
a) Determination that the proper elevation of the excavation has been reached.
b) Inspection of the sand and stone to be used.
c) Final inspection by Board of Health staff or consultant.
d) Installation of tank, D-box, pipes, stone, vent, pump chamber, retaining wall and other
components.
6. As the installer I understand that I am solely responsible for the installation of the system as
per the approved plans. No instructions by the homeowner, general contractor, or any other
persons shall absolve me of this obligation.
Undersigped,Licensed Septic Installer
Date:
��i