HomeMy WebLinkAboutCertificate of Compliance - 83 OLYMPIC LANE 7/25/2006 %AoRri4
O
ORATED
C HU5�t
PUBLIC HEALTH DEPARTMENT
(ommunity Development Division
C TI(F IC.A`�j �' �l<'�IA.
As of:
,Vuly 25, 2006
,This is to certify that the individual subsurface d4osal system was repaired with a
Septic Tank Replacement
6y:
,john Soucy
At:
83 Olympic Lane
`North fl ndover. XA O 1 R4S
The issuance of this certificate shall not 6e construed as a guarantee that the system will
function satisfactorily.
Susan T Sawyer, ICE TS/RR
,Pu6lic ifealth(Director
1600 Osgood Street,North Andover,Massachusetts 01845
Phone 978.688.9540 Fax 978.688.8476 Web www.townofnorthandover.com
TOWN OF NORTH ANDOVER a"°aTM�H
Office of COMMUNITY DEVELOPMENT AND SERVICES
HEALTH DEPARTMENT
400 OSGOOD STREET ,
_ p
ppAnp✓PN'M1'
NORTH ANDOVER, MASSACHUSETTS 01845 ACHWU ,
I�Q 3' 2 00(N'
978.688.9540-Phone
OWN Sasan Y.Sawyer,R HS/RS 978.688.8476-FAX
Ii li%U►r r E-MAIL:healthdept @townofnorthandover.com
i t
i � ,Di
WEBSITE:hgp://www.townofnorthandover.com
TOWN OF NORTH ANDOVER
SEPTIC DISPOSAL SYSTEM - INSTALLATION CERTIFICATION
The undersigned hereby certify that the Sewage Disposal System( ) constructed; W repaired;
by J,>Vx vi (6 0r
(Print Name)
located at 0 >
(Installation Address)
was installed in conf rmance with the North Andover Board of Health approved plan, originally
dated and last Revised on ,with a design flow of
gallons per day. The materials used were in conformance with those
specified on the approved plan;the system was installed in accordance with the provisions of 310
CMR 15.000, Title 5 and local regulations, and the Final grading agrees substantially with the
approved plan. All work is accurately represented on the As-built which has been submitted to
the Board of Health.
- Bed inspection date: I
Engineer Representative(Signature)
And-Print Name
Final inspection date: / o- (-.:;'
Engineer Represen ative(Signature)
And-Print Name
Installer JA (Signature) Date:—'7 ' 16-0
And-Print Name
Engineer: - (Signature) Date: 7 �-
CA-
And-Print Na
TOWN OF NORTH ANDOVER
11E,Ai..,,n1 D1�13,XRIMEN"I' 4
400 0SGOOD SIR1.11-1,11"
NORTH ANDOVI.-I'R, NIASSACHUSFAI'S 0 1845 OW
SLISMI Y. Sawyer, REIIS/RS 978.688.9540 Phone
Public Health Director 9'78.688.8,176 FAX
QNSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: MAP: LOT:
INSTALLER:
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN:
INSPECTIONS
TANK INSPECTION:
DATE OF BED BOTTOM INSPECTION;
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
SITE CONDITIONS
❑Existing septic tank properly abandoned
❑Internal plumbing all to one building sewer
ETopography not appreciably altered'-
Comments: eql
I'Z
SEPTIC TANK ...........
..................
Bb' tt0 M"oft a-ink''hole has 6" stone base
eephcile,,�lugged
(1500 gallon tank has been installed
H-1' a
"- Tlba�ding&' Monolithic construction
❑ 'Water tightness of tank has been achieved
(Visual or Vacuum Test or Water held for 24hrs)
Inlet tee installed, centered under access port
Outlet tee as baffle or effluent filter) installed,
centered .err access port
❑ 24" inch cover to within 6" of final grade installed over
ihtone access port, must be over outlet of tank if effluent
�
filter is present
Hydraulic cement around inlet & outlet
�v t Feb 2006
System Documentation
Page I of 6
A
TOWN OF NORTH ANDOVER F �aORTH
Office of COMMUNITY DEVELOPMENT AND SERVICES
HEALTH DEPARTMENT 0 .- A
4 F
a i v
400 OSGOOD STREET
NORTH ANDOVER, MASSACHUSETTS 01845 9SSACHUSESA�
Susan Y. Sawyer, REHS/RS 978.688.940—Phone
Public Health Director 978.688.8176—FAX
Comments:
PUMP CHAMBER
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ Combo Tank installed. Size:
❑ 1000 gallon Pump Chamber installed
H-10 loading
Monolithic construction)
❑ Inlet tee installed, centered under access port
❑ Pump(s) installed on stable base
❑ Alarm float working
❑ Pump On/Off floats working
❑ Separate on/off floats
❑ Drain hole in pressure line
❑ 24" inch cover to within 6" of final grade installed over
pump access port
❑ Water tightness of tank has been achieved
Visual testing
❑ Hydraulic cement around inlet & outlet
Comments:
ADVANCED TREATMENT TECHNOLOGY
❑ Type of treatment device:
❑ Installed per manufacturers requirements
❑ All components working in accordance with
manufacturer's requirements
Comments:
Wastewater System Documentation—Feb 2006
Page 2 of 6
TOWN OF NORTH ANDOVER F NORTH �
Office of COMMUNITY DEVELOPINIENT AND SERVICES 4,��
® 0 ' ' P
AL's DEPARTMENT
400 OSGOOD STREET
NORTH ANDOVER, MASSACHUSETTS 01845 �gSsACHUgetay
Susan Y, Sawycr, REHS/RS 978.688.9540—Phone
Public Health Director 978.688.8476—FAX
D-BOX
❑ Installed on stable stone base
❑ Inlet tee (if pumped or >0.08'/foot)
❑ Hydraulic cement around inlet & outlets
❑ Observed even distribution
❑ Speed levelers provided (not required)
Comments:
SOIL ABSORPTION SYSTEM'
❑ Bottom of SAS excavated down to soil layer, as
provided on plan
❑ Size of SAS excavated as per plan
❑ Title 5 sand installed, if specified on plan
❑ 3/4-1 Y2" double washed stone installed
❑ 1/8-1/2" (peastone) double washed stone installed
❑ Laterals installed and ends connected to header
❑ Laterals vented if impervious material above
❑ Orifices @ 5 & 7 o'clock positions
❑ Gravel-less disposal systems: type, number and
location as per plan
❑ Elevations of laterals installed as on approved plan
❑ 40 Mil HDPE barrier installed
❑ Retaining wall (boulder/ concrete /timber/ block)
❑ Final cover as per plan
Comments:
Wastewater System Documentation—Feb 2006
Page 3 of 6
TOWN OF NORTH ANDOVER HrH
1 1 1 1 ~ ,Z.ob SaD eD��rO
Office of CONIi� UNI T°Y DEVEL.OPNIENT AND SERVICES 0
HEALTH DEPARTMENT
TENT
a
400 OSGOOD STREET
NORTH ANDOVER, MASSACHUSETTS 01845 ?r�ss""° .�gy
US
Susan Susan Y. Sawyer, REHS!RS 978.688.940—Phone
Public Health Director 978.688.8476—FAX
PRESSURE DISTRIBUTION
❑ -- inch manifold
laterals installed with end sweeps
size:
material:
❑ Squirt test ft in height
❑ Equal distribution to all laterals
❑ orifice size inch as per plan
Comments:
CONTROL PANEL
❑ Alarm & Pump are on separate circuits
❑ Alarm sounds when float is tripped
❑ Location of control panel:
❑ Rated for exterior if placed outside
Comments:
Wastewater System Documentation—Feb 2006
Page 4 of 6
TOWN OF NORTH ANDOVER o�"O oT" q
Office of COMMUNITY DEVELOPMENT AND SERVICES ,r� "`'` `�°�0
0 p
HEALTH DEPARTMENT
400 OSGOOD STREET
NORTH ANDOVER, MASSACHUSETTS 01845 �'�ss „5es��
Susan Y. Sawyer, REHS/RS 978.688.9540—Phone
Public Health Director 978.688.8476—FAX
CRITICAL SETBACK DISTANCES
Mark those distances checked in the field against the design plan and regulatory
setback
Tank SAS Sewer
❑ Property line 10 10 --
❑ Cellar wall 10 20 --
❑ Inground pool 10 20 --
❑ Slab foundation 10 10 --
❑ Deck, on footings, etc 5 10 --
F-1 Waterline 10 10 101
❑ Private drinking well 75 1002 50
❑ Irrigation well 75 100
❑ Surface Water 25 50
❑ Bordering Vegetated Wetland ,
Salt Marsh, Inland/Coastal Bank3 75 100
❑ Wetlands bordering surface
water supply or trib. (in Watershed) 150 150
❑ Trib. to surface water supply 325 325
❑ Public well 400 400
❑ Interim Wellhead Prot. Area
❑ Reservoirs 400 400
❑ Drains (wat. supply/trib.) 50 100
❑ Drains (intercept g.w.) 25 50
❑ Drains (Other)Foundation 10(5) 20(10)
❑ Drywells 20 25
r Suction line 222(2)
2 100 feet is a minimum acceptable distance and no variance is allowed for a lesser distance(NA 5.02).
3 As defined in 310 CMR 10.55, 10.32, 10.54,and 10.30,respectively,pursuant to 15.21 l(3),also by NA wetland
bylaws
Wastewater System Documentation—Feb 2006
Page 5 of 6
TOWN OF NORTH ANDOVER N0 TH
Office ofCOi MUNITY DEVELOPMENT AND SERVICES 0
HE AL,T11 DEPikR'I ME i'I p
400 OSGOOD STREET
� i
NORTH ANDOVER, MASSACHUSETTS 01845 'r�ss""°"•kg�e
geHUs
Susan Y. Sawyer, REHS/RS 978.688.940—Phone
Public I-lealth Director 978.688.8476—FAX
SYSTEM ELEVATIONS
INVERT ON DESIGN PLAN FIELD INVERT ELEV.
Building Sewer OUT
Septic Tank IN
Septic Tank OUT
Pump Chamber IN
Pump Chamber OUT
Distribution Box IN
Distribution Box OUT
Lateral 1 HIGH
Lateral 1 LOW
Lateral 2 HIGH
Lateral 2 LOW
Lateral 3 HIGH
Lateral 3 LOW
Lateral 4 HIGH
Lateral 4 LOW
Lateral 5 HIGH
Lateral 5 LOW
Wastewater System Documentation—Feb 2006
Page 6of6