Loading...
HomeMy WebLinkAboutCertificate of Compliance - 195 OLYMPIC LANE 6/8/2000 TOWN OF NORTH ANDOVER BOARD OF HEALTH CERTIFICATE OF COMPLIANCE DATE OF COMPLIANCE: 6/8/00 This is to certify that the individual subsurface disposal system constructed O or repaired (X) by John Soucy at 195 Olympic Lane has been installed in accordance with the provisions of Title V of the State Sanitary Code and with the North Andover Board of Health regulations. The Issuance of this certificate shall not be construed as a guarantee that the system will function satisfactorily. A �� g Board of Health Inspector F11011 R. C. TANGARD PF-101qE hdG. 781 334 011 � ✓ '�'�f�..P3<.we ,Sr$:..F"+ s"�'' ra�pm3T�F'° Q*' •.'::..v'.. """A;. h .}�...YYi ��} .`1"'�1'',6sd..,.Ge. `"'��''"'i 4�e�""' > 1 I TOWN 0x7, ,VoP,( H AND SIiWACYt:. D[Spo,�.•k z: S'Y'Z Ej [ IN'M--kLLAT 101N CERTIFICATION ir The urtdersk�ntd hcre��v certiry that tl�e S-vxagc i)isposni Svwtc:,, (' ren irev; located was installed in c:MSc-'xMnce With the North, Andover.Board of ith arpr�v��' plan, System ,Dasi,n Pc,:.j-dt dated _ __ , �viti7 ar xr)Crc;Vd desim�r) r"lodv rai gallon$ per day The mater�nls usad were in coil lunar ", with those specified oh the app'ov.b plan; the systM was installed in accordiirce ith the prcvision_� rn of 310 C:�t l 5 000, Title 5 and local resJlat Otis, and the final uradim, agrees substantially Nrtith the approved plan. All work: is accurateiv represented ,;n cho .3,sAhr;iit which has bin subrnlrted to the Board c` tia" alth. t Bed Insp"don date: En$,neer Rep v ..iative Fin*1 inspmc cn dnte, _ �. t ' A n a.. ree: ltepres lii3t31ier: �,g 4 Gesirnszineer; CC lC ARa Date' r ' " TANGA!'n QIS7t' `4 k� A E21G m) TANG,t\RD ;rte' G INSPECTION CHECKLIST FOR SEPTIC SYSTEMS Yes NO Initials A. Bottom of Bed 1. Excavation to proper depth {z- "2°' With trenches,sides of excavation are beneath B horizon 3. Edge of excavation specified distance from foundation,etc. Comments: B. Retaining Wall 1. Wall height and width as specified 2. Waterproofed 3. Wall minimum 10'to leaching facility 4. Wall meets specifications of plan Comments: C. Building Sewer 1. Pipe diameter minimum 4" 2. Schedule 40 pipe 3. Watertight joints 4. Inlet to tank cemented 5. Slope minimum 0.01 or 1/8"per foot minimum 6. Pipe properly set on compact firm base 7. Pipe laid on continuous grade in straight line 8. Cleanouts precede all change in alignment and grade 9. Manholes at any 900 change 10. 10' minimum offset to water line Comments: D. Septic Tank 1. Level 2. 1,500 gal minimum ,t �/� 3. Gas baffle present on outlet = �� 4. Manhole to grade 5. Manholes over center and each tee v e = 6. 3-20"manholes 7. Inlet tee minimum 12"under invert 8. Outlet tee minimum 14"under invert 9. Outlet line cemented 10. Air space 3"above tees 11. 2"-3"drop from inlet to outlet 12. Pipe set 13. Compact base with 6"of'/4"crushed stone under tank 14. Tank is watertight Comments: Yes NO E. Pump Chamber 1. If separate from tank,compact base with 6"of/4"stone underneath 2. Minimum 2"pipe to d-box if gravity system 3. 20"access manhole 4. Tank level 5. Watertight 6. Tank size agrees with plan specification 7. Manhole to grade 8. Check valve and bleeder hole present 9. Alarm in building on separate circuit 10. Alarm functions 11. Manual operating switch 12. Pump delivers liquid to d-box Comments: F. Distribution Box 1. D-box level 2. Minimum 0.1T'(2")drop from inlet to outlet 3. Minimum 6"sump 4. Outlet pipes show equal distribution 5. Compact base with 6"of stone beneath box 6. Box is watertight 7. All lines cemented with hydraulic cement 8. Schedule 40 pipe Comments: G. Soil Absorption system 1. All stone double-washed-'/4"- 1 ''/2" -pea stone e, Bucket test done? 2. Minimum 2"of pea stone above distribution lines 3. Minimum 6"stone 4. Dis bu on lines capped etor connected together 5. Grading meets 3:1 slope � m- 6. Minimum of 9"of fill graded over system 7. Toe of slope stops minimum 5' from edge of property; if not,then swale, Comments: H. Leach Trenches I. Minimum 2 trenches 2. Length of trenches agree with plan. (Max, length 100') 3. Width of trenches agree with plan-Minimum 2';maximum-4'. 4. Vent present if{50 feet or specified 5. Distance between trenches minimum 4' and maximum of 6' 6, Minimum distance between trenches 10' 7. Pipe slope minimum 0.005 or 6"per 100' 8. Depth of trenches below outlet invert minimum of 6". Yes NO 9. Pipes set on stable base, Comments: I. Leach Field 1. Maximum length of field 100' 2. Pipe slope minimum 0.005 or 6"per 100' 3. Separation between pipe 6'maximum 4. Pipes connected at end 5. Separation between adjacent fields 10' minimum 6. Pipes set on stable base 7. Maximum 4' separation fi°om edge of field to first line 8. Minimum two distribution lines 9. Maximum perc rate 20 mpi Comments: J. Leaching Pits 1. Minimum inlet pipe 4" 2, Pits of concrete 3. Sidewall between 12"and 48"wide 4. Access manholes on each pit 5. Pipes cemented with hydraulic cement Comments: K. Final Grade I. Slope over soil absorption system minimum 0.02 2. All system components covered by at least 9"soil 3. Cover soil free of stones larger than 6" 4. Grading slopes away from dwelling 5. No areas over system that may pond