Loading...
HomeMy WebLinkAboutBuilding Permit # 6/1/2016 (3) OORrH BUILDING PERMIT o 'ta ao TOWN OF NORTH ANDOVER o ,A APPLICATION FOR PLAN EXAMINATION " w .... ' Merit NO; Date Received Arao Data Issued: LP 1 Macau IIS PORTANT: ApI tcEant must eom fete all items on this arc `;.LOCATION „- �� �� tt �� ✓° PRtPERTY 7VJN1=Ft w.... .-.«,ww l I t �orro'I rstNr k yc no y Machine Shop Vrll e e no _ �w w...� �.0 ...AM ..M �. . .. ..ww_...... .... .. .... _... ,.a .__..._ . _. ..m. . .. _.�..,.� TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential New Building One family Addition Two or more family Industrial Alteration No. of units: Commercial Repair, replacement Assessory Bldg Others: Demolition Other �eptt Well IlopC�airt d Wetlands Watershed Di qtr i' Water/�,ewr w '14, A k Identification I'iease `iype or Print C leas—ty) OWNER: Name; Phane: Address: ""CONTRACTOR Name a 7777�;77 Adtlress p '''77-777,C nstfucttan � r , Epp E►ate i H�me�lpra�ret�ant �taer� e spa Date "" �a °� 6 ARCHITECT/ENGINEER Phone:-171f < Address: �� � ��. 'E Reg. Na. FEE SCHEDULE.BULDING PERMIT.`$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. 1 _„.. Total Project �a��: � FEE: Check Na.' " ...t Receipt No,:. NOTE:1rJ: Pergcrns cantrr�ctirr avit r rsrrre ' t rid contractors do not have access to the! rrarantY"�rrnd Signature of A enYO`; r� ,1 ° .-Signature of contract �� Plans Submitted ❑ "-PTans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL Public Sewer ❑ Tanning/Massage/Body Art ❑ Swinuning Pools ❑ Well ❑ Tobacco Sales ❑ Food Packaging/Sales ❑ Private(septic tank,etc. ❑ Permanent Dumpster on Site ❑ THE FOLLOWING SECTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM DATE REJECTED DATE APPROVED PLANNING & DEVELOPMENT ❑ ❑ COMENTS CONSERVATION ❑ ❑ COMMENTS DATE REJECTED DATE APPROVED HEALTH ❑ ❑ COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Water & Sewer Connection/Signature& Date Driveway Permit Located at 384 Osgood Street FIRE DEPARTMENT Temp Dumpster on site `yes � , t r no C..ocat�d���X24 M�rri�tFeef 3 y t t _ Fire Department srgn�atulre/date i t COMMEN`fS� r „ e a r e ndover Town of ® �•. ® - C, ver, Mass, "'lurit OCOCNIC LnN! Nl WICK V 4ArE® U BOARD OF HEALTH PERM T 4Li Food/Kitchen Septic System Ah LD THIS CERTIFIES THAT ......... ... BUILDING INSPECTOR .... . .... ... ........ . ..... Foundation has permission to erect ..... ................... buildings on .... .... ... ........... ...5w-& Rough i to be occupied as ... .. Pccepiing ... ..... . ..... .. ....... .. ..... . .... . .... ..... ... ......... ............. Chimney provided that the person this permit sh n every respec con to the terms of he application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection, Alteration and Construction of Buildings in the Town of North Andover. ew PLUMBING INSPECTOR 'wx Rough VIOLATION of the Zoning or Building Regulations Voids this Permit. Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS l STARTS Rough Service .......... ::. UILDING INSPECTOR Final GAS INSPECTOR ccupancE Permit Required t® Occupy Buil ani Rough Display in s CoSic S Place on the Premises — ® Not Remove Final LathingNo r allBe one FIRE DEPARTMENT Until Inspected and Approvedthe Building Inspector. Burner Street No. Smoke Det. Page 1 of 1 VAYAlse CONSTRUCTION client: Watts Water Technologies Project: Fire Pump/Sprinkler Room Location: 815 Chestnut Street - North Andover Date of Estimate: 12-May-16 Plan Date: 14-Apr-16 Estimate#: E16-064 Estimate Summary CSI # Trade Cost 02100 Demolition $3,472 03300 Concrete $1,236 06000 Rough/ Finish Carpentry $19,750 07000 Thermal and Moisture Protection $650 08100 Doors, Frames and Hardware NIC 08800 Glass & Glazing NIC 09250 Drywall See Carpentry 09500 Acoustical Ceilings $750 09650 Flooring NIC 09900 Painting $1,089 10100 Specialties NIC 11100 Equipment NIC 12100 Furnishings NIC 15300 Fire Protection $63,600 15400 Plumbing $9,918 15500 HVAC $1,000 16000 Electrical $23,990 TOTAL $125,455 Wise Construction - Eric Libby W" - Jackie Co 7key c � �:� w.€`issue;a���£�i'm���n,,,%�z. -�.,.�,�s�i.'ss,`'�: .9 _.,.�..r.,M y,�.�9,..�_.;";��,w -�f.s...,,..a ,.,,r=_ �_,..,�'`�s-,.✓.�,�P-j�:v,. '` .e ,.� M, �,a`,'�=a_.,��r,*- '�`c.��z,�a�2,..��w.,_��.� f.._.,a,.��,-:: r, r_z:� HIMIN ENGINEERS 200 Brickstone Square I Andover, MA 01810-1488 P: 978-296-6200 1 F: 978-296-6201 RDD Uncle rstcmds Hear Engineering l 15G,,cts People LETTER OF TRANSMITTAL TO: Wise Construction DATE: 5/26/16 PROJ.NO: 20160157.00 21 East Street ATTN: Mr. Eric Libby Winchester, MA 01890 RE: Watts Water Technology—Permit Package Sprinkler Room Equipment Upgrades WE ARE SENDING YOU Attached ❑ Under separate ❑ via Wise to Pick Up on 5/26/16 Shop drawings ❑ Prints ❑ Plans ❑ Submittal ❑ Specifications ❑ Copy of letter ❑ Change order ❑ Diskettes ❑ Other COPIES DATE NO. DESCRIPTION 3 sets 5/26/16 1 Permit drawings 1 set 5/26/16 2 Design Affidavits 1 5/26/16 3 Narrative 1 5/26/16 4 COMcheck THESE ARE TRANSMITTED AS NOTED BELOW For approval ❑ Approved as submitted ❑ Resubmit copies for approval For your use ❑ Approved as noted ❑ Submit copies for distribution As requested ❑ Returned for corrections ❑ Return corrected prints For review and comment ❑ Prints returned after loan ❑ DUE ON: REMARKS CC: RDK File Signed: If enclosures are not as noted, kindly notify us at once. Q:\2016\20160157-WWT Sprinkler Rm Equipment Upgrades\0200 Correspondence\202 Transmittals\16 LtrTrans Wise Libby Permit 5-26.doc Andover I Amherst I Boston I Charlotte ( Durham � � '-� slsrs;'tit,ti"•'= `%_ Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8'h edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Watts Water Technology- Sprinkler Room Equipment Upgrades Date: May 23,2016 Property Address: 815 Chestnut Street,North Andover, Massachusetts Project: Check(x)one or both as applicable: New Construction X Existing Construction Project description: Sprinkler equipment repairs and piping revisions within existing fire pump room (basement). Relocation of plumbing system booster pump and irrigation pumps out of sprinkler room and into the adjacent janitor's closet(being converted into mechanical room). Note: Repairs as outlined in International Building Code. It is not the intent of this project to bring the entire room U to code as this would require additional architectural and electrical scope not included in this project. 1,Jeffrey Faucon, MA Registration Number: 47208 -Expiration date: 6/30/16, am a registered design professional, and that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: ] Entire Project ] Architectural ] Structural HVAC [X] Fire Suppression—NFPA 13 ] Electrical Fire Alarm -NFPA 72 ] Plumbing for the above named project and that,to the best of my knowledge, information and belief, such plans,computations and specifications meet the applicable provisions of'the Massachusetts State Building Code, (780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services in accordance with the Professional Standard of Care and be present on the construction site on a periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents, 2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable) 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. The Conti-actor shall be responsible for performing the work in accordance with the contract documents and shall be exclusively responsible for its construction means,methods, sequences and procedures, and for construction safety. Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CMR 17. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit tot OF MAO fficial a 'Final Construction Control Document'. Enter in the space to the right a"wet" JEFFREY T. or electronic signature and seal: FAUCON --i FIFIEPROIECT10N to No.47208 Phone number: 978-296-6375 Email: jfaucoii@rdkeiigineers.com Wwilding Official Use Only Building Official Natne: PermitNo.: Date: Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional wa for work per the 8'h edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Watts Water Technology-Sprinkler Room Equipment Upgrades Date: May 23,2016 Property Address: 815 Chestnut Street,North Andover,Massachusetts Project: Check(x)one or both as applicable: New Construction X Existing Construction Project description: Sprinkler equipment repairs and piping revisions within existing fire pump room (basement) Relocation of plumbing system booster pump and irrigation pumps out of sprinkler room and into the adjacent.janitor's closet(being converted into mechanical room). Note: Repairs as outlined in International Building Code. It is not the intent of this project to bring the entire room up to code as this would require additional architectural and electrical scope not included in this project. 1, Scott Guertin,MA Registration Number:46837 -Expiration date: 6/30/16, am a registered design professional, and that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Entire Project ] Architectural Structural ] HVAC Fire Suppression—NFPA 13 ] Electrical I Fire Alarm -NFPA 72 [X] Plumbing for the above named project and that,to the best of my knowledge, information and belief, such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee)shall perform the necessary professional services in accordance with the Professional Standard of Care and be present on the construction site on a periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable) 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code.The Contractor shall be responsible for performing the work in accordance with the contract documents and shall be exclusively responsible for its construction means, methods, sequences and procedures,and for construction safety. Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CMR 17. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the buil al Construction Control Document'. SCOT1 G. Enter in the space to the right a"wet" G2WERTIN or electronic signature and seal: v MECHANICALNo.46837 C6 Phone number: (978) 296-6338 Email: sgueititi@RDKEngiiieers.com Building Official Use Only Building Official Name: Permit No.: Date: Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8t" edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Watts Water Technology- Sprinkler Room Equipment Upgrades Date: May 23,2016 Property Address: 815 Chestnut Street,North Andover, Massachusetts Project: Check(x)one or both as applicable: New Construction X Existing Construction Project description: Sprinkler equipment repairs and piping.revisions within existing fire pump room(basement) Relocation of plumbing system booster pump and irrigation pumps out of sprinkler room and into the adjacent janitor's closet(being converted into mechanical room). Note: Repairs as outlined in International Building Code. It is not the intent of this project to bring the entire room up t code as this would require additional architectural and electrical scope not included in this pr 1, Keith Giguere, MA Registration Number: 49637 -Expiration date: 6/30/16, am a registered design professional, and that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: Entire Project ] Architectural ] Structural ] HVAC Fire Suppression—NFPA 13 [X] Electrical Fire Alarm-NFPA 72 ] Plumbing for the above named project and that,to the best of my knowledge, information and belief, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the Professional Standard of Care and be present on the construction site on a periodic basis to: I. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable) 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. The Contractor shall be responsible for performing the work in accordance with the contract documents and shall be exclusively responsible for its construction means, methods, sequences and procedures, and for construction safety. Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CMR 17. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the buildin official a 'Final Construction Control Document'. ,\A OF MAO, Enter in the space to the right a"wet" 0y or electronic signature and sea]: KEITH E. GIGUERE ELECTRICAL NO,49637 - "P, S A) Phone number: 978-296-6357 Email: kgiguei-e@rdkengineers.com 0 N tKILL Buil ing ficial Use Only Building Official Name: Permit No.: Date: Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8"'edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Watts Water,Technology- Sprinkler Room Equipment Upgrades Date: May 23,2016 Property Address: 815 Chestnut Street,North Andover, Massachusetts Project: Check(x)one or both as applicable: —New Construction X Existing Construction Project description: Sprinkler equipment repairs and piping revisions within existing fire pump room(basement). Relocation of plumbing system booster pump and irrigation pumps out of sprinkler room and into the adjacent janitor's closet(being converted into mechanical room). Note: Repairs as outlined in International Building Code. It is not the intent of this project to bring the entire room up to code as this would require additional architectural and electrical scope not included in this project. 1, Keith Giguere, MA Registration Number: 49637 -Expiration date: 6/30/16, am a registered design professional, and that I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Entire Project ] Architectural ] Structural ] HVAC Fire Suppression–NFPA 13 ] Electrical [X] Fire Alarm-NFPA 72 ] Plumbing for the above named project and that,to the best of my knowledge, information and belief, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the Professional Standard of Care and be present on the construction site on a periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17. (not applicable) 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code.The Contractor shall be responsible for performing the work in accordance with the contract documents and shall be exclusively responsible for its construction means,methods, sequences and procedures, and for construction safety. Nothing in this document relieves the Contractor of its responsibilities regarding the provisions of 780 CMR 17. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to t ial a 'Final Construction Control Document'. Al KC-1-44 E. Enterin the space to the right a"wet" GIGUERE or electronic signature and seal: ELECTRICAL No.49637 S I Phone number: 978-296-6357 ht Email: kgigue e@rdkengineers.com Building Official Use Only Building Official Name: Permit No.: Date: COMMONWEALTH OF MASSACHUSETTS STATE BUILDING CODE 780 CMR, 8TH EDITION CHAPTER 9 FIRE PROTECTION SYSTEMS NARRATIVE REPORT 780 CMR—901.2.1 PROJECT NAME: Watts Water Technology Sprinkler Room Equipment Upgrades ADDRESS: 815 Chestnut Street North Andover, MA RDK PROJECT#: 20160157.00 DATE OF ISSUE: May 24, 2016 , RUN V� � L"i-Z 5 Andover ( Amherst Boston Charlotte Durham 780 CMR 901.2.1 Fire Protection Systems Narrative Report—May 24, 2016 Project Name: Watts Water Technology Sprinkler Rm Equip. Upgrades RDK Project Number: 20160157.00 As required by 780 CMR§901.2.1, this narrative report is a written description of the proposed fire protection system features to be installed as part of the Watts Water Technology Sprinkler Room Equipment project located at 815 Chestnut Street in North Andover, Massachusetts. 901.2.1 (1)(i) - BASIS (METHODOLOGY) OF DESIGN Section 1 - Building Description A. "Use" Group(s)within Scope of Renovation: "B" Business(office). B. Location & Area of Renovation: Renovation to the Fire Pump Room located on the Basement Level. This building is not a high rise. C. Type(s)of Construction: 1. Non-combustible. D. Hazardous Material Usage and Storage: None in excess of exempt amounts within scope of renovation. E. High-pile Storage(over 12 ft.) of Commodities: None within scope of renovation. F. Site Access Arrangement for Emergency Response Vehicles: Existing features to remain; not affected by scope of renovation. Section 2-Applicable Laws Requlations& Standards A. Massachusetts State General Laws (MGL), Chapter 148 1. MGL§148, sections as applicable. B. 780 CMR—Massachusetts State Building Code, 8th Edition (amended IBC-2009) 1. Chapter 9"Fire Protection Systems" 2. Chapter 34"Existing Structures" C. Existing Building Code of Massachusetts (amended IEBC-2009) 1. Chapter 6"Alterations—Level 1" 527 CMR—Massachusetts State Fire Prevention Regulations 2, Chapter 1 "Massachusetts Comprehensive Fire Safety Code" 3. Chapter 12"2014 Massachusetts Electrical Code Amendments" D. National Fire Protection Association (NFPA) Standards: 1. NFPA 10 (2007)—"Portable Fire Extinguishers" 2. NFPA 13 (2013)—"Installation of Sprinkler Systems" Page 1 of 5 780 CMR 901.2.1 Fire Protection Systems Narrative Report—May 24, 2016 Project Name:Watts Water Technology Sprinkler Rm Equip. Upgrades RDK Project Number:20160157.00 3. NFPA 70 (2014) — "National Electric Code" as amended by 527 CMR Chapter 12 "Massachusetts State Electrical Code" NFPA 72 (2010)—"National Fire Alarm Code" E. Federal Regulations (significant requirements thereof to the extent applicable to RDK scope) 1. 28 CFR Part 36, ADA Standards for Accessible Design 2. 29 CFR Part 1910, Occupational Safety & Health Standards F. Documented Local Ordinances (Voluntary Compliance) 1. local bylaws and ordinances Section 3 -Design Responsibility for Fire Protection Systems A. Engineer of Record: RDK Engineers (RDK) has engineered and specified the fire protection systems to be installed. For each fire protection system designed by RDK, RDK shall review the installing contractor's Tier II shop drawings for conformance to the approved construction documents and be present at the site at intervals appropriate to become generally familiar with the progress and quality of work and to determine if the work is being performed in manner consistent with the construction documents and 780 CMR. RDK shall certify each fire protection system installation to the extent required by 780 CMR §901.5.1(1). B. The existing installation, including means of egress, fire resistance construction to be utilized. RDK Engineers shall review the installing contractor's Tier II shop drawings for conformance to the approved construction documents and be present at the site at intervals appropriate to become generally familiar with the progress and quality of work and to determine if the work is being performed in manner consistent with the construction documents and 780 CMR. Section 4-Fire Protection Systems to be Installed A. Fire Mains& Hydrants: Existing features to remain; not affected by scope of renovation. B. Automatic Sprinkler System: The existing sprinkle system piping and sprinkler layout downstream of the main riser alarm valves will remain unchanged. C. Fire Pump / Main water service entrance: The existing fire pump room and associated equipment will be demolished and replaced in kind with new equipment including a new backflow preventor, vertical electric fire pump, main pump bypass, relocated jockey pump,jockey pump controller, and fire pump test header. The equipment selected is the same service rating and duty unless otherwise required for new installation per code. D. Standpipe System: there is no standpipe system in this building. E. Fire Alarm System: Existing fire alarm system head-end, back-bone, sequence of operation, etc. to remain and are not affected by the scope of renovation. 1. Existing initiating circuits (SLC) within scope of renovated area to be modified to accommodate new or relocated initiating devices. New circuits may be added as dictated by the capacity of the existing circuits as determined by the installing contractor; the style and class of new circuits shall match that of the existing system. The following types of initiating devices shall be added: Page 2 of 5 780 CMR 901.2.1 Fire Protection Systems Narrative Report—May 24,2016 Project Name: Watts Water Technology Sprinkler Rm Equip. Upgrades RDK Project Number: 20160157.00 a. Automatic sprinkler waterflow switch b. Automatic sprinkler valve tamper switch F. Hazardous Materials Monitoring: Not applicable to the proposed renovation. Section 5 -Features Used in the Design Methodology A. Occupant Notification Procedures: Existing occupant notification via the fire alarm system and subsequent building management personnel procedures shall remain and are not affected by the scope of renovation. 1. The existing fire alarm system treats the building as a single evacuation zone. B. Safeguards: Existing fire protection systems shall be maintained throughout the construction as required by the Authority Having Jurisdiction (AHJ). Impairment to existing fire protection systems shall be approved by the AHJ and Owner prior to commencing work. A fire watch shall be provided during impairments to the fire suppression or fire alarm system in accordance with AHJ requirements. C. Future Testing & Maintenance: Modifications performed as part of the scope of renovation shall be warranted by the installing contractors for a period of one year covering defects in materials and workmanship. NFPA required inspection, maintenance and testing activities associated with the building fire protection system are the responsibility of the owner and are to be conducted under existing and/or future maintenance contracts. Section 6 -Special Consideration and Description A. Unless otherwise noted, the design of the fire protection systems does not utilize alternative compliance design methods and is not intended to deviate from the prescriptive requirements of 780 CMR or other applicable codes and standards. 901.2.1 (1)(ii) - SEQUENCE OF OPERATION A. The existing "base building" coordinated fire protection system basis of design and sequence of operation shall remain unchanged and shall not be modified under the scope of renovation. The general arrangement of the existing sequence of operation is described below and is subject to confirmation by the installing contractor and fire alarm system control unit technical representative. B. Activation of an existing or new manual pull station, smoke detector, heat detector or sprinkler system waterflow switch, taper switch or pressure switch shall initiate the predefined fire alarm system"alarm condition" sequence: 1. Display alarm condition at fire alarm control unit and remote annunciator(s). 2. Energize audible (temporal-3 pattern) and visual (UL 1971 synchronized strobe) occupant notification circuits within evacuation zone(s) as designated by pre-established control unit sequence of operations. 3. Perform auxiliary fire safety functions as designated by pre-established control unit sequence of operations such as door closure, AHU shutdown, etc. Page 3 of 5 780 CMR 901.2.1 Fire Protection Systems Narrative Report—May 24,2016 Project Name:Watts Water Technology Sprinkler Rm Equip. Upgrades RDK Project Number:20160157.00 4. Transmit alarm condition to central / supervising station and/or local fire department via existing alarm system. C. The operation of an existing or new sprinkler tamper switch or tamper switch shall initiate the predefined fire alarm system"supervisory"sequence: 1. Display supervisory condition at fire alarm control unit and remote annunciator(s). 2. Transmit supervisory condition to central/remote supervising station. D. Normal power failure to fire alarm system remote power supplies, ground faults, short circuits and open circuit conditions shall initiate the predefined fire alarm system "trouble" sequence. 1. Display supervisory condition at fire alarm control unit and remote annunciator(s). 2. Transmit trouble condition to central/supervising station. 901.2.1 (1)(M) -TESTING CRITERIA Section 1 -Testing Criteria A. Fire Protection System testing shall be scheduled, administered, conducted and overseen by the general contractor, subcontractors and manufacturer's technical representatives. B. The following fire sprinkler system inspections and testing shall be performed: 1. Visually inspect system installation for completeness, presence of defects or damage, and confirm system is placed into"all normal" operational service. 2. Hydrostatically test system piping for a period of 2-hours. Piping shall be tested to normal system operating pressure where new installed piping cannot be isolated from the existing piping. 3. Functionally operate any new sprinkler waterflow or valve supervisory switches as part the fire alarm testing. C. The following fire alarm system inspections and testing shall be performed: 1. Confirm integrity of new or modified circuits (free of grounds, shorts, opens) prior to the installation of devices, appliances or equipment. 2. Visually inspect system installation for completeness, presence of defects or damage, and confirm system is placed into"all normal" operational service. 3. Confirm correct system supervision of wiring faults, missing devices and status of normal and standby power supplies(for new equipment installed as part of the work). 4. Functionally operate new devices installed as part of the work and confirm correct sequence of operation and address/zone identification at the fire alarm control unit. 5. Confirm audibility/intelligibility and visual synchronization of notification appliances. 6. Confirm correct operation of circuits under fault conditions in accordance with installed circuit style and class. D. Documentation, to be submitted to the Engineer of Record and AHJ: Page 4 of 5 780 CMR 901.2.1 Fire Protection Systems Narrative Report—May 24,2016 Project Name: Watts Water Technology Sprinkler Rm Equip. Upgrades RDK Project Number: 20160157.00 1. Sprinkler System: NFPA 13 "Contractor's Material and Test Certificate", accurately completed and endorsed by installing contractor's signature. 2. Fire Alarm System: NFPA 72 "Fire Alarm System Record of Completion", accurately completed and endorsed by installing contractor's signature. E. Upon completion of the work, and receipt of the appropriate close-out documentation, the Engineer of Record shall certify completion for each fire protection system to the extent required by 780 CMR§901.5.1 F. The general contractor shall then schedule final acceptance demonstration testing with the AHJ in order to obtain approval for a Certificate of Occupancy. Section 2 -Equipment and Tools A. The contractor shall provide all required tools and equipment necessary to perform full functional testing as outlined. As a minimum these items shall include: 1. NFPA Forms 2. Manufacturer's Instructions 3. Fire Protection Systems Narrative Report 4. Voltage Meters 5. Gauges 6. Communication Radios 7. Printer or data transfer device for recording each FACP event Section 3 -Approval Requirements A. The contractor shall obtain written acceptance of the installed system from the AHJ prior to the owner request for a Certificate of Occupancy. B. The contractor shall replace and/or repair each system or component of a system that fails to pass the Final Acceptance Test satisfactorily. Preliminary and Final Testing shall be rescheduled and testing shall be conducted until compliance is fully demonstrated. The contractor shall be liable for all additional charges as a result of retesting. C. Final certification shall be provided from the contractors that the installation is in accordance with the approved construction documents and applicable codes. The Engineer shall certify that the installation complies with the approved construction documents per 780 CMR 901.5.1. D. Operations Manuals and Record as-built drawings shall be submitted with any modifications as a resultant of changes that were dictated from the Final Testing process. E. The Owner shall provide an emergency contact list for use by the AHJ in the event of an emergency at the protected property. END OF NARRATIVE Page 5 of 5 CoMcheck Software Version 4.0.0 Interior Lighting ComplianceCertificate Project Information Energy Code: 2012 IECC Project Title: Watts Sprinkler Rm Upgrades Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: North Andover, MA 01845 RDK Engineers 200 Brickstone Square ANDOVER, MA 01810 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-SPRINKLER ROOM(Common Space Types:Electrical/mechanical) 98 1 .10 108 Total Allowed Watts= 108 Proposed Interior Lighting Power A B C D E Fixture ID :Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. SPRINKLER ROOM(Common Space Types:Electrical/mechanical 98 sa.ft.) LED 1:S1 E:4'LED LENSED STRIP:LED Linear 33W: 1 2 33 66 Total Proposed Watts= 66 a : 1 Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.0 and to comply with the mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Watts Sprinkler Rm Upgrades Report date: 05/23/16 Data filename: Q:\2016\20160157 -WWT Sprinkler Rm Equipment Upgrades\0600 Electrical Design\603 Page 1 of 6 Lighting\20160157 com check.cck COMcheck Software rsio Inspection Checklist Energy Code: 2012 IECC Requirements: 94.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. 2012 IECC Plan Review Complies? Comments/Assumptions j C103.2 Plans, specifications, and/or OComplies Requirement will be met. [PR4]1 calculations provide all information ODoes Not with which compliance can be determined for the interior lighting Not Observable'. and electrical systems and equipment EINot Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: _.._._._._.._._..._....._........---._..___.._...._—. _ ..._.._ ............. i 1 'High Impact(Tier 1) 1 2 Medium Impact(Tier 2) i 3 Low Impact(Tier 3) Project Title: Watts Sprinkler Rm Upgrades Report date: 05/23/16 Data filename: Q:\2016\20160157 -WWT Sprinkler Rm Equipment Upgrades\0600 Electrical Design\603 Page 2 of 6 Lighting\20160157 corn check.cck � � � � � � � 2012 IECCI Rough-in Electrical Inspection Complies? Comments/Assumptions C405.2.2. Autornatic controls to shut off all E]Complies Exception: Emergency egress lighting. 1 building lighting installed in all ElDoes Not [EL22]2 buildings. RNot Observable EINot Applicable C405.2.1. I Independent lighting controls installed ElComplies Exception: Areas such as security or emergency areas that I per approved lighting plans and all ElDoes Not need continuous lighting. [EL23]2 manual controls readily accessible and FINot Observable visible to occupants. TINot Applicable C405.2.1. Lighting controls installed to uniformly.[]Complies Exception: Corridors, equipment rooms,storerooms, 2 reduce the lighting load by at least E]Does Not restrooms, public lobbies, electrical or mechanical rooms. [EL1511 50%. .RNot Observable. .E]Not Applicable ElComplies C405.2.2, Daylight zones provided with Exception: Requirement does not apply. 3 individual controls that control the ElDoes Not [EL16]2 lights independent of general area FINot Observable EJNot Applicable C405.2.3 Sleeping units have at least one Exception: Requirement does not apply. [EL17]3 master switch at the main entry door ElDoes Not that controls wired luminaires and FlNot Observable switched receptacles. ':E]Not Applicable C405.2.2. 'Occupancy sensors installed in E]Complies Exception: Requirement does not apply. 2 required spaces. ElDoes Not FINot Observable TINot Applicable C405.2.2. ,Primary sidelighted areas are :E]Complies Exception: Requirement does not apply. 'E]Does Not 3 equipped with required lighting [EL20]1 controls. .RNot Observable C405.2.2. Enclosed spaces with daylight area ElComplies Exception: Requirement does not apply. 3 under skylights and rooftop monitors :E]Does Not [EL2111 are equipped with required lighting 'RNot Observable 'E]Not Applicable C405.2.3 Separate lighting control devices for ElComplies Requirement will be met. [EL411 specific uses installed per approved ElDoes Not lighting plans. UNot Applicable C405.3 Fluorescent luminaires with odd OComplies Exception: Requirement does not apply. numbered lamp configurations that E]Does Not are with 10 feet center to center(if FINot Observable. recess mounted) or are within 1 foot EINot Applicable edge to edge (if pendant or surface mounted)shall be tandem wired. C405.4 Exit signs do not exceed 5 watts per ElComplies Exception: Requirement does not apply. � [EL611 face. ElDoes Not ]Not Observable ONot Applicable C405.2.3 Additional interior lighting power ElComplies Requirement will be met. [EL811 allowed for special functions per the :E]Does Not approved lighting plans and is .RNot Observable automatically controlled and separated from general lighting. EINot Applicable Addddoma| Coommments/Assommptioms: High Impact(Tier 1) d Project Title: Watts Sprinkler KmUpgrades Report date: 05/23/I6 Data filename: Q:\2016\20100157 VVVVTSprinkler Rm Equipment Upg,adrs\0600 Electrical Deoign\503 Page 3 of h Lighdng\20l60l57corn checkzck 1 ;High Impact(Tier 1) 2 1Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Watts Sprinkler Rm Upgrades Report date: 05/23/16 Data filename: QA2016\20160157-WVVT Sprinkler Rm Equipment Upgrades\0600 Electrical Design\603 Page 4 of 6 Lighting\20160157 com check.cck 2012IECC Final Inspection Complies? E Comments/Assumptions -- - ---- ----- ----- ---- --1-- — -- -- —--- ..............-- --._.._.------ C408.2.5. C408.2.5. Furnished as-built drawings for ❑Complies Requirement will be met. 1 electric power systems within 30 days ❑Does Not [FI16]3 of system acceptance. ❑Not Observable ❑Not Applicable -- -- -------...--- --------- -- -- -—. ........ ----------_ .._._...---- - C303 3,C4'Furnished O&M instructions for ❑Complies Requirement will be met. 08.2.5.2 systems and equipment to the ❑Does Not [FI17]3 building owner or designated representative. .[:]Not Observable ❑Not Applicable C405.5.2 Interior installed lamp and fixture ❑Complies see the Interior Lighting fixture schedule for values. [F118]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts ❑Not Observable' are less than or equal to allowed ❑Not Applicable watts. C408.3 Lighting systems have been tested to ❑Complies Requirement will be met. [FI33]1 ensure proper calibration, adjustment, ❑Does Not programming, and operation. ❑Not Observable. ❑Not Applicable C406 Efficient HVAC performance, efficient ;❑Complies [FI34]1 lighting system, or on-site supply of ❑Does Not renewable energy consistent with what is shown the approved plans. ❑Not Observable []Not Applicable Additional Comments/Assumptions: __-------__-__.....__..-......_._........_—_..... - — — - 1 High Impact(Tier 1) 2 Medium Impact(Tier: 3 Low Im �._..._ pact(Tier 3) ..._....___.:_. Project Title: Watts Sprinkler Rm Upgrades Report date: 05/23/16 Data filename: Q:\2016\20160157 -WWT Sprinkler Rm Equipment Upgrades\0600 Electrical Design\603 Page 5 of 6 Lighting\20160157 com check.cck Project Title: Watts Sprinkler Rm Upgrades Report date: 05/23/16 Data filename: Q:\2016\20160157 -WWT Sprinkler Rm Equipment Upgrades\0600 Electrical Design\603 Page 6 of 6 Lighting\20160157 com check.cck The Commonwealth of'Massachusetts Department of'Industrial Accidents Office of'Investigations � a 600 Washington Street Boston, MA 02111 www.Ynass.gav/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name (Business/Organization/Individual): Wise Construction Address: 21 East Street City/State/Zip: Winchester, MA 01890 Phone #: 781-721-1100 Are you an employer? Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ® I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. ❑ New construction 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. ® Remodeling ship and have no employees These sub-contractors have g, ❑ Demolition workingfor me in an capacity. employees and have workers' Y p' Y• 9. ❑ Building addition [No workers' comp, insurance comp. insurance.1 required.] 5. ❑ We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof.repairs insurance required.] t c. 152, §1(4), and we have no employees, [No workers' 13.❑ Other comp. insurance required.] *Any applicant that checks box#1 must also till out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I atrn ati employer that is p-oviding workers'eotrrpensation irrstrratrce for my enrp/oyees. Beloit,is the policy and job site information. Insurance Company Name: DeSantis Policy#or Self--ins. Lie. #: WCC50050135352015AMA Expiration Date: 6/27/16 ,rob Site Address: 815 Chestnut Street City/State/zip: North Andover, MA 01845 Attach a copy of the workers' compensation policy declaration page (showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to $1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORI,ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. p an p ties fpeijiiry that the information provided above is true and correct. I do hereby cer7ify under the arms d rt ��.-a Signature: � '" y° ` Date: 05/20/16 Phone#:781-721-1100 Official use only. Do not write in this area, to be completed by city or torvtr official. City or Town: Permit/License# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: OP ID:LO 'M MID YYYY) /1 FIT LIABILITY INSURANCE5 CER ° TE HOLDER. IS THIS CERTIFICATE IS ISSUED A S A MATTER OF INFORMATION ONLY AND CONFERS N R TIRE COVERAGE AFFORDED GHTS UP N THE ABY TME POLICIES CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALT BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED b subject REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. may require an endorsement. A statement on this certificate does not confer rights to the IMPORTANT: if the certificate holder Is an ADDITIOAL INSURED,the policy(les)must be endorsed. If SUBROGATION IS co the terms and conditions of the policy,certain policiesy certificate holder in lieu of such endorsement(s). CONTACT PRODUCER Phone:781-935-8480 NAME: F AIC No Inc. PHONE DeSanctis Insurance Agcy, Fax:781-933-5645 Alc No Ext 100 Unicorn Park Drive EMAIL ADDRESS: Woburn,MA 01801 PROD CER WISEC-1 CUSTOMER ID#: NAIC# INSURERS AFFORDING COVERAGE INsuRERA:Libe Mutual Insurance Cos. INSURED Wise Construction Corp INSURER B:Associated Em to era 17370 21 East Street Winchester,MA 01890 INSURERRER a D:American Insurance Coman INSURER E: INSURER F REVISION NUMBER: RIOD COVERAGES CERTIFICATE NUMBER: RESPECT TERM OR CONDITION OF ANY CONTRACT OR OTHREBR DOCUMEN IS ITH ECT TO ALL O THE TERMS, THIS IS TO CERTIFY THAT THE PCH THIS OLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PE INDICATED. NOTWITHSTANDING ANY REQUIREMENT, CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED N THE POLICIES ID LIMITS OUCY EFF POLICY EXP EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOOWNYMAMBE HAVE BEEN REDUCED PAID D�mYY 1,000,00 ITR TYPE OF INSURANCE EACH OCCURRENCE $ GENERAL LIABILITY 06127/15 06127/16 PREMISES Ea occurrence $ 300,00 T62Z11261323025 10,00 A X COMMERCIAL GENERAL LIABILITY MED EXP(Any one person) $ 1,000,00 CLAIMS-MADE Q OCCUR PERSONAL&ADV INJURY $ 2,000,00 X Per Project Agg GENERAL AGGREGATE $ 2,000,00 PRODUCTS-COMPIOP AGG $ S GEN'L AGGREGATE LIMIT APPLIES PER: LOC COMBINED SINGLE LIMIT $ 1,000,00 POLICY X PR0 (Ea accident) AUTOMOBILE LIABILITY 06127115 06127/16 S2Z11261323015 BODILY INJURY(Per person) $ A X ANY AUTO BODILY INJURY(Per accident) $ ALL OWNED AUTOS PROPERTY DAMAGE $ SCHEDULED AUTOS (per accident) $ X HIRED AUTOS $ X NON-OWNED AUTOS 10,000,00 EACH OCCURRENCE $ 10,000,00 X UMBRELLA UAB X OCCUR AGGREGATE $ EXCESS LIAR CLAIMS-MADE TH7Z11261323035 06127115 06127116 $ A $ DEDUCTIBLE X RETENTION $ 10 000 X WC STATU- OTH- WORKERS COMPENSATION 1'000'00 AND EMPLOYERS'LIABILITY CC50050135352015A 06127115 06127116 E.L.EACH ACCIDENT $ 1,000,00 B ANY PROPRIETORIPARTNERIEXECUTIVE Ya N I A E.L.DISEASE-EA EMPLOYEE $ 1,000,00 OFFICERIMEMSER EXCLUDED? MA (Mandatory In NH) E.L.DISEASE-POLICY LIMIT $ 3miU1mi If yes,describe under 06127/15 06127116 Aggloccur DESCRIPTION OF OPERATIONS below CPL201193411 C Pollution Liab "ADDITIONAL INSURED LIMITS ARE NO GREATER THAN THOSE REQUIRED BY WRITTEN DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Attach ACORD 101,Additlonal Remarks Schedule,If more space Is required CONTRACT." Evidence of Coverage CANCELLATION CERTIFICATE HOLDER EVIDE-1 EFORE SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED B EVIDENCE OF INSURANCE THE ACCORDANCE EXPIRATION HTHE POLICY PROViSIONSE WILL BE DELIVERED IN AUTHORIZED REPRESEN NE L� c 19 -2009 ACORD CO 0 N. All rights reserved. ACORD 25(2009109) The ACORD name and logo are registered marks of ACORD Massachusetts Department of Public Safety Board of Building Regulations and Standards License: CS-097661 Construction Supervisor ERIC S LIBBY 200 JEWETT ST GEORGETOWN MA Z;"K VA— Expiration: Commissioner 08/09/2017