HomeMy WebLinkAboutCorrespondence - 102 PETERS STREET 5/11/2012 'Eel: 978-682-4042 DI-J"NIDEE Fax: 978-682--3413
May 11, 2012
Ms Judy M. Tymon, AICP
Town Planner
Town of North Andover
1600 Osgood Street
North Andover, MA 01845
RE: 102 Peters Street
North Andover, MA
Please find the following enclosed:
Copy of the Certified Decision
Three Copies of the signed inylar plans
Registry of Deeds receipt dated 5/9/12
If you have any questions,please call me,
Thank you.
JeaErey heehy
EnclI
osu
)r '(5)
Mailing: Offilce:
P0. Box 3099 - Andover, M.A 018310 30 Cdenn Street, Lawrence, MA 01843
Cambridge
Statistical
—Makln Diselnetiansa Eeientlr
November 19th, 2013
North Andover Planning Board
1600 Osgood Street
North Andover, MA 01845
RE: 94/102 Peters Street
To whom it may concern:
My name is William Dwyer, and I am the owner of 94 Peters Street. It has just come to my attention
that my neighbor, Jeffrey Sheehy, at 102 Peters Street, is planning to construct a fence along our
common lot line. I am opposed to Mr. Sheehy putting this fence up for a number of reasons.
I feel that it will have a negative impact on my property. There is currently a grass strip that runs
along the common lot line where the fence is planned, and adding the fence will increase my
landscaping costs. The fence will be very close to my pavement, this will cause safety issues with
cars hitting the fence while entering and exiting my driveway. Finally, the proximity to the new fence
will also make properly plowing my driveway nearly impossible without causing damage to the fence.
I see no benefit or purpose to this fence being constructed and I would ask that the town not require
Mr. Sheehy to build the fence.
Sincerely,
William J. Dwyer, M.D.
94 Peters Street o North Andover, Massachusetts 01845
Office 978-697-2556 m Fax 978-697-2556
TOWN OF NORT1.4 ANDOVER
DIVNI()N OF PUBLIC WOI�KS
3840S(]000SllRBB7
NORTH ANDOVER, MASSACHUSETTS Ol845-2989
BRUCE D.THQ}00GAO, P.E.
DIRECTOR
Eugene P. Willis, PE 7elechume (97<�) 0B5-0950
Director o/Ennzineer//t�T Fax/97,D 604-9573
February 24'20i2
North Andover Planning Dept
l600 Osgood St.
North Andover MA.0l845
Re: IO2 Peters St. site second plan review
Dear Board Members,
I have received the preliminary plan for cornment"Proposed Site Plan for 102 Peters St." by �
Andover Consults, dated 2-15-12. l offer the following comments:
i. The overflow structure proposed iDNVY corner of lot was not relocated t0 the south and �
�
away from the Peters SL right-of-way but rcp)mocd by u gouc evvo|e. ()vcrtinuo" the
voids in the stone will fill with sediment resulting in zero storage vo|uouo. The
originally proposed dryvve|l should he included iu the final design.
2. The hydraulic modeling of the site, as well as the subsequent report, has not been
rnv|ovvcd by DPW.
�
Sincerely, �
Eugene P. Wi8io, P.[I. �
Director of Engineering
Co: fi|e,0AConservation, BmunTbihodeau DPW
E ri ht, Joan
Fronm: Tymon, Judy
Sent Wednesday, February 2B. 2O1212:31 PM
To: 'James Fairweather'
Co: Hughes, Jennifer; Enright, Jean
Su 102 Peters St.
.Attachments: 1U2 Peters St comments#3.pdf; Hencook-2nd review 102Petans.pdf; 2 24_12DPVVrev2
.pdf
Jim,
I have the following remaining items to be addressed regarding 102 Peters St.:
| talked with Gene Willis and he says heissatisfied as long as Lisa has reviewed the hydraulic modeling he has nofurther �
issues.
There are several items in Lisa's latest review letter(2/24/12)that need a response-#2, #3,#4 #5 and#6.
There are several items on the Hancock review tobe resolved /2/22/12\:
#7. |t would be helpful to know where the sign would go. | know the applicant has not tenants, but vve struggle with
this issue after the building is built and no signage was indicated during the Site Plan Review process.
#26. | agree that more than m sketch needs tobeprovided. There should bea plan showing the full sight lines and the
issue of the proposed maple trees should beaddressed.
If you have a new set of plans and responses to these questions, I need to send it to the Planning Board in advance of
the meeting next week. | send the electronic packet out onFriday. |f you need more time, we will require a request for
postponement.
Let me know K you have any questions.
Judy Tymon, AICP �
Town Planner �
Town of North Andover
16OO Osgood St.
North Andover, MA 01845
978'688-9535 �
PleaSC,[lot(-'the MaSSaCIIUSOIIS Secretary of State's office has detei-mined that most emails to and ftom I-OLMiCirRI OffiCO,alld officials am public mcoixis. For More
information please,refer to:
Please consider the onwmomon/bumm printing this omoo.
1
James Fairweather
From: BILL MacLEOD
Sent: Tuesday, February 28, 2012 3:39 PM
To:
Subject: Fwd: Peters Street Response
Attachments:Andover--Wall fixture Point By Point.pdf
----------Original Message----------
From: George Nammour
Date: Feb 28,2012 3:30:22 PM
Subject: Peters Street Response
To:
18. The proposed building is shown less than one foot from an excising sewer easement. It is unclear from
the plans if the intent is for the building to be at 15 feet from the property line or if the dimension shown is
labeling the easement width. Hancock is concerned that building footings would encroach into the
easement.
Andover Consultants' Response: The building will be constructed outside of the easement.
Hancock Response: It remains unclear from the details provided how the building structure below
grade would not encroach into the sewer easement.Standard construction details have footings
extending beyond the face of the structure.
If the soil conditions permit, a spread footing will be used, which extends no more
than 6" from the face of the foundation and will not encroach into the easement.
11. Section 8.5.e.xvii—LIGHTING FACILITIES:Identification of the proposed illumination, indicating the
direction and the degree of illumination offered by the proposed lighting facilities, including an example of
the light fixture to be used. It is unclear from the submitted plans whether any illumination is proposed and if
the type, direction and degree of illumination conform to the guidelines set forth in Section 6.0—Signs and
Outdoor Lighting Regulations of the Zoning Bylaw.
Andover Consultants' Response: No lighting for the parking lot is proposed. The architect's final plans will
include details of any lighting located on the exterior of the building. A cut sheet of a typical wall mounted
light proposed for use is attached for your review.
Hancock Response: The plans still do not depict the direction and degree of illumination proposed.
Two wall packs (fixture cut submitted) will be mounted on the building (one at
each gable). Another recessed-ceiling light fixture will be mounted over the front
entrance.
The wall pack fixture is I T° Impact Mite LED Trapezoid, cutoff wall fixture 02,
with 21 LED LightBARS, and 51 watts total. The foot-candle at the base of the wall
is 3.6.
George Nammour, AIA
Maclaren Associates
11 Main Street
P O Box 606
Atkinson, NH 03811
603 329 3511 T
603 329 3494 F
2/28/2012
100' 0"
0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 1 1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0
00-1 5/8'
0.0 0.1 01 A-1 0.1 0.1 --0.2-__0.2_- n 9 n 9 9.2 0.2-___0.2 0.0
I
0.0 0.1 .1 0.2 0.2 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.2 0.2 0. ( 0.1 0.0
0.0 0.1 0.1 .2 0.3 0.4 0.4 0.5 .5 0.6 0.6 0. 0.5 0.4 0.4 0.3 0. 0.1 0.1 0.0
0.0 0.1 0.1 0.3 0.4 0.5 0.6 0.6 0.7 0.8 0.8 0.7 0.6 0.6 0.5 0.4 0.3 0.1 0.1 0.0
50'-10 1
0.0 0.1 0.2 0.3 0.4 0.6 0.6 0.7 0.8 0.8 0.8 0.8 0.7 0.6 0.6 0.4 0.3 0.2 0.1 0.0
2-1 1/8..
0.0 0.1 0.2 0.3 0.4 0.6 0.5 0.6 0.9 1.1 1.1 0.9 0.6 0.5 0.6 0.4 0.3 0.2 0.1 0.0
i
0.0 0.1 0.2 0.3 0.4 0.6 0.6 0.9 1.3 1.8 1.8 1.3 0.9 0.6 0.6 0.4 0.3 0.2 0.1 0.0
0.0 0.1 0.2 0.3 0.5 0.6 0.7 1.1 1.9 2.6 2.6 1.9 1.1 0.7 0.6 0.5 0.3 0.2 0.1 0.0
0.0 OJ 0.1 0.3 0.4 0.6 0.7 1.3 2.6 3.8 3.8 2.6 1.4 0.7 0.6 0.4 0.3 0.1 0.1 0.0
z4
-
La r � J
From: Tymon, Judy
Sent: Tuesday,
To:
Cc: 'James Fairweather'; Enright, Jean
Subject: 1O2 Peters St.
Attachments: 120313 Continuance. 120312 LisaReview1O2 PebsnsSt.pdf
Jeff,
As you know,the public hearing for your project will be continued at the March 20t" meeting. There is only one
outstanding issue, which is treatment of groundwater during high groundwater conditions( large storm events).
Although you are not required to meet this standard (Site Plan Review does not require it and that section of the parcel
is outside of Conservation Commission jurisdiction), our peer reviewer does recommend that this be addressed. (see
attached letter) It will be the Planning Board's decision to make and I am sure they will take into account the changes
that have already been made to the project based on the review process.
That said,the Board could decide on March 20th to leave the hearing open so that I can draft a decision that would be
ready for them at the meeting on April 3. At that meeting, they could close the public hearing, review the decision and
vote. The decision would then be filed the next day,April 4. The timefranne for this project requires that vve file m
decision with the town clerk by April 5. |n order to make sure that | have time to make final changes and file with the
c|erk, |amrequestinQthatyouaOroetoacontinuanmefnrynurpro'ectunti|Apri| 3//h. | don'tseeanyprob|emvvith
filing the decision xion by the 4 but in case something comes up, | want to make sure we don't overrun the deadline.
�
The form is attached. You can bring it to the next meeting or email it back to me ortoJean Enright. Let me know if you
have any questions.
Judy Tyinionw AICP
Town Planner
Town of North Andover
1600 Osgood St.
North Andover, MA 01845
�
978'688'9535 �
�
�
�
�
Please note the M0000chu*ettsSecretary of State's office has determined that most anailsm and from municipal offices and officials are public records.For more
information please refer to:
Please consider the onwmnmont before printing this email.
1
%40RTPI
ICY
o'*"' Town of North Andover
Office of the Planning Department
(;OlnrllLunity Development and Services Division
P(978)688-9535 7.600 Osgood Street
F(978)688-9542 Building 20, Sprite 2-36
North Andover,Massachusetts 41845
TO: Jeff Sheeh FAX:
FROM: Jean Enright, Planning Assistant
FAX: 978-688-9542 PHONE: 978-688-9535
Please sign your name and fill in address of premises affected, fill in current date,
return same to fax 978-688-9542. Or email to jenrightCa)town ofn ortli-,in d over.com.
Thank you.
Special Permit
66REQUEST FOR A CONTINUANCE"
NAME: —Jeff Sheehy
ADDRESS OF PREMISES AFFECTED: 102 Peters St.
North Andover
PHONE NUMBER:
AREA CODE: ( 978 462-4042
461 WISH TO REQUEST A CONTINUANCE UNTIL 04 /30 /12 9
THEREFORE, WAIVE THE TIME CONSTRAINTS FOR ISSUING OF
ANY AND/ALL DECISIONS RELATIVE TO ANY/AND ALL PERMITS
OF THE PLANNING BOARD FOR THE TOWN OF NORTH ANDOVER,
MA."
SIGNED BY PETITIONER OR REPRESENTATIVE:
(SIGNATURE)
DATE:
(FILL IN CURRENT DATE)
BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
���A������� ����^������������
Eggleston _ ' _ -
March |2` 2OL2
North Andover Planning Board
]dOO Osgood Street
North Andover, MA 0 184
Attn: Judy Tymou° Town Planner
North Andover Conservation Commission
1600 Osgood Street
North Andover, M/\ 0l845
/\t o: Jennifer Hughes, Conservation Coordinator �
�
RE: Stonmwatrr Management Rcview
102 Peters SCrcs1
Dear Ms. 1yn/on and Ms. IluQhoo:
In to||ovv up 10 my most recent (February 24, 2012) oocnrncotm on the above-referenced
project I have received and reviewed the February 28, 2012 response b.ocn Andover
Consultants Inc. With these latest revisions, all of my previous oon000mrdm on the project
have now been satisfactorily addressed and I have no further comments at this time.
The project as proposed onup)icm with North Andover's zoobu& requirements for Site
P1mu Xov}evv with respect to dcniuugo' and largely complies with the stornnwsdor
management requirements of the Massachusetts Wetlands Protection Act (WPA) and the
North Andover Wetlands Bylaw; the one exception being that there may be times during
high groundwater conditions when the volume of water retained and treated onsite is less
than the 1/2-inch vvote[ quality vn)ucuo for the project. As indicated in Andover
Consultants' roapouon` the discharge fi-ono1he parking lot d[a|uVgs system in |0001od
outside of Conservation Commission jurisdiction and foi| compliance with the Z)BP
Standards (e.g. by ensuring that 80 percent TSS removal is provided even during seasonal
high groundwater) is not strictly required. The zoning requirements for Site Plan Review
do not address water quality.
Once again, I appreciate the opportunity to assist the North Andover Planning Board and
Conservation Cnnonoiaoiou with the review of this project, and hope that this iofbrnocdioo
is suitable for your needs. Please feel ficu to contact nuo if you or the opp|icnoLy have any
questions regarding the issues addressed herein.
Sincerely,
88GLB9T0NBNV|KVNM8NlAL
Lisa D. Eggleston, P.E.
3I Old Fr4minghannRd Unit 29 Sudbury MA 01776 t8i5D8.25Y.11]7 fax 866.820.7840
Enright, Jean
From: Tymon, Judy
Sent: Friday, February 24, 2012 10:22 AM
To: 'Lisa Eggleston'
Cc: Enright, Jean; 'James Fairweather'
Subject: RE: 102 Peters St
Lisa,
I will be out this afternoon and on Monday. if you have your response ready before Tuesday, could you forward it to Jim
Fairweather and to Jean Enright(Planning Dept.Administrator)? Thanks,
Judy
From: Lisa Eggleston
Sent: Friday, February 24, 2012 9:58 AM
To: Tymon, Judy
Subject: RE: 102 Peters St
html>head>meta http-equiv="Content-Type" content="text/html; charset=utf.--16"> /head> body>
Nape, didn't have those. Thanks Judy.
Lisa D. Egg eston, PE.
Eggleston Environmental
32 Od Framingham Rd., Unit X29
Sudbury, MA 01776
tel 508.259.1137
fax 866,820,7840
From: jtrr
Date: Fri, 24 Feb 2012 09:15:10 -0500
Subject: RE: 102 Peters St
Lisa,
There's been so much back and forth on this project so I may be sending you items that you already have, Here's two
more:
Applicant's response to DPW
Hancock's response- Unfortunately, he did not have the Feb 22. Plans, so some of his issues have been resolved.
Judy
From: Lisa Eggleston ]
Sent: Wednesday, February 22, 2012 11:47 AM
1
To: Ty0on, Judy
Subject: FVV: 1O2 Peters Sl
ht0|> h8dd> meta h[Lp-eqUiY="COOteOt-Type" content='text/ht0|/ Ch8Bet=UU-16"> /hedd> bOdy>
Lisa D. Eggleston, P.E.
Eggleston Environnierital
fleCl5e170te OWx�eW aCIC11'6155:
32 Old Framm[nghamN Rd~ Unit #29
Sudbury, MAQ1776
ha� 500.259.1,137
fax 866.820.7840
From: fi
/o:
CC:
Subject: 102 Peters St
Date: Wed, 22 Feb 2O1209:5G:02 -O5OO �
�
Lisa:
The attached plans reflect the latest revisions for the 1O2 Peters Street project. The attached are basically the same
plans sent last week with the exception of the reintroduction of the drywell down stream of the detention outlet. The
d/yweU was added at the request nf the Town engineer. | have attached a copy nf our letter responding tu Gene Willis's
comments for your information. As was previously explained, the infiltration components are not needed to attenuate
peak flow rates and are just added features to provide the opportunity to infiltrate additional flow. A|ao, there is no direct �
discharge to any nearby wetland. I believe that the latest revision adequately addresses all concerns. Let me know if you �
want a hard copy of the attached. �
�
Sincerely,
James S. Fait-weather D'P8
Andover Consultants,Inc.
I East River Place
Methuen,&4A 0|844
978'687'3828 ox1. 13
br> hr> [onthaoe="Ar|a|" cO|o[="8rey" size="1">P|eaoe note the Massachusetts Secretary ofState's o0iom has
determined that most emai|stoand from municipal offices and officials are public records. For more information please
refer to: br> Please consider the environment before printing this
eOlai|.br> /font> /body> /h\m|>
~/htozlbt~}u> font fanc=//Az ul// oo}or~"Gxay" sizm=''l/'>],/eooenote the Massachusetts Secretary o[State's
office has determined that most cnnoiln10 and from municipal offices and officials are public records. For more
information please refer to: br>Please consider the covicoRozcoI
before printing this eooail.br>/fon1>/body>/htzn{>