Loading...
HomeMy WebLinkAboutDecision - 1591 OSGOOD STREET 4/13/2001 To-svn Of,Nor�h Andover e10RTH o�tT`eo 6r9�V0 Office ®f the Manning Department o Community Development and Sery ices Divisi®n William J. Scott, Division Director 9 A�ApTeO PP�y�y 27 Charles Street 9SSACHUS�� Heidi Griffin North.Andover,Massachusetts 01845 Telephone (978)688-9535 Planning Director Fax(978)688-9542 Notice of Decision O C__ Any appeal shall be filed ° Within 20 days aftmIhe _ ---I Date of filing this Notice = n J- In the Office of the Town w Clerk. r r-n c) C) CJ y Date: April 13, 2001 Date of Hearings: Feb. 204001, March 20, 2001, April 3, 2001 &April 10, 2001 Petition of. S.P.E.C. Realty Trust (Chris Adams, Trustee) P.O. Box 574 North Andover, MA 01922 Premises affepted: 1591 Osgood Street,North Andover, MA 01845 Referring to the above petition for a special permit from the requirements of the: North Andover Zoning Bylaw Section 8.3. After a public hearing given-on-the-date,-the Planning-Board voted-to APPROVE the site plan special permit based upon the following conditions: X1 Cc: Applicant Signed: =F C2z ).�a 1e 'GLCzt� /� '' Engineer Alison Lescarbeau, Chairman Abutters John Simons, Vice Chairman Building Department Alberto Angles, Clerk ZBA Richard Nardella Health Department Richard Rowers Conservation Department BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 1 r Site Plan Review - Special Permit 1591 Osgood Street The Planning Board herein approves the Special Permit/Site Plan Review for the construction of six two-story storage units totaling approximately 50,800 square feet located in the I-S Zoning District. This Special Permit was requested by S.P.E.C. Realty Trust (Chris Adams Trustee), P.O. Box 574 North Andover, MA 01922. This application was filed with the Planning Board on January 17, 2001. The Planning Board makes the following findings as required by the North Andover Zoning Bylaws Section 8.3 and 10.3: FINDINGS OF FACT: 1. The specific site is an appropriate location for the project as it is located in the Industrial-S Zone and involves the construction of six two-story storage units. 2. The use as developed will not adversely affect the neighborhood as a sufficient buffer has been provided. Extensive landscaping has been provided around the frontage of Osgood Street. Landscaping is also proposed along the sides of the abutting property. 3. There will be no nuisance or serious hazard to vehicles or pedestrians. The applicant has demonstrated that the entrance/egress driveway is adequate, and has been reviewed by the outside engineering consultant for adequate access. 4. The landscaping approved as a part of this plan meets the requirements of Section 8.4 as amended by the Planning Board, of the North Andover Zoning Bylaw; 5. The site drainage system is designed in accordance with the Town Bylaw requirements and has been reviewed and approved by the Outside Consulting Engineer, Vanasse,Hangen Brustlin, Inc; 6. The applicant has met the requirements of the Town for Site Plan Review as stated in Section 8.3 of the Zoning Bylaw with the exception of waivers granted in Condition #18. 7. Adequate and appropriate facilities will be provided for the proper operation of the proposed use. Finally the Planning Board finds that this project generally complies with the Town of North Andover. Zoning Bylaw requirements as listed in Section 8.35 but requires conditions in order to be fully in compliance. The Planning Board hereby grants an approval to the applicant provided the following conditions are met: SPECIAL CONDITIONS: 2 1. Prior to the endorsement of the plans by the Planning Board, the applicant must comply with the following conditions: a) The final plan must be reviewed and approved by the Town Planner and subsequently endorsed by the Planning Board. The final plans must be submitted for review within ninety days of filing the decision with the Town Clerk. b) A bond in the amount of eight thousand ($8,000) dollars must be posted for the purpose of insuring that a final as-built plan showing the location of all on-site utilities, structures, curb cuts, parking spaces, topography, and drainage facilities is submitted. The bond is also in place to insure that the site is constructed in accordance with the approved plan. The form of security must be acceptable to the Planning Board. c) The applicant must supply a copy of the approved Massachusetts Highway Department permits necessary for construction of the site to the Planning Department. 2. Prior to the start of construction: a) A construction schedule shall be submitted to the Planning Staff for the purpose of tracking the construction and informing the public of anticipated activities on the site. b) During construction,the site must be kept clean and swept regularly. 3. Prior to FORM U verification (Building Permit Issuance): a) The Planning Board must endorse the final site plan mylars and three (3) copies of the signed plans must be delivered to the Planning Department. b) One certified copy of the recorded decision must be submitted to the Planning Department. 3 4. Prior to verification of the Certificate of Occupancy: a) The applicant must submit a letter from the architect and engineer of the project stating that the building, signs, landscaping, lighting and site layout substantially comply with the plans referenced at the end of this decision as endorsed by the Planning Board. b) The Planning Staff shall approve all artificial lighting used to illuminate the site. All lighting shall have underground wiring and shall be so arranged that all direct rays from such lighting falls entirely within the site and shall be shielded or recessed so as not to shine upon abutting properties or streets. The Planning Staff shall review the site. Any changes to the approved lighting plan as may be reasonably required by the Planning Staff shall be made at the owner's expense. All site lighting shall provide security for the site and structures however it must not create any glare or project any light onto adjacent residential properties. C) The building must have commercial fire sprinklers installed in accordance with the North Andover Fire Department. d) The applicant must obtain a sign permit in accordance with and as required by Section 6 of the Town of North Andover Zoning Bylaw. 5. Prior to the final release of security: a) The Planning Staff shall review the site. Any screening as may be reasonably required by the Planning Staff will be added at the applicant's expense. b) A final as-built plan showing final topography, the location of all on- site utilities, structures, curb cuts, parking spaces and drainage facilities must be submitted to and reviewed by the Planning Staff and the Division of Public Works. 6. Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a plan and reviewed and approved by the Planning Staff. Any approved piles must remain covered at all times to minimize any dust problems that may occur with adjacent properties. Any stock piles to remain for longer than one week must be fenced off and covered. 7. In an effort to reduce noise levels, the applicant shall keep in optimum working order, through- regular maintenance, any and all equipment that shall emanate sounds from the structures or site. 4 8. The hours for construction shall be limited to between 7:00 a.m. and 7:00 p.m. Monday through Friday and between 8:00 a.m. and 5:00 p.m. on Saturday. 9. Any plants, trees or shrubs that have been incorporated into the Landscape Plan j approved in this decision that die within one year from the date of planting shall be replaced by the owner. 10. The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation. 11. Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the respective utility companies. 12. No open burning shall be done except as is permitted during burning season under the Fire Department regulations. 13. No underground fuel storage shall be installed except as may be allowed by Town Regulations. 14. The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns in interest or control. 15. Any action by a Town Board, Commission, or Department, which requires changes in the plan or design of the building, as presented to the Planning Board, may be subject to modification by the Planning Board. 16. Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed substantial, the applicant must submit revised plans to the Planning Board for approval. 17. This Special Permit approval shall be deemed to have lapsed after (two years from the date permit granted) unless substantial use or construction has commenced. Substantial use or construction will be determined by a majority vote of the Planning Board. 18. A waiver to Section 8.3.5.e.xix has been granted so as to allow the applicant not to provide a traffic study as data from the publication entitled "Trip Generation, Volume 1 of 3" by the Institute of Transportation Engineers has been provided and demonstrates that a traffic study is not required. 5 19. The following information shall be deemed part of the decision: Plan Titled: Design Considerations for Site Development of a Warehouse Design S.P.E.C. Realty Trust (Chris Adams Trustee), 1591 Osgood Street, North Andover, MA 01845 fPrepared for: S.P.E.C. Realty Trust (Chris Adams Trustee) 1591 Osgood Street, North Andover, MA 01 845 Prepared By: Phalen & Allen Limited, 4 Eugene Drive, Winchester, MA 01890, 32 Arabella Street, Salem, MA 01970 Date: November 3, 2000, revised 12/27/00, 1/12/01, 2/14/01 & 3/07/01 Plan Titled; Untitled, Received by Planning Department March 28, 2001 Prepared for: S.P.E.C. Realty Trust(Chris Adams Trustee) 1591 Osgood Street, North Andover, MA 01845 Prepared By: Phalen&Allen Limited, 4 Eugene Drive, Winchester, MA 01890, 32 Arabella Street, Salem, MA 01970 Plan Depicting: Architectural Rendering of Storage Warehouse on Osgood Street Plan Titled: Proposed Sign for Warehouse Design Prepared for: S.P.E.C. Realty Trust, 1591 Osgood Street,North Andover, MA Prepared By: Phalen&Allen Limited, 4 Eugene Drive, Worcester, MA 01890 Date: April 5, 2001 cc: Applicant Engineer File 6