Loading...
HomeMy WebLinkAboutStormwater Report - 701 SALEM STREET 5/1/1996 SITE DESCRIPTION AND DRAINAGE IS FOR PROPOSED I FACILITY STREET AT ABBOTT AND SALEM S NORTH ANDOVER9 MASSACHUSETTS SYSTEM BUILDERS, INC. 202 SUTTON STREET NORTH ANDOVER, MASSACHUSETTS AY, 1996 MERRIMACK ENGINEERING SE VICES, INC. 66 PARK STREET ANDOVER, MASSACHUSETTS 01810 WLEY cfvtt ., TABLE OF CONTENTS SITE DESCRIPTION METHODOLOGY PRE-DEVELOPMENT DRAINAGE ANALYSIS POST-DEVELOPMENT DRAINAGE ANALYSIS DESIGN SUMMARY CHARTS AND TABLES SOIL TEST RESULTS SITE DESCRIPTION SITE DESCRIPTION EXISTING CONDITIONS The project site is located at the corner of Abbott Street and Salem Street in North Andover. At the present time the site is in a developed state on which a commercial building occupies about 3,500 square feet of floor area, and a two story wood-frame dwelling occupies about 1500 square feet. The area of the property is 42,086 square feet (0.97) acres). There is about 7,000 square feet of pavement for access and parking for the commercial building and about 750 square feet of pavement for the dwelling. These buildings are serviced by Town water via a 12" C.L.D.I. watermain and 6" high pressure gas. A subsurface sewage disposal system is located in the rear of the buildings and handles the sewage flows for both buildings, which discharge sewage into a septic tank, then to a pump chamber, through a two inch forcemain, to a slightly raised leaching facility. The topography of the land is a gradient of 2 to 4 percent slope from the northwest to the southeast portion of the property, where virtually allow of the runoff from the site flow to and then beyond onto Salem Street in a southeasterly direction, after flowing across Abbott Street. No catch basins were found along the Abbott Street frontage. A copy of a Topographic Plan from the South Groveland Quadrangle (1" = 2083'), a portion thereof, showing the location of the project site and vicinity, is included in this report. The soils on the site are entirely"Sudbury - SrA", based on the soil maps prepared by the U.S.D.A. Soil Conservation Service. This soil type is a loamy sand to a sandy gravel in texture. This was verified by actual deep hole tests done on May 3, 1995. The test results are included in this report. The permeability of the parent soil can range between 2 and 20 inches per hour. A portion of the Soils Map (1" = 1320') showing the location of the project site and vicinity, is included in this report. A soil of the Sudbury description is suitable for subsurface drainage system'given the high permeability of the parent material. The only foreseeable restriction would be the seasonal high water table. However, the water table were found to range between 60" and 90", as the observed water tables throughout the site, at five different locations, and assuming the seasonal high water table(S.H.W.T.) to be potentially up to 24" above the observed level witnessed on the date of testing. PROPOSED SITE DEVELOPMENT . Based on a preliminary site design prepared for our client by John Daly, Project Architect, we further developed an overall site plan for the proposed 7680 square foot - commercial building to be constructed. Site development shall occur shortly after the existing buildings are razed and demolition is completed, in the preparation of site for all proposed earthwork and appurtenant construction activity, including water service connection and a sewer service connection, which will require a sewer extension from the vicinity of Summer Street to Abbott Street.. Also, in order to mitigate the increase in potential runoff from the new site, at least three subsurface infiltration facilities are proposed on the site. These systems will store the runoff from the new building roof area as well as large portions of the paved areas to be built around the new building for access and parking provisions. The stored water will infiltrate into the ground below and surrounding each subsurface system, as they are engineered and designed to capture, detain, and percolate 100% of the runoff, back into the ground based on an inflow volume from a 100 year storm event. The remaining areas of the site will not drain into these facilities. This runoff will flow unmitigated to the lowest part of the property(Design Point#1) at the southeasterly corner. . Along the perimeter of the site, adjacent to abutting residential properties, a landscaped buffer strip will be constructed to provide sufficient"green" space between the commercial and residential properties. A landscaping plan has been designed to provide a variety of trees, shrubbery, and other plantings throughout the site, in mulched islands, for visual aesthetics. The remaining areas will be loamed and seeded or sodded. Along the edge of pavement will be sloped granite and bituminous concrete curbing, which will serve adequately in channelizing and directing surface water runoff into catch basins or swales, as proposed, to ensure that each facility will receive all of the runoff based on the design: The net effect and intent of this subsurface drainage system is to produce an overall reduction in the peak rate of runoff from the site when comparing pre-development to post- development conditions. METHODOLOGY METHODOLOGY The method of analysis for determining stormwater runoff rates is based on the Soil Conservation Service TR-20 procedures. This method takes into account the following information: watershed area, soil type, ground cover condition, topography, time of concentration. Using this information for input, the HydroCAD computer program contains a statistical Type Iii rainfall distribution, which then internally generates a separate hydrograph for each watershed being considered, called a subcatchment area. Rainfall rates on the basis of a 24 hour total rainfall are provided as input data, i.e. 2 year storm - 3.1", 10 year - 4.5", and 100 year - 6.5". For the subcatchments, the peak rates of runoff are calculated. The post-development rates shall not exceed the predevelopment rates. In order to mitigate any increase, we must design either a retention facility, such as the subsurface infiltration facilities d e signed for this project, or a detention facility. Runoff from the subcatchments are routed to or through these types of facilities. Doing this enables the engineer to meet the specific objective, which-is not to create any increase in runoff beyond the limits of the project. The Summary Chart within this report is based on the combination of all hydrographs of subcatchments and ponds, which are the subsurface infiltration systems by description. This is done to account for the time during the storm event, given that all of the peak flows do not occur simultaneously, when the runoff exits the project site. A R E- DEVELOPMENT i R DEVELOPMENT 2-YEAR PRE- DEVELOPMENT Data for SYSTEM BUILDERS,INC-ABBOTT ST. ,NORTH ANDOVER Page 73 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 1 PRE-DEVEL. TOTAL SITE, 2-YEAR STORM PEAK= .76 CFS @ 12.23 HRS, VOLUME= .08 AF PERCENT CN SCS TR-20 METHOD 35.00 98 PAVED SURFACE AREA TYPE III 24-HOUR 45.00 61 GRASS SURFACE AREA RAINFALL= 3. 1 IN 5.00 58 LANDSCAPED AREAS SPAN= 10-20 HRS, dt=.1 HRS 15.00 58 WOODED AREA 100.00 73 TOTAL AREA = 1.09 AC Method Comment Tc (min) TR-55 SHEET FLOW OVER WOODED AREA 12.5 Woods : Light underbrush n=.4 L=50' P2=3.1 in s=.02 SHALLOW CONCENTRATED/UPLAND FLOW OVER GRASSED AREA 4.2 Short Grass Pasture Kv=7 L=250' s=.02 '/' V=.99 fps CHANNEL FLOW IN GUTTER TO D.P.# 1 .8 a=1.4 sq-ft Pw=12.2' r=. 115' s=.02 ' /' n=.016 V=3.1 fps L=150' Capacity=4.3 cfs Total Length= 450 ft Total Tc= 17.5 SUBCATCHMENT 1 RUNOFF PRE-DEUEL , TOTAL SITE , 2-YEAR STORM . 75 70 AREA- 1 . 09 AC . 65 Tc= 17 . 5 MIN . 60 CN= 73 . 55 55 SCS TR-20 METHOD 45 TYPE III 24-HOUR u �� RAINFALL= 3 , 1 IN ' 35 PEAK= . 76 CFS a 130 @ 12 , 23 HRS . 25 UOLUME= 08 AF �- . 20 . 15 . ] a . 05 0 . 03 CD TIME (hours ) 10-Y AR PRE- DEVELOPMENT Data for SYSTEM BUILDERS, INC-ABBOTT ST-NORTH ANDOVER Page 72 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4 51 000899 (c) 1986-1996 Applied Microcomputer ystems SUBCATCHMENT 1 PRE-DEVEL. TOTAL SITE,10-YEAR STORM PEAK= 1.67 CFS @ 12.21 HRS, VOLUME= .16 AF PERCENT CN SCS TR-20 METHOD 35.00 98 PAVED SURFACE AREA TYPE III 24-HOUR 45.00 61 GRASS SURFACE AREA RAINFALL= 4.5 IN 5.00 58 LANDSCAPED AREAS SPAN= 10-20 HRS, dt=.1 HRS 15.00 58 WOODED AREA 100.00 73 TOTAL AREA = 1.09 AC Method Comment Tc (min) TR-55 SHEET FLOW OVER WOODED AREA 12.5 Woods : Light underbrush n=.4 L=50' P2=3.1 in s=.02 SHALLOW CONCENTRATED/UPLAND FLOW OVER GRASSED AREA 4.2 Short Grass Pasture Kv=7 L=250' s=.02 '/' V=.99 fps CHANNEL FLOW IN GUTTER TO D.P.# 1 .8 a=1.4 sq-ft Pw=12.2' r=.115' s=.02 '/' n=.016 V=3. 1 fps L=150' Capacity=4.3 cfs Total Length= 450 ft Total Tc= 17.5 SUBCATCHMENT 1 RUNOFF PRE-DEUEL , TOTAL SITE , 10-YEAR STORM 1 . 6 1 , 5 AREA= 1 . 09 AC 1 , 4 Tc= 17 . 5 MIN 1 , 3 CN= 73 1 . 2 LO 1 . 1 SCS TR-20 METHOD 1 O TYPE III 24-HOUR u g RAINFALL= 4 . 5 IN . 7 PEAK= 1 . 67 CFS 0 . 6 e 12 , 21 HR5 -� . 5 UDLUME= 16 AF . 4 . 3 , 2 . 1 O l e m t r- as rn CD TIME (hours ) 100-YEAR PRE- DEVELOPMENT Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 74 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4 51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 1 PRE-DEVEL. TOTAL SITE, 100-YR STORM PEAK= 3. 14 CFS @ 12.21 HRS, VOLUME= .29 AF PERCENT CN SCS TR-20 METHOD 35.00 98 PAVED SURFACE AREA TYPE III 24-HOUR 45.00 61 GRASS SURFACE AREA RAINFALL= 6.5 IN 5.00 58 LANDSCAPED AREAS SPAN= 10-20 HRS, dt=. l HRS 15.00 58 WOODED AREA 100.00 73 TOTAL AREA = 1.09 AC Method Comment Tc (min) TR-55 SHEET FLOW OVER WOODED AREA 12.5 Woods: Light underbrush n=.4 L=50' P2=3.1 in s=.02 SHALLOW CONCENTRATED/UPLAND FLOW OVER GRASSED AREA 4.2 Short Grass Pasture Kv=7 L=250' s=.02 '/' V=.99 fps CHANNEL FLOW IN GUTTER TO D.P.# 1 .8 a=1.4 sq-ft Pw=12.2' r=.115' s=.02 ' /' n=.016 V=3. 1 fps L=150' Capacity=4.3 cfs Total Length= 450 ft Total Tc= 17.5 SUBCATCHMENT 1 RUNOFF PRE-DEVEL , TOTAL SITE , 100-YR STORM 3 . e 2 S AREA= 1 , 09 AC 2 . 6 Tc= 17 . 5 MIN 2 . 4 - CN= 73 2 ' 2 SCS TR-20 METHOD 2 ' 6 TYPE III 24-HOUR 1 , 6 RAINFALL= 6 . 5 IN 1 . 4 PEAK= 3 . 14 CFS CD 1 . 2 @ 12 , 21 HR5 1 . 8 UOLUME= . 29 AF , 6 . 4 2 1310 N M st- to kD ao 0') m TIME (hours ) { POST- DEVELOPMENT Oat for SYSTEM BUILDERS,INC-ABBOTT ST. ,NORTH ANDOVER Prepared by Merrimack Engineering Services, Inc. HydrQCAD 4.51 000899 (c) 1986-1996 ARolied Microcom inter Systems 7 6 5 4 3 z 1 0 a SUBCATCHMENT ❑ REACH APOND LINK w SUBCATCHMENT 1 = POST-DEV.- FLOW TO CB#1 -> POND 1 SUBCATCHMENT 2 = POST-DEVEL. ROOF AREA -> POND 1 SUBCATCHMENT 3 = POST-DEVEL. REAR ROOF & PAVEMENT -> POND 3 SUBCATCHMENT 4 = POST-DEVEL. FRONT ROOF & CB#3 AREAS -> POND 4 SUBCATCHMENT 5 = POST-DEVEL.. LOW PARK'G AREA -> REACH 1 SUBCATCHMENT 6 = POST-DEVEL. REAR PARKING & SWALE -> REACH 1 SUBCATCHMENT 7 = POST-DEVEL. FRONTAGES & WEST SWALE -> REACH 1 REACH 1 = DESIGN POINT FOR SUBCATS 5,6,&7 -> POND 1 = INFILT.SYSTEM FOR CB#1 & .04 AC ROOF -> POND 3' = INFILT.SYSTEM FOR SUBCAT# 3 -> POND 4 = INFILT.SYSTEM FOR SUBCAT # 4 -> SUBCAT AREA Tc WGT'D Tpeak NUMBER (ACRE) (MIN) --GROUND COVERS (RCN) -- CN (HRS) 1 .06 1.4 100%98 - - - 98 11.98 2 .04 .2 100%98 - - - 98 11.96 3 .12 1.9 100%98 - - - 98 111.99 4 .21 1.7 100%98 - - - 98 11.99 5 .11 1.2 100%98 - - - 98 11.98 6 .17 8.7 46%98 20%61 34%58 - 77 12.09 7 .38 4.5 32%98 57%61 11%58 - 73 12.02 2-YEAR POST- DEVELOPMENT Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 50 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 1 POST-DEV. , 2-YR FLOW TO CB#1 PEAK= .18 CFS @ 11.98 HRS, VOLUME= .01 AF PERCENT CN SCS TR-20 METHOD 100.00 98 PAVED SURFACE AREA TYPE III 24-HOUR TOTAL AREA = .06 AC RAINFALL= 3.1 IN SPAN= 10-20 HRS, dt=.l HRS Method Comment Tc (min) TR-55 SHEET FLOW ACROSS PAVEMENT 1.0 n=.016 L=50' P2=3. 1 in s=.02 ' / ' CHANNEL FLOW IN GUTTER, TO CB#1 .4 a=1.4 sq-ft Pw=12.2' r=. 115' s=.01 '/' n=.016 V=2. 19 fps L=50' Capacity=3. 1 cfs Total Length= 100 ft Total Tc= 1.4 SUBCATCHMENT 1 RUNOFF POST-DEU , 2-YR FLOW TO CB# 1 17 . 16 AREA= 06 AC 1 Tc= 1 . 4 MIN 14 CN= 98 13 r, . 12 SCS TR-20 METHOD . 11 TYPE III 24-HOUR u . 10 RAINFALL= 3 . 1 IN . 09 . 08 PEAK= 18 CFS CD . 86 @ 11 , 98 HRS VOLUME= 01 AF LL_ . 05 . 04 . 03 . 02 01 0CD M d- in 0 r- co a) 0 TIME ( hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST—NORTH ANDOVER Page 51 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 2 POST-DEVEL. , 2-YR,ROOF AREA PEAK= .11 CFS @ 11.96 HRS, VOLUME= .01 AF PERCENT CN SCS TR-20 METHOD 100.00 98 ROOF SURFACE TYPE III 24-HOUR TOTAL AREA = .04 AC RAINFALL= 3.1 IN SPAN= 10-20 HRS, dt=.l HRS Method Comment Tc (min) TR-55 SHEET FLOW TO ROOF GUTTER 1 Smooth surfaces n=.011 L=35' P2=3.1 in s=.5 CHANNEL FLOW IN GUTTER, TO SYSTEM#1 l a=.2 sq-ft Pw=1' r=.2' s=.02 ' /' n=.01 V=7. 19 fps L=60' Capacity=1.4 cfs Total Length= 95 ft Total Tc= .2 SUBCATCHMENT 2 RUNOFF POST-QEUEL , , 2-YR , ROOF AREA . 11 1O AREA= . 04 AC Tc= . 2 MIN 09 CN= 98 . �8 SCS TR-20 METHOD � , 07 TYPE III 24—HOUR U . 06 RAINFALL= 3 , 1 IN 3 . 85 PEAK= 11 CFS O , 04 @ 11 . 96 HRS —� UOLUME= 01 AF . 02 , 81 M d' In tD r- CO O} CD TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 61 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomp t� er Systems POND 1 INFILT.SYSTEM FOR CB#1 & .04 AC ROOF, 2-YR Qin = .29 CFS @ 11.98 HRS, VOLUME= .02 AF Qout= . 10 CFS @ 12.24 HRS, VOLUME= .02 AF, ATTEN= 66%, LAG= 15.7 MIN Qpri= 0.00 CFS @ 14.60 HRS, VOLUME= -0.00 AF Qsec= . 10 CFS @ 12.24 HRS, VOLUME= .02 AF ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD (FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 160 CF 0.0 0 0 0 0 PEAK ELEVATION= .5 FT .l 396 13 13 396 FLOOD ELEVATION= 3.0 FT 1.5 396 554 568 495 START ELEVATION= 0.0 FT 2.5 50 196 763 844 SPAN= 10-20 HRS, dt=.1 HRS 3.0 60 27 791 861 Tdet= 9.8 MIN ( .02 AF) # ROUTE INVERT OUTLET DEVICES 1 S 0.0' EXFILTRATION V= .014 FPM over WETTED AREA Primary Discharge Secondary Discharge �--1=Exfiltration POND 1 INFLOW & OUTFLOW INFILT , SYSTEM FOR CB# 1 & 04 PC ROOF , 2-YR , 28 . 26 STOR-IND METHOD . 24 PEAK STOR= 160 CF 22 PEAK ELEU= . 5 FT 20 Qin= 29 CFS c+ 1 Qout= . 1 0 CFS U . 16 Qpri = 0 . 00 CFS . 14 Q5(--c= . 10 CFS 12 LAG= 15 . 7 MIN C 10 �. IL . 08 l 1 1 . 04 7. . 02 ',I- Ln �D r- co 0) m TIME ( hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 52 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 3 POST-DEVEL. , 2-YR,REAR ROOF & PAVEMENT PEAK= .36 CFS @ 11.99 HRS, VOLUME= .02 AF PERCENT CN SCS TR-20 METHOD 100.00 98 ROOF & PAVEMENT TYPE III 24-HOUR TOTAL AREA = . 12 AC RAINFALL= 3. 1 IN SPAN= 10-20 HRS, dt=. l HRS Method Comment Tc (min) TR-55 SHEET FLOW OVER ROOF /PAVVEMENT 1 .0 n=.016 L=50' P2=3. 1 in s=.02 '/ ' SHALLOW CONCENTRATED/UPLAND FLOW ALONG GUTTERS .4 Paved Kv=20.3282 L=50' s=.01 '/ ' V=2.03 fps CHANNEL FLOW ALONG GUTTER TO CB#2 .5 a=1.4 sq-ft Pw=12.2' r=.115' s=.01 '/' n=.016 V=2. 19 fps L=60' Capacity=3. 1 cfs Total Length= 160 ft Total Tc= 1 .9 SUBCATCHMENT 3 RUNOFF POST-DEUEL , , 2-YR , REAR ROOF & PAUEMENT . 36 34 AREA= . 12 AC . 32 Tc= 1 . 9 MIN . S0 CN= 98 26 24 SCS TR-20 METHOD � . 22 TYPE III 24-HOUR u , 20 RAINFALL= 3 , 1 IN `-' . 18 . 16 PEAK= . 36 CFS CD . 14 @ 11 . 99 HRS -� . 1 UOLUME= . 02 AF i- . ] a . 08 . 06 . 04 , 02 0 ' 00 CD M d u7 w r- ao a) r� TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 60 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems POND 3 2 YR STORM,INFILT.SYSTEM FOR SUBCAT# 3 Qin = .36 CFS @ 11.99 HRS, VOLUME= .02 AF Qout= .13 CFS @ 12.23 HRS, VOLUME= .02 AF, ATTEN= 65%, LAG= 14.2 MIN Qpri= 0.00 CFS @ 11.00 HRS, VOLUME= 0.00 AF Qsec= . 13 CFS @ 12.23 HRS, VOLUME= .02 AF ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD (FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 173 CF 0.0 0 0 0 0 PEAK ELEVATION= .4 FT . 1 528 18 18 528 FLOOD ELEVATION= 3.0 FT 1.5 528 739 757 642 START ELEVATION= 0.0 FT 2.5 50 247 1004 1123 SPAN= 10-20 HRS, dt=. 1 HRS 3.0 60 27 1031 1140 Tdet= 8.1 MIN ( .02 AF) # ROUTE INVERT OUTLET DEVICES 1 S 0.0' EXFILTRATION V= .014 FPM over WETTED AREA Primary Discharge Secondary Discharge -1=Exfiltration POND 3 INFLOW & OUTFLOW 2 YR STORM , INFILT , SYSTEM FOR SUBCAT# 3 . 36 . 34 STOR-IND METHOD ' 32 PEAK STAR= 173 CF , 30 PEAK ELEU= . 4 FT . 28 . 26 ' O , 24 Qin= 36 CFS , 22 Qout= 13 CFS U 20 Qpri = 0 . 00 CFS `-` . 18 05ec= . 13 CFS . 16 LAG= 14 . 2 MIN O 14 12 �. . aS � . 04 7 . 02 am T M d- n r� TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST-NORTH ANDOVER Page 53 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 4 POST-DEVEL. , 2-YR. ,FRONT ROOF & CB#3 AREAS PEAK= .63 CFS @ 11.99 HRS, VOLUME= . 04 AF PERCENT CN SCS TR-20 METHOD 100.00 98 ROOF/PAVED AREA TYPE III 24-HOUR TOTAL AREA = .21 AC RAINFALL= 3.1 IN SPAN= 10-20 HRS, dt=. 1 HRS Method Comment Tc (min) TR-55 SHEET FLOW ACROSS IMPERVIOUS SURFACES .8 n=.016 L=50' P2=3.1 in s=.03 '/ ' SHALLOW CONCENTRATED/UPLAND FLOW ALONG GUTTER .3 Paved Kv=20.3282 L=40' s=.01 '/' V=2.03 fps CHANNEL FLOW ALONG GUTTER TO CB#3 .6 a=1.4 sq-ft Pw=12.2' r=. 115' s=.01 '/' n=.016 V=2.19 fps L=80' Capacity=3.1 cfs Total Length= 170 ft Total Tc= 1.7 SUBCATCHMENT 4 RUNOFF POST-DEUEL , , 2-YR , , FRONT ROOF & CB#3 AREAS ' 55 AREA= . 21 AC 55 Tc= 1 . 7 MIN . 50 CN= 98 45 SCS TR-20 METHOD � 40 TYPE III 24-HOUR u . 35 RAINFALL- 3 . 1 IN 30 PEAK= 63 CFS 0 25 @ 11 . 99 HRS -� . 20 UDLUME- 04 AF 15 . 10 . 05 0 , 0 am T ni M It Ln co 0) CD TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 59 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems POND 4 2-YR STORM, INFILT.SYSTEM FOR SUBCAT# 4 Qin = .63 CFS @ 11.99 HRS, VOLUME= .04 AF Qout= .24 CFS @ 12.19 HRS, VOLUME= .04 AF, ATTEN= 61%, LAG= 12.4 MIN Qpri= 0.00 CFS @ 12.30 HRS, VOLUME= 0.00 AF Qsec= .24 CFS @ 12.19 HRS, VOLUME= .04 AF ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD (FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 270 CF 0.0 0 0 0 0 PEAK ELEVATION= .3 FT . 1 1020 34 34 1020 FLOOD ELEVATION= 3.0 FT 1 .5 1020 1428 1462 1179 START ELEVATION= 0.0 FT 2.5 50 432 1894 2151 SPAN= 10-20 HRS, dt=.1 HRS 3.0 60 27 1921 2167 Tdet= 6.7 MIN ( .04 AF) _# ROUTE INVERT OUTLET DEVICES 1 S 0.0' EXFILTRATION V= .014 FPM over WETTED AREA Primary Discharge Secondary Discharge -1=Exfiltration POND 4 INFLOW & OUTFLOW 2-YR STORM , INFILT , SYSTEM FOR SUBCAT# 4 , 5 5 STDR-IND METHOD PEAK STDR= 270 CF . 50 PEAK ELEU= . 3 FT . 45 '-` Q in= , 63 CFS (4- . 40 - Qout= 24 CFS u . 35 Qpr i = 0 . 00 CFS `-` , 30 Qsec= . 24 CFS LAG= 12 . 4 MIN 0 25 �.� -J , 2e l 15 S 1 ti 10 . e5 ale 0 M r- m TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 54 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 5 POST-DEVEL. , 2-YR. ,LOW PARK'G AREA PEAK= .32 CFS @ 11.98 HRS, VOLUME= .02 AF PERCENT CN SCS TR-20 METHOD 100.00 98 PAVED PARKING AREA TYPE III 24-HOUR TOTAL AREA = . 11 AC RAINFALL= 3.1 IN SPAN= 10-20 HRS, dt=. l HRS Method Comment Tc (min) TR-55 SHEET FLOW ACROSS PAVEMENT .8 n=.016 L=50' P2=3. 1 in s=.03 ' /' SHALLOW CONCENTRATED/UPLAND FLOW ACROSS PAVEMENT TO GUTTER .2 Paved Kv=20.3282 L=40' s=.03 ' /' V=3.52 fps CHANNEL FLOW ALONG GUTTER .2 a=1.4 sq-ft Pw=12.2' r=.115' s=.02 ' /' n=.016 V=3.1 fps L=40' Capacity=4.3 cfs Total Length= 130 ft Total Tc= 1 .2 SUBCATCHMENT 5 RUNOFF POST-DEUEL , , 2-YR , , LOW PARK ` G AREA 3 , 30 AREA= . 11 AC . 28 Tc= 1 . 2 MIN . 26 CN= 98 . 24 . 22 SCS TR-20 METHOD 20 TYPE III 24-HOUR U 18 RAINFALL= 3 . 1 IN 16 . 14 PEAK= 32 CFS 0 12 @ 11 , 98 HRS -� 10 UOLUME= , 02 AF . 08 . 06 , 04 , 02 0 , 000 T N M n 0 �- TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 56 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 6 POST-DEVEL. , 2-YR. ,REAR PARKING & SWALE PEAK= . 19 CFS @ 12. 10 HRS, VOLUME= .01 AF PERCENT CN SCS TR-20 METHOD 46.00 98 PAVEMENT TYPE III 24-HOUR 20.00 61 GRASS SWALE RAINFALL= 3. 1 IN 34.00 58 LANDSCAPED SPAN= 10-20 HRS, dt=.1 HRS 100.00 77 TOTAL AREA = .17 AC Method Comment Tc (min) TR-55 SHEET FLOW ACROSS PAVEMENT .9 Smooth surfaces n=.011 L=50' P2=3.1 in s=.01 SHALLOW CONCENTRATED/UPLAND FLOW ACROSS PAVEMENT TO GUTTER .6 Paved Kv=20.3282 L=60' s=.007 '/ ' V=1.7 fps SHALLOW CONCENTRATED/UPLAND FLOW WITHIN GRASS SWALE 2.2 Grassed Waterway Kv=15 L=140' s=.005 '/ ' V=1 .06 fps CHANNEL FLOW WITHIN GRASS SWALE 5.0 a=8 sq-ft Pw=12.2' r=.656' s=.005 ' / ' n=.24 V=.33 fps L=100' Capacity=2.6 cfs Total Length= 350 ft Total Tc= 8.7 SUBCATCHMENT 6 RUNOFF POST-DEUEL , , 2-YR , , REAR PARKING & SWALE 19 . 18 17 AREA= . 17 AC 16 Tc= 8 , 7 MIN . 15 - CN= 77 . 14 r, 13 SCS TR-20 METHOD ' 12 TYPE III 24-HOUR u , 11 RAINFALL= 3 . 1 IN . 89 3 , 08 PEAK= . 19 CFS CD 07 C 12 , 1 HRS -� , 06 UOLUME= , @ 1 AF �- . 05 , 04 . a3 , 02 , O1 ' @ am N M T Ln tD r- CC) TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 57 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 7 POST-DEVEL. , 2-YR. ,FRONTAGES & WEST SWALE PEAK= .36 CFS @ 12.03 HRS, VOLUME= .03 AF PERCENT CN SCS TR-20 METHOD 32.00 98 PAVEMENT TYPE III 24-HOUR 57.00 61 GRASS RAINFALL= 3. 1 IN 11.00 58 LANDSCAPED SPAN= 10-20 HRS, dt=.1 HRS 100.00 73 TOTAL AREA = .38 AC Method Comment Tc (min) TR-55 SHEET FLOW OVER PAVEMENT 1 .2 Smooth surfaces n=.011 L=50' P2=3.1 in s=.005 SHALLOW CONCENTRATED/UPLAND FLOW WITHIN GRASS SWALE 1.7 Grassed Waterway Kv=15 L=150' s=.01 '/ ' V=1.5 fps SHALLOW CONCENTRATED/UPLAND FLOW ALONG GUTTER LINE .9 Paved Kv=20.3282 L=150 ' s=.02 '/ ' V=2.87 fps CHANNEL FLOW WITHIN GUTTER .7 a=1.5 sq-ft Pw=12.2' r=.123' s=.02 '/' n=.016 V=3.25 fps L=140' Capacity=4.9 cfs Total Length= 490 ft Total Tc= 4.5 SUBCATCHMENT 7 RUNOFF POST-DEUEL , , 2-YR , , FRONTAGES & WEST SWALE . 36 . 34 AREA= . 38 AC . 32 Tc= 4 , 5 MIN . 30 . 28 CN= 73 . 26 r, 24 SCS TR-20 METHOD LO 22 TYPE III 24-HOUR u 20 RAINFALL= 3 . 1 IN �f 18 16 PEAK= 36 CFS 0 14 @ 12 , 03 HRS -� 12 UOLUME-- 03 AF I� 10 . O8 . 06 . 04 , 02 0 , 00CS) T rp to ca � C D, TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 58 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems REACH 1 DESIGN POINT FOR SUBCATS 5,6,&7 < 2-YR > Qin = .82 CFS @ 12.02 HRS, VOLUME= .06 AF Qout= .74 CFS @ 12.07 HRS, VOLUME= .06 AF, ATTEN= 10%, LAG= 2.9 MIN DEPTH END AREA DISCH (FT) (SO-FT) (CFS) 20' x .8' CHANNEL STOR-IND+TRANS METHOD 0.0 0.0 0.00 SIDE SLOPE= .01 ' /' PEAK DEPTH= .02 FT . l 2.2 3.27 n= .016 PEAK VELOCITY= 1.5 FPS .2 5.8 12.34 LENGTH= 90 FT TRAVEL TIME = 1.0 MIN .2 10.6 28.33 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=. l HRS .3 18.7 61.55 .5 32.6 130. 17 .6 53.8 254. 18 .8 80. 0 432.70 REACH 1 INFLOW & OUTFLOW DESIGN POINT FOR SUBCATS 5 , 6 , &7 < 2-YR > . 0 . 75 20' x . 8' CHANNEL . 70 r� SIDE SLOPE- . 01 ' l' . 65 4 n= . 016 L=90' S= . 01 60 5 n 55 STOR-IND+TRANS METHOD LO 150 1 VELOCITY= 1 , 5 FPS u . 45 TRAVEL= 1 MIN . 35 f Q i n= . 82 CFS o 30 Gout= 74 CFS , 25 LAG- 2 , 9 MIN . 20 . 15 . 10 05 ' (DID r-� M in � as a-) m TIME (hours ) 10-YEAR POST- DEVELOPMENT Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 41 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 1 POST-DEV. ,10-YR FLOW TO CB#1 PEAK= .26 CFS @ 11.98 HRS, VOLUME= .02 AF PERCENT CN SCS TR-20 METHOD 100.00 98 PAVED SURFACE AREA TYPE III 24-HOUR TOTAL AREA = .06 AC RAINFALL= 4.5 IN SPAN= 10-20 HRS, dt=. 1 HRS Method Comment Tc (min) TR-55 SHEET FLOW ACROSS PAVEMENT 1 .0 n=.016 L=50' P2=3.1 in s=.02 '/ ' CHANNEL FLOW IN GUTTER, TO CB#1 .4 a=1.4 sq-ft Pw=12.2' r=. 115' s=.01 ' /' n=.016 V=2. 19 fps L=50' Capacity=3.1 cfs Total Length= 100 ft Total Tc= 1.4 SUBCATCHMENT 1 RUNOFF POST-DEU , , 10-YR FLOW TO CB# 1 . 26 . 24 AREA= . 66 AC . 22 Tc= 1 . 4 MIN 20 CN= 98 ,� 18 SCS TR-20 METHOD 16 TYPE III 24—HOUR U 14 RAINFALL= 4 . 5 IN 12 PEAK= . 26 CFS 0 . 1e @ 11 . 98 HRS —� • 88 UOLUME- 02 AF 06 . 04 , 02 0 , 0 am T cv r� d r~ ca 0) CD TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 36 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 2 POST-DEVEL. ,10-YR,ROOF AREA PEAK= . 16 CFS @ 11.96 HRS, VOLUME= .01 AF PERCENT CN SCS TR-20 METHOD 100.00 98 ROOF SURFACE TYPE III 24-HOUR TOTAL AREA = .04 AC RAINFALL= 4.5 IN SPAN= 10-20 HRS, dt=. l HRS Method Comment Tc (min) TR-55 SHEET FLOW TO ROOF GUTTER . 1 Smooth surfaces n=.011 L=35' P2=3.1 in s=.5 CHANNEL FLOW IN GUTTER, TO SYSTEM#1 . 1 a=.2 sq-ft Pw=1' r=.2' s=.02 ' /' n=.01 V=7. 19 fps L=60' Capacity=1.4 cfs Total Length= 95 ft Total Tc= .2 SUBCATCHMENT 2 RUNOFF POST-DEVEL , , 10-YR , RO0F AREA . 16 . 15 AREA= . 04 AC . 14 Tc- 2 MIN 13 CN= 96 12 . 11 SCS TR-20 METHOD L 10 TYPE III 24-HOUR u . 09 RAINFALL- 4 . 5 IN . 08 . 07 PEAK= 16 CFS o . 06 @ 11 , 96 HRS . 05 UOLUME- . 01 AF 04 . 03 . 02 . 01 e , @e@ T , r'7 �- m TIME (hour5 ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 37 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4. 51 000899 (c) 1986-1996 Applied Microcomputer Systems POND 1 INFILT.SYSTEM FOR CB#1 & .04 AC ROOF,100YR Qin = .42 CFS @ 11.98 HRS, VOLUME= .03 AF Qout= . 11 CFS @ 12.33 HRS, VOLUME= .03 AF, ATTEN= 75%, LAG= 21.5 MIN Qpri= 0.00 CFS @ 11.80 HRS, VOLUME= -0.00 AF Qsec= .11 CFS @ 12.33 HRS, VOLUME= .03 AF ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD (FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 325 CF 0.0 0 0 0 0 PEAK ELEVATION= .9 FT . 1 396 13 13 396 FLOOD ELEVATION= 3.0 FT 1.5 396 554 568 495 START ELEVATION= 0.0 FT 2.5 50 196 763 844 SPAN= 10-20 HRS, dt=. 1 HRS 3.0 60 27 791 861 Tdet= 19.7 MIN ( .03 AF) # ROUTE INVERT OUTLET DEVICES 1 S 0.0' EXFILTRATION V= .014 FPM over WETTED AREA Primary Discharge Secondary Discharge �-1=Exfiltration POND 1 INFLOW & OUTFLOW INFILT , SYSTEM FOR CB# 1 & , 04 PC ROOF , 100YR 4B STOR-IND METHOD . 35 PEAK STOR= 325 CF PEAK ELEU= 9 FT '� 38 Qin= 42 CFS 25 Qout= . 11 CFS U Qpri = 0 , 00 CFS . 20 Qsec= , 11 CFS LAG= 21 . 5 MIN 0 15 V_ r �.t .y TIME (fours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST-NORTH ANDOVER Page 42 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 3 POST-DEVEL.10 -YR,REAR ROOF & PAVEMENT PEAK= .53 CFS @ 11.99 HRS, VOLUME= .03 AF PERCENT CN SCS TR-20 METHOD 100.00 98 ROOF & PAVEMENT TYPE III 24-HOUR TOTAL AREA = . 12 AC RAINFALL= 4.5 IN SPAN= 10-20 HRS, dt=. l HRS Method Comment Tc (min) TR-55 SHEET FLOW OVER ROOF /PAVVEMENT 1.0 n=.016 L=50' P2=3. 1 in s=.02 '/ ' SHALLOW CONCENTRATED/UPLAND FLOW ALONG GUTTERS .4 Paved Kv=20.3282 L=50' s=.01 '/' V=2.03 fps CHANNEL FLOW ALONG GUTTER TO CB#2 .5 a=1.4 sq-ft Pw=12.2' r=.115' s=.01 ' /' n=.016 V=2. 19 fps L=60' Capacity=3.1 cfs Total Length= 160 ft Total Tc= 1.9 SUBCATCHMENT 3 RUNOFF POST-DEUEL , 10 -YR , REAR ROOF & PAUEMENT ' 50 AREA= 12 AC 45 Tc= 1 . 9 MIN CN= 98 . 40 35 SCS TR-20 METHOD LO TYPE III 24-HOUR 4 U . 30 RAINFALL- 4 . 5 IN U 25 PEAK= . 53 CFS cD . 20 e 11 . 99 HR5 I 15 VOLUME= 03 AF 1 0 . 05 010 0m N M � Ln to co rn TIME ( hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST-NORTH ANDOVER Page 47 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HYdroCAD 4. 51 000899 (c) 1986-1996 Applied Microcomputer Systems POND 3 10 -YR INFILT.SYSTEM FOR SUBCAT# 3 Qin = .53 CFS @ 11.99 HRS, VOLUME= .03 AF Qout= .14 CFS @ 12.33 HRS, VOLUME= .03 AF, ATTEN= 74%, LAG= 20.4 MIN Qpri= 0.00 CFS @ 17.10 HRS, VOLUME= -0.00 AF Qsec= . 14 CFS @ 12.33 HRS, VOLUME= .03 AF ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD (FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 365 CF 0.0 0 0 0 0 PEAK ELEVATION= .8 FT . 1 528 18 18 528 FLOOD ELEVATION= 3.0 FT 1.5 528 739 757 642 START ELEVATION= 0.0 FT 2.5 50 247 1004 1123 SPAN= 10-20 HRS, dt=. 1 HRS 3.0 60 27 1031 1140 Tdet= 16.7 MIN ( .03 AF) # ROUTE INVERT OUTLET DEVICES 1 S 0.0' EXFILTRATION V= .014 FPM over WETTED AREA Primary Discharge Secondary Discharge �1=Exfiltration POND 3 INFLOW & OUTFLOW 10 -YR INFILT , SYSTEM FOR SUBCAT# 3 ' 50 STDR-IND METHOD . 45 PEAK STDR= 365 CF , 40 PEAK ELEU= . S FT • S5 Qin= . 53 CFS 'LO Qout- . 14 CFS L) 30 Qpri = 0 . 00 CFS L) Qsec- . 14 CFS LAG= 20 . 4 MIN cD . 20 - J It ' 15 05 t t e 0 Bm ni d do Co 0-) TIME ( hours ) Data for SYSTEM BUILDERS,INC-ABBOTT ST. ,NORTH ANDOVER Page 43 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 4 POST-DEVEL.10 -YR. ,FRONT ROOF & CB#3 AREAS PEAK= .92 CFS @ 11.99 HRS, VOLUME= .06 AF PERCENT CN SCS TR-20 METHOD 100.00 98 ROOF/PAVED AREA TYPE III 24-HOUR TOTAL AREA = .21 AC RAINFALL= 4.5 IN SPAN= 10-20 HRS, dt=.l HRS Method Comment Tc (min) TR-55 SHEET FLOW ACROSS IMPERVIOUS SURFACES .8 n=.016 L=50' P2=3. 1 in s=.03 ' / ' SHALLOW CONCENTRATED/UPLAND FLOW ALONG GUTTER .3 Paved Kv=20.3282 L=40' s=.01 ' / ' V=2.03 fps CHANNEL FLOW ALONG GUTTER TO CB#3 .6 a=1.4 sq-ft Pw=12.2' r=. 115' s=.01 ' /' n=.016 V=2. 19 fps L=80' Capacity=3.1 cfs Total Length= 170 ft Total Tc= 1.7 SUBCATCHMENT 4 RUNOFF POST-DEUEL , 10 -YR , , FRONT ROOF & CB#3 AREAS , 90 , 85 AREA= . 21 AC . 80 Tc= 1 . 7 MIN . 75 CN= 98 . 70 65 SCS TR-20 METHOD . 60 - 55 TYPE III 24-HOUR U , 50 RAINFALL= 4 , 5 IN '-' . 145 , 40 PEAK-- 92 CFS 0 . 35 @ 11 , 99 HRS J • 30 VOLUME= 06 AF 25 . 20 . 15 . 10 . 05 M �r Ln w r- ao a) m TIME ( hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 48 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HvdroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems POND 4 10 -YR INFILT.SYSTEM FOR SUBCAT # 4 Qin = .92 CFS @ 11.99 HRS, VOLUME= .06 AF Qout= .25 CFS @ 12.31 HRS, VOLUME= .06 AF, ATTEN= 73%, LAG= 19.3 MIN Qpri= 0.00 CFS @ 10. 10 HRS, VOLUME= -0.00 AF Qsec= .25 CFS @ 12.31 HRS, VOLUME= .06 AF ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD (FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 595 CF 0 .0 0 0 0 0 PEAK ELEVATION= .6 FT . 1 1020 34 34 1020 FLOOD ELEVATION= 3.0 FT 1 .5 1020 1428 1462 1179 START ELEVATION= 0.0 FT 2.5 50 432 1894 2151 SPAN= 10-20 HRS, dt=. l HRS 3.0 60 27 1921 2167 Tdet= 14.3 MIN ( .06 AF) # ROUTE INVERT OUTLET DEVICES 1 S 0.0' EXFILTRATION V= .014 FPM over WETTED AREA Primary Discharge Secondary Discharge �1=Exfiltration POND 4 INFLOW & OUTFLOW 10 -YR INFILT , SYSTEM FOR SUBCAT # 4 . 90 . 85 STOR-IND METHOD PEAK STOR= 595 CF , 75 PEAK ELEU= . 6 FT . 70 65 Qin= . 92 CFS LO . 60 t,- . 55 Qout= 25 CFS L) . 50 Qpri = 0 , 00 CFS '-` . 45 Qsec= . 25 CFS 40 LAG- 19 . 3 MIN O 35 1 . SO LL . 25 20 i 15 . 10 y . 05 O 0 00 N M 'r D ca M CD ERROR 900 TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 44 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomp to er Systems SUBCATCHMENT 5 POST-DEVEL.10 -YR. ,LOW PARK'G AREA PEAK= .47 CFS @ 11.98 HRS, VOLUME= .03 AF PERCENT CN SCS TR-20 METHOD 100.00 98 PAVED PARKING AREA TYPE III 24-HOUR TOTAL AREA = . 11 AC RAINFALL= 4.5 IN SPAN= 10-20 HRS, dt=. l HRS Method Comment Tc (min) TR-55 SHEET FLOW ACROSS PAVEMENT .8 n=.016 L=50' P2=3.1 in s=.03 '/ ' SHALLOW CONCENTRATED/UPLAND FLOW ACROSS PAVEMENT TO GUTTER .2 Paved Kv=20 .3282 L=40' s=.03 ' /' V=3.52 fps CHANNEL FLOW ALONG GUTTER ,2 a=1.4 sq-ft Pw=12.2' r=.115' s=.02 '/' n=.016 V=3. 1 fps L=40' Capacity=4.3 cfs ---------- Total Length= 130 ft Total Tc= 1.2 SUBCATCHMENT 5 RUNOFF POST-DEUEL , 10 -YR , , LOW PARK ' G AREA . 45 AREA= . 11 AC . 40 Tc= 1 , 2 MIN CN= 98 . 35 SCS TR-20 METHOD c 30 TYPE III 24-HOUR U 25 RAINFALL= 4 . 5 IN v , 20 PEAK= . 47 CFS O 8 11 . 98 HRS -� . 15 UOLUME= 03 AF . 1 � . �5 ' �m cv M d' Ln tD r- co Q1 @ TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 45 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 6 POST-DEVEL.10 -YR. ,REAR PARKING & SWALE PEAK= .38 CFS @ 12.09 HRS, VOLUME= .03 AF PERCENT CN SCS TR-20 METHOD 46.00 98 PAVEMENT TYPE III 24-HOUR 20.00 61 GRASS SWALE RAINFALL= 4.5 IN 34.00 58 LANDSCAPED SPAN= 10-20 HRS, dt=.l HRS 100.00 77 TOTAL AREA = .17 AC Method Comment Tc (min) TR-55 SHEET FLOW ACROSS PAVEMENT .9 Smooth surfaces n=.011 L=50' P2=3.1 in s=.01 SHALLOW CONCENTRATED/UPLAND FLOW ACROSS PAVEMENT TO GUTTER .6 Paved Kv=20.3282 L=60' s=.007 '/ ' V=1.7 fps SHALLOW CONCENTRATED/UPLAND FLOW WITHIN GRASS SWALE 2.2 Grassed Waterway Kv=15 L=140' s=.005 '/ ' V=1.06 fps CHANNEL FLOW WITHIN GRASS SWALE 5. 0 a=8 sq-ft Pw=12.2' r=.656' s=.005 '/ ' n=.24 V=.33 fps L=100' Capacity=2.6 cfs Total Length= 350 ft Total Tc= 8.7 SUBCATCHMENT 6 RUNOFF POST-DEUEL , 10 -YR , , REAR PARKING & SWALE , 36 . 34 AREA= , 17 AC . 32 Tc= 8 . 7 MIN 38 CN= 77 . 28 26 SCS TR-20 METHOD . 22 TYPE III 24-HOUR u 20 RAINFALL= 4 . 5 IN `-` . 18 16 PEAK= 38 CFS CD , 14 @ 12 , 09 HRS -� . 12 UOLUME= 03 AF . 18 . 08 . 06 , 84 . 02 Om M d- Ln �D r- co a) m TIME ( hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 46 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HvdroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 7 POST-DEVEL.10 -YR. ,FRONTAGES & WEST SWALE PEAK= .80 CFS @ 12.02 HRS, VOLUME= .06 AF PERCENT CN SCS TR-20 METHOD 32.00 98 PAVEMENT TYPE III 24-HOUR 57.00 61 GRASS RAINFALL= 4.5 IN 11.00 58 LANDSCAPED SPAN= 10-20 HRS, dt=. l HRS 100.00 73 TOTAL AREA = .38 AC Method Comment Tc (min) TR-55 SHEET FLOW OVER PAVEMENT 1.2 Smooth surfaces n=.011 L=50' P2=3. 1 in s=.005 SHALLOW CONCENTRATED/UPLAND FLOW WITHIN GRASS SWALE 1 .7 Grassed Waterway Kv=15 L=150' s=.01 ' /' V=1.5 fps SHALLOW CONCENTRATED/UPLAND FLOW ALONG GUTTER LINE .9 Paved Kv=20.3282 L=150' s=.02 '/' V=2.87 fps CHANNEL FLOW WITHIN GUTTER .7 a=1.5 sq-ft Pw=12.2' r=. 123' s=.02 '/' n=.016 V=3.25 fps L=140' Capacity=4.9 cfs Total Length= 490 ft Total Tc= 4.5 SUBCATCHMENT 7 RUNOFF POST-DEUEL , 10 -YR , , FRONTAGES & NEST SWALE 80 . 75 AREA= . 38 AC ' 70 Tc= 4 . 5 MIN ' 65 CN= 73 . 60 . 55 SCS TR-20 METHOD 50 TYPE III 24-HOUR U 45 RAINFALL= 4 . 5 IN u . 40 135 PEAK-- 80 CFS Ca . 30 - 8 12 . 02 HRS -� . 25 UOLUME= 06 AF 20 15 . 10 . 05 0 , 08 CS) TIME ( hour5 ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 49 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems REACH 1 DESIGN POINT FOR SUBCATS 5,6,&7 <10-YR> Qin = 1.56 CFS @ 12.02 HRS, VOLUME= .12 AF Qout= 1.40 CFS @ 12.06 HRS, VOLUME= .12 AF, ATTEN= 10%, LAG= 2.8 MIN DEPTH END AREA DISCH (FT) (SO-FT) (CFS) 20' x .8' CHANNEL STOR-IND+TRANS METHOD 0.0 0.0 0.00 SIDE SLOPE= .01 ' /' PEAK DEPTH= .03 FT . 1 2.2 3.27 n= .016 PEAK VELOCITY= 1,5 FPS .2 5.8 12.34 LENGTH= 90 FT TRAVEL TIME = 1.0 MIN .2 10.6 28.33 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=.1 HRS .3 18.7 61.55 .5 32.6 130. 17 .6 53.8 254. 18 .8 80.0 432.70 REACH 1 INFLOW & OUTFLOW DESIGN POINT FOR SUBCATS 5 , 6 , &7 C10-YR> 1 . 5 1 . 4 20' x . 8' CHANNEL SIDE SLOPE= 01 ' /' 1 , 2 f1 n= , 016 L=90' S= , 01 1 . 1 STOR-IND+TRANS METHOD 1 , e VELOCITY= 1 . 5 FPS 5 TRAVEL= 1 MIN . 7 Din= 1 . 56 CFS 0 6 Gout= 1 , 40 CFS -� . 5 LAG= 2 . 8 MIN , 4 . 3 . 2 . 1 0 . 0 M rn m TIME (hours ) 100-YEAR POST- DEVELOPMENT Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 32 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 1 POST-DEV.100-YR FLOW TO CB#1 PEAK= .38 CFS @ 11.98 HRS, VOLUME= .02 AF PERCENT CN SCS TR-20 METHOD 100.00 98 PAVED SURFACE AREA TYPE III 24-HOUR TOTAL AREA = .06 AC RAINFALL= 6.5 IN SPAN= 10-20 HRS, dt=. 1 HRS Method Comment Tc (min) TR-55 SHEET FLOW ACROSS PAVEMENT 1.0 n=.016 L=50' P2=3.1 in s=.02 '/ ' CHANNEL FLOW IN GUTTER, TO CB#1 .4 a=1.4 sq-ft Pw=12.2' r=. 115' s=.01 ' /' n=.016 V=2.19 fps L=50' Capacity=3. 1 cfs Total Length= 100 ft Total Tc= 1 .4 SUBCATCHMENT 1 RUNOFF POST-DEU , 100-YR FLOW TO CB# 1 . 38 . 36 34 AREA= . 06 AC . 32 Tc- 1 . 4 MIN , 30 CN= 98 . 28 . 26 SCS TR-20 METHOD LO ' 24 TYPE III 24-HOUR u RAINFALL= 6 , 5 IN 18 . 16 PEAK= . 38 CFS 0 14 @ 11 , 98 HRS -j 12 UOLUME= 02 AF 10 . 08 . 06 . 04 . 02 cu M co o) m TIME (hour5 ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 34 Prepared by Merrimack Engineering Services, Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 2 POST-DEVEL.100-YR,ROOF AREA PEAK= .24 CFS @ 11.96 HRS, VOLUME= .02 AF PERCENT CN SCS TR-20 METHOD 100.00 98 ROOF SURFACE TYPE III 24-HOUR TOTAL AREA = .04 AC RAINFALL= 6.5 IN SPAN= 10-20 HRS, dt=.l HRS Method Comment Tc (min) TR-55 SHEET FLOW TO ROOF GUTTER . 1 Smooth surfaces n=.011 L=35' P2=3. 1 in s=.5 CHANNEL FLOW IN GUTTER, TO SYSTEM#1 l a=.2 sq-ft Pw=1' r=.2' s=.02 '/' n=.01 V=7.19 fps L=60' Capacity=1.4 cfs Total Length= 95 ft Total Tc= .2 SUBCATCHMENT 2 RUNOFF POST-DEUEL , 1O0-YR , RO0F AREA ' 22 AREA= . 04 AC . 20 Tc= . 2 MIN . 1S CN= 98 r, 16 SCS TR-20 METHOD LO 14 TYPE III 24—HOUR u RAINFALL- 6 . 5 IN 12 . 10 PEAK= 24 CFS CD @ 11 , 96 HRS 08 LL 1 VOLUME= 02 OF 06 . 04 . 02 0 , 0 0m N M 73- Ln to ti co o� m TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 35 Prepared by Merrimack Engineering Services , Inc. 16 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems POND 1 INFILT.SYSTEM FOR CB#1 & .04 AC ROOF,100YR Description changed since last calculation Qin = .61 CFS @ 11.98 HRS, VOLUME= .04 AF Qout= .12 CFS @ 12.40 HRS, VOLUME= .04 AF, ATTEN= 80%, LAG= 25.3 MIN Qpri= 0.00 CFS @ 11.60 HRS, VOLUME= 0.00 AF Qsec= . 12 CFS @ 12.40 HRS, VOLUME= .04 AF ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD (FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 584 CF 0 .0 0 0 0 0 PEAK ELEVATION= 1.6 FT . 1 396 13 13 396 FLOOD ELEVATION= 3.0 FT 1.5 396 554 568 495 START ELEVATION= 0.0 FT 2.5 50 196 763 844 SPAN= 10-20 HRS, dt=.l HRS 3.0 60 27 791 861 Tdet= 36.3 MIN ( .04 AF) # ROUTE INVERT OUTLET DEVICES 1 S 0.0' EXFILTRATION V= .014 FPM over WETTED AREA Primary Discharge Secondary Discharge �1=Exfiltration POND 1 INFLOW & OUTFLOW INFILT , SYSTEM FOR CB# 1 & 04 AC ROOF , 10OYR . 60 Description changed since last calculation 155 STOR-IND METHOD 50 PEAK STOR= 564 CF PEAK ELEU= 1 . 6 FT . 45 , 40 Q i n- . 61 CFS Qout= . 12 CFS U 35 Qpri = 0 . 00 CFS `-' . 30 Qsec= . 12 CFS 25 LAG= 25 . 3 MIN O -1 . 20 � . 15 . 05 �t 1 TIME (hours ) Data for SYSTEM BUILDERS, INC-ABBOTT ST-NORTH ANDOVER Page 17 Prepared by Merrimack Engineering Services, Inc. 14 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 3 POST-DEVEL 100 YR,REAR ROOF & PAVEMENT PEAK= .77 CFS @ 11.99 HRS, VOLUME= .05 AF PERCENT CN SCS TR-20 METHOD 100.00 98 ROOF & PAVEMENT TYPE III 24-HOUR TOTAL AREA = .12 AC RAINFALL= 6.5 IN SPAN= 10-20 HRS, dt=. 1 HRS Method Comment Tc (min) TR-55 SHEET FLOW OVER ROOF /PAVVEMENT 1.0 n=.016 L=50' P2=3. 1 in s=.02 ' / ' SHALLOW CONCENTRATED/UPLAND FLOW ALONG GUTTERS .4 Paved Kv=20 .3282 L=50' s=.01 ' / ' V=2.03 fps CHANNEL FLOW ALONG GUTTER TO CB#2 .5 a=1.4 sq-ft Pw=12.2' r=. 115' s=.01 ' /' n=.016 V=2. 19 fps L=60' Capacity=3. 1 cfs Total Length= 160 ft Total Tc= 1.9 SUBCATCHMENT 3 RUNOFF POST-DEUEL 100 YR, REAR ROOF & PAVEMENT .75 .70 AREA= . 12 AC .65 Tc= 1 .9 MIN .60 CN= 98 55 SCS TR-20 METHOD j 50 TYPE III 24-HOUR u ,40 RAINFALL= 6.5 IN 35 PEAK= .77 CFS p •30 C 11 ,99 HRS J .25 UOLUME= .05 AF 'j- .20 15 10 05 0,0am - co M TIME (hours) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 20 Prepared by Merrimack Engineering Services , Inc. 14 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems POND 3 100 YR INFILT.SYSTEM FOR SUBCAT# 3 Qin = .77 CFS @ 11.99 HRS, VOLUME= .05 AF Qout= . 15 CFS @ 12.41 HRS, VOLUME= .05 AF, ATTEN= 81%, LAG= 25.2 MIN Qpri= 0.00 CFS @ 10.50 HRS, VOLUME= -0.00 AF Qsec= .15 CFS @ 12.41 HRS, VOLUME= .05 AF ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD (FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 674 CF 0 .0 0 0 0 0 PEAK ELEVATION= 1.3 FT . 1 528 18 18 528 FLOOD ELEVATION= 3.0 FT 1.5 528 739 757 642 START ELEVATION= 0.0 FT 2.5 50 247 1004 1123 SPAN= 10-20 HRS, dt=.1 HRS 3.0 60 27 1031 1140 Tdet= 31.7 MIN ( .05 AF) # ROUTE INVERT OUTLET DEVICES 1 S 0.0' EXFILTRATION V= .014 FPM over WETTED AREA Primary Discharge Secondary Discharge 1-1=Exfiltration POND 3 INFLOW & OUTFLOW 100 YR INFILT , SYSTEM FOR SUBCAT# 3 75 .70 STOR-IND METHOD .65 PEAK STOR= 674 CF .60 PEAK ELEU= 1 .3 FT .55 j 50 Qin= .77 CFS + .45 Gout= . 15 CFS U 40 Qpri= 0,00 CFS Gsec= . 15 CFS 35 LAG= 25.2 MIN p .30 J .25 L- .20 - . 15 --- -�._. . 10 .e5 , 0.0 TIME (hours) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 26 Prepared by Merrimack Engineering Services , Inc. 14 May 96 HYdroCAD 4 51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 4 POST-DEVEL.100-YR. ,FRONT ROOF & CB#3 AREAS PEAK= 1.34 CFS @ 11.99 HRS, VOLUME= .09 AF PERCENT CN SCS TR-20 METHOD 100.00 98 ROOF/PAVED AREA TYPE III 24-HOUR TOTAL AREA = .21 AC RAINFALL= 6.5 IN SPAN= 10-20 HRS, dt=. l HRS Method Comment Tc (min) TR-55 SHEET FLOW ACROSS IMPERVIOUS SURFACES .8 n=.016 L=50' P2=3. 1 in s=.03 '/ ' SHALLOW CONCENTRATED/UPLAND FLOW ALONG GUTTER .3 Paved Kv=20.3282 L=40' s=.01 '/' V=2.03 fps CHANNEL FLOW ALONG GUTTER TO CB#3 .6 a=1.4 sq-ft Pw=12.2' r=.115' s=.01 '/ ' n=.016 V=2. 19 fps L=80' Capacity=3.1 cfs Total Length= 170 ft Total Tc= 1.7 SUBCATCHMENT 4 RUNOFF POST-DEUEL . 100-YR , , FRONT ROOF & CB#3 AREAS 1 .3 1 .2 AREA= .21 AC 1 . 1 Tc= 1 .7 MIN CN= 98 1 ,0 .9 SCS TR-20 METHOD O g TYPE III 24-HOUR RAINFALL= 6.5 IN v 3 6 PEAK= 1 .34 CFS o .5 C 11 .99 HRS -i 4 UOLUME= .09 AF 3 .2 . I TIME (hours) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 27 Prepared by Merrimack Engineering Services , Inc. 14 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems POND 4 100 YR INFILT.SYSTEM FOR SUBCAT # 4 Qin = 1.34 CFS @ 11.99 HRS, VOLUME= .09 AF Qout= .27 CFS @ 12.40 HRS, VOLUME= .09 AF, ATTEN= 80%, LAG= 24.6 MIN Qpri= 0.00 CFS @ 17.60 HRS, VOLUME= -0.00 AF Qsec= .27 CFS @ 12.40 HRS, VOLUME= .09 AF ELEVATION CON.AREA INC.STOR CUM.STOR WET.AREA STOR-IND METHOD (FT) (SF) (CF) (CF) (SF) PEAK STORAGE = 1131 CF 0 .0 0 0 0 0 PEAK ELEVATION= 1.2 FT . 1 1020 34 34 1020 FLOOD ELEVATION= 3.0 FT 1 .5 1020 1428 1462 1179 START ELEVATION= 0.0 FT 2.5 50 432 1894 2151 SPAN= 10-20 HRS, dt=.1 HRS 3.0 60 27 1921 2167 Tdet= 28.5 MIN ( .09 AF) # ROUTE INVERT OUTLET DEVICES 1 S 0.0' EXFILTRATION V= .014 FPM over WETTED AREA Primary Discharge Secondary Discharge �1=Exfiltration POND 4 INFLOW & OUTFLOW 100 YR INFILT , SYSTEM FOR SUBCAT # 4 1 .3 1 .2 STOR-IND METHOD 1 1 PEAK STOR= 1131 CF PEAK ELEU= 1 .2 FT 1 ,0 .9 Qin= 1 ,34 CFS 4 •g Qout= .27 CFS U 7 Qpri= 0.00 CFS Qsec= .27 CFS 3 6 LAG= 24.6 MIN O .5 J 4 LL .3 . 1 t N TIME (hours) Data for SYSTEM BUILDERS, INC-ABBOTT ST-NORTH ANDOVER Page 28 Prepared by Merrimack Engineering Services , Inc. 14 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 5 POST-DEVEL.100-YR. ,LOW PARK'G AREA PEAK= .69 CFS @ 11.98 HRS, VOLUME= .05 AF PERCENT CN SCS TR-20 METHOD 100.00 98 PAVED PARKING AREA TYPE III 24-HOUR TOTAL AREA = .11 AC RAINFALL= 6.5 IN SPAN= 10-20 HRS, dt=. l HRS Method Comment Tc (min) TR-55 SHEET FLOW ACROSS PAVEMENT .8 n=.016 L=50' P2=3. 1 in s=.03 ' /' SHALLOW CONCENTRATED/UPLAND FLOW ACROSS PAVEMENT TO GUTTER .2 Paved Kv=20.3282 L=40' s=.03 ' /' V=3.52 fps CHANNEL FLOW ALONG GUTTER .2 a=1.4 sq-ft Pw=12.2' r=. 115' s=.02 ' /' n=.016 V=3. 1 fps L=40' Capacity=4.3 cfs Total Length= 130 ft Total Tc= 1.2 SUBCATCHMENT 5 RUNOFF POST-DEUEL , 100-YR, , LOW PARK'G AREA .65 AREA= . 11 AC ,60 Tc= 1 .2 MIN .55 CN= 98 .50 j 45 SCS TR-20 METHOD �+ .40 TYPE III 24-HOUR U 35 RAINFALL= 6.5 IN 3 30 PEAK= .69 CFS O .25 e 11 .98 HRS 20 VOLUME= .05 AF Lj_ 15 . 10 .05 0,eem - N M - U) w r O1 m TIME (hours) Data for SYSTEM BUILDERS, INC-ABBOTT ST-NORTH ANDOVER Page 32 Prepared by Merrimack Engineering Services , Inc. 14 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 6 POST-DEVEL.100-YR. ,REAR PARKING & SWALE PEAK= .67 CFS @ 12.09 HRS, VOLUME= .05 AF PERCENT CN SCS TR-20 METHOD 46.00 98 PAVEMENT TYPE III 24-HOUR 20.00 61 GRASS SWALE RAINFALL= 6.5 IN 34.00 58 LANDSCAPED SPAN= 10-20 HRS, dt=. 1 HRS 100.00 77 TOTAL AREA = .17 AC Method Comment Tc (min) TR-55 SHEET FLOW ACROSS PAVEMENT .9 Smooth surfaces n=.011 L=50' P2=3.1 in s=.01 SHALLOW CONCENTRATED/UPLAND FLOW ACROSS PAVEMENT TO GUTTER .6 Paved Kv=20.3282 L=60' s=.007 '/ ' V=1.7 fps SHALLOW CONCENTRATED/UPLAND FLOW WITHIN GRASS SWALE 2.2 Grassed Waterway Kv=15 L=140' s=.005 '/' V=1 .06 fps CHANNEL FLOW WITHIN GRASS SWALE 5.0 a=8 sq-ft Pw=12.2' r=.656' s=.005 '/ ' n=.24 V=.33 fps L=100' Capacity=2.6 cfs Total Length= 350 ft Total Tc= 8.7 SUBCATCHMENT 6 RUNOFF POST-DEUEL , 100-YR . , REAR PARKING & SWALE .65 .60 AREA= . 17 AC .55 Tc= 8.7 MIN .50 CN= 77 .45 SCS TR-20 METHOD c� .40 TYPE III 24-HOUR v 35 RAINFALL= 6.5 IN 3 •30 PEAK= .67 CFS 0 25 e 12,09 HRS 20 UOLUME= .05 AF 15 , 10 .05 N TIME (hours) Data for SYSTEM BUILDERS, INC-ABBOTT ST-NORTH ANDOVER Page 39 Prepared by Merrimack Engineering Services, Inc. 14 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems SUBCATCHMENT 7 POST-DEVEL.100-YR. ,FRONTAGES & WEST SWALE PEAK= 1.50 CFS @ 12.02 HRS, VOLUME= . 10 AF PERCENT CN SCS TR-20 METHOD 32.00 98 PAVEMENT TYPE III 24-HOUR 57.00 61 GRASS RAINFALL= 6.5 IN 11.00 58 LANDSCAPED SPAN= 10-20 HRS, dt=. l HRS 100.00 73 TOTAL AREA = .38 AC Method Comment Tc (min) TR-55 SHEET FLOW OVER PAVEMENT 1.2 Smooth surfaces n=.011 L=50' P2=3. 1 in s=.005 SHALLOW CONCENTRATED/UPLAND FLOW WITHIN GRASS SWALE 1.7 Grassed Waterway Kv=15 L=150' s=.01 '/' V=1.5 fps SHALLOW CONCENTRATED/UPLAND FLOW ALONG GUTTER LINE .9 Paved Kv=20.3282 L=150' s=.02 ' /' V=2.87 fps CHANNEL FLOW WITHIN GUTTER .7 a=1.5 sq-ft Pw=12.2' r=. 123' s=.02 ' / ' n=.016 V=3.25 fps L=140' Capacity=4.9 cfs Total Length= 490 ft Total Tc= 4.5 SUBCATCHMENT 7 RUNOFF POST-DEUEL . 100-YR , , FRONTAGES & WEST SWALE 1 .5 1 .4 AREA= .38 AC 1 ,3 Tc= 4.5 MIN 1 .2 CN= 73 1 . 1 1 ,0 SCS TR-20 METHOD 4- g TYPE III 24-HOUR U 8 RAINFALL= 6.5 IN 7 PEAK= 1 ,50 CF5 3 '6 C 12.02 HR5 of •5 UOLUME= . 10 OF �- .4 ,3 .2 . I M TIME (hours) Data for SYSTEM BUILDERS, INC-ABBOTT ST. ,NORTH ANDOVER Page 1 Prepared by Merrimack Engineering Services, Inc. 14 May 96 HydroCAD 4.51 000899 (c) 1986-1996 Applied Microcomputer Systems REACH 1 DESIGN POINT FOR SUBCATS 5,6,&7 Qin = 2.72 CFS @ 12.02 HRS, VOLUME= .20 AF Qout= 2.45 CFS @ 12.06 HRS, VOLUME= .20 AF, ATTEN= 10%, LAG= 2.8 MIN DEPTH END AREA DISCH (FT) (SO-FT) (CFS) 20' x .8' CHANNEL STOR-IND+TRANS METHOD 0.0 0.0 0.00 SIDE SLOPE= .01 ' / ' PEAK DEPTH= .06 FT . 1 2.2 3.27 n= .016 PEAK VELOCITY= 1.5 FPS .2 5.8 12.34 LENGTH= 90 FT TRAVEL TIME = 1.0 MIN .2 10.6 28.33 SLOPE= .01 FT/FT SPAN= 10-20 HRS, dt=. l HRS .3 18.7 61.55 .5 32.6 130.17 .6 53.8 254. 18 .8 80.0 432.70 REACH 1 INFLOW & OUTFLOW DESIGN POINT FOR SUBCATS 5 , 6 , &7 2 . 6 2 . 4 20' x . S' CHANNEL SIDE SLOPE-- 01 '/' 2 . 2 r ti n= , 016 L=90 ' S= . 01 2 , O ti 1 STOR-IND+TRANS METHOD cO 1 6 UELOCITY- 1 , 5 FPS `u 1 4 y TRAVEL= 1 MIN :13 1 . 2 Qin= 2 . 72 CFS O 1 . O Qout= 2 , 45 CFS -� LAG= 2 , 8 MIN L� . 6 . 4 . 2 O , Om T M M CS) TIME (hours ) STORM WATER INFILTRATION FACILITY DESIGN Based on U.S.D.A. Soil Conservation Services Soil Maps for the project, the soil type is 100% Sudbury"SrA', hydrologic soil group"B", consisting of loamy sand and sandy gravel in the C Horizon, well drained soil, with permeability up to 20" per hour. The soil classification based on actual test pits done on May 3, 1996, revealed a sandy to coarse sand and gravel parent material. From this information, a permeability rate of 10" per hour(0.014 FPM) was used as the exfiltration rate over the contact area within the perimeter and bottom of the facility for each system. The combined action of storage volume and exfiltration has been evaluated to contain the peak flow and maximum runoff volume up to and through the peak rate period to the greatest extent feasible and within economic reason. i t SHEA CONCRETE PRODUCTS P.O. Box 520 773 Salem St., Route 62 No. Wilmington; Mass. 01887 Tel. (508) 658-2645 500 GALLON DRYWEL H-20-44 MANHOLE 18 OLA I I �i i g� � PLAtJ 4"—4 2 DlA 7° TOP NTS INLETS DRAINAGE HOLES NOTES: 1„ N.T.5. i. ALL WALLS ARE 2— THICK AND „ HAVE DRAINAGE HOLES 4" DIA TO 22 DIA TAPER. 2. REINFORCED WITH 6"X6"X NO. 10 WIRE THROUGHOUT AND NO.4 RE—BAR IN TOP 6 I ON CENTER. DESIGN SUMMARY DESIGN SUMMARY As determined by analysis and design, the proposed subsurface infiltration facilities proposed in three location on the site will completely eliminate all runoff from the contributory areas which they will serve. Each facility has additional reserve capacity, even for the 100 year storm event, for which we anticipate a probable, though minimal, reduction in the infiltration rate through the wetted perimeter over time. To minimize this reduction, each catch basin will have a 2' - 6" sump, to collect any sediment in the runoff water, and a gas/oil trap, to retain any oils, grease, gas, or floating debris. Periodic inspection and maintenance of the catch basins will ensure a long operational expectancy of the facilities. SUMMARY CHART PRE- VS. POST-DEVELOPMENT FLOW COMPARISON TO DESIGN POINT #1 Pre-D Post-D Storm Flow Flow Difference Event (CFS) (CFS) (CFS) 2 0.76 0.82 +0.06 (+8%) 10 1.67 1.56 -0.11 (-7%) 100 3.14 2.72 -0.42 (-13%) CHARTS AND TABLES � �• TOPOGRAPHIC MAP / - Opt?�l _\,j �r^'l o` 'C'/„�``,.0 - `� ._ �,.- "• Cerri � L — No � over ;�o' - Q° r I. den r /.° v g C as \•oO .� o DAL —.- O� �• �� i _ ����_.\ \O :,jA o ^'�� 1, ./ - - Ll- \,J /` `'�' I •� o ••�� , 1 •� � • , �1 - \ _ v ,i! �L ( u� ° ,per ' j O I ST �y� 3 '•�T•, +.u, R,E',�' r� \ I,r •� �o � ,DER RFJ�• % —X770. �• °� 90 ;Y� do uC 1 ATS FOREST - 00 AA I y . '� ✓/ .� 0 1 :,' °may P a 169 174 191 v. ! - III MERRIMACK ENGINEERING SERVICES,INC. 66 PARK STREET ANDOVER, MASSACHUSETTS 01810 .0 -J 2 8 3 & ES;IfX FRANKUN MIDDLESEX 3.2" SUFFOLK HAMPSHIRE WORCESTER HAMPDEN 3.4" eA 3.6 RAINFALL DATA MAP BARNSTA E 2-YEkti, 24 HOUR PRECIPITATION (INCHES) DUKES NANTUCKET 4.2 4.3' 4.5 ESSEX 4 6" FRANKLIN IM11100LESEX X SUFFOLK 4.7" HAMPSHIRE RE V- WORCESTER HAMPDEN vo 0 j, o' 4.8 RAINFALL DATA MAP 10.YEAR, 2-1 HOUR PRECIPITATION (INCHES) 419 DUKES NANTUCKET 6.0" 6.2 6.4" PRANKUN ESSE X WIODLESEX 6.6" SUFFOLK y WAMPS141RE WORCESTER 6.8" r, HALIPOEN i -7 RAINFALL DATA MAP Rainfall Data Map j BARNST^IL, 100—YEAR, 24 HOUR PRECIPITATION (INCHES) 7.2 (scs) NANTUCKET MERRIMACK ENGINEERING SERVICES,INC 66 PARK STREET ANDOVER, MASSACHUSETTS 01810 Appendix E: CULVERT ENTRANCE LOSS COEFFICIENTS Entrance Loss Coefficients. Type of Structure and Design of Entrance Coefficientke Pipe, Concrete Projecting from fill,groove end. . . . . . . . . . . . . . . . . . . . . . 0.2 Projecting from fill,sq.cut end. . . . . . . . . . . . . . . . . . . . . . 0.5 Headwall or headwall and wingwalls Grooveend of pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.2 Square-edge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.5 Rounded(radius= 1/120) 0.1 Mitered to conform to fill slope 0.7 End-Section conforming to fill slope'. . . . . . . . . . . . . . . . . . 0.5 Pipe,or Pipe-Arch,Corrugated Metal Projecting from fill (no headwall) 0.9 Headwall or headwall end wingwalls t Square-edge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.5 Mitered to conform to fill slope . . . . . . . . . . . . . . . . . . . . . 0.7 End-Section conforming to fill slope*. . . . . . . . . . . . . . . . . . 0.5 Box, Reinforced Concrete Headwall parallel to embankment(no wt ils) Square-edi.ed on 3 edges. . . . . . . . . . . . . . . . . . . . . . . . 0.5 Rounded in 3 edges to radius of 1/12 barrel dimension. . . . . . . 0.2 Wingwai' .,s0'to 75' co Darrel Sq,; ­-edged at crown. . . . . . . . . . . . . 0.4 Crown edge rounded to radius of 1/12 barrel - nsion . . . . . 0.2 Wingwalls at 100 to 300 to barrel Square-edged at crown. . . . . 0.5 Wingwalls oarallel (extension of sides) Square-edged at crown. . . ... . . . . . . . . . . . . . . . . . . . . 0.7 Appendix F: SHEET FLOW ROUGHNESS COEFFICIENTS Surface Description n Appendix G: VELOCITY FACTORS Smooth surfaces .011 Fallow .05 Surface Description Kv Cultivated: Residue< =20% .06 Paved 20.3282 Cultivated: Residue>20% .17 Unpaved 16.1345 Grass: Short .15 Grassed Waterway 15.0 Grass: Dense .24 Nearly Bare & Untilled 10.0 Grass: Bermuda .41 Cultivated Straight Rows 9.0 Range I .13 Short Grass Pasture 7.0 Woods: Light underbrush .40 Woodland 5.0 Woods: Dense underbrush 80 Forest w/Heavy Litter 2.5 Memmack Engineering Services, Inc. Appendix A: RUNOFF CURVE NUMBERS Runoff curve numbers for urban areas) Cure numbers for Cover description h}•drologic soil group— Average percent Cover type and hydrologic condition impervious areaz A )s C D Fully developed urban areas Negetation established) Open spay ,: (lawns, parks, golf courses, cemeteries, etc.)': Poor condition (grass cover < 50%) .............. 68 7C) 86 89 Fair condition(grass cover 50% to 7570)......... .. 49 69 79 84 Good condition(grass cover > 75%) .............. 39 61 74 SO Impervious areas: Paved parking lots, roofs, driveways, etc. (excluding right-of-way). ........... .............. 93 98 93 98 Streets and roads: Paved; curbs and storm sewers (excluding right-of-way)........................... ..... 98 98 98 98 Runoff curve numbers for other agricultural lands' Curve numbers for Cover description hydrulogic soil group— Hydrologic Cover type condition A B C D Pasture,grassland, or range—continuous Poor 68 79 86 89 foi age for grazing.2 Fair 49 69 79 84 Good 39 61 A— 74 80 Meadow—continuous grass, protected from — 30 58 4-- 71 78 grazing and genes ally mowed for hay. Brush—brush-weed-grass mixture with brush Poor 48 67 77 S3 the major element.3 Fair 35 56 e-- 70 77 Good 430 48 65 73 Woods—grass combination (orchard Poor 57 73 32 86 or tree farm).5 Fair 43 65 76 82 Good 32 58 4- 72 79 Woods.' Poor 45 66 77 83 Fair 36 60 73 79 Good 430 5.3 70 77 Merrimack Engineering Services, Inc. SOIL TEST RESULTS SYSTEMS BUILDERS,INC. PROPERTY AT ABBOTT AND SALEM STREETS NORTH ANDOVER,MASSACHUSETTS TEST PIT RESULTS -MAY 3, 1996 TP#1 0"- 8" "A"Br.L.S. 8"-24"'S"Br.L.S. 24"-70""C"Br. Sand w/graveUsome small cobbles Water @ 70" TP#2 0"- 14""A"B.L.S. 14"-20""B"Br. Coarse Sand 20"-68""C"Br. Loose-line sandy gravel Water @ 60" TP#3 0"- 12""A!,B.L.S. 12"- 18"'S"Br/Samd 18"-66""C"Med Br. Sand/IGravel(loose-live) No Water @ 66" TP#4 07"- 8" "A"B.S.L. 8"-30""B"Lt. Br. S.L. 30"-90""C" Br. Sand w/losse live gravel Water @ 80" TP#5 0" - 12" "A" Br. S.L. 12" - 18" "B" B.S.L. 18"- 90" "C" B. Sand w/losse coarse gravel No Water @ 90" � i Or'-lb mail r \\ e. v \ t5vr=/s6.of V z `'1\ jo NN C SpSTANIA �+ r LET 31 � \ It ,.. \ 4-2,086 s F .�' \ '97 AC s�f �4 • h 1� " itr ALE Zl / I \ If, 0 S�C1L J9- 2 j\ 16 O 1e1.. 4 ONE O ' / 'f lrws Kt. �A ca ltwt-C rT I CG \ CENT,c 150.BJ Mi ss..s � 79'56' 5' S 79 56 \ • �/r'm� -- -a W / 277.8 / ——— —is4 — — — as 4 /r E 12~ YR/AME OV1H R.O.WJ CB WA�RMA/N STRE r 3a5 CENr150.17 A L950 T T Ng2 c \ MI I lea \ 51.57 - 68.7"S ss�\ S \�1,4E I� E5 16 IJ.I .1...\ -p � r Ip,�\ \ PO i NT kI41 ! \ \ -is �- A V E L 0 F MT A(yiEtlED,WT/GT.l'AT/O•(/SACK/TYAZ \ .^ 6 a9 NIT C/ZP/TJ- TOT.ILJ °�\ �� //\�U /�• JOHN CRISOSTANIA — \ AM ,l„ RL"TE.VT/O.V/N 6�fA.SS may,CQ•E SH'AGE •CSI/•/SC.O \ pA New" r4— .-T 1101 "Or •asp* ,u•+I ` "' /I' / � -... PiPOPOSED •Y \ 79, ARP/ �P�t� t' ,�T x,f.,a• fN' , \ �,.z '.. ot 1 \ \ Z CD 11Y47 AU��1 �C�C L/ //I(5 yy� n Z ,' p S/6$ N✓�/ Z /YY rs tjb Cl ',. -_` -__ __ / ''\ \� ` �Yl' � C r^f.N.IN 7J '.` 'i �, F�✓-IF/O -, f � �. ✓AR/AB '7M� 1` 6 W _ ,}^ s� CC.j . 5! c.•,. - . . 1 Pn.3r2 !E�OIH /x• _• I ."A. � \\ CB RIH t FR. R►FSe� /956 pp� K, \ �ENT"SC d1� w �• � \\ / �\ Al 8 q r \\ \ ry r; DES IGW y ` � POI NT _ °F ..p