Loading...
HomeMy WebLinkAboutPlans - 10 HEATH CIRCLE 6/16/2016 i Framing I Delobis 4 Marr 5ohrer 10 Hath Circle, North Ancl v r 5' April-2016 Drawn by:AG Scale 114"=1' Steel "L" Brackets Framing Notes: -- Deck Live Load = 60 PSF Deck Dead Load = 10 FSF ' - -- Framing is *1 or better Ft SYP -- Beam Is (2) 2x10 Ai -- Girder is (2) 2x8 \ -- Column are 6x6, Notched and bolted {_-- beams to e s = -- Joists are 2x8, 116° o/c \\ f --Decking is Gambera 1x4, attached f _ (2f 2x8 Girder with SS Screws W1 Painted Heads �� `2x8 Blocking Mid Span iDouble Joist it (2) 4 Board box Step i =� ` -_� ="� _-, �7rtple Joist `� i 5sam and Footing I Debbie4 Mark 5ohrer Beam 4 Footing Notes: 10 Heath Circle, North Andover -- Deck Live Load - 60 PSF 5-April-206 -- Deck Dead Load = 10 PSF Drawn by:AC scare ird°=r -- Roof Snow Load = 50 PSF Roof Load onto Steel "L" Brackets = 01630 -® Roof Dead Load = 15 PSF -- Room Live Load ® 40 PSF -- Room Dead Load = 10 PSF -- Beam is (2) 2x10 -- -- Girder is (2) 2x8 Columns are 6x6, notched and bolted to Deck ubeams -- Footing brackets are galvanized steel screwed to columns 1260 Open Porch 4 # 5 840 -- Footings are galvanized steel pipe with l2 2x8 Girder 210 PLF 8" Nelix, over 4 et deep 1 *4168 2 03284 3 04168 Q` (2) 2x10 Beam 215 PLF s ; loi e.n