Loading...
HomeMy WebLinkAboutCertificate of Compliance - 485 FOREST STREET 9/24/1999 TOWN OF NORTH ANDOVER BOARD OF HEALTH CERTIFICATE OF COMPLIANCE DATE OF COMPLIANCE: 09/24/99 This is to certify that the individual subsurface disposal system constructed (x) or repaired ( ) by Lou Baldoumas at Lot IA Long Pasture Estates has been installed in accordance with the provisions of Title V of the State Sanitary Code and with the North Andover Board of Health regulations as described in the Design Approval Site System Permit# 876 dated 4/4/97. The Issuance of this certificate shall not be construed as a guarantee that the system will function satisfactorily. Board of Health Inspector TOWN OF NORTH ANDOVER SEWAGE DISPOS JU SYSTEM INSTALLATION CERTIFICATION The undersigned hereby certify that the Sewage Disposal System constr-ucted, repaired- bv /11d 4L>z, k�l d located at was installed in conformance with the North Andover Board of Health approved plan, System Design Permit 4 dated /14' with an approved desip flow of gallons per day. The materials used"were in conformance with those specified on the approved plan; the system was installed in accordance with the provisions of 310 CNIR 15-000, Title 5 and local regulations, and the final grading agrees substantially with the approved plan. All work,is, accurately represented on the As-built which has been submi ed to,th d, Bed inspection date: 41.Final inspection ct(4t Inspector 1�0 Installer: 7� Lie. 9:1 C Date: qQ_ Design Engineer: Date: Z- AS-BUILTCHECKLIST LOT NUMBER, STREET NAME ASSESSORS MAP & PARCEL NUMBER Lf LOT LINES & LOCATION OF DWELLINGS LOCATION & DEMENSIONS OF SYSTEM, INCLUDING RESERVE TIES TO LOT LINES & DWELLING, WELLS a. FROM SEPTIC TANK b. FROM LEACH AREA LOCATIONS OF DEEP HOLES & PERC TESTS V/ ELEVATIONS OF DISPOSAL SYSTEM TOP OF FDN ELEVATION LOCATIONS OF WELLS, DRAINS, WATERCOURSES W/TN 150' OF SYSTEM LOCATION OF WATER, GAS, ELECTRIC LINES, CABLE DISTANCES FROM CORNERS OF HOUSE TO CENTER OF TANK & D-BOX STAMP & SIGNATURE IMPERVIOUS AREAS - DRIVEWAYS, ETC, NORTH ARROW FINAL CONTOURS LOCATION & ELEVATION OF BENCHMARK USED LOCUS PLAN