HomeMy WebLinkAboutHealth Permit # 12/8/2005 Commonwealth of Massachusetts Map-Block-Lot
105.D-0146- --
-------------------- -
0
Board of Health Permit No
® BHP-2005-0723
North Andover
P.I.
FEE
SAC U1, F.1. $250.00
Disposal Works Construction Permit
Permission is hereby granted Davem4p d
to(Construct)an Individual Sewage Disposal System.
at No 4-9--EQUESTRIAN DRIVE
as shown on the application for Disposal Works Construction Permit No. -BHP-2-005---072--- DatedDecember-0-8,-2-005-
--------------- -------------------
Issued On:Dec-08-2005
Board of Health
..................... ................................ .................................................................................................................
lication for Septic Disposa 9 tem
,'fib —�_". � .,^'"_�„ � ,".✓�
°�- . TODAY'S DATE
t 5Ad'A =YuM1a �^
$ 250,00 —l=ull Repair
$125.00 -Component
k,�
Important: Application is hereby made for a permit to:
When filling out ❑ Construct a new on-site sewage disposal system*
forms on the
computer, use F1 Repair or replace an existing on-site sewage disposal system*
only the tab key
to move your ❑ Repair or replace an existing system component
cursor-do not
use the return
key. A. Facility Information
rab Address or Lot#
---- — --
e� City/Town
2.® *TYPE OF SEPTIC SYSTEM*:
�[ .Pump ❑ Gravity (choose one)
***If pump system, attach copy of electrical permit to application***
❑ Conventional System (pipe and stone system)
❑ Infiltrator or Biodiff user(Gravel-Less) (Attach a copy of your certification to install this type of system.
❑ Pressure Distribution S.A.S. (No D-Box) (Attach Draft Maintenance Agreement)
❑ Pressure Dosed (D-Box Present) S.A.S.
2. Owner Information
----- „
Name _----
..,,.(
A -----'- -- -------- ---. —_.
--- -
Address(if -- -----------....._.._.—
different from above)
City/Town State Zip Code
✓"''°"
Telephone Number
3. Installer Information ✓ /
Name fJ c..,-.--s- 'C=,.----- ✓'% _,.,!k' a.- - --------- I_ /^'' ,.^✓'" /e.
s r t �.,.. a��-^"r; " `,ry/ '_ ^`a' s"p✓r:,'--
Name of Gd`mpany
r
Address
City/Town State Zip Code
Telephone Number(Cell Phone#if possible please)
4. Designer Information
Name Name of Company
Address - - -
City/Town State Zip Code
Telephone Number(Best#to Reach)
Application for Disposal System Construction Permit•Page 1 of 2
Z 10 Z abed VWJ9d�opnjj�uoo walsAS jesodsi(]jol uoijeoilddV
ON S aA :(Aluouo!jonjjsuoomou) �siivld cool j
(upIdpxo-iddv spalvas aiuvS)
ON S dA :(Aluoi uopowisuoo mou) pyng-sV tiozirpunol -p
ON s dA 1!1"-IddIvOuloalljOW-ooqiFi-7—VosjI pudisiCS- ilia -c
ON Sax zpdqavvV uuol uoqv�ijqo JAMPN7,140,1d •7
ON saA 2pdpvnVadj *j
:Aiuo esn aoijid job
:SUOSeGJ 6UIM01101 9qj J01 PGAoiddesi(I uoijeoilddV
6
ale(] 9w8N
(any;ejuese.id98 qlIeOH 10 PJe0G),)Aj3 POAoiddv 4eoqddv
Y'! .
@w8N
JO PJe0G S�Iq;Aq pensst ueaq
sey oomidwoo jo ajeoy!peo e 1!;un uopejedo ut tuojsAs eqj eleld of jou pue 'JDAopuv qpON
jo ump_L atil joj suopelnBey lesods►(I eoepnsqnS jeoo-7 eLp se 119m se 'apoo lejumuo-itAug
8yj JO 9 01;!.L JO SUOISIAOJd eyj qpm eouppi000e ut walsAs lesods�ip efiemes aj!'s-uo
paqposep-eipp eqj jo 9oueuejtqew pue uo!jonjjsuoo eq)einsue of see.Xe pouBisiepun 9q.L
JugmeeAv -8
jelojaww0c)[:] as 6ulllam(] jeIju@p!Sq87j' :Uu—!pj!nj3 jo a -9
....penuiluoo uoijewiolul AmPej V
Z .AO Z 39Vd
jueuodmoo T TDION
medeM lin.4 -00*09z $ M10 VW 'dgAOk'JNV jr-I
L40 N&01 I!WJGd uogonjIsuo
w Bil
GIs s iesodsid 314des o
joi U614
INSTALLER PROJECT MANAGEMENT OBLIGATIONS
As the North Andover licensed installer for the construction of the septic system for the
o ert at .
p i° p y '19 i" ��°�1 , m:����a,,,°.�.�,.. ��".,�',�� ,. relative to the application
of �.,� �, /dated ��;dz �a for tans b �^�� and
�Mr ..,,,,,/dated
p y ---
a. r
dated4Q ��" o +� with revisions dated ?
I understand the following obligations for management of this project:
I. As the installer I am obligated to obtain all permits and Board of Health approved plans prior
to performing any work on a site. I must have the approved plans and the permit on site
when any work is being done.
2. As the installer I must call for any and all inspections. If homeowner, contractor, project
manger, or any other person not associated with my company schedules an inspection and the
system is not ready then item three shall be applicable.
3. As the installer I am required to have the necessary work completed prior to the applicable
inspections as indicated below. I understand that requesting an inspection, without
completion of the items in accordance with Tile 5 and the Board of Health Regulations may
result in a$50.00 fine being levied against my company.
a) Bottom of Bed - generally first inspection unless there is a retaining wall which should be done
first. Installer must request the inspection but does not have to be present.
b) Final inspection — Engineer must first do their inspection for elevations, ties, etc. As-built or
verbal OIL from engineer must be submitted to Board of Health, after which installer calls for
inspection time. Installer must be present for this inspection. With pump system all electrical
work must be ready and able to cause pump to work and alarm to function.
c) Final Grade-- Installer must request inspection when all grading is complete. Does not have to be
on site.
4. As the installer I understand that only I may perform the work(other than simple excavation)
required to complete the installation of the system identified in the attached application for
installation, I further understand that work by others unlicensed to install septic systems in
North Andover can constitute reasons for denial of the system, and/or revocation or
suspension of my license to operate in the Town of North Andover; significant fines to all
persons involved are also possible.
5. As the Installer I understand that I must be on site during the performance of the following
construction steps:
a) Determination that the proper elevation of the excavation has been reached.
b) Inspection of the sand and stone to be used.
c) Final inspection by Board of Health staff or consultant.
d) Installation of tank, D-box, pipes, stone, vent, pump chamber, retaining wall and other
components.
6. As the installer I understand that I am solely responsible for the installation of the system as
per the approved plans. No instructions by the homeowner, general contractor, or any other
persons shall absolve me of this obligation.
Undersigned
� sed Septic Installer,
Date: