HomeMy WebLinkAboutCertificate of Compliance - 984 TURNPIKE STREET 5/15/2004 1 ic oi th(m i � :ltii
e �Services
27 ( Iiark,s Street
,w I
��PDXffi Andov 1 t%8i""'bagdGwOofts 01845 w kh
Susan Y. a.)r.:wyer, q .��.N��� CN�1C1P"q'"
TOWN OF NORTH ANDOVER
BOARD OF HEALTH
CERTIFICATE OF COMPLIANCE
DATE OF COMPLIANCE
May 15, 2004
This is to certify that
the individual subsurface disposal system
constructed ( )
or
repaired (X)
by
John Soucy
at
984 Turnpike Street
North Andover, MA 01845
has been installed in accordance with the provisions of Title V of the State Sanitary Code and with the
North Andover Board of Health regulations.
The Issuance of this certificate shall not be construed as a guarantee that the system will function
satisfactorily.
Susan Y. Sawyer,REHS/RS
Public Health Director
BOARD(*fAV'9T 0 �d 088.95^8 G BUH 9)N16 688-95(p5 CONron?RAl,h'p tl` N 698 95 10 111, A I 1088,1),",40 PI ANNU N(u 6'M-9535
May 1.4, 2004
Susan Sawyer
North Andover Board of Health
27 Charles Street
North Andover, MA 01845
Re: 984 Turnpike Street,North Andover, Septic System As-Built
Dear Susan:
New England Engineering is submitting a septic system as-built for the above referenced
property. We have also included the system installation certification. Enclosed are three
(3) copies of the as-built plan and one copy of the installation certification.
If you have any comments or questions please do not hesitate to contact this office.
Since ly,
Thomas Hector
New England Engineering Services, Inc.
60 BEECI Iwt."JC; D DRIVE-NORTH ANDOVER, MA 01845-(978)686..1768-(868)359-7645• FAX(178)685-1099
TOWN'OF NORTH ANDOVER SEWAGE DISPOSAL SYSTEM
INSTALLATION CERTII+ICATION
The undersigned hereby certify that the Sewage Disposal System ( )'constructed;
(,q) repaired;
by 6
located
. at E
was installed in conformance with the North Andover Board of Health approved plan,
System.Design Permit# ,plan dated , with a design flow
of gallons per day. The materials used were in conformance with those specified
on the approved plan; the system was installed in accordance with the provisions of 310
CMR 15.000,Title S and local regulations, and the final grading agrees substantially with
the approved plan. All work is accurately represented on the As-built which has been
submitted to the Board of Health.
Bed inspection date: 5''' l 1
Engineer Representative
Final inspection date: 3-11,3&
Engineer Represents iv ,
Installer:
� '��� o ��a�z",,M" Lic.#: Date:
�i (,r /�(q/
� acct �� ..✓ !
Engineer "' Date:
TANGA[4) = faro
13021
itA
MILL RIVER CONSULTING
Septic System Management Services
TOWN OF NORTH ANDOVER
SEPTIC SYSTEM CONSTRUCTION NOTES
ADDRESS: 964 Turnpike St MAP:107C LOT: 6
INSTALLER: John Soucy
DESIGNER: NEES
PLAN DATE:3/15/2004
BOH APPROVAL DATE ON PLAN:
DATE OF BED BOTTOM INSPECTION:5/6/2004
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
ELECT SYSTEM TYPE Pressure Distribution
COMPONENT SUMMARY FROM PLAN
GALLON TANK ® 1500
LOADING OF SEPTIC TANK = H10
GALLON PUMP CHAMBER ® 1000
LOADING OF PUMP CHAMBER ® 1410
TYPE OF SAS ® Infiltrator Field
DIMENSIONS AND DETAILS OF SAS: 25' x 22.83'
SITE CONDITIONS
Date & Initials Inspections
❑Existing septic tank properly abandoned
❑Internal plumbing all to one building sewer
❑Topography not appreciably altered
Comments:
5 Blackburn Center, Gloucester, Massachusetts 01930-2259
toll free 1. 800.377.3044 978.282. 0014 f fa f o(m f l l K i it ,r(",()xi,ri)1.t
Page 1 of 5
Septic System Management, Services
SEPTIC TANK
® Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1500 gallon tank has been installed
FI-10 loading 2-Piece construction
❑ Water tightness of tank has been achieved
(Visual or Vacuum Test or Water held for 24hrs)
❑ Inlet tee installed, over access port
❑ Outlet tee (gas baffle or effluent filter) installed, over
access port
❑ inch cover to within 6" of final grade installed
over one access port, must be over outlet of tank if
effluent filter is present
❑ Hydraulic cement around inlet & outlet
Comments:
Installer reported that tank on bed of stone, did not observe first-hand but saw excess
stone on-site.
PUMP CHAMBER
® Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1000 gallon Pump Chamber installed
H-10 loading
2-Piece construction)
❑ Inlet tee installed, over access port
❑ Pump(s) installed on stable base
❑ ,Alarm float working
❑ Pump On/Off float working
❑
Drain hole in pressure line
❑ inch cover to within 6" of final grade installed over
one access port
❑ Water tightness of tank has been achieved
Visual testing
❑ Hydraulic cement around inlet & outlet
Comments:
Installer reported that tank on bed of stone, did not observe first-hand but saw excess
stone on-site.
5 Blackburn Center, Gloucester, Massachusetts 01930-2259
tall free 1. 800.377.3044 978.282. 0014 1 lo, ('m I,, u/ Y i m;.
Page 2 of 5
KILL RIVER CONSULTING
Septic System Management Services
ACl1 NC C T ATME T TECHNOL Ol(
❑ Type of treatment
❑ Installed per manufacturers requirements
❑ All components working in accordance with
manufacturer's requirements
Comments:
D- OX
❑ Installed on stable stone base
❑ Inlet tee (if pumped or >0.08'/foot)
❑ Hydraulic cement around inlet & outlets
❑ Observed even distribution
❑ Speed levelers provided (not required)
Comments:
OIL ABSORPTION SY TEM
® Bottom of SAS excavated down to C soil layer, as
provided on plan
® Size of SAS excavated as per plan
❑ Title 5 sand installed, if specified on plan
❑ 3/4-1 Y2" double washed stone installed
❑ 1/8-1/2" (peastone) double washed stone installed
❑ laterals installed and ends connected to header (and
vented if impervious material above)
❑ Orifices @ 5 & 7 o'clock positions
❑ Gravelless disposal systems: type, number and
location as per plan
❑ Elevations of laterals installed as on approved plan
❑ 40 Mil HIDPE barrier installed
❑ Retaining wall (boulder/ concrete /timber/ block)
❑ Final cover as per plan
Comments:
One area of material - probably stone from old septic tank. This was in Overdig area
and did not want to undermine house, so left undisturbed. Excavation depths were
approx 7' in West corner, and only 3-4' in East corner. One small lens of denser
material observed, but felt that excavator on field would do more damage than removing
a 3x3 patch of questionable soil
5 Blackburn Center, Gloucester, Massachusetts 01930-2259
toll free 1. 800.377.3044 978.282. 0014 111 If o0m i I I corer Mj.:1. i urf, r r�rn
Page 3 of 5
Septic System Management Services
PRESSURE IST'RI U TI N
❑ inch manifold
❑ laterals installed with end sweeps
size:
material:
❑ Squirt test ft in height
❑ Equal distribution to all laterals
❑ orifice size inch as per plan
Comments:
C NTR L PAN L
❑ Alarm & Pump are on separate circuits
❑ Alarm sounds when float is tripped
❑ Location of control panel
❑ Rated for exterior if placed outside
Comments:
5 Blackburn Center, Gloucester, Massachusetts 01930-2259
Loll free 1. 800.377.3044 978.282. 0014 i I)I o('Im i ) 11 1 c w) ,' a) I.Y' i m�. c(')m
Page 4 of 5
KILL RIVER CONSULTING
Septic ,System Management Services
SYSTEM L V TI NS
Benchmark:
Rod at Benchmark:
Haight of Instrument:
INVERT ON DESIGN PLAN ELEV TOP OF PIPE INVERT ELEVATION
Building Sewer OUT
Septic Tank IN
Septic Tank OUT
Dump Chamber IN
Pump Chamber OUT
Distribution Sox IN
Distribution Box OUT
Manifold
Lateral 1 HIGH
Lateral 1 LOW
Lateral 2 HIGH
Lateral 2 LOW
Lateral 3 HIGH
Lateral 3 LOW
Lateral 4 HIGH
Lateral 4 LOW
Lateral 5 HIGH
Lateral 5 LOW
5 Blackburn Center, Gloucester, Massachusetts 01930-2259
toll free 1. 800.377.3044 978.282. 0014 i ra f ONux i I l r r" mj. < om
Page 5 of 5