HomeMy WebLinkAboutHealth Permit # 12/22/2005 Commonwealth of Massachusetts Map-Block-Lot
090.8-0048-
Board of Health ---- - ------- ----
Permit No
•
} w North Andover BHP-2005-0728
P.I. -
FEE
'34CHa F.I. $125.00
---- -----------------
Disposal Works Construction Permit
Permission is hereby granted _JAMES KELLETT
— —
to(Construct)an Individual Sewage Disposal System.
at No 386 SHARPNERS POND ROAD Lry x
as shown on the application for Disposal Works Construction Permit No. BHP-2005-072 Dated December 22 2005
- ----
- -- -- ------
Issued On:Dec-22-2005 Board of Health
044 %°RTfj I
Application for Septic Disposal System
i v�>
R , VV -
a o
k #
Construction Permit - TOWN OF TODAY'S DA
` NORTH DOVER MA 01845
$ 250.00 —Full Repair
X9''4„.,. '�h ' $125.00 - Component
�SSA C NUSE't
Important: Application is hereby made for a permit to:
When filling out ❑ Construct a new on-site sewage disposal system*
forms on the
computer, use ❑ air or replace an existing on-site sewage disposal system*
only the tab key a
to move your Repair or replace an existing system component
cursor-do notv6 /
use the return
key. A. Facility Information
ra8 Address or Lot# /
e tCi y/Town
2.- *TYPE OF EPTIC SYSTEM*:
❑ Pump ff Gravity (choose one)
If pump system, attach copy of electrical permit to application***
L—�/Conventional System (pipe and stone system)
❑ Infiltrator or Biodiff user(Gravel-Less) (Attach a copy of your certification to install this type of system.
❑ Pressure Distribution S.A.S. (No D-Box) (Attach Draft Maintenance Agreement)
❑ Pressure Dosed (D-Box Present) S.A.S.
2. Owner Information
Name
Address(if different from above)
City/Town State Zip Code
Telephone Number
3. Installer Information
Name , Name of Company
�Iad pr��
A?dress L�
Ci /Town State Zip Code
Telephone Number(Cell Phone#if possible please)
4. Designer Information
Name Name of Company
Address
City/Town State Zip Code
Telephone Number(Best#to Reach)
Application for Disposal System Construction Permit•Page 1 of 2
Z;o Z abed.liwad uoilonilsuoo walsAS jesodsi0 jo;uoileoilddy
ON SdA :(Aluo uol;ona;suoo mou) z suvlg coo13 'S
(uvld pa3ocddv sv alvos awvS)
ON —sad :(Aluoa uo!jana;suoo mou)Zll!ng-sy uoilvpunoI •t,
ON —sdA p?�pcl9lp, ?ui5alg Po oi g3v11V`osJI 2wols S ucng -f
ON 1rJ sdA zpagovllV uuoj uotiv�ilgo iagvaivN7o4oid •z
ON —sad 2pagovllv ddj t
pup asn oowo ao=i
auoseaa 6uinnoIIOI ayj J01 panoiddesid uog oilddy
ale(] aweN
(and;e;uasaidad y;leoH,;o preow) :A8 panoaddy uoijeoilddy
alea
EN
4'/?
paeo8 siy;Aq pan ►ueaq
sey eousydwoo to a;eoy!VaC) a Igun uoi;eaado ul wa;sAs ;ou pue `aanopud y oN
10 umol a y;aol suoe;e;nBed lesodsio ooepnsgnS jeoo7 ay; se Beam se `opoo oe;uawuoilAu
ay;to g algL to suoismoid ey; y;!m aouepi000e ui wa;sAs lesodsip eBemas aps-uo
pagiaosep-aaole aq;,;o aoueue;Wew pue uW;ana;suoo ay;ainsue o; seeiBe pouBisropun ayl
4uauaaGJBV • 3
IePJ@ww0:DE1 ao 6uIIIGmG leiluePs9a 1E: ulpling jo adA.L 5
„f
••••penuiluoo uoijeuaaojuj I!1!3eg 'V
Z :1OZ3Jdd
}3�17N'J�,qS
;ueuodwoC)- 00'9Z6$
aiedoH Ilnj–00,09Z $ M10 VW QgAOUNI V 11IXON
JO I�I&OI - I!WJOd uoi;3na}suo�W
- --- W84S S peso sid 3i1 es aoi 0603ilcia d
INSTALLER PROJECT MANAGEMENT OBLIGATIONS
As the North Andover licensed installer for the construction of the septic system for the
property at o°P4 '��� ��� relative to the application
of , ,,, dated A, for plans by / and
dated with revisions dated
I understand the following obligations for management of this project:
I. As the installer I am obligated to obtain all permits and Board of Health approved plans prior
to performing any work on a site. I must have the approved plans and the permit on site
when any work is being done.
2. As the installer I must call for any and all inspections. If homeowner, contractor, project
manger, or any other person not associated with my company schedules an inspection and the
system is not ready then item three shall be applicable.
3. As the installer I am required to have the necessary work completed prior to the applicable
inspections as indicated below. I understand that requesting an inspection, without
completion of the items in accordance with Tile 5 and the Board of Health Regulations may
result in a$50.00 fine being levied against my company.
a) Bottom of Bed - generally first inspection unless there is a retaining wall which should be done
first. Installer must request the inspection but does not have to be present.
b) Final inspection — Engineer must first do their inspection for elevations, ties, etc. As-built or
verbal OK from engineer must be submitted to Board of Health, after which installer calls for
inspection time. Installer must be present for this inspection. With pump system all electrical
work must be ready and able to cause pump to work and alarm to function.
c) Final Grade—Installer must request inspection when all grading is complete. Does not have to be
on site.
4. As the installer I understand that only I may perform the work(other than simple excavation)
required to complete the installation of the system identified in the attached application for
installation. I further understand that work by others unlicensed to install septic systems in
North Andover can constitute reasons for denial of the system, and/or revocation or
suspension of my license to operate in the Town of North Andover; significant fines to all
persons involved are also possible.
5. As the Installer I understand that I must be on site during the performance of the following
construction steps:
a) Determination that the proper elevation of the excavation has been reached.
b) Inspection of the sand and stone to be used.
c) Final inspection by Board of Health staff or consultant.
d) Installation of tank, D-box, pipes, stone, vent, pump chamber, retaining wall and other
components.
6. As the installer I understand that I am solely responsible for the installation of the system as
per the approved plans. No instructions by the homeowner, general contractor, or any other
persons shall absolve me of this obligation.
Undersigned icensed Septic Installer
Date: