PUBLIC HEALTH DEPARTMENT
Town of North Andover
Community Development Division
CURVTIFICATE
COMPLIANCE
As of: 7/14/16
This is to certify that the individual subsurface disposal system received a
SATISFACTORY INSPECTION of the:
Repair of D-box and outlet tee
By: Todd Bateson
Ate
337 Summer Street
Map 107.A Lot 0173
Ve ,Th Issuance of this �' i�at N�rth
not be construed as a guarantee that the system will function satisfactorily.
- g Y Y
icliele Grant
Public Health Agent
1600 Osgood Street,North Andover,Massachusetts 01845
Phone 978.688.9540 Fax 978.688.8476 Web www.townofnorthandover.com
North Andover Health Department
Community and Economic Development Division
ON ITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 337 Summer St. MAP: 107.A LOT: 0173
INSTALLER: Todd Bateson
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN:
INSPECTIONS
D-box and outlet tee INSPECTION: ll ll(-v
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
SITE CONDITIONS
❑ Contractor reports any changes to design plan
❑ Existing septic tank properly abandoned
❑ Internal plumbing all to one building sewer
❑ Topography not appreciably altered
Comments:
SEPTIC TANK
❑ Building sewer in continuous grade, on
compacted firm base
❑ Cleanouts per plan
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1500 gallon tank has been installed
H-10 loading
❑ Monolithic tank construction
❑ Water tightness of tank has been achieved by
visual testing
❑ Inlet tee installed, centered under access port
❑ Outlet tee installed, centered under access port
(gas baffle/effluent filter)
❑ inch cover to within 6" of finish grade
installed over one access port
❑ Hydraulic cement around inlet & outlet
Comments:
PUMP CHAMBER
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1500 gallon Pump Chamber installed
❑ H-10 loading
❑ Monolithic tank construction
❑ Inlet tee installed, centered under access port
❑ Pump(s) installed on stable base
❑ Alarm float working
❑ Pump On/Off floats working
❑ Separate on/off floats
❑ Drain hole in pressure line
❑ cover at final grade installed over pump
access port
❑
Watertightness of tank has been achieved by
testing
❑ Hydraulic cement around inlet & outlet
Comments:
CONTROLPANEL
❑ Alarm & Pump are on separate circuits
❑ Alarm sounds when float is tripped
❑ Location of control panel: basement
❑ Alarm signal located inside: basement
Comments:
DISTRIBUTION-BOX
Installed on stable stone base
/H-20 D-Box
Inlet tee (if pumped or >0.08'/foot)
Hydraulic cement around inlet & outlets
Observed even distribution
Speed levelers provided (not required)
❑ Schedule 40 PVC Pipe
Comments: