Loading...
HomeMy WebLinkAboutCorrespondence - 50 SHERWOOD DRIVE 11/22/2005 I ' t i a (, 1 1K�Mdw��S�4C��I��1¢Ill StCB�t: Norkh I► fiov�ti,CIA 0845 irfnfild 9�8w68864i)''*Phone" � a Tyui 'e, wuibtut o �'ti resat ay "+ xol lo to it ouro X17 Q h rwo PO h r f t61 r n , Sp/ f3151 SCI fdU r��jd�w,f�nn c�iin for�,�ir��pect�n. r 1 J1�ldk FVol, ll�Yl ......... ....,«frf r.... FtcivdP ........................I ............ -I'll/.............-A/,:-lI-, ........ .......... ............ ................. ..............:........................ ............ ................ ........-11-1 11-111 ........ --4 ........... ............ ............../"-" . .. ............. ............. ............... .............. .......... .............. -1111,........... ............................ inat,r, J r Texr pp ,manks,furl rlI"ett ov a serge you! November 7, 2005 Susan Y. Sawyer, REHS/RS Health Director North Andover Health Department 400 Osgood Street North Andover,Massachusetts 01845 RE: Septic System Repair Inspection, 50 Sherwood Drive,Map 1-5C, Lot 14 Dear Ms. Sawyer, On November 1,2005,Mill River Consulting performed a final construction inspection for the septic system repair for the property at 50 Sherwood Drive. The repair was performed by Jim Kellett of Kellett Excavation. The plan date was August 22, 2005, and the BOH approval date on the plan was August 30,2005. During the inspection,we verified that the length and width and approximate location of the trench addition was per plan,that the appropriate stone was used in the trench, and that the pipe elevations provide proper fall from the existing distribution box to the start and end of the new leaching line. The following elevations were recorded at the site: Distribution box outlet 139.25 (Used as base elevation) Start of lateral 139.14 End of Lateral 138.99 Please feel free to contact me should any questions arise. Sincerely, Andrew McBrearty Project Manager consulting R"i'li,"ver � W Fora conq,'de[(., soun'cr N.)r (m sk'c w<tsk"' °EIA err NOV - 9 2005 TOWN OF NORTH ANDOVER HEALTH DEPARTMENT November 7, 2005 Susan Y. Sawyer, REHS/RS Health Director North Andover health.Department 400 Osgood Street North Andover, Massachusetts 01845 RE: Septic System Repair Inspection, 50 Sherwood Drive, Map 1-5C,loot 14 Dear Ms. Sawyer, Out November 1, 2005,Mill River Consulting performed a final uonstiuction inspection for the septic system repair for the property at 50 Sherwood Drive,. The repair was per bf iii"by Jim Kellett of Kellett Excavation. The plan date was August 22, 2005, and the BO I approval date on the plan was August 30, 2005. During the inspection, we verified that the length and width and approximate location of the trench addition was per plan,that the appropriate stone was used in the trench, and that the pipe elevations provide proper fall from the existing distribution box to the start and end of the new leaching line. The following elevations were recorded at the site: Distribution box outlet 139.25 (Used as base elevation) Start of lateral 139.14 End of Lateral 138.99 Please feel free to contact me should any questions arise. Sincerely, Andrew McBrearty Project Manager @ h i w w 2 Blackburn Center, Gloucester, Massachusetts 01930-2259 1-800-377-3044 or 978-282-0014 0 Fax 978-282-0012 uan�aaf ;r�uuBl��r�: ��.�b6u;�.�Vteout� r:wn 00k elleChiaie, Pamela Subject: Bed Bottom Inspection Location: 50 Sherwood Drive Start: Mon 10/31/2005 11:00 AM End: Mon 10/31/2005 11:30 AM Show Time BAs: Tentative Recurrence: (none) Meeting Status: Not yet responded Required .Attendees: Grant, Michele; Sawyer, Susan Off of Boxford Street. 781.953.7146 -Jim Kellett Only call if you need to cancel or reschedule (and let Pam know). Thanks! Ile i 7 � w r j� p� w,r 1 Town of North Andover Office of the Health Department Community Development and Services Division 27 Charles Street North Andover,Massachusetts 01-845 406 Sandra.Starr Telephone(978)688-9540 Efealth Director Fax(978) 688-9542 March 18,2002 Mr.and Mrs.John Kelly 50 Sherwood Drive North Andover,MA 01845 Re: Application to finish the basement at 50 Sherwood Drive Dear Mr. and Mrs.Kelly: Your application to finish the basement at 50 Sherwood Drive has been reviewed by the Health Department. The application was denied on March 18,2002 for the following reason: The size of the current septic system servicing the dwelling will not be adequately sized for any additional living space without being upgraded. Please feel free to call the Health Office at 978-688-9540 with any questions you may have. Sincerply, 6i,�r J,L Grasse,Health Inspector cc: Building Department File X 130AIZD OF APPFIAI S 688-9541 BUILDING 688--9545 CONSERVATION 698-9530 NURSH 688-9543 PLANNING 688-9535 s b r � b 9 b t f {I P j 6t — ---------- b r r t � { r i 9 r a ! aas { ! 9p rd WdLv-*l a 6661 1.0 °LAnjr T2.02 60 T82 'ON XUA !D-LW SwdZllTD SONor,14 d WOW -d bdCJdA VAV6 t :! 666L-20-9 FROM M.JONES CITIZENS MTO FAX NO. 701 639 3071 Jun. 07 1999 04:06PM P1 m i = i iP — -- — ---_® ® ---- VM ---------------� t I ' ° 6 y ` to -------------- ° c C> "d HodA HV0z:L 666 l-00-9