Loading...
HomeMy WebLinkAboutCertificate of Compliance - 67 VEST WAY 2/19/2004 Office oft the liealt1 t., � � t Town � f North n s $ W Con : . ity De �° � � R b"J�� t e�° h.e wsi.on �',Joidfi Andover, Massachtiselts M84,13 A4 1W Fax (c)78)688-9,542 42 TOWN OF NORTH ANDOVER BOARD OF HEALTH CERTIFICATE OF COMPLIANCE DATE OF COMPLIANCE February 19, 2004 This is to certify that the individual subsurface disposal system constructed ( ) repaired (X) by Mike Reilly at 67 Vest Way North Andover, MA 01845 has been installed in accordance with the provisions of Title V of the State Salutary Code and with the North Andover Board of Health regulations. The Issuance of this certificate shall not be construed as a guarantee that the system will function satisfactoril Jonath Markey Chairman,North Andover Board of Health pafN✓aIaI;DSlI AI'"9"I',✓11 °'b fl-'5&I 1# IL6;41]°+d4ifry P,954`I ('O SI�ltVA'L'[OCMd(uI',9-9`'iO 6$RFIMA'1'I088-9540 I"1,14NNN(u68K.95i5 TOWN OF NORTH ANDOVE R SEWAGE DISPOSAL SYSTEM INSTALLATION CERTIFICATION The Vndersigned hereby certify that the Sewage Disposal System ( ) constructed; ( —)(repaired: by I I ~ 1 r ► , i° located at was installed in conformance with the North Andover Board of Health approved plan, System Design Permit# dated with an approved design flow of-e ` gallons per day. The materials used were in conformance with those specified on the approved plan; the system was installed in accordance with the provisions of 310 CMR 15.000, Title 5 and local regulations, and the final grading agrees substantially with the approved plan. All work is accurately represented on the As-built which has been submitted to the Board of Health. Bed inspection date: . Engineer Repres ntative Final inspection date: Engineer Represents ive m , Installer. ' ' Lic.#: Date: Design Engineer: Date: ` ` � t INSPECTION CHECKLIST FOR SEPTIC SYSTEMS Yes NO Initia),s,j A. Bottom of Bed 1. Excavation to proper depth 2. With trenches sides of excavation are beneath B horizon 3. Edge of excavation specified distance from foundation, etc. Comments: B. Retaining Wall 1. Wall height and width as specified 2. Waterproofed 3. Wall minimum 10'to leaching facility 4. Wall meets specifications of plan Comments: C. Building Sewer 1. Pipe diameter minimum 4" (e !f 2. Schedule 40 pipe t/ 3. Watertight joints 4. Inlet to tank cemented f y 5. Slope minimum 0.01 or 1/8"per foot minimum 6. Pipe properly set on compact firm base -- � 7. Pipe laid on continuous grade in straight line 8. Cleanouts precede all change in alignment and grade 9. Manholes at any 90°change 10. 10' minimum offset to water line Comments: D. Septic Tank 1. Level 2. 1,500 gal minimum r 3. Gas baffle present on outlet 4. Manhole to grade 5. Manholes over center and each tee 6. 3-20"manholes 7. Inlet tee minimum 12"under invert 8. Outlet tee minimum 14"under invert 9. Outlet line cemented L� 10. Air space 3"above tees 11. 2"-3"drop from inlet to outlet 12. Pipe set 13. Compact base with 6"of/"crushed stone under tank 14. Tank is watertight Comments: Yes NO E. Pump Chamber 1. If separate from tank,compact base with 6"of 3/4"stone underneath 2. Minimum 2"pipe to d-box if gravity system 3. 20"access manhole 4. Tank level IQ-1j 5. Watertight L.o 6. Tank size agrees with plan specification 7. Manhole to grade 8. Check valve and bleeder hole present 9. Alarm in building on separate circuit 10. Alarm functions 11. Manual operating switch � 12. Pump delivers liquid to d-box Comments: F. Distribution Box �o 1. D-box level 2. Minimum 0.IT'(2")drop from inlet to outlet 3. Minimum 6"sump 4. Outlet pipes show equal distribution 5. Compact base with 6"of stone beneath box 6. Box is watertight , 7. All lines cemented with hydraulic cement 8. Schedule 40 pipe Comments: G. Soil Absorption system 1. All stone double-washed-'/4"- 1 ''/2" -pea stone Bucket test done? �/,� 2. Minimum 2".of pea stone above distribution lines J� 3. Minimum 6"stone beneath pipe ►/ 4. Distribution lines capped or connected together LZ 5. Grading meets 3:1 slope 6. Minimum of 9"of fill graded over system 7. Toe of slope stops minimum 5' from edge of property; if not,then Swale. Comments: H. Leach Trenches 1. Minimum 2 trenches 2. Length of trenches agree with plan. (Max. length 100') 3. Width of trenches agree with plan-Minimum 2%maximum-4'. 4. Vent present if<50 feet or specified � A 5. Distance between trenches minimum 4' and maximum of 6' �' 6. Minimum distance between trenches 10' ' 7. Pipe slope minimum 0.005 or 6"per 100' - 8. Depth of trenches below outlet invert minimum of 6". Yes , NO 9. Pipes set on stable base. Comments: 1. Leach Field 1. Maximum length of field 100' 2. Pipe slope minimum 0.005 or 6"per 100' 3. Separation between pipe 6'maximum 4. Pipes connected at end 5. Separation between adjacent fields 10'minimum 6. Pipes set on stable base 7. Maximum 4' separation from edge of field to first line 8. Minimum two distribution lines 9. Maximum perc rate 20 mpi Comments: I Leaching Pits 1. Minimum inlet pipe 4" 2. Pits of concrete 3. Sidewall between 12"and 48"wide 4. Access manholes on each pit 5. Pipes cemented with hydraulic cement Comments: K. Final Grade 1. Slope over soil absorption system minimum 0.02 2. All system components covered by at least 9"soil 3. Cover soil free of stones larger than 6" 4'. Grading slopes away from dwelling 5. No areas over system that may pond -