Loading...
HomeMy WebLinkAboutCertificate of Compliance - 120 CARLTON LANE 8/9/2016 • t PUBLIC HEALTH DEPARTMENT Town of North Andover Community Development Division CERTIFICATE OF COMPLIANCE As of: 8/8/16 This is to certify that the individual subsurface disposal system received a SATISFACTORY INSPECTION of the: Repair of Tank, D-Box, tank to D-box By. Todd Bateson At: 120 Carlton Lane Map 106.0 Lot 0097 rr ,o- -tb Andover, MA 01 T'he s'arise of"this cerCgt -to s al,l not be construed as a guarantee that the system will function satisfactorily. ° r ° Mic ele Grant Public Health. Agent 1600 Osgood Street,North Andover,Massachusetts 01845 Phone 978.688.9540 Fax 978.688.8476 Web www.townofnorthandover.com • North Andover Health department (ommanity and Economic Development Division ®NSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 120 Carlton Lane MAP: 106.0 LOT: 0097 INSTALLER: Todd Bateson DESIGNER: PLAN DATE: BOH APPROVAL DATE ON PLAN: INSPECTIONS Tank, D-Box, pipe from tank to D-box INSPECTION: 8/8/16 DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned ❑ Internal plumbing all to one building sewer ❑ Topography not appreciably altered Comments: SEPTIC TANK ❑ Building sewer in continuous grade, on j compacted firm base ❑/ Cleanouts per plan Bottom of tank hole has 6" stone base Weep hole plugged 1500 gallon tank has been installed ° H-10 loading 0 Monolithic tank construction ❑ Watertightness of tank has been achieved by visual testing ❑ Inlet tee installed, centered under access port ❑ Outlet tee installed, centered under access port (gas baffle/effluent filter) ❑ inch cover to within 6" of finish grade installed over one access port ❑ Hydraulic cement around inlet & outlet C meat " I s . ..� � PUMP CHAMBER .,..^.. � w ❑�M , . .., a g "❑, .. u,w ... ❑ Bottom of tank hole has 6 stone based ❑ Weep hole plugged , ,� .❑�� .... ❑ 1500 gallon Pump Chamber installed ( ` .� (, ..... , ❑ H-10 loading ❑ Monolithic tank construction ® Inlet tee installed, centered under access port ❑ Pump(s) installed on stable base ❑ Alarm float working ❑] Pump On/Off floats working ❑ Separate on/off floats ❑ Drain hole in pressure line ❑ cover at final grade installed over pump access port ❑ Watertightness of tank has been achieved by testing ❑ Hydraulic cement around inlet & outlet Comments: CONTROL PANEL ❑ Alarm & Pump are on separate circuits ❑ Alarm sounds when float is tripped ❑ Location of control panel: basement ❑ Alarm signal located inside: basement Comments: DISTRIBUTION-BOX ❑ Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08'/foot) Hydraulic cement around inlet & outlets Observed even distribution Speed levelers provided (not required) 0" Schedule 40 PVC Pipe Comments: ._