HomeMy WebLinkAboutBuilding Permit # 7/25/2016 TOWN OF NORTH ANDOVER
APPLICATION FOR PLAN EXAMINATION
0
Date Received
Permit NO:--V&--z*4
Date lssued:OR—sf--�-__._-
IMPORTANT: Applicant must coin fete all items on this Dave
L �KjAD
LOCATION
1 4- KAI fiLr-p�,"
PROPERTY OWNER \1q,,rr1PK
F
Print
MAP NO, : PARCEL: ZONING DISTRICT:
TYPE AND USE OF BUILDINC HISTORIC DISTRICT ------
TYPEOF IMPROVEMENT PROPOSED USE -------
Residential Non- Residential
New Building One family
Addition Two or more family Industrial
Alteration—-—---, Noof units:—
XRepair, replacement .-j Assessory Bldg commercial
Demolition
7'—
cAl i)n) Other
Moving�E _�.eat o Others:
Foundation only
DESCRIPTION OF WORD T TO BE PREFORMED
e
Identification P'lrease Type gar Tint Clearly)
boC,A, Ac'- Phones_~
OWNER: Name: ILL/
Ile,
Address:-
ce-*C Phone: -7
CONTRACTOR Maine:—A—
Address._.-
i).
Supervisor's Constitiction License:—... Ex
—.— I Date:
3)� D
I tome Improvement License: V1 I C--S- ( Exp. ate:
d
ARCHITECT/ENGfNEER Name: Phone:
Address: --.—.—Reg.
FEE SCHEDULE.BULDINGPERMIT:.512.00 PER$1000.000FTILE 7,07AL ESTIMATED COST BASED !$125.0 S.F.
Total Project Cost :$ I S x12.00=-FEE:$—
Check Receipt No.:---,�
Page I of 4
ttORTh
Town of
,� L
O -- _ 0%
No.
h ver, Mass, 04 2f,SO[ VI
SID
S U BOARD OF HEALTH
PERMIT T LD Food/Kitchen
Septic System
THIS CERTIFIES THAT .. .LAW....Aft..-0 ....•..... ...+l1A.Ir....... ........ BUILDING INSPECTOR
G Foundation
has permission to erect ..:....................... buildings on ...��•. �.���,/�_. .....•..
PM
ough
to be occupied as . AwX00.. �.. . . • •. . ! ••a Chimney
provided that the person accepting this permit shall in every respect conform to the terms of the application Fina
on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration anc
Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR
VIOLATION of the zoning or Building Regulations Voids this Permit. Rough
Final
PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR
UNLESS CONSTR ION S Rough
Service
.. . . ... ......
BUILDING PE OR Final
GAS INSPECTOR
Occupancy Permit Required to Occupy Buildin Rough
Display in a Conspicuous Place on the Premises — Do Not Remove Final
No Lathing or Dry Wall To Be Done FIRE DEPARTMENT
Until Inspected and Approved by the Building Inspector. Burner
Street No.
Smoke Det.
g
Page 1 of 6
Nexus II Carpentry and
Construction Design
P.O. Box 2823
Woburn,MA 01888
781 7602031
Fax 978 975 1263
CS#-073991
H1C#1.29177
Contract
This is a contract between dames and Kathleen Yonchak of 73 Lancaster Road, North
Andover MA 01845 (Hereafter referred to as the "owners" or "owner") and Nexus II
Services (hereafter referred to as "Nexus") dated June V 2016.
1
GENERAL SCOPE OF WORK DESCRIPTION
WE HEREBY SUBMIT SPECIFICATIONS AND CONTRACT FOR: work as stated
below for bathroom and basement work
Scone of work:
General details
e Meet with local building official and apply for permits
® All work will be in accordance with local building code regulations and will be
inspected by local officials prior to continuing with the next phase—Nexus will be
responsible for arranging and being available for all inspections
® All work will be coordinated directly between"owners", architect if required and
Nexus
Nexus confirms that it is licensed, insured as required and ensures any sub-
contractors utilized on this site will have the appropriate insurance coverage
® Nexus will be responsible for the safe storage of all its property and any materials to
be used on the site. Any items left on site will be covered under Nexus insurances
Owner is responsible for removal and return where necessary of all items within the
work area and their safe storage prior to our work commencing
® Owner will then be responsible for returning all items to the area after completion of
the scope of work
SPECIALIZING IN QUALITY FINISH CARPENTRY, REMODELING,SPECIALIST ROOF SYSTEMS,SITE AND
PROJECT MANAGEMENT
Page 2 of 6
Nexus will remove all trash associated with this project into a Nexus supplied
durnpster and arrange for safe disposal in to a registered site—if required
♦ Nexus will contact Dig Safe" and confirm all utilities location—if required
Scope of work- master bathroom;
® Provide onsite dumpster for the duration of the project
♦ Remove and trash the existing light in cathedral ceiling, tile floor, tile from walls
around existing tub, 2 wall units, existing shower stall, 2 sinks with faucets and 1
counter top
o Remove and SAVE existing toilet
NOTE: existing vanity cabinet to remain in place
NOTE: New counter ton to be tem
{ templated and installed by "others"
Furnish and install framing to create a new shower stall approximately NOTE: frame
a seat into the shower stall
Furnish and install rubber pan to base of shower
s Finnish and install plumbing to code inclusive of shower "head", and a hand held
shower spray NOTE: fixtures including valve to be supplied by "owners"
e Furnish and install 1 vapor barrier light over new shower stall
+ Install (one) customer supplied light fixture into the existing feed in cathedral ceiling
o Install tile and grout supplied by owners to the floor of the new shower and the walls
of the new shower NOTE: we recommend a piece of granite is used as the top of the
new seat in the shower-this should be supplied and installed by your granite
company and should be installed prior to the the walls being installed
® Install threshold supplied by customer to entry to shower
1
® Install tile and grout supplied by the customer to area around the existing tub
♦ Make compound repairs to the wall above the vanity
® Install sinks, faucets, toilets and fixtures supplied by owners
Ia ♦ Prep then paint the existing vanity cabinetry - exterior only NOTE: no painting
included for the interior of the cabinet box NOTE 2: the door and drawer fionts will
be painted "all sides"
# Prep, inclusive of removing the wallpaper,then paint the walls, ceiling and existing
trim to colors advised by owners
Proposed cost including materials and labor as noted above is $15, 550.00
Scope of work-full bathroom;
NOTE: New counter top to be templated and installed by "others"
i
® Remove counter top, sink,and faucet
a
♦ Install sink and faucet provided by "owners"
♦ Prep then paint the existing vanity cabinetry - exterior only NOTE: no painting
included for the interior of the cabinet box NOTE 2: the door and drawer fronts will
be painted "all sides"
® Proposed cost including materials and labor as noted above is $490.00 including
materials and labor
SPECIALIZING IN QUALITY FINISH CARPENTRY,REMODELING,SPECIALIST ROOF SYSTEMS,SITE AND
PROJECT MANAGEMENT
Page 3 of 6
Basement projects;
® Bedroom;
® Paint walls, trim and doors to colors chosen by customer- $800.00
® Ceiling tile swap to Armstrong#1.205 utilizing existing 2'x 2' ceiling grid - $990.00
0 Bathroom;
♦ Primer, then paint walls, trim and doors to colors chosen by customer - $630.00
Ceiling file swap to Armstrong#1205 utilizing existing 2' x 2' ceiling grid - $410.00
Living area including hall to stairs;
e Remove existing ceiling grid system and install framing to box in duct work
♦ Furnish and install strapping to accept new sheetrock ceiling system choosing highest
elevation around existing pipes etc.
Furnish and install sheetrock with smooth plaster finish to strapping and new
framing - $2, 670.00 for these 3 items above
® Remove existing light box and install 2 x 5' recessed cans on existing switch -
$450.00
♦ Furnish and install blocking to wall to support TV bracket, install an outlet and cable
outlet - $465.00
Primer, then paint ceiling,paint walls, trim and doors to colors chosen by customer-
$2, 000.00
u
d ® Staircase;
® Primer,then paint walls and trim to colors chosen by customer- $560.00
u
The above quotation does not include the cost of any of the following and in some
cases where stated allowances have been given to assist you in selection. If
requested,we would be happy to provide any costs on items listed below, if not here
stated;
Permit costs (these are repairs so there should not be permit fees), unseen conditions,
and architect or engineering costs
Painting or staining or prep work beyond specifically noted in the scope of work above
Upgrades to existing utility conditions or structure
M moving of personal property
0
Asbestos remediation of any kind
3;
Fixtures and fittings including shower heads and valves,
Granite counters,
—Tile and grout,
Glass shower doors,
upgrades to any existing utilities,
changing out any existing trim pieces of the existing tub (you were going to show
Diane at Peabody Supply a photograph to see if this can be done?)
SPECIALIZING IN QUALITY FINISH CARPENTRY, REMODELING,SPECIALIST ROOF SYSTEMS,SITE AND
PROJECT MANAGEMENT
Page 4 of 6
All material is guaranteed to be as specified.All work to be completed in a workmanlike manner according to standard practices.Any
alteration or deviation from above specifications involving extra costs will be executed only upon written orders,and will become an
extra charge over and above the estimate.All agreements contingent upon strikes,accidents or delays beyond our control owner to
carry fire,tomado and other necessary insurance.Our workers are fully covered by Workman's Compensation Insurance.
PERMITS
"Nexus"has accepted the responsibility to obtain the necessary building permits.'`Nexus"will act as a GC and work in
accordance with fair and reasonable practices,and cooperate fully and under the guidance of the"Owners"and
authorized patties.
Standard Exclusions:
Unless specifically included in the"General Scope of Work"section above,this agreement does not include labor or
materials for the following work(any Exclusions in this paragraph which,have been lined out and initialed by the
parties do not apply to this Agreement): Removal and disposal of any materials containing asbestos or any other
hazardous material as defined by the EPA. Custom milling of any wood for use in project. Moving"Owners"property
around the site. Labor or materials required repairing or replacing any"Owners"-supplied materials. Repair of
concealed underground utilities not located on prints or physically staked out by"Owners",which are damaged during
construction. Surveying that may be required to establish accurate property boundaries for setback purposes(fences
and old stakes may not be located on actual property lines). Final construction cleaning("Nexus"will leave site in
"broom swept"condition). Landscaping and irrigation work of any kind. "Temporary sanitation,power,or fencing.
Removal of soils under house in order to obtain 18 inches(or code-required height)of clear space between bottom of
joists and soil. Removal of filled ground or rock or any other materials not removable by ordinary hand tools(unless
heavy equipment is specified in scope of work section above),correction of existing out-of-plumb or out-of-level
conditions in existing structure. Correction of concealed substandard framing. Removal and replacement of existing
rot or insect infestation. Construction of a continuously level foundation around structure(if lot is sloped more than 6
inches from front to back or side to side,"Nexus"step the foundation in accordance with the slope of the lot). Exact
matching of existing finishes. Repair of damage to roadways,sidewalks,or driveways that could occur when
construction equipment and vehicles are being used in the normal course of construction.The"Owner''is to enter into
contracts for all of the above-mentioned services and provide direct payment to"Nexus"for al I of the services we are
to provide.Nexus"will be responsible for removing all components and all construction materials relevant to the
i
2 "scope of work"in this contract.
9
Dumpsters,trailers and signs
o "Nexus"will provide as included in the cost of this project,a dumpster for the sole purpose of the removal of trash
o associated with this project.This dumpster should not be used by any persons for any other waste items or for any
put-pose outside of the specific use under the scope of work, unless authorization is received from"Nexus".Nexus may
have on site for part,or the whole of the project,a trailer containing materials and tools belonging to"Nexus".This
trailer will be parked in a position agreed to in coordination with the"Owners"and will be covered under the
insurances of"Nexus"at all times."Nexus"will have on site,a sign,with our contact details,in the event that anyone,
including your neighbors,has a need to contact us directly.
i'
Photo ra hs
"Nexus"reserves the right to,from time to time,take photographs of the contracted work for use in its general
marketing or for production on its web site.At no time will"Nexus"share any personal contact details of the"owner"
for any photographs that it may use without seeking authorization from the"owner".
Warranties
AI l the components supplied by"Nexus"as part of the original order are covered under the warranty exercised by
is "Nexus"and supported by the vendors or sub-contractors.All labor and materials purchased from other suppliers to
s
achieve completion of contract are warranted(1)one year from completion of the construction.
9'
Owner appointed sub contractors
From time to time an"owner"may request that we incorporate a sub-contractor of the"owners"choosing on a project,
"Nexus"will facilitate this request provided the assigned sub-contractor is connected directly with"Nexus"for al]
scheduling requirements and"nexus"wilt manage this sub-contractor in a fashion comparable with any other sub-
contractor.All sub-contractors must be licensed and insured in accordance with State law."Nexus"will meet with
these sub-contractors and will ask them to submit a written proposal of all the work that will be included which
"Nexus"will then confirm with the"owner"'."Nexus"will oversee this scope of work and ensure that it is completed in
a professional manner but the sub-contractor will be responsible for any future warranty issues directly with the
'`owners".All sub-contractors are responsible for the safe and clean upkeep of the working environment and will be
responsible to remove their associated trash on a daily basis.
SPECIALIZING IN QUALITY FINISH CARPENTRY,REMODELING,SPECIALIST ROOF SYSTEMS,SITE AND
PROJECT MANAGEMENT
Page 5of6
Deliveries
"Nexus"will be responsible for the safe arrival to site of all materials required for construction purposcs for items
contained within the scope of work.The"owners"shall be responsible for the safe arrival to site of other items outside
of construction materials,however,should"owners'require"Nexus"to collect and bring to site,any of these items,
"Nexus"will accommodate as able and add a minimal cost to cover time and fuel to a change order.
Weather Delays
Nexus has made provision to attend the site throughout the project,and as weather allows—any changes to this
schedule will be advised to the client as appropriate.Inclement weather,inclusive of hurricanes,tornado's,snow storms
and other events,wi11 affect the ability of Nexus to attend the site,and will therefore affect the ability of Nexus to
perform those tasks assigned within this contract.In the event of an unplanned weather event,it is the responsibility of
the"owner"to ensure that access to the site is maintained,so as to allow for work to recommence as soon as possible.
Personal Property Pets and Children
Nexus"will be respectful at all times,of the personal property of the `owners"but does ask that all personal items be
removed by the"owners prior to commencement of the scope of work,and not returned to the area until the scope of
work is complete.It is the responsibility of the"owners'to make alternative arrangements for the safety of any pets
that dwell in the residence or facility,and"Nexus"will not be responsible for the care of these pets,or other live
animals,during the duration of the scope of work.Children living in the residence or facility,should be advised by the
"owners"of the dangers connected with construction projects and the need to stay clear of the areas being worked
upon,as well as away from any tools that will be on site.
Allowances with the contract cost
Within the cost structure of this contract,certain cost allowances may have been given for the"owners"to purchase
items chosen by them—these allowances will be noted above with the amount allowed clearly noted.If the"owners"
do not spend the full allowance in an area,this amount will be credited back to the customer and not included in the
final contracted amount.If the"owners"spend beyond the allowance noted,then the"owners"shall be responsible for
this balance and a payment made to cover this amount either to the vendor,the sub-contractor or to"Nexus'
i
Ex iration of this A reement:
This Agreement will expire 30 days after the date at the top of page one of this agreement if not accepted in writing by
"Owners"and returned to"Nexus"along with the necessary deposits within that time flame.
of
People Authorized to Sian Chan a Orders:
The following people are authorized to sign.Change Orders:
i.
"Nexus": Mark Gotobed or Ged White
"Owner/Owners": Jame or Kathleen Yonchalc
Concealed Conditions:
This Agreement is based solely on the observations"Nexus"was able to make with the area in its current
condition at the time this Agreement was bid. If additional Concealed Conditions are discovered once
work has cotnanenced which were not visible at the time this proposal was bid,'Nexus"will stop work and
point out these unforeseen Concealed Conditions to"Owners"so that"Owners"and"Nexus"can execute a
Change Order for any Additional Work.
SPECIALIZING IN QUALITY FINISH CARPENTRY,REMODELING,SPECIALIST ROOF SYSTEMS,SITE AND
PROJECT MANAGEMENT
Page 6 of 6
Chan es in the Work:
During the course of the project,"Owners"may order changes in the work(both additions and deletions).
"Nexus"will determine the cost of these changes and the cost of this additional work will be added to
"Nexus"profit and overhead.
Schedule of wont
1t is agreed by both parties that this work will be coordinated with the"Owners"and"Nexus"to be
undertaken in various stages to avoid complete disruption of the home environment."Nexus"will
give"Owners"no less than 2 days notice prior to arriving on site for commencement of any of the
agreed stages of worm to allow"Owners"to prepare."Owners"commits to have sites identified for
construction work available for start at the beginning of the scheduled day so as to avoid any
unnecessary delays.
Contract Cost and Payment Schedule:
Total cost of work description and materials included in the Proposal except
materials/work stated - $25, 015.00 (Twenty Five thousand,zero dollars and zero
cents)
G
PAYMENT SCHEDULE c `
1st Payment due upon sil4ning this contract
TOT $7, 500.00
2nd Payment due upon Installation of framin
TOTAL $7, 500.00
3rd Payment due upon Installation of ceilin s
TOTAL $7, 500.00
Final payment due upon completion of scope of work
TOTAL $2, 515.00
Amount due upon signing this contraCis 500.00 ._ _ _
I have read and understand, and I agree to, all the terms and conditions contained
in the proposal above.
Date..ul I t ........ "Nexus" Authorization............. ....................... .,..............
t �Il?.�.1 ..... "Owner/Owners"Authorization.... ... ` .�'�"�'
U
AND/OR
Date............................... "Owner/Owners" Authorization.....................................................
SPECIALIZING IN QUALITY FINISH CARPENTRY, REMODELING,SPECIALIST ROOF SYSTEMS,SITE AND
PROJECT MANAGEMENT
Th e Comm of Massaeh usetts
z Depaptfneut of industrialAceldents
X Congress Street,Suite.100
Boston,MA 02. 14-2017
www mass.gov/dla
,v. Workers'Compensation insurance Affidavit:Builders/Contractors/Electricians/Plumbers.
TO BE PIED VnTR TBE kFRWTTMC-AUTHORITY'
APPlicautlnformation Please 1Print Le 'hl
Name(Susuaess/Organizationlbdivadual):
Address: (Sq5,QALE D41(ZEAL 'Vrc D# 4geS MA 01 l-2,
city/state/zip: Phone#: IS, -Ito — 2030
•
Are you an employer?Checlrt�c aplirotprXRie box: Type of project(Tcquired):
1,�Y am a empleyervsitFr„ s,,,,,.,.,employees(full and/or paw tune) 7, New coristructlon
I am'a sola proprietor or partnership and have no employees working for mein Remo clelixig
any capacity.[No workers'comp.insurance required.] 9 Demolition
3.❑1 am a homaownerdoingall work myself.[No werkers'comp..iasurance required.]t o ❑Building addition
4.❑I am a homeowner andwill be hiring contractors to conduct all.work on my property. Iwill
. Electrical repairs airs nr additions
ensurethat all contractors either have workers'compensation insurance or are sole p
prabrietors with no employees. 12. Plumbing repairs oradditions
5,0 I arc a general contractor and X have hired the sub-cokrtraotors listed on the attached sheet. 13. Roofzepau's
These sub-contractorstave employees and have workers'comp.insurance t 14.El Other
6.Q We are a corporatipn and its officers have exercised their right of exemption perMGL o,
152,§I(4),and we have no,e�tiployees.[No workers'comp.insurance required.]
*Away applicant that checks box#i must also Ertl out the seotionbelow showingtheirworkers'compensation policy information.
T homeowners vrho submit"affidavit indicating they are doing all work and then hire outside contractors must submit a neve affidavit indicating such.
tcontractors that cbeckthis boxmust-attagied an additional sheet showing the name of the sub-contractors and state whether ornotthose entities have
employees. Ifthe sub-coriiractors Piave employees, Izoy must pravidetheir workers'comp.policy number.
X am an eMployer that ispr'ovidingworkers'compensation insurancefor my employees'Below is thepolicy andjob site
irt'formation.
Insurance Company Name:
policy-#or Self-ins.Lzc.#: N i P � �`� ��' (Z' ExpirationDate:
Job Site Address:• —13 i A`SASI Ek 'City/State/Zip:
Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date).
Failure,to secure coverage as required under MGL c. 1.52,§25A is a criminal violation punishable by a fine up to$1,500.00
and/oar one-year imprisonment,as well as civil penalties in the form-of a SWOP WORK ORDER and a fffie of up to$250.0 0 a
day against the violater.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance
coverage verification..
T do l2ereby certi�UnLtfpa�Md�p �erjurytliat the information provided above
�is true and correct.
Date-
signat Ire.
Phone#' 16
Officialuse only. Do not-write in flits area,to be completed by city or town off ciax
CPermitUcense
ity or To � #
ssuingAuthority(circle one): i
1.Board of Health 2.BuildingDepartrr>ent 3.City/Town Clerk 4.Electrical Inspector- 5.Plumbing Inspector
6.Other
9
3
Phone#:
Contact Person:
9
i
t
t
In ,
1
}
, ( s: .,€ ,€. , ��;IT; �5,:
-
( ;i (�i:. 1 W Q 0 a PAM Wol
a'=k a's � �[Q'Ii
C 11d;
a f € C• �,�„
IN
Wi
fill
1 In Q Novi
Aflfhks and,ous... WE''! WIN
1` C
a
� t S 7 �
_ WWI 4 no ;) Q VOW
€ { } €
'm�, ch ', Botts 0 2 - .(,,_ C a 'MANAs € -
10 A
I
a Tye: dl�did
n _ _
son -oil 11
00
t, a
11 of Sky UT
42
son
y
i
------------
-Not TINUMA
W.
Alone ymvu�
qv 17"
qk 154,
ONE
i I
(
�.:
€ c
i
i I
_ - - - i } r '
r r„ T� '�,J it IJ/ rr/il///%/i/ijri,li///i��//ii/////i/ U i a i iii/ ii /r / ,r /i/
i �j1 �f ���J�1G�r'J1��1 �,%�j�����lrr�/%%�i/i�j is// / i„„ ,�!i ,.< /ri/ii r ii/i rr �i;!„ �„ „ „ „
,;,,,,,-� .�y
/ /r r ����G/lir/l�.r/i � //✓ r i/, �, ,, � ,",: '`,”, "�,; „-,
� ���///%Or/��/%%/r l//r%�/� i rr i. "
r, �����r/�li��/�/r�rri//r r
�� r
1 ff '1 f / �; l' // (%
r % f iii/� �%r
/� i� �� � � � � � /
/ /ii
��, � � r �� I � ��r 1
f � � �,
i � � l
��1�/
r
O 1
t'
i, � ��
1�
%/
i
i
��
r
�:�
�/
j
I % ,
j
�, J ;
/%
j
�,
%i
i
i
,,?,,
r:
i.
�/
� iu�uuuum �I' �uuummm uuu IIIIIIIIIIIII�
�� V����N i i ui��i IVI uui i � uu i,
/� � �� �1 � �� Som I li iii����� �� VV� �m
r J/� I II II 4
%/ � �j���r �Il u .iy��lhlii uu i w it� i
r, (/li�iii//pi i��� 117goiiiii�i�l
%ij
� // � i i uui Olin 10 ���I
r � Vv!'VV BVI Yuu
y / ��
�i � r//,,� rr ,�',�/�
� j �i//fir,
i
i
�,,
,i� �,
� �� rr ���
�/��/„ �6
///r
% %'i//r�� r,
��/�'//�i/�r
///r rir�/ii
i //%ii�/��ii�/r