Loading...
HomeMy WebLinkAboutBuilding Permit # 9/19/2016 JAORTH �TVYD rb 1%,, BUILDING PERMIT � � ��"g-_ ° °L TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINAT N - nit Date Received Ci Rwrea ,t�y E Issued-C2 � �. . VS S�c►aus IMPORTANT:Applicant must complete all items on this page CATIA y / "Of 60 { v \ a 'E OF IMPROVEMENT PROPOSED USE Residential Non- Residential New Building /One family Addition CI Two or more family Industrial Alteration No. of units: Commercial Repair, replacement Assessory Bldg Others: Demolition [:i Other { r - _55 Identification Please Type or Print Clearly) :R: Name: 6 VLL?--, I _b Phone: ! N f r r ,yyee / r ..,..✓.:' ,,..i,... .....,✓.: ,:'moi._ � „� v ,l. Aa` .il.. ✓ f CHITECTIENGINEER Phone: tress: Reg. No. FEE SCHEDULE:BULDING PERMIT:$12.00 PER.$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$925.00 PER S.F. :al Project Cost: $ 9 00 FEE: $ ick No.: Receipt No.: TE: Persons contracting with unregistered contractors do not have access to the guaranty frsndl'rt '§ m 3i " to p� f p# w� � =gtte ntct �„ .,. Town of ndover No. a• , ver, Mass, A_ LCLNIC f4lWKR It. 9 U BOARD OF HEALTH Food/Kitchen ER Septic System THIS CERTIFIES THAT ............... ..... ...... .. ........... ............ 4L....................... .......,....... BUILDING INSPECTOR . . . Foundation ... has permission to erect .......................... buildings on .. .. !4� .... ............... � Rough to be occupied as ..... l �.........43....... .. .. .. i1, .................................. ................................ chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR Rough VIOLATION of the Zoning or Building Regulations Voids this Permit. u Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR LESS CONST Lor Rough Service ... ........... ... ......... ..... Final BUILDINMNSPECTOR GAS INSPECTOR Occupancy Permit Required to Occupy Building Rough Display in a Conspicuous Place on the Premises — Do Not Remove Fina' No Lathing or Dry Nall To Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke bet. 214 Sutton Hill Rd 4ph Contract North Andover MA 01845Dodge_35_Equestrian 978 852-4491 TA' www,TMKremodeling.com IiElylE DELING CONTRACTOR AGREEMENT THIS AGREEMENT made this 9311614C. .o 20_by and between TMK Remodeling, LLC Construction Supervisor License# 105086, 214 Sutton Hill Rd, North Andover MA 01845 hereinafter called the Contractor, and Rebecca Dodge hereinafter called the Homeowner. WITNESSETH, that the Contractor and the Homeowner for the consideration named herein agree as follows: ARTICLE 1. SCOPE OF THE WORK The Contractor shall perform all of the work described in the specifications entitled Exhibit A--Statement of Work, as annexed hereto as it pertains to work to be performed on property located at 35 Equestrian Drive North Andover MA 01845. Work Scope Summary:Remodel 2nd floor master bathroom approx. 132 SF in existing footprint. Remove existing fixtures, tub, shower stall, 2 lav vanity, and finishes. Install new fixtures and finishes. Construct Walk- in shower 72x48"with bench seat, wall niche, tiled floor, 112" glass enclosure. Tile floor over new sub floor. Rough-in plumbing and install freestanding tub, Paint walls, ceiling and trim. Update electrical. Remodel 2nd floor hallway bathroom approx. 75 SF in existing footprint. Remove fixtures and finishes. Install new fixtures and finishes. Install new 60x32 tub, tile shower stall and tile floor over new sub floor. Install 60x21 vanity wl 2 sinks &faucets. Paint walls ceiling and trim. Remodel 1 st floor powder room approx. 70 SF in existing footprint. Replace vanity 42", mirror, light, fan/lite. Paint walls ceiling and trim. Retain toilet. ARTICLE 2. TIME OF COMPLETION The work to be performed under this Contract shall be commenced on or before September 16, 2016 and shall be substantially completed on or before December 06, 2016 ARTICLE 3. THE CONTRACT PRICE The Homeowner shall pay the Contractor for the labor and materials to be performed and supplied under the Contract the estimated sum of Seventy One Thousand Nine Hundred Dollars and No Cents ($71,900.00), subject to additions and deductions pursuant to authorized change orders, The contract price includes two components; Fixed cost of Fifty Three Thousand Four Hundred Eighty Two Dollars and No Cents ($53,482.00) for the building materials and construction labor as specified in Exhibits A and B. Variable cost of Eighteen Thousand Four Hundred Eighteen Dollars and No Cents ($18,498.00) for the allowance items listed in Exhibit B Allowances and will be 110%of the actual invoice price paid by the Contractor to his suppliers. Exhibit B lists the allowance items and budget costs the Contractor will purchase for the Homeowner. Sales tax and freight are not inlcuded in allowance budget. Project Breakdown Project admin and overhead; $12,433.00 Master bath; $34,700.00 Fixed:$24,826.00 + Variable:$9,874.00 Hallway bath; $18,348.00 Fixed:$12,329.00 +Variable:$6,019.00 u Powder room; $6,419.04 Fixed:$3,894.00 +Variable:$2,525.00 Contractor will furnish and install all building materials, fixtures and finish items unless noted otherwise. Any Homeowner supplied materials will be charged a 15% handling and coordination fee based on actual invoice. ARTICLE 4. PROGRESS PAYMENTS Payments of the Contract price shall be paid in the following manner from the Homeowner to the Contractor: Payment 1: 100% Project admin and overhead upon contract acceptance and signature; $12,433.00 Payment 2: 50% of Master bath project upon rough building inspections;$17,350.00 Payment 150% of Master bath project upon final building inspections + allowances;$7,476.00+$9,874.00 Y Copyright TMK Remodeling, LLC Initials 2Ib!l � All Rights Reserved Page 1 6'11, �o 214 Sutton Hill Rd Contract North Andover MA 01845 Dodge-35_Equestrian 978 852-4491 IMEC www.TMKremodeling.com REMOD)<%Y.,i ICY Payment 4: 50% of Hallway bath project upon rough building inspections;$9,174.00 Payment 5: 50% of Hallway bath project upon final building inspections + allowances;$3,155.00+$6,019.00 Payment 6: 50% of Powder room project upon rough building inspections;$3,209.50 Payment 7: 50% of Powder room project upon final building inspections + allowances;$684.50+$2,525.00 The contract cost for mutually agreed to change orders will be paid 50% at time of change order signature and 50% after completion and Homeowner sign-off. ARTICLE 5. GENERAL PROVISIONS 1. All work shall be completed in a workmanship like manner and in compliance with all building codes and other applicable laws. 2. To the extent required by law all work shall be performed by individuals duly licensed and authorized by law to perform said work. 3. Contractor may at its discretion engage subcontractors to perform work hereunder, provided Contractor shall fully pay said subcontractor and in all instances remain responsible for the proper completion of this 4. Contractor shall furnish Homeowner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due. 5. All change orders shall be in writing and signed by both Homeowner and Contractor. The cost for mutually agreed to additional work, required due to unknown conditions or substantive change orders, will based on the current bill rates for the actual time used. Additional materials will be billed at contractor cost. All change orders subject to 15% markup for overhead. 6. Contractor warrants it is adequately insured for injury to its employees and others incurring loss or injury as a result of the acts of Contractor or its employees and subcontractors. 7. Contractor shall at its own expense obtain all permits necessary for the work to be performed. 8. Contractor agrees to place all debris in an on-site trash receptacle (dumpster) and leave the premises in broom clean condition. 9. In the event Homeowner shall fail to pay any periodic or installment payment due hereunder, Contractor may cease work without breach pending payment or resolution of any dispute. 10. The Contractor and the Homeowner hereby mutually agree in advance that in the event that the Contractor has a dispute concerning this contract, the Contractor may submit such dispute to a private arbitration service which has been approved by the Office of Consumer Affairs and Business Regulation and the Homeowner shall be required to submit to such ar�, bion as provided in MGL c 142A. Homeowner ©ate: Conti for Date: Notice: The signatures of the parties above apply only to the agreement of the parties to alternate dispute resolution initiated by the Contractor. The Homeowner may initiate alternative dispute resolution even where this section is not signed by the parties, Copyright TMK Remodeling, LLC initial — All Rights Reserved Page 2 SMA( 214 Sutton Hill Rd ON Contract North Andover MA 01845 Dodge_35_Equestrian 978 852-4491 TJW www,TMKremodeling.com REIVItli)1:U.JNG 11, Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty or general unavailability of materials, or inclement weather. 12. Contractor warrants all work for a period of 12 months following completion. 13. Contractor may post small signage (36x36") on property advertising services during the duration of the project. 14. The Contractor and subcontractors shall be registered and any inquiries about a contractor or subcontractor relating to a registration should be directed to: Office of Consumer Affairs and Business Regulation Ten Park Plaza, Suite 5170 Boston, MA 02116 Phone: (617) 973-8700 15, The Contractor or Homeowner may terminate this contract at any time for any reason by giving 3 days notice in writing to the other party. If either party terminates the contract as provided herein, then the contractor will be paid for work (labor and materials) completed as of the date of termination plus any materials or equipment that are backordered and not delivered. Payment is defined as actual job costs for the project plus 15% overhead charge.The contractor will provide a written report detailing actual job costs plus overhead for payment. The Contractor will refund any funds paid by the Homeowner that are a remaining balance for the labor and materials used as of the date of termination, plus any materials or equipment that are backordered and not delivered, plus 15% overhead charge. The Contractor will make arrangements for the backordered items to be delivered to the Homeowner. 16. The Homeowner is responsible for maintaining adequate access to the property including snow removal, personal property storage, and working doorways, stairways and walkways. In the event the contractor is required to provide access or repair to the doorways, stairways and walkways, then the Contractor will bill the Homeowner at the hourly bill rate for same. ARTICLE 6. OTHER TERMS ARTICLE 7.ACCEPTANCE Signed this day of ./�V6 V5< 20_4�L. 71 C � Homeowner V C ntractor i Copyright TMK Remodeling, LLC Initials All Rights Reserved Page 3 I 214 Sutton Hill Rd ON Contract North Andover MA 91845 ©odge_35_Equestrian 978 852-4491 www.TMKremodeling.com REMODELING NOTICE: The signatures of the parties above apply only to the agreement of the parties to alternate dispute resolution initiated by the contractor. The Homeowner may initiate alternative dispute resolution even where this section is not signed separately by the parties. DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES Copyright TMK Remodeling, LLC Initials All Rlghts Reserved Page 4 214 Sutton Hill Rd Exhibit A-Statement of Work Borth Andover MA 01845 "'" Dodge_35–Equestrian 978 852-4491 www.TMKremodeling.com Ill_ '€ODELLI G A B C D E F G I 1 Owner: 2 Rebecca Dodge Estimate No:2016-077 Estimate valid for 30 days 3 35 Equestrian Drive Estimate Date:0810912016 Expiration Date:0910812016 4 North Andover MA 01845 5 reebsfro@aol-com 6 97S687-62 6 7 8 Scope of Work Remodel 2nd floor master bathroom approx.132 SF in existing footprint.Remove existing fixtures,tub,shower stall,2 lav vanity,and finishes. Install new fixtures and finishes.Construct Walk-in shower 72x48°with bench seat,wall niche,tiled floor,112"glass enclosure.Tile floor over new sub floor.Rough-in plumbing and install freestanding tub.Paint walls,ceiling and trim.Update electrical.Remodel 2nd floor hallway bathroom approx.75 SF in existing footprint.Remove fixtures and finishes.Instal]new fixtures and finishes.Install new 60x32 tub,tile shower stall and tile floor over new sub floor.Install 60x21 vanity w/2 sinks&faucets.Paint walls ceiling and trim.Remodel 1st floor powder room approx.70 SF in existing footprint_Replace vanity 42",mirror,light, 9 fan/lite- Paint walls ceiling and trim.Retain toilet. 10 Notes: 11 Pricing includes labor and materials to instal]finished item+allowances. EA=Each LF=Linea]Feet SF=Square Feet 12 EA LF sr Total Cost. 13 Quantity Cost Quantity Cost Quantity Cost -------- - ---$1– — -� _ 14 1 0 Admimstrat�on 16 $12,432 $12,432. 15 01 Plans and Permits:01.2 Building Permits 3 $1,048 $1,048 16 01.0 Permit-Building 1 $828 $828 17 02.0Permit-Electrical 1 $115 $115 18 03.0 Permit-Plumbing 1 $105 $10:5. 19 01 Plans and Permits:01.3 Building Inspections 6 $390 $390 20 €16.0 Rough Inspection-Electrical 1 $85 $65. 21 07.0 Rough Inspection-Plumbing 1 $65 $65 22 08.0 Rough Inspection-Building 1 $65 $65 23 09.0 Final Inspection-Electrical 1 $65 $65 24 10.0 Final Inspection-Plumbing 1 $65 $65 25 11.0 Final Inspection-Building 1 $65 $65 26 02 Site Work 6 $1,617 .$1,617 27 20 YdDumpster 2 $1,210 $1,210 28 Adjacent spaces to be protected by temporary barriers from dust infiltration 1 $1.32 $132 29 All floor coverings and hand rails between the work area and primary entrance to be covered with protective covering material 1 $171 $171 30 Owner responsible for storing any items tore-installed 1 $0 '.$0'. 31 Work area to be vented during demolition and construction to minimize dust infiltration 1 $105 $105 32 31 Overhead&Expenses 1 $9,377 s0t3 33 Overhead and project administration 1 $9,377 $9,377 34 1st Fir Powder Room-70 SF 14 $4,26_2 154 $476 347 $1,680 $6,419 . ............ _ 3-._.-----_-_ $131 –---------------------------------. .------$131 36 Disconnect and remove electrical fixture 2 $105 $1`05. 37 Disconnect and remove wall cabinet 1 $26 $26 38 14 Plumbing 1 $343 $343 39 Install 48x21"bathroom vanity,countertop,sink,faucet+fixture allowances 1 $343 $343 40 15 HVAC 1 $440 $440" 41 Furnish&install 4"metal ducting and vent caps,vented to exterior for appliance 1 $440 $440 42 16 Electrical&Lighting 4 $1,349 43 Furnish and instal]GFC]outlet on new circuit 2 $472 $472 O Copyright TMK Remodeling,LLC All Rights Reserved Page-5 Unlawful to distribute without permission 214 Sutton Hill Rd Exhibit A-Statement of Work Borth Andover MA 01845 "/�� Dodge_35_Equestrian 3 978 852-4491 www.TMKremodeling.com RE,,1'10DELING A S C D E F G I 44 Furnish and install Panasonic 110 CFM fanlight combo unit on new switch 1 $638 $638; 45 Furnish and install surface mounted fixture on new switch+fixture allowance 1 $239 $239 46 18 Interior Walls 120 $336 270 $756 $1;092 47 Prep, Prime(1 coat)and Paint(1 coats)trim 120 $336 $336 48 Prep,Prime(1 coat)and Paint(2 coats)walls 270 $756 $756- 49 19 Ceilings&Cover 70 $399 $399 50 Ceiling-112"plasterbase,plaster skim,2 coats paint on 1x2 strapping 32 $306 $306; 51 Painted Ceiling;primer and 1 finish coat 38 $93 $93 52 20 Millwork&Trim 34 $140 $140 53 4.25"wood baseboard,painted 34 $140 $140 54 33 Allowances 5 $2,000 7 $525 $2,525 55 42x21"Vanity, 1 sink, 1 lav faucet 1 $1,250 $1,250 56 Granite Countertop 7 $525 $525 57 Light Fixture 2 $150 $150 58 Mirror/medicine cabinet 2 $600 $600: 59 2nd Fir Hallway Bathroom-75 SF 30 $16,156 150 $460 945 $7,732 $18,348 60 02 Site Vltork:02.1©©emo --...-... -..- ------—.._ ..-. ..- -- -.-. -..-.- --- _$_ ._$549 -..--..-- --...426 $1,247 ..___.$1,7961 61 Disconnect and remove electrical fixture 1 $52 $52 62 Disconnect and remove plumbing fixture 5 $261 $261 63 Disconnect and remove wall cabinet 1 $26 $26 64 Remove finished floor and sub floor. 74 $315 $315 65 Remove tub/shower stall 1 $209 $209 56 Remove walliceiling(partial)finishes to expose framing. 352 $933 $933 67 07 Wall Frame 2 $255 $255 68 Install blocking in walls for fixtures,cabinets or accessories 1 $118 $118 69 Install fire stopping in stud wall cavities 1 $138 $138 70 14 Plumbing 6 $2,836 $2,836 7 T Furnish and install 10'of 112"PEX supply lines 1 $319 $319 72 Furnish and install 60x30tub AS Americast tub 1 $957 $957 73 Furnish and install 8'baseboard radiator convector cover 1 $175 $175 74 Furnish and install new toilet,wax ring,flange,shut-off valve+fixture allowance 1 $353 $353 75 Install 60x21"bathroom vanity,countertop,2 sinks,2 faucets+fixture allowance 1 $539 $539 76 Install Tub Shower Setup:Valve wl diverter,trim,tub spout and overhead spray +fixture allowance 1 $493 .$493 77 15 HVAC 1 $440 $440 78 Furnish&install 4"metal ducting and vent caps,vented to exterior for appliance 1 $440 $440 79 16 Electrical&Lighting 5 $1,591 $1,591 80 Furnish and install 5"recessed wet space fixture on new switch 1 $242 $242: 81 Furnish and install GFCI outlet on new circuit 2 $472 $472 82 Furnish and install Panasonic 110 CFM fanilight combo unit on new switch 1 $638 $638 83 Furnish and install surface mounted fixture on new switch+fixture allowance 1 $239 $239 84 18 Interior Wails 120 $336 197 $2,760 $3,096 85 1 side wall finish: 1I2"plasterbase,plaster skim coat,3 coats paint 197 $2,760 $2,760 86 Prep, Prime(1 coat)and Paint(1 coats)trim 120 $336 $336. 87 19 Ceilings&Cover 74 $708 $708 88 Ceiling-112"plasterbase,plaster skim,2 coats paint on 1x2 strapping 74 $708 $708 89 20 Millwork&Trim 30 $124 $124 90 4.25"wood baseboard, aimed 30 $124 $f24 ©Copyright TMK Remodeling,LLC All Rights Reserved Page-6 Unlawful to distribute without permission .............................. ............................. ......... .. .... . 214 Sutton Hill Rd Exhibit A-Statement of Work North Andover MA 01845 "I Dodge_35_Equestrian 978 852-4481 www.TMKremodeling.com : lstlllai A B C D E F G t 91 22 Specialty 2 $411 1 $17 $428 92 Install Accessories:towel rod,TP holder,hand towel ring+fixture allowance 1 $169 $169. 93 Shower Bullnose 3x6 30 pcs,grout and seal joints+the allowance 1 $242 $242 94 Shower Walls custom tile on cement board backer, grout and seal joints+the allowance 1 $17 $17 95 23 Floor Coverings 63 $1,057 $1,057 96 Floor 12x12 porcelain or ceramic tile,grout and seal joints+.tile allowance 63 $1,057 $1,057 97 33 Allowances 6 $4,075 184 $1,944 $6,010 98 60x21°Vanity,2 sink,2 lav faucet 1 $2,500 $2,500 99 Accessories:towel rod,TP holder,towel rings,shower curtain rod 1 $300 $300 100 Bullnose tile 24 $144 $144 101 Floortile 70 $490 $490 102 Granite Countertop @$751SF 10 $750 $750 103 Light Fixture 1 $75 $75 104 Mirrorlmedicine cabinet 1 $300 $300 105 Shower wall tile 80 $560 $560 106 Toilet 1 $450 $450' 107 Tub Shower setup:valve,diverter,tub spout,spray,unions 1 $450 $450 108 2nd Fir Master Bathroom-132 SF 47 $20,595 264 $771 1521 $13,334 $34,704 109 02 Site Work:02.10 Demo 13 $1,072 645 $1,920 $2,993 110 Disconnect and remove electrical fixture ' 3 $157 $9.57 111 Disconnect and remove plumbing fixture 6 $314 $314 112 Disconnect and remove wall cabinet 2 $52 $52 113 Remove finished floor and sub floor. 132 $561 $561 114 Remove tublshower stall 2 $550 $550. 115 Remove walllceiling(partial)finishes to expose framing. 513 $1,359 $1,359 116 07 Wall Frame 2 $265 $255 117 Install blocking in walls for fixtures,cabinets or accessories 1 $118 $118 118 Install fire stopping in stud wall cavities 1 $138 $138 119 14 Plumbing 10 $4,561 $4,561 120 Furnish and install 10'of 112"PEX supply lines 2 $638 $638 121 Furnish and install 10'of 2"PVC waste line and vent 2 $660 $660 122 Furnish and install 60x30 tub AS Americast tub 1 $957 $957 123 Furnish and install new toilet,wax ring,flange,shut-off valve+fixture allowance 1 $353 $353 124 Furnish and install toe kickiheater 1 $175 $175. 125 Install 72x21°bathroom vanity,countertop,2 sinks,2 faucets+fixture allowance 1 $679 $679 126 Install Acrylic soak tub& tub filler+fxture allowance 1 $746 $746 127 Install Shower Setup:Valve,trim overhead spray +fixture allowance 1 $353 $353 128 15 HVAC 1 $440 $440` 129 Furnish&install 4"metal ducting and vent caps,vented to exterior for appliance 1 $440 $440 130 16 Electrical&Lighting 6 $2;091 $2,091 131 Electrical Demo Budget.Invoiced at T&M+15% 1 $500 $500 132 Furnish and install 5"recessed wet space fixture on new switch 1 $242 $242 133 Furnish and install GFCI outlet on new circuit 2 $472 $472 134 Furnish and install Panasonic 110 CFM fanllight combo unit on new switch 1 $638 $638': 135 Furnish and install surface mounted fixture on new switch+fixture allowance 1 $239 $239 13618 Interior Walls 240 $672 301 $4,217 $4;889 137 1 side wall finish: 112"plasterbase,plaster skim coat,3 coats paint 301 $4,217 $4,217 ©Copyright TMK Remodeling,LLC All Rights Reserved Page-7 Unlawful to distribute without permission 214 Sutton Hill Rd Exhibit A-Statement of Work North Andover MA 01845 Dodge-35–Equestrian 978 852-4491 www.TMKremodeling.com PL.li1)1-1 d A B C D F F G l 138 Prep,Prime(1 coat)and Paint(1 coats)trim 240 $672 $672 139 19 Ceilings&Cover 198 $1,895 $1,895 140 Ceiling-112"plasterbase,plaster skim,2 coats paint on 1x2 strapping 198 $1,895 $1;895 41 120 Millwork&Trim 24 $99 $99 142 4.25"wood baseboard,painted 24 $99 $$9 143 22 Specialty 6 $5,777 1 $17 $5,793 144 Install Accessories:towel rod,TP holder,hand towel ring+fixture allowance 1 $169 $1'69: 145 Shower 112"Tempered frameless glass door and panel system 100x66" 1 $2,835 $2,835 146 Shower 12x18"2 tiered wall niche,314"granite shelves 1 $611 $611 147 Shower Bench seat 1846"1 114"granite slab with standard edge 1 $467 $467 148 Shower Bullnose 3x6 30 pcs,grout and seal joints+the allowance 1 .$242 149 Shower Stall-2x4 frame,rubber membrane floor,pitched mortar mud pack floor,drain, 112"cement board walls,taped and mortared 1 $1,453 $1,453 150 Shower Walls custom He on cement board backer, grout and seal joints+tile allowance 1 $17 $17 161 23 Floor Coverings 108 $1,811 $1,811 152 Floor 12x12 porcelain or ceramic tile,grout and seal joints+the allowance 108 $1,811 $1 819= 153 33 Allowances 9 $6,400 268 $3,474 $9,874 154 72x21"Vanity,2 sink;2 lav faucet 1 $2,500 $2,500 155 Accessories:towel rod,TP holder,towel rings 1 $250 $250 156 Bullnose the 24 .$144: $144. 157 Floor tile 120 $840 $840 158 Granite Countertop 12 $900 $900 159 Granite Shower Pieces 10 $750 $750 160 Light Fixture 2 $150 $150 161 Mirror/medicine cabinet 2 $600 $600 162 Shower floortile18 $180 $180: 163 Shower setup:valve,diverter,tub spout,spray, unions 1 $650 $650 164 Shower wall accent tile 4 $100 $100 165 Shower wall tile 80 $560 $560 166 Toilet 1 $450 $456 167 Tub 1 $_1,800 _ $1,800 168 Grand Total_. _.._.____._—... .- -- - -107 $47,445 . 568 $1,707 ._.....2813 $22,747-- $71,900 ©Copyright TMK Remodeling,LLC All Rights Reserved Page-8 Unlawful to distribute without permission 214 Sutton Hill Rd 4ph Exhibit B-Allowances North Andover MA 01845Dodge_35_Equestrian 978 852-4491 rri-IR& www.TMKremode[ing.com UNI:ODl✓LINIG Owner: Rebecca Dodge 35 Equestrian Drive North Andover MA 01845 reebsfro@aol.com 978 687-6286 T Estimate Date:08109I2016 Estimate No:2016-077 Note: Tax and freight charges not included in allowance budget. Allowances Schedule Category 33 Allowances Row Labels Quantity Cost 1st Fir Powder Room -70 SF 12 $2,525 42x21"Vanity, 1 sink, 1 lav faucet F$1,250 Granite Countertop 7 $525 Light Fixture 2 $150 Mirror/medicine cabinet 2 $600 2nd Fir Hallway Bathroom -75 SF 190 $6,019 60x21"Vanity, 2 sink, 2 lav faucet 1 $2,500 Accessories: towel rod, TP holder, towel rings, shower curtain ro, 1 $300 Bullnose tile 24 $144 Floor tile 70 $490 Granite Countertop @$75/SF 10 $750 Light Fixture 1 $75 Mirror/medicine cabinet 1 $300 Shower wall tile 80 $560 Toilet 1 $450 Tub Shower setup: valve, diverter, tub spout, spray, unions 1 $450 2nd Fir Master Bathroom - 13.2 5F 277 $9,874 72x21"Vanity, 2 sink, 2 lav faucet 1 $2,500 Accessories: towel rod, TP holder, towel rings 1 $250 Bullnose tile 24 $144 Floor tile 120 $840 Copyright©TMK Remodeling, LLC All Rights Reserved Page 9 Unlawful to distribute without permission 214 Sutton Hill Rd Exhibit B-Allowances North Andover MA 01845 Dodge_35_Equestrian 978 852-4491 www.TMKremodeling.corn REMODELL TCCr Granite Countertop 12 $900 Granite Shower Pieces 10 $750 Light Fixture 2 $150 Mirror/medicine cabinet 2 $600 Shower floor file 18 $180 Shower setup: valve, diverter, tub spout, spray, unions 1 $650 Shower wall accent tile 4 $100 Shower wall tile 80 $560 Toilet 1 $450 Tub t- FiLiv 1 $1,800 Grand Total 479 $18,418 Copyright Q TMK Remodeling, LLC All Rights Reserved Page 10 Unlawful to distribute without permission 08 Commonwealth offfass<o,�ehusetts I Coiggress&met,Suite 100 �a Roston.,MA 0.1(14- 017 a K e� �ww max-ygopldia Co��exiss#�.o�.�nsuxance. da��:�ui�dars/Coxa.-ts:ac�arsl.Eiectz'iczaa��IP�mm.T�exs. A 7zcant�oxx�.a�on. - Px�asePx�.t �e�� Addrms 11 01 City/Statefzj : ,�i ,/ Pham#: ' saz project Te €d): Areycu an employcx? L'�ae �lie appxo�rzafie�iox, � �;.[�� � �r l Y am a empxayez sib _e�npZoyees(£nll andlar part ane}.* 7.• New. const&cion amssolegrop�jotwzorpmbaarshipa-adhave normplveesv[rnrkingfozmein $. �Rei�lo�o�3lig any capacity.[No Vloskers'comp.ii7 an-e retlnirad[ 9. n Dexaolitioxi 3f:]1am.abomeovnexdoiagallwi)zkmyse]i 9TowQ1kers'comp_iusuran00racluzced�� $ flgiagadd1#:3:on �.�IamshameoWnorartd4viLlbebuingconfra�ors�ocandnctal�wnzkonm3`Pr°perf.Y• xvuill ��•L�._!�'�eCi�.'IGaY.Sep2So�.2.t7[�1�DJtS ensure flea ail contra citirs ei ezbavE-Workers'compensafim jtJSmrmee or are sole prci hoforsvnmemployees. 12 [ 'Zumbngxepairsoxadditions 5.E]Tamageneralaap}racarandIl�ayelvrcdth�suit-oon ac slcs don be scl ds eel. 3, ROUrepart7'-- These sub-contractnrsliatYe employees andl�ave'wcrkers"comp.insurance. 14.E]Othbx 6.0 We,arescazporatinn. udzf ai cersbaVee�ereised:he ri of'e empfionpsii rC c. I52,§I(4),andureh�Y�na.,e�ployees.Lt�Tovrarkers'comp.insz.Trmicerequired,� "s. `Any applicaruibat clieei�sb oxl mast alsorII nuttbe seeon beioYTapvi�g Cheer workers'cflmpensafionpoiicyzoiormaiion 'T Someo�ets-sfaho siif�s'ai�daYiti�c�mg�ey are doing all�nrkandthan7aise onfside cor�tractorsmuststibmftar�egv a�dav��d#ca�ing�h rConfracfazs�aatrJieck�asbtu�m�.sca��aci�edep.addi�.ona�sire�tshra��gtheuameofr"6esab-eonsactorsaud�tewlaefiheror3�o� aoseenti�esha�e employees.Iftbesvb-cavi cozsly eemployees, ieymusEpratldetheirTaoxkeis'eczmp.polingnumbez. Iain an ejaployex tla cri as pr-ovi mss g-PPOV "carnpenS'Waf ans��c�cefa�my ewvlayees.' 73eloiv i<s tliepolicy an l jab site tnfoz�r�atio�z. _ - �s�xrance Pal ,Y4 y or Set ins.Zic.# W&C—,foe) City/5 p �e1 V j o Yob Szte Addxess: 5lJf " At�'acb.a copy ofthe r�a�kexs'coa�apONatiOnPaJzcy doclaxat'an.page(shovvzngthepo�cynumbex mad e�pzxa�toxi tate). Faxlnre to sccure.coverage as xec*ed-aa erMOL m 152, §25A.is a cxlmfn:al violation pmdshabla by a fi e ttp to$x,500.00 axed/or Oneyear s�vrnen�;as tivell m ci�il pena7i e 'fie a a of a STOP WORK DR17 and a zine ofup to$2,50-0 0 a e�tmaybe oz�varded#o'�eOfrcceoflnvestigatzanso in �r eDxAfaxancc day againstfe-:iolator_A,copyofthissfate coverage veifcatZo7L. 1da hffeby emlify rid" P thO pra vs andpennd env ar` �t7arzt the ixzjorrnafio�yroWegd a7xoi�e is�cae c�d cafe e� Si ataxe: Date: " �v Phone Offidd rise only. _lo not-wtne Az this area,#a b--eornpleterZ by city or Ca3Ypt�f czat City or Town: �'exmitlLicense� Tssuitxg.A.uffioxitg(ezxcle one): i 1.Boax d a i Cealt .� c �D epi ire t �.Ci-iyl own Clerk 4.Wedxzcal bspecto 5.W-a biz 9 inspectax' 6.Qtb.er Colatact Person. OP IDS PVV DATE(MMIDDrfYYY) CERTIFICATE OF LIABILITY INSURANCE os11sr2016 THIS S 1FICATE t8 issu=D AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIUHTS UPON THE CERTIFICATE HOLDER. THIS , EXTEND OR ALTER THE COV CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND BELOW BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THC ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: if the certificate holder Is an AID DITIONAL 1NSURED,the policy(ieG) muat be endorsed. if SUBROGATION Is WAIVI~gr subject to the terms artd Conditions of the POHOy,Certain policies may require an endorsement. A statement on this certificate does not confer rights t*the certificate holder in lieu ofsuch endorsement S . CONTA PRODUCER N E' AX Segreve&Hall Insur.AssOC-IFIC A'C xt No 308 North Main St. D n: Andover,MA 01810 ADDRV4 = Lawrence J.I loll PR TOMER #:TMKRE-1 INSURCR S AFFORDING COVERAGE NAIG 0 tNSURL•RA:Arbelia Protection Ins.Co. 413GO INSURED TMK Remodeling LLC 11104 214 Button Hill Rd INsuRERB;AEIC North Andover, MA 01845 INSURER 6: INSURER 0: INSURER 9; INSURER F I COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: GOHIS TVE IS To CERTIFY THAT SHE POLIG(ES OF INSURANCE LIST1 p BELOW HAVE BEEN ISSUED TO THE ENSURED NAMED A90 FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITIONOF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF 5UCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCEDCY EF PPA CLAIMS LIMITS TYpI»OF INSURANCE fY INSPOLICY NUMBER M i161YYYY MM1DDYYY 1 000,00 EACH OCCURRENCE $ r GENERAL LIABILITY R 144,00 PRE SES Ea urrence 6 A X COMMERCIAL GENERAL LIABILITY MFl r EXP Any one arson) $ 5'0c CLAIMS-MADE Ln,j OCCUR 1,000,00 PERSONAL&ADV INJURY $ 9520037133 0311812016 0 311 812 01 7 GENERAL AGGREGATE 2,000,0( PRODUGTS-CDMPIOP AGG $ 2,000,01 GEN'L AGGREGATE LIMIT APPLIES PER! $ POLICY PIPCIT El RO LOC COMB ItV6D5INGtEl.IM1T $ AOTOM081L1;LIA13ILITY (EH mold6nt) _ ANY AUTO BODILY INJURY(Perp$reon) $ � ALL OWNED AUTOS OODII Y INJURY(Per sccidenl) S 5GHErpULEO AUTO& PROPERTY DAMAGE $ (PER ACCIDENT) HIRED AUTOS $ NON-OWNED AUT06 $ ERGH OCCURRENCE„ $ UMeRE LLA L1R6OCCUR AGGREGATE 6 EXCESS UAB CLAIMS-MADE DEDUCTIBLE $ RETENTION S WC STAB T 04H- WORKER5 COMPEN9AT€ON 600,0 AND P-MPLOYERS,LIABILITYYWCC-600-50111372 041011201a 04101/2017 E,L,EACH ACCIDENT S B ANY pRopRIETORIPARTNERfEXECUTIVE ❑ NIA E.L,PISEASE-EA F�IPLOYGE 3 500,0 OFPICERIMEMBER EXCLUDED Y (Mandat"In NOLICYLIMrf H) 500,0 I(yea dowribaunder E.L.016EASE-PS DESG�WPTION OF OPE ATIONG ba(uw DESCRIPTION OF OPERATION$I LOCATIONS I VEHICLOS (Attach ACORD 101,Addltlonsl Rumdrks Schedule,If mune space Is roqulrad) CERTIFICATE HOLDER CANCELLATION SHOULD ANY Ofz THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORI THE EXPIRATION PATE THEREOF, NOTICE WILL BE DELIVERED II Town of North Andover ACCORDANCC WITH THE POLICYpROVIS(ONS• Meura C]ean 1600 Osgood Street AUTHORIZan REPT UOkNTATP4E North Andover, MA 01845 AQ)� ®1988-2009 ACORD CORPORATION. All rights reserved. ACORD 26(2008109) The ACORD name and logo aee registerod narks of ACORD T/[° f('n?he.Mo1,rnea11,1,r./C�i(l.(cr;J�rc�rrfcllr 3_ License or registration valid for individul use Doty Office of Consumer Affairs&Business Regulation l SHOME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Registrationg5887 Type: Office of Consumer.Affairs.and Business Regulation t'I Expiration; 4/512018 DBA 10 Park Plaza-Suite 5170 _ Boston,MA 02116 TNIK REMODELING THEODORE KELLEY 214 SUTTON HILL RD. NORTH ANDOVER, MA 41845 Undersecretary Not valid without signature of Public Safety u. Massachusetts Department Regulations and Standards . Board of Building J 101 License: GS_10e0f3 visor Construction Sur' THEODORE M KEL-CEY 214 SUTTON HILL FR, FORTH ANDOVFP-M F a S. .WO,. Expiration: �"-� W 70108!2017 Commissioner