400%
200%
100%
75%
50%
25%
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Building Permit # 10/3/2016
TOWN OF NORTH ANDOVER tLORT14 APPLICATION FOR PLAN EXAMINATION 0 Permit NO: Date Received . .... .S CHUS Date ISSUed: i tG IMPORTANT. Applicant must eolete all itegns on this page ? LOCATION--2L0 .�IleplrA/1 e,4 9 1 A Print C PROPERTY OWNER Print MAP NO.: b PARCEL:_ ZONING DISTRICT, TYPE AND USE OF BUILDING HISTORIC DISTRICT YES El TYPE OF IMPROVEMENT PROPOSED USE Residential Non- Residential I-1 New Building Ae family F I AAlteration ddition IYX I I Two or more family Industrial ---- No. of units: ------- L Repair, replacement Assessory Bldg Commercial —1 Demolition Movina (relocation) I Other Others: 'I Foundation only DESCRIPTION OF WORK TO BE PREFORMED 15 Identification Please Type or Print Clearly) OWNER: Name: e Phone: Address: Phone: CONTRACTOR Name: JZ e4W Address: 7e ell' el Supervisor's Construction License: el')ID Exp. Date: Home Improvement License- / _Exp. Date: ARCHITECT/ENGINEER Name: Phone: Address: .......... Reg. No. ---—------ FEE SCHEDULE:BULDING PERMIT.-$12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED()N$125.60 PFR S.F. Total Project Cost S x12.00=FEE:$ Check No.: Receipt No.: :30 21 r Page I of 4 f Alladover fown of •�!�}! 0 To &Ah ver, Mass, / 06I.AK3 1 c "Ic"a s" BOARD OF HEALTH Food/Kitchen PERMI �T I LD Septic System R� -ticBUILDING INSPECTOR THIS CERTIFIES THAT ..... .X: 44I.,. L.�. rvQ. .0j1..s............................. ..... g Q.... 1:6�hip...*.r.Iof-4) Ix Foundation has permission to erect .......................... buildings ..... ..,... .......... Rough to be occupied as .........91f.......R01W.0ro-f ......... .�+.�..... ...... c[ ... A.& jr chimney provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS Rough .. Service .............. .... .. .... ... . ...... Final BUILDING INSPECTOR GAS INSPECTOR Occ"ancv Permit REquired to Occum BuLlding Rough Display in ons is lace on the Premises — Do Not Remove Final No Lathing r Dry Wall To Be DoneEIRE DEPARTMENT Until Inspected and Approveduil i Inspector. Burner Street No. Smoke Det. ��pmmnoiryp��„ valeon Town of North Andover Building Department— Inspectional Services 1600 Osgood Street North Andover, MA RE: Googins Residence Solar Panel Installation 20 Fuller Meadow Road North Andover, MA 01845 Dear Sirs, Invaleon Technologies Corp., has performed a limited structural evaluation of the roof framing at the above referenced site to determine if the roof has adequate capacity to support proposed solar PV panels. This analysis has been based on field measurements, framing information and configurations observed at the proposed site. The existing residence is located at 20 Fuller Meadow Road, North Andover, MA 01845. Structural Data and Code Information Our analysis has been performed in accordance with the requirements of the MA Residential Building Code 780 CMR — Eighth Edition. The main roof of this residence is framed with conventional roof rafters in a gable configuration. The existing roof structure is in good condition and currently has one layer of asphalt shingles as roof covering. The pertinent data is listed below: Main Roof Rafters: 2" x 8» (#2 Spruce Pine Fir, Hem Fir, D Fir Assumed) Rafter Spacing: 16" on center Roof Slope: 33 Degrees Horizontal Projected Length of Rafter: 13 feet Ceiling ,Joist: Present Collar Ties: Present Roof Sheathing: Plywood sheathing Condition of Framing: Excellent Ground Snow Load, Pg: 50 PSF from Table R301.2(5) Importance Factor, I: 1.0 Exposure Factor, Ce: 1.0 (Partially Exposed) Thermal Factor, Ct: 1.0 Existing condition (Warm Roof) 1.1 With panels (Cold Roof) Invaleon Technologies Corporation 26 Parkridge Rd, Suite 1 B, Haverhill, MA 01835 978-794-1724 1 www,invaleonsolar.com �►valeon Design Snow Loads: 32 PSF (Existing — Unobstructed Warm Roof) 29.53 PSF (New Condition — Slippery Surface on Cold Roof) Basic Wind Speed: 100 MPH from Table R301.2(4) Importance Factor: 1.0 Exposure: B Analysis Results General The proposed solar panels impose a total weight of approximately 3 pounds per square foot (PSF) on the roof surface. Based upon the configuration of the rafters as described in the previous section, the framing of the structure will allow the addition of the proposed solar system along with the current existing shingles (one layer) with an imposed dead weight of 3.0 psf. Further calculations and analysis can be found in the appendix of this letter. The existing structural configuration (as described in the previous section), will allow the imposed dead load of the solar system, along with a single layer of shingles, and design snow loads to be adequately supported. I Gravity Loading: n the size spacing, and configuration of the existing roof framing, we have Give g p g g determined that the existing framing for the residence is adequate to support the additional loading from the weight of the solar electric system, including the panels, i racking system, and all connections without any need for additional bracing or framing members. The panels will be installed using Snap N' Rack rails with L-brackets in portrait configuration with a rail towards the top and bottom of each panel edge. The L-brackets will be fastened directly to the roof rafters with 5116" diameter lag screws. The fastener layout shall start near each corner and for portrait orientation shall have a maximum spacing of 32" on center parallel to the roof slope and 48" on center perpendicular to the slope (e.g. every third rafter), except the maximum spacing shall be 32" on center perpendicular to the slope (e.g. every other rafter) for the areas of the array which lay in Zones 2 & 3, or if the rail and roof attachment are within six (6) feet of the edge of the j roof. Invaleon Technologies Corporation 26 Parkridge Rd, Suite 1 B, Haverhill, MA 01335 j 973-794-1724 1 www.invaleonsolar.com valeon Each 5/16" diameter lag screw shall have a minimurn of 2.5" thread penetration into the existing rafter. It is also important that the L-bracket attachment locations be staggered between adjacent rails so that no single rafter supports more load than under existing conditions. Wind Loading: Provided that the L-bracket attachments to the roof are made in a typical staggered pattern, the overall wind loading imposed on the structure will not be impacted to any great extent. The net wind loads on the roof framing with attachment spacing as described above will be less than the current loading on the rafters. Conclusion: Our evaluation of the proposed solar-electric installation has established that the roof framing IS adequate to support the addition of the solar panels to the existing roof as indicated on the Solar PV plans. We have only reviewed the adequacy of the connection to the existing rafters and the capacity of the existing rafters to support the vertical and lateral loads from the solar electric system. We do not take responsibility for any other portion of the solar panel array support system, the existing roof framing construction, or the integrity of the structure as a whole. The entire roof structure as existing is capable of,supporting the new loads impose by the installed panels and snow. Do not hesitate to contact my office at 978-809-8316 should you have any questions or if you require any additional information. Respectfully, Invaleon Tech logics Corpor 1,10 f7 airy �^sU r`r, i�r TUU/l. Invaleon Technologies Corporation 6 Parkridges fid, Suite 1B, Haverhill, MA 01835 978-794-1724 1 www.invslwnsolar,com DocuSign Envelope ID:6BOD8DCO-2BC8-4184-A868-ED126CD6B4A6 „ va eon �� TURNKEY CONTRACT This TURNKEY CONTRACT is made this 27th day of September,2016 (the "EFFECTIVE DATE") by and between: "ITC" Invaleon Technologies Corporation ATTN: fT'om Kangl<ui Wu 26 Parkridge Rd, Smite 1B Haverhill, MA 01.835 P: (978)-794-1724 AND "SYSTEM OWNER" (Name) Christopher Googins (Address) 20 Fuller Meadow Road, North Andover, MA 01845 (Phone)978-609-8360 ccgoogins@corncast.net ITC desires to provide Solar Installation services to the SYSTEM OWNER and the SYSTEM OWNER desires to obtain such services from the ITC. THEREFORE, in consideration of the mutual promises set forth below, the parties agree as follows: 1. PROJECT MANAGER. Christopher Melville is an employee of Tnvaleon Technologies Corporation, and will act as the PROJECT MANAGER and representative for ITC. 2. PROJECT LOCA'T'ION: 20 Fuller Meadow Road,North Andover, MA 01845 3. CONTRACT PRICE: $25,805.00 i 4. SOLAR SYSTEM SPECIFICATIONS. ITC will install an electricity grid-connected photovoltaic, solar power system with a total generating capacity rated at approximately 7.68kW-DC (referred to as the "ENTIRE SYSTEM") located at the PROJECT LOCATION (the "SITE"). The PROJECT will qualify for the SREC-TI prograrn. The installation of the "ENTIRE SYSTEM" shall hereinafter be referred to as the "WORD."; specifically with major equipment listed in Attachment 1. Page 1 of 9 DocuSign Envelope ID:6BOD8DCO-2BC8-4184-A868-ED126CD6B4A6 rv lEon S. MANUFACTURER WARRANTY. The material provided by ITC is warranted by the manufacturers and each has different terms and conditions. ITC provides no additional warranty on the materials. Warranty claims may be submitted to ITC, who will act as agent for SYSTEM OWNER. 6. INSTALLER WARRANTY. Invaleon provides a 20 -year warranty against defective workmanship by Invaleon and its employees to the SYSTEM OWNER. 7. PLANS, SPECIFICATIONS AND CONSTRUCTION DOCUMENTS. The SYSTEM OWNER will make available to ITC all plans, specifications, drawings, blueprints, and similar construction documents necessary for 11C to provide the Services described herein. Any such materials shall remain the property of the SYSTEM OWNER. ITC will promptly return all such materials to the SYSTEM OWNER upon completion of the WORD. 8. REQUIRED PERMITS. The following building permits are required and will be secured by L ITC as the SYSTEM OWNER's agent: Y Building Permit from The "Town of North Andover ® Permit to Perform Electrical Work.from The Town of North Andover i Interconnection Approval from National Grid SYSTEM OWNER shall remain the sole proprietor of all permits, licenses, drawings, j schematics, I-line & 3-line diagrams, or any other pertinent documents and communications pertaining to the abovementioned permits and approvals. 9. PROPOSED START AND COMPLETION SCHEDULE.. The following schedule will be adhered to unless circumstances beyond ITC's control arise. I O Start Date: On or before 3 weeks from the execution of this contract O Completion Date: On or before 3 weeks from project start date Payments will be made according to the following schedule: 1. (35%) $9,031.68 upon execution of this TURNKEY CONTRACT. 2. (65%) $1.6,773.12 at Commissioning of the SYSTEM as defined by the Utility's r Permission to Operate (PTO) i I 10. SUBCONTRACTORS. ITC will not subcontract any and all portions of this TURNKEY CONTRACT. Page 2 of 9 DocuSign EnvOope ID:6BOD8DCO-2BC8-4184-A868-ED126CD6B4A6 %� nva / n 1.1. CHANGE ORDER. The SYSTEM OWNER and ITC may make changes to the scope of the work from time to time during the term of this TURNKEY CON'T'RACT. However, any such change or modification shall only be made in a written "CHANGE ORDER" which is signed and dated by both parties. Such CHANGE ORDER's shall become part of this TURNKEY CONTRACT. The SYSTEM OWNER agrees to pay any increase in the cost of the WORK as a result of any written, dated and signed CHANGE ORDER. In the event the cost of a CHANGE ORDER is not known at the time a CHANGE ORDER is executed, ITC shall estimate the cost thereof and the SYSTEM OWNER shall pay the actual cost whether or not this cost is in excess of the estimated cost. 12. CONFIDENTIALITY. ITC and its employees, agents, or representatives will not at any time or in any manner, either directly or indirectly, use for the personal benefit of ITC, or divulge, disclose, or communicate in any manner, any information that is proprietary to the SYSTEM OWNER. ITC and its employees, agents, and representatives will protect such information and treat it as strictly confidential. This provision will continue to be effective after the termination of thisTURNKEY CONTRACT. Upon termination of this TURNKEY CONTRACT, ITC will return to the SYS'T'EM OWNER all records, notes, documentation and other items that were used, created, or controlled by ITC during the term of this TURNKEY CONTRACT. 14. FREE ACCESS TO WORKSITE. The SYSTEM OWNER will allow free access to work areas for workers and vehicles and will allow areas for the storage of materials and debris. Driveways will be kept clear for the movement of vehicles during work hours. ITC will make reasonable efforts to protect driveways, lawns, shrubs, and other vegetation. ITC also agrees to keep the SITE clean and orderly and to remove all debris as needed during the hours of work in order to maintain work conditions which do not cause health or safety hazards. 15. UTILITIES. The SYSTEM OWNER shall provide and maintain water and electrical service, connect permanent electrical service, gas service or oil service, whichever is applicable, and tanks and lines to the building constructed under this TURNKEY CONI"RACT" after an acceptable cover inspection has been completed, and prior to the installation of any inside wall cover. The SYSTEM OWNER shall permit ITC to use, at no cost, any electrical power and water use necessary to carry out and complete the work. 16. INSPECTION. The SYSTEM OWNER shall have the right to inspect all work performed under this "T'URNKEY CONTRACT. All work that needs to be inspected or tested and certified by an engineer as a condition of any government departments or other state agency, or inspected and certified by the local health officer, shall be done at each necessary stage of"construction and Page 3 of 9 DocuSign Envelope ID:6BOD8DCo-2BC8-4184-A868-ED126CD6B4A6 "pr nvaleon before further construction can continue. All inspection and certification will be done at the ITC's expense. 17. DEFAULT. The occurrence of any of the following shall constitute a material default under this TURNKEY CONTRACT: a.The failure of the SYSTEM OWNER to make a required payment when due. b.The insolvency of either party or if either party shall, either voluntarily or involuntarily, become a debtor of or seek protection under Title I I of the United States Bankruptcy Code, c.A lawsuit is brought on any claim, seizure, lien or levy for labor performed or materials used on or furnished to the project by either party, or there is a general assignment for the benefit of creditors, application or sale for or by any creditor or government agency brought against either party. d.The failure of the SYSTEM OWNER to make the building site available or the failure of ITC to deliver the Services in the time and manner provided for in this Contract. 1.8. REMEDIES. In addition to any and all other rights a party may have available according to if art defaults b failing to Substantially pet-form an law of the State o f Massachusetts a a Yp Y 5 b party Y provision, ternor condition of this TURNKEY CONTRACT(including without limitation the failure to make a monetary payment when due), the other party may terminate the TURNKEY CONTRACT by providing written notice to the defaulting party. This notice shall describe with sufficient detail the nature of the default. The party receiving said notice shall have 45 days from the effective date of said notice to cure the default(s). Unless waived by a party providing notice, the failure to cure the defaults) within such time period shall result in the automatic termination of this TURNKEY CONTRACT I 19. FORCE MAJEURE. If performance of this TURNKEY CONTRACT or any obligation under this TURNKEY CONTRACT is prevented, restricted, or interfered with by causes beyond either party's reasonable control ("FORCE MAJEURE"), and if the party unable to carry out its obligations gives the other party prompt written notice of such event, then the obligations of the party invoking this provision shall be suspended to the extent necessary by such event. The terrn FORCE MAJEURE shall include, without limitation, acts of God, fire, explosion, vandalism, storm, casualty, illness, injury, general unavailability of materials or other similar occurrence, orders or acts of military or civil authority, or by national emergencies, insurrections, riots, or Page 4 of 9 I i DocuSign Envelope ID:660178aC0-2608-4184 Fl868 EL712FCD8B4A6 /ME � j vakon wars, or strikes, lock-outs, work. stoppages, or other labor disputes, or supplier failures. The excused party shall use reasonable efforts under the circumstances to avoid or remove such causes of non-performance and shall proceed to perform with reasonable dispatch whenever such causes are removed or ceased. An act or omission shall be deemed within the reasonable control of a party if committed, omitted, or caused by such party, or its employees, officers, agents, or affiliates. 20. CONTRACT ARBI'T'RATION. ITC and the SYSTEM OWNER hereby mutually agree in advance that in the event the ITC or SYSTEM OWNER has a dispute concerning this contract, ITC or SYSTEM OWNER may submit the dispute to a private arbitration firm which has been approved by the Secretary of the Executive Office of Consumer Affairs and Business Regulations and the SYSTEM OWNER shall be required to submit to such arbitration as provided in Massachusetts General Laws. pocusigned by: SYSTEM OWNER Signature; Ersf,r`, ,',b ,S 883836BCAOA242D... Docusigned by: ITC's PROJECT MANAGER's Signature: I/D72600DO4938401., NOTICE: The signatures of the parties above apply only to the agreement of"the parties to alternative dispute resolution initiated by ITC. The SYSTEM OWNER may initiate alternative dispute resolution even where this section is not separately signed by the parties. 22. Taxes The CONTRACT PRICE includes all sales, consumer, use, and other similar taxes on materials i provided by ITC, which are legally enacted by the governing authority in the area where the installation is located. 23. Miscellaneous This TURNKEY CONTRACT represents the entire and integrated agreement between the SYSTEM OWNER and CTC with respect to the WORK and supersedes all prior negotiations, representations or agreements, either written or oral. This TURNKEY CONTRACT may be amended only by written instruments signed by both the SYSTEM OWNER and ITC. Any oral representation of modification concerning this TURNKEY CONTRACT shall be of no force or effect. i Page 5 of 9 DocuSign Envelope ID:6BOD8DCO-2BC8-4184-A868-ED126CD6B4A6 °6b va, eon This TURNKEY CONTRACT shall be executed in two counterparts, both of which taken together shall constitute one and the same instrument. The undersigned individual(s)represent that they are fully authorized to bind their respective entities. The SYSTEM OWNER acknowledges that it has carefully read this TURNKEY CONTRACT and understands the contents thereof, that it has had the opportunity to consult with its own attorney(s) in respect to the terms and conditions set out herein and it has agreed to the provisions hereof without reliance on any representation or promise by ITC or anyone acting on behalf of ITC. The invalidity or unenforceability of any particular provision of this TURNKEY CONTRACT shall not affect the other provisions, and this 'TURNKEY CONTRACT shall be construed in all respects as if any invalid or unenforceable provision were omitted. Nothing in this TURNKEY CONTRACT shall be construed or deemed to create a contractual relationship between ITC and any third party; a cause of action in favor of a third party against ITC; or create any third party beneficiary rights of any kind. ITC and the SYSTEM OWNER waive all claims against each other for consequential damages arising out of or relating to this TURNKEY CONTRACT. This mutual waiver applies, without limitation to all consequential damages which arise as a result of either party's termination of this TURNKEY CONTRACT. 24. GOVERNING LAW. 'Phis TURNKEY CONTRACT shall be construed in accordance with, and governed by the laws of the State of Massachusetts, regardless of the choice of law provisions of Massachusetts or any other jurisdiction. 25. ASSIGNMENT. Neither party may assign or transfer this TURKNEY CONTRACT without the prior written consent of the non-assigning party, which approval shall not be unreasonably withheld. 26. CONTRACT ACCEPTANCE. Upon signing, this document becomes a binding contract under law. Unless otherwise noted within this document, the contract shall not imply that any lien or other security interest has been placed on the property. Review the following cautions and notices carefully before signing this contract. IN WITNESS WHEREOF, the undersigned have duly executed and delivered this TURNKEY CONTRACT as of the day and year fust above written. DO NOT SIGN THIS TURNKEY CONTRACT IF THERE, ARE ANY BLANK SPACES. Page 6 of 9 DocuSign Envelope!D:6BOD8DCO-2BC8-4184-A868-ED126CD6B4A6 a . nvaleon No work shall begin prior to the signing of the TURNKEY CONTRACT and transmittal to the SYSTEM OWNER. of a copy of such contract. ITC Tom Wu Name: CEO Title: DocuSigned by: Signature: C?72 RQBQ49384DI 9/27/2016 Date: SYSTEM OWNER Christopher Goggins Name: � DacuSigned by:C, Sib t.V Signature: 883836BCAOA242D.abbous.. 9/27/2016 Date: Page 7 of 9 DocuSign Envelope ID:6BOD8DCO-2BC8-4184-A868-ED126CD6B4A6 - nvaleon NOTICE OF CANCELLATION YOU MAY CANCEL THIS TRANSACTION, WITHOUT PENALTY OR OBLIGATION, WITHIN THREE BUSINESS DAYS FROM THE ABOVE DATE. IF YOU CANCEL, ANY PROPERTY TRADED IN, ANY PAYMENTS MADE BY YOU UNDERTHE CONTRACTOR SALE, AND ANY NEGOTIABLE INSTRUMENTS EXECUTED BY YOU WELL BE RETURNED WITHIN TEN BUSINESS DAYS FOLLOWING RECEIPT BY THE SELLER OF YOU CANCELLATION NOTICE, AND ANY SECURITY INTEREST ARISING OUT OF THE TRANSACTION WILL BE CANCELLED IF YOU CANCEL, YOU MUST MAKE AVAILABLE TO THE SELLER LER AT YOUR RESIDENCE, THE SUBSTANTIALLY AS GOOD CONDITION AS WI.IEN RECEIVED, ANY GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE; OR YOU MAY, IF YOU WISH, COMPLY WITH THE INSTRUCTIONS OF THE SELLER. REGARDING THE RETURN SHIPMENT OF TLIE GOODS AT THE SELLER'S EXPENSE AND RISK. IF YOU MAKETHE GOODS AVAILABLE TO THE SELLER AND THE SELLER DOES NOT PICK THEM UP WITHIN TWENTY DAYS OF THE DATE OF CANCELLATION, YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTFIER OBLIGATION. IF YOU FAIL TO MAKE TLIE GOODS AVAILABLE TO THE SELLER, OR IF YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO SO, THEN YOU REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER TLIE CONTRACT. TO CANCEL,TT-IIS 'TRANSACTION, MAIL OR DELIVER A SIGNED AND DATED COPY OFTHIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE, OR SEND AN EMAIL TO INVALEON TECHNOLOGIES CORPORATION, AT 26 PARKRIDGE RD, SUITE IB, HAVERHILL, MA 01835 NOT LATER TI-IAN MIDNIGHT OF I HEREBY CANCEL THIS TRANSACTION. DATE: BUYER'S SIGNATURE: Page 8 of 9 DocuSign Envelope ID:6BOD8DCO-2BC8-4184-x868-ED126CD664A6 /a ° � r valiEon Attachment 1. Major Equipment Schedule and Proposed Layout Options (24) LG 320 Watt Neon2—LG320N1 C-G4 (1) SolarEdge 7600 Watt inverters—SE760OA-US (24) SolarEdge 320 Watt optimizers— SE P320 Optimizer SnapNrack black matching color rails and racking system , ..... ,,, , i/ /ii 04A/1" /; �i/ // /i/�/iii��'/ /�/�r/I, / ///i/✓ilii/i/iii i/i/i/ii� r% f J iii ///� /a✓i///�///////////alai��/%/�%/�///////iii �/� ///// /i iii.:; / . Page 9 of 9 lar . � � S®IarEdge Single Phase Inverters 9k For North America SE000OA-IJS SE380OA-U / SE500OA-IJS / SE600OA-US SE760OA-US SE1000OA-LJS SE1140OA-IJS �+ Vears i 4 i r I I y I The best .choice for SolarEd a enabled systems Integrated arc fault protection for NEC 2011690,11 compliance Rapid shutdown for NEC 2014 690.12 Superior efficiency(98%) — Small, lightweight and easy to install on provided bracket — Built-in module-level monitoring Internet connection through Ethernet or Wireless c — Outdoor and indoor installation — Fixed voltage inverter, DC/AC conversion only Pre-assembled Safety Switch for faster installation Optional—revenue grade data,ANSI C12.1 USA-GER,MANY-MAI`( I-RANCE ,JAPAN-[:I-TINA-AUSTRALIA H11:1:N&:IIIERL,ANDS-UK-ISRAEL wwwsolaredge.LIS Single Phase Inverters for North America soiar - 5E3000A-US/SE3800A-US/SE5000A-US/SE6000A-US/ S17600A-US/SC10000A-US/SE1140OA-US N SE3000A-US SE380OA-USI SESp00A US I5E6000A U5 ( SE7600A US SE10000A U5 SE11400A US - OUTPUT Nominal AC Power Output 3000 3800 5000 6000 7600 9980 @ 208V 11400 VA ........... ............... 10Qp0.@2n04, ..,.,......,,,... ........... 5400 @ 208V 10800 @ 208V p 5450cG 24QV„ Oa 8350 1200(7 VA Max.AC Power Output 3300 4150 AC Output Voltage Min:Nom.-Max.ill / - 183-208-229 Vac ........... ................ ............... ................. ................ .... ........... AC Output Voltage Min:Nom:Max.I't ✓ 211-240-264 Vac AC Frequency Min.-Nam Max,it? 59.3 60-60,5 Hz.... Max.Continuous Output Current 1.2.E 1� 24 @ 208V 25 32 48 @ 2a8V I 47.5 A f?1,(c�240U 42(7,24QV... .. .... .... ... GFDIThreshold.. ...................... .... .......... ........ ............. ........... .........1............,.. ........................ .............. ... . ....A..... Utility Monitoring,Islanding Protection,Country Configurable Thresholds Yes Yes INPUT Maximum DC Powcl'(STC) 4050 5180 1 6750 8100 , 1025p 13500 15350 .. W..... Transformer less,Ungrounded Yes ........ .,Max.Input Voltage..........., 50( Vdc ... Max.Input Current 9.5 13 16.5 @.2a8V 18 a C 240V. Vdc .... 1�,�,(�29,OV.. ,. ..,.., l4 Nom D�In ukVoltia.e...... ... .... ....,.,, c r 325 C�208V/3,.. .... .�� V..3,()3���w7 40V.. ..,. .�a.5...., . . ,Ado . Max.Input Short Circuit Current AS .Adc .. Revc,rse-Ppinrlty Protect on Yes Ground-Fauldsalation Detection 61l Sensitivity y MaximmuInverter Efficient 97,7 98.2 98.3 98 3 98 97 @ 208V 97 @ 208V CEC Weighted Efficiency 97.5 98 97.5 97.5 97.5 ....... .. ............ , ,... Nighttime Power Consumption 2.5 _ `4 W ADDITIONAL FEATURES Supported Cornrrtunkcahon Interfaces RS485 RS232 Ethernet,ZlgBee(optional) ,Revenue...,...... Isy Grade Data,ANSI,C12.1 ., Optional,,..,..,,, Rapid Shutdown—NEC 2014 690.12 Yes STANDARD COMPLIANCE Safety UL1741,UL16998,UL1998,CSA 22.2 Grid Connection Standards „ ,. IEEE1S47 . Emissions FCC partly class B INSTALLATION SPECIFICATIONS p..., $e... .............. ........ irumurn/83AWG AC out ut conduit size/AWG ran e 3/4”minimum/16-6 AWG 3/4"m P string s3/4"input conduit size/q of stria s/ 3/4'"minimum/1-3 strings/ 3/4"minimum/1-2 strings/16-6 AWG I AWG ranfe...... ................ 14-6 AWG ... ... .,,........ .... ...,. .................. ............. .,........, .. .30.�c 12.5,.......,,., . . . Dimensions with Safety Switch < x 10.5/ in/ ,., x184 „(.xVJx[7),,,.,,, . 30�x12.�x7.2 775x31c .. 77_r,x315x26(7 .... ... ...min,,... ,..g.,.. ..... ,..y ,., 51.2/23.2. , I 4.7/24,7 88.4/401. ......... .lb!.kg... Wei ht with 5afet Switch � , Natural convection Cooling Natural Convection and internal Fans(user replaceable) fan(user . ,rc�placeahle} ........... ........... Min.-Max.Operating Temperature 13 to+140/-2.a to+60(40 to+6a version availableini) 'F/'C Range.............. .. ....,.,.. .............,.....,................ ........ Protection Itatin� NEMA 311 For other regional settings please contact SnlurEdge support. ISI A higher current source may be used;tare inverter will limut its Input current to the values stated. 131 Revenue grade inverter P/N:5ExxxxA-US000NNR2(tor 7600w overter:6E7600A-US002NNR2). Iai.40 version P/N:SExxxxA-US000NNUA(for 7600w inver1ecSE760bA-US002NNU4). IN i tv. Sk1R�f�'k:C: V I'll solar=@ " ® N SolarEdge Power zer Module Add-On For North America P300 / P320 P400 / P40 i r 1 f PV power optimization at the module-level Up to 25%more energy Superior efficiency(99.5%) Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading Flexible system design for maximum space utilization Fast installation with a single bolt Next generation maintenance with module-level monitoring Module-level voltage shutdown for installer and firefighter safety USA-CANADA-GERMANY-ITALY FRANCE!-JAPAN-CII INA"AIJSI"RAI-IA 1HEI[ NE:' HERL.ANDS Udo ISRAF L www.SCJ�c1rC't��;�.11'� solar=@@ SolarEdgeftwerOptimizer Module Add-On for North America P300 / P:320 / P400 / P405 P300 P320 P400 PAOS.. (for high-power (for 72&96- 1 (for thin film (for 60-cell modules) 60 cell modules) modules) modules) INPUT Rated lnput,DCPower°'r. . .. ......... . 300 1 320 400 ., .405 ... ' .... Absolute Maximum Input Voltage 4$ 80 125 Vdc (Voc at,lowest temperature) , MPPT Operating,Range., .., $ 48 . ... 8-80 ..... ..... ..12.5..105,....... ....Vdc .... MaxirnumShortCircuitCur.rent(Isc)..', ..., .... 10. .... .1.. . .......Z ... ........ .... 10.1..,. Adc..... Maximum DC InputCurrent. .. ...... . ........ 1.2:5...,. ......x..... . ..13,75 12163 Maximum Efficiency. .. ...... 99.5 % ..... . .... Weighted Efficiency.. ... ..., 98,8 ... ... Overvoltage Category II OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current Maximum Output Voltage 60 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power 1 Vdc Optimizer STANDARD COMPLIANCE EM ........................................ FCC Part15 Class B,IEC61000-6-2,IEC61000-6-3 Safety IEC62109.1(class II safety).UL1741 I.I. . ... ..... .... . .... Yes... . RoHS INSTALLATION SPECIFICATIONS _. Maxi rlum Allowed System.Voltage... ......... . ........ 1000,. ......... ........... .. .... .. ... ............. ....Vdc Compatible Inverters All 5olarEdge Single Phase and Three Phase inverters 128x152x27.5/ 128x152x35/ 128x152x48/ Dimensions(W x L x H) mm/in 5x5,37x1,08 5x5.97x1.37 Sx5.97x1.89 Weight(including cables) 760/1 7 $30/1$ 1064 Input Conne.cto.r...... ......... MC4 Compatible ,,.. Output Wire Len th 1. Double Insulated;MC4 Compatible . „ ., ... Out ut Wire Type./Connector ,p .,.. ..,...g.. ., ...,.. 09-5/3.Q......, ?.2�, .3........,, , ,..... , .m/ft, .. Operating Temperature R n.ge.....,.. -40 +85/-40-+185 'C/'F Protection Rating... ... .,,.. ...,IP6$/NEMA6P ._...... Relative Hurnrdlty........ ..... ... 0-100 n/°...... 01 Rated STC power of the module.Module of up to+5%Power tolerance allowed. , PV SYSTEM DESIGN USING SINGLE PHASE THREE PHASE 208V THREE PHASE 480V A SOLAREDGE INVERTER(') Minirnurn String Length 8 10 18 PowerO tirnizers .,,.... .............. .............. Maximum String Length 25 25 50 (Power Optimizers) Maximum Powerper.Strin.9........ ... . . .. .....5250. . .,.. , ... 6000.., 12750........ ... ...W...... Parallel Strings of Different Lengths Yes or Orientations lxl It Is not allowed to mix P405 with P300/P400/P600/P700 in one string. (8 LG M Life's Good LG NeONI 2 MEM LG's new module,NeONIm 2,adopts Cello technology.Cello technology replaces 3 busbars with 12 thin wires to enhance APPROVED PRODUCT 60 cellpower output and reliability.NeON11 2 demonstrates LG's /D6VEC E us efforts to irrcreasc custorne�r's values beyond efficiency.ciency.It Wim.__ Intertek features enhanced warranty,durability,performance under KM 564573.. e5 EN 69215 real environment,and aesthetic design suitable for roofs. MeG"m,M.,10" Entranced Performance Warranty High power Output LG NeONT"°'2 has an enhanced performance warranty. Compared with previous models,the LG NeONTr'2 The annual degradation has Fallen from-0,7%/yr to has been designed to significantly enhance its output -0.6%/yr.Even after 25 years,the cell guarantees 2.4%p efficiency,thereby making it efficient even in limited space. more output than the previous NLON""modules. Aesthetic Roof Outstanding Durabwtity LG NeONT`1 2 has been designed with aesthetic,in mind; With its newly reinforced frame design,LG has extended thinner wires that appear all black at a distance.The the warranty of the NeONf6'2 for an additional 2 years, product may increase the value of a property with its Additionally,LG NeONT11 2 can endure a front load up to modern design. 6000 Pa,and a rear load up to 5400 Pa, Better Performance on a Sunny flay Doubte-Sided Celt Structure ° LG NeON714 2 now performs better on sunny days thanks The rear of the cell used In LG NeON111 2 will contribute to to its improved temperature coe'fficiency. generation,just like the front;the light beam reflected from the rear of the module is reabsorbed to generate a great amount of additional power. About LG Electronics to Electronics is a global player who has been committed to expanding its capacity,based on solar energy business as Its future growth engine-We embarked on a solar energy sourr„e research program in 1985,supported by LG Group's rich experience in semi-conductor,LCD,chemistr y,and materials industry.We successfully released the first Mono X'"series to the market in 2010,which were eXported to 32 Countries in the following 2 years,thereaf't'er,In 2(7'13,NeoN-(previously known as Mono x�NeON)won"Intecsolar Award':which proved LG is the leader of innovation in the Industry. LG NeON"'2 MMM Mechanical Properties Electrical Properties Celts 6x 10 320 W ................... Celt Vendor LIG MPP Voltage(VmPp) 33.6 .................. ", - ---... ... .CeItType Monoicrysuilline/N-type MPP Current(hupp) 9.53 ............ .... Celt Dimensions 156.75 x 156.75 rum/6 x 6 inch Open Circuit Voltage(Voc) 40.9 st of Busbar 12(Multi Wire BUsbar) Short Circuit Current(Isc) 10.05 ............ Dimensions(I.x W x 1-1) 1640 x 1000 X 110 mm Module Efficiency 19,5 —— ......HEY-N--) - '5.7 X� ,39.37 x 1.57 inch Operating Temperature(*C) -40-+90 ............. Front Load 6000 Pa/125 psf 0 Maximum System Voltage(V) 1000 ......................... -—--------- Rear Load 5400 Pa/113 psf 0 Maximum Series Fuse Rating(A) 20 Weight 17.0±O.S I<g/37.48±1.1 lbs Power Tolerance 0-+3 -1111111- —-------------- Connector Type MC,4,MC4 Compatible,IP67 S TC(150-d,,,d tett C.cdti.ri 1,rad,a,ic,,1000 W/i M$rdude To,upoi 25'C,AM 1.5 Junction Box IP67 with 3 Bypass Diodes Thi,nwni p.--,—tp,i m-surctl ond detcrrnned by UG Eli at its solp ind akn1i di-i .............. lhi typi'A d',I"q,III III Jule'rffi6voq,,t 200 W/.I,n rcl.i to 1000 Wh,'k�2.()Y� Length of Cables 2 x 1000 nim/2 x 39.37 inch Glass High Ilansrrlission Ternipered Glass Electrical Properties(NOCT*) Frame Anodized AlunninUrn 320 W .......... —--------- Certifications and Warranty Maximum Power(PiTipp)~ ---234 -- MPP Voltage(Vnipp) 30.7 Certifications In Progress) JEC 6121 S,EC 61730-1/-2,UL 1703, Mpp MPP Current(11 7.60 ............... --- ISO 9001,IEC 62716(Ari Fiest), Open Circuit Voltage(Voc) 37.9 IEC 61701(Salt Mist Corrosion Test) Short Circuit Current(Isc) 8,10 Module Fire-peyp ( Performance T - . e 2 Ul,170 3) NOC I—(N-,iodl 0pvr,,t-;CO F—r—turo) 800 W/ 2, biii t,,r1,pr,,Wo.20,T,-nd speed I rt/s Product Warranty ~~ 12 years Output warranty of Pmax Linear warrai Dimensions(mm/in) (measurement Tolerance t3%) I)1 t y—98%,2)Afti 2,d ycar 0 6-/p-c-1 3)33 6%for 25 yi?w, Temperature Coefficients NOCT 46 3 T ............. Pn1pp a 38%/'C .......... Voc -0.28%!'C Isc 0,03%/'C Characteristic Curves 1006 Url6.N:Vw \F ------------—---------....... B 000 oo 6'10- ------------------- 600w 400 400w 200w 00 Soo 10(X1 1500 2000 2500 3000 3500 4O 00 4500 g: 1'4 F----I 100 40 '25a 21 to 75 nIe distance beoveen the ocwer of the hales North America Solar Business Team Product specifications are subject to chango without notice. (a LG [.G Electronics US.A.inc 0S-N2.-60 C G-I'-EN-5042 7 LW Life's Good 1000 Sylvan Ave,Englewood Cliffs,NJ 07632 0 Copyright(0 10'15 LG Electronics.All rights reserved. Innovation for a Bi fe Contact:Ig solarPlgexom 01/0412015 wwwkpolafusl.coal of".4 Snap rack- Series The SnapNrack Series "NCC Beef Mount System is engineered e d tea o tirni e material rase, labor resources grid aestl'-ietic appeal, This innovative system sirnplifies the process of installing solar ri odrilO , S11ortens installation times, and lowers iri tallation costs; rna irni ing productivity Barad profits. The Series '100 ["Wof Mount Syst rn boMtS tarlklue, pre-assernbled, stainless ste l " rrapl° In" hardware and watertight flash attachments. I,his system is installed with a single total. No cutting or drilling rneans less rail waste,, It is fully integrated d with built-in wire , a. , iori� for all v'oof r°i°a�a ri� �� r�°i��ra t l uwithstand � 1. ���. "y�;�e'i�;'��, i""t��' ;�i�"e-�,��i� ,������#lI 'fe"i'ak°� .rir"��"�� , r'a��,� e: i'°6 extreme environrrie ntal conditions. Series "100 is liste d to UL Standard 2703 for Gr r.rnding/Bondir.iq, Fire Class if i atloiri and Mechanical:a l Loading. L)L 2703 Certification and Covyiplianc.e e:ansure s iha t: Sn all rack installers can continue to provide the best in class installations in qui„ility, safety c'ant° efficiency. • Appealing design with built-in aesthetics • No grounding lues required for modules Al • All bonding hardware is fully integrated • nail splices brand rails together, no rail urn ers required J p q 0 No drilling of rail or reaching for other tools required 0 Class A Fire Dating for Type 1 and 2 modules �`w.'rr, ��'�`"%,�"r,,,, ng V v� ,��ri r P,F,�,4�✓ ��P�rf V�ar9 l System Features Include Snap in Single Tool Easy No Cutting Hardware Installation Leveling or Chilling Integrated Wire preassembled Integrated bonding UL 2703 Certified Management hardware Resources snapnrack.com/resources Design snapnrack,corn/configurator where to Buy stiapnracl<.cof-n/where-tri-bL.ay Snap rack- Stainless Bolt with -SCainicss Steel Bonding Splice Standard Rail Split-Lock Washer Bolt with Split- Insert 015-09816 Lock Washer ---Bonding Adiustable .._.Bondin End Clamp Top , Splice Mid Clamp Base Bonding --Bonding Adjustable Channel Nut End Clamp Bottorn Bonding / Stainless Channel Nut ../Stainless Hardware with Bolt with Split-Lock Washers- Split Lock Bonding Adjustable End Clamp Bonding Mid Clamp Bonding Standard `Hasher x4^r-n2nG2 242-02es3 Rail Splice Crzxunl Ling ..-. 242-0401v 242-02101 12-6 AWG ._..............._....._.._... „ . Copper Wire Ground Lug Assembly (ONE REQUIRED PER ROW OF MODULES) ... .---°Universal End Clamp(UEC) Wave UEC Pull Strap V5 y UEC Wedge --Stainless Steel Bolt rv� with Flat Washer Universal End Clamp 741-0221": Standoff Clamp Assembly Rubber--, Serrated Stainless__,es farann01 Channel Nut Rain Collar Steel Flange Nut .. Nut Stainless Serrated Stainless Flange Nut Mill Finish—...-,- p Steel Flange Bolt —92 Degree - Stainless L Foot Flange Standoff ��r' Bolt d _All Purpose 1 L..Foot Mill Finish Standoff Base(1-Hole L Font -.-Metal Roof Base Shown) Mill Finish—"�, Base Assembly L Foot Base ' F=lashing Standoff L Foot Base with Flashing Metal Roof Basewith L Foot 241-92057 742-970;0 242-09e37 j i i l i I i • 6000 Series alLlminum Materials < Stainless steel * Galvanized steel and aluminum flashing - Silver and black anodized aluminum Material Finish Mill finish on select prodtictS • Silver or black coated hardware Nato>.Appearance of mill finish products may vary and Change over tiryle. j Wind Loads 110 - 190 mph (ASCE 7-10) j, Snow Loads 0 - 120 psf Array Pitch 0 - 60 degrees 877-732-2860 www.snapnrack.com contact( napnra k.com Erb 2016 by i;rla pNr ck polar Mounting Solutions All rights reserved swr7N,.k5,,ws,100 Rfmhu,e..2, r a r v r/�!r/ i /✓i D%//i/////%//r//�/i/�/�////�/ / /���r /Ilii ri� //i //i//ri�/a/�� ly „ ,,;,/, r/// "ri/l ✓rrr //,� „/i liP i, ,: �,,, �c ME, ///ii,,. i-�r rill/�!ii, ,%//�/�/tri//ii r ar,,;,,r�/rr///,�/i/� ✓ii/ai/%//, // iaii �%/ %,i�r/�ir r %�/%i%%% tai: ///,i/%/l/� /„-,i<�///�i iii/r',✓ri,�i�/I�/I,���i:;,; % D////,uri% �� o �///j// G/%////i/�l ��l r%a !;�/i ii /%ia /�/�/lir,,,/ riirii /�r� %r'%//i%%j %rov////%� �' .; „✓// �i// / �/i irk%//// ! I � Y 4 h� ri rad// / ✓�i/�/i/i/,/i/ r i,,,,/, lii�� �fr ��,.�,�. //� � // ,,, o�� �i--/�,�c,/ �//, r /// ii r a / ri ,-/ /,,, ,r ra iii ,/, % a / /, � ✓. ,.aic /rr/��.✓ //� l/i///r,.�, oar ri .✓, ��.//// , � � / r// %/// rte/ r ,<,. / ..�/ �:, �// r///// // //i ,,,,,/// ,✓/ ria � / � 6/ / // /iii Dig / ;, �,,, ,, / / l /,,, // // /� - / /��//�%%�j 'r//iiia////�/ e,, ,,,, //, ✓// rrii i�� r r�' ✓ %' r/r/i /r/// /%/i ,�� /„ /i/� // <,: ri ,, l/i .,., /, �.,//%ri,,,,iii,�i%ii //ii//%./r/ / .✓, / , �n/.r,r/ .. �� ;moo/ o/ .. r,,,, ,rio ,d,,,,.� ,/ ,/i �r�....,%// ✓�r/ /i /iii%/i////�//iii//�,,,;;. ///// /� a�/,, r/o �✓ yr/iii r/J. /i r I, �/�%�% rill,. ..///, /,�//iii///ri ,,, o/�/% ,///„� r / ,/// //� ,.v/i i/ % i r�j // r/it ,,,,✓/i,/// � ,, „r /�ri��� �/i/ //�. / r / �,•/ / ion,/� ��/ /, ,i/,/r li/���/j %/ r�iJ,. ���// �ri�. /,,,,,Dir,.,,%, a%/iia,s//%/ ,i�/iii, �///% riiii�✓%/ii�rri% '• ri r ����// /�, o / /r/iii / %✓ '° r / j r rii// rr Illi �' I I I � /mai,rrr D AM /d y r i I u solar=@@ z M SolarEdge Single Phase Inverters For North America SE300O ►-US / SE 80OA-US / SE5O0OA-IJS / SEOOOOA-US / SE7600A,..US / SE10000A-US / SE11400A.-US ��S�,wtsrCer �' 'o watrao�l, i I i I 1 i i i 111T�U3- t��y J r �y l �1��11��ii�d»����2�f+�9„omlc;urll��Jl!rmLf�19��1911�1�c�llrrrdvilJ�u,�l�c�r;»» � The best choice for SolarEd a enabled systems Integrated arc fault protection for NEC 2011690.11 compliance Rapid shutdown for NEC 2014 690.12 - Superior efficiency(98%) Small, lightweight and easy to install on provided bracket I - Built-in module-level monitoring - Internet connection through Ethernet or Wireless — Outdoor and indoor installation — Fixed voltage inverter, DC/AC conversion only - Pre-assembled Safety Switch for faster installation — Optional—revenue grade data,ANSI C12,1 ' USA--GERMANY-ITALY-I°RAMCE-.IAPAN °CHINA-AIJSFRALIA TI°4ENETH IRLANDS-I.X ISRAEL www,sola1edge.LIS i Single Phase Invertersfor North America solar - SE3000A-US/SE3000A-US/SE5000A-US/SE6000A-US/ =9 -00- SE7600A-US/SE10000A-US/SE11400A-US SE3000A-US SE3800A-US L SES000A-US SE6000A-US CSE760OA-US I SE10000A-US Yi SE11400A US OUTPUT 1111-. . __ i _1111 .. ............ 9980 @ 208V Nominal AC Power Output 3004 3804 5400 6000 76(10 11400 VA P 000 10 �7240V .. ... 1111. .......... ............... ............... ........ .. .. .,, Max.ACPower Output. 3300 4150 5400 @ 208V 6000 8350 10800 @ 208V 12000 VA s4s0 @2iiQY.. ..... 1111 .. �iq so, z 14y AC Output Voltage Min.-Nom.-Max,l'I ✓ ✓ 183-248-229 Vac I ... ......... .......... ........ .. . .........., ............... .. _,........ ......,.. 1111.. .............. ... .,....,.... ..,,..... AC Output Voltage Min.Norn.-Max.l'I ✓ ✓ ✓ ✓ ✓ ✓ 211-240-,264 Vac c.. ............. ...... ......... ................ 1111. 1111.. .,... ..,....... ....... ........... AC Frequency Min.-Ncrn,Max.(" 59.3 60 60.5 ...Hz...,, 1111... ..,,,,.. ........,. 1111 ....,. ..... ... .. ........ ... ,. , Max.Continuous Output Current 12.5 16 24(@ 2g8V . 1111. 2S 32 486 2g8V 47.5 A ?.1.@.24CJV... „ ., . ....,... 1111.. ......... ...42 @ 24lJV... GFDIThreshold.............——........ ......,.....,..................,......... ................1............ .... 1A 111 1111 Utility Monitoring,Islanding Protection,Country Configurable Thresholds Yes Yes INPUT Maximum DC Power IS ... .4050 5100.. 675,0 8100 10250 13500 ( 1535(1 W mer Icss UnmundedYes Transfor...,. 1111... 1111.., 1111.. .. .......................... .......... 1111 1111 .. .. Max..lnVoltag .................... ....................... 1111.. ......,,.,..,.. ............ ,,.,........... ., ..put e 00 Vdc. ........ ... ... Norn.DC Inp ut Va6tatae 325 C�?208V/350 @ 240V Vdc .,. 1111 .. ... Max.Input Currentlzi 9.5 13 16 5 ,. l @ 208V 18 23 3()35CC?.0�� 34.5 Adc 15.S.().2�fC)V.. ... .. .. 1111 . MaxMax.Input Short Circuit Current 45 Adc .,, , 1111 ,. ... ,. .. .. .. , ,., Reverse-Polarity Protection Yes Ground Fault Isolation Detection 600ksaSensitivity .., Maximum Inverter Efficiency 977 7 98 2 98 3 98 3 98 98 98 9l @ 208V 97 @ 208V GEC Weighted Efficiency 97.5 98 97 5 97.5 .@.?40�!.. ............. .. .,9—— ,.y,1 S,Cal 24gV.. ....... 1111.. Nighttime Power Consumption <2.5 <4 W__,. ADDITIONAL FEATURES gBee(optional). Supported Comm uniratian Interfaces . ... .. . .. .. I S.... RS.. . Ethernet,Zi Bee ...... .......... ....... Revenue Grade Data,ANSI 012.1 Optionalt'y 1111 1111 1111. ... ... ... 1111. .. ......... .... ................ .............. ............... 1111.. 1111. Rapid Shutdown—NEC 2014 690.1.2 Yes -1111-,-1111. 1111 . STANDARD COMPLIANCE SafetyUL1.741,UL1699B tJL1998,CSA 22 2 .................................. 1111... ....... ......... . Grid Connection Standards IEEE1547 .. ..... ................................... .................................. ......................................................... ....,1111. Emissions FCC partly class B _ INSTALLATION SPECIFICATIONS AC output conduit size/AWG range 3/4,,minimum/16-6 AWG 3/4 minimum/8-3 AWG ,. 111^1. 1111 1111 1111 .. DC input conduit sire/#t of strings/ 3/4"minimum/1-3 strings/ AWG ran e /1-2 strings/16-6 AWG f1:................. ........... 1111. .,.....,..,. 3/4'"minimum..............,.,.............,.,.,.,.,....,..,. ,...,.......,...,..... Dimensions with Safety Switch / / 30.5x12.5x72/775x315x184 30.S x 12.5 x 10.5 in ... 1111., .. .., 1111, ... ..775x315x2;6t7. ,. 1111 . ,mm .., weight with safety switch 1111 . . Natural convection Cooling Natural Convection and internal Fans(user replaceable) fan(user ...................... ................ ............................... 1111.,. .,,.,,.,,...... rc.pl,Efce,Efl�le). .......,..,,..,... 1111.. ............. , . 1111., Noise <25 <50 dBA ........................ .......,..,.,..,. .............._1111 Min.-Max. perang 13 to+140 -4OCa+6Qversion available.,.....,....,.....................,....,............ .......,... OtiTemperature -25 to+64( rn / ) °F/`C ..f png?.....-- . 11..11,..... 1..1.1.,.1................. ........... . ..,1111. ............... 1111. .. 1111. .,. .. .. 1111 ... Protection Rating. NEMA 3Ft ...For other regional settings s please contact SolarEdges, ........ .,1111..,. .. . 1111.. ........... .......... 1......... 111..,.... .... Irf g g r support. lzi A higher current source may be used;the inverter will limit its input current to the values stated. t>I Revenue grade inverter P/N:SExxxxA-US000NNR2(tar 7600w inverter:5E7600A-U5002NNR2), Iai-40 version P/Nt SExxxxAAUS000N NU4(for 160OW Inverter.SE7600A-U50021,11,11-14). ff ME 11110 11 cal.ifl`ti",c4 �r V. solar=@ " Module Add-On For North America P300 / P320 / P400 / P40 1 i r ill I ats► aw y� .raze i PV power optimization at the module-level Up to 25%more energy Superior efficiency(99.5%) Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading Flexible system design for maximum space utilization Fast installation with a single bolt Next generation maintenance with module-level monitoring Module-level voltage shutdown for installer and firefighter safety 't USA-C'ANAL)A-CERIWIANY ITALY-FRAN(:E-JAPAN-C:NINA AUSTRALIA-TI-ENEI 1-IF.RLAN DS E{K-ISRAEL WWW.SOl'aredge.Cis solar=@o z SolarEdgeftwerOptimizer (Module Add-On for North America P300 P320 / P400 / P405 P300 _ P320P400 P405 (for 60-cel{modules) (for high power (for 72&96-cell (for thin film 60 cell modules) modules) I modules) INPUT I _ Rat,ed'Input DC,Power!')........ .. 300 320., . .. ....400. 405,........., ... .. Absolute Maximum Input Voltage 48 80 125 Vdc (Vac at lowest temperature} MPPT Clperahng Range 8-48 8-IIO12.5-105 Vdc Maximum Short Circuit Current(isc) 10 11 . .... 1Q.1 Adc Maxlmum DC Input Current 12.5 13.75 12 63 Adc Maximum Efficiency, 99.5 °la Weighted Efficiency................ 98: ..,...,...........,.,...............,,.. % Overvoltage Category II OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Maximum Output Current 15 Ad Maximum Output Voltage 60 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power 1 1 Vdc Optimizer _ .__._ . STANDARD COMPLIANCE EMCFCC Part15 Class 8,IEC61000-6-2,IEC61000-6-3 ....... ... ....................... ...................................................................................................... .......... ..... .. Safety.... IEC62109,1(class II safety),.U11741 RoHS Yes INSTALLATION SPECIFICATIONS Mawmum Allowed System Valtag? 1000... ............... ..... ............ ...... ........ ....Wd.c..... Compatible inverters All g d Three Phase inverters . .. .... ..... ........ ...... SolarEd e Single Phase an . . .. ,....... .,,, .... . ......, 128x152x27.5/ 12IIx152x35/ 128x152x48/ Dimensions(W x L x hl) mm/in 5.5.97x1.08 ..5xS.97x1.37 5... x1... Weight(including cables) .... ... ... .. . ..... ............%60/1. .... ... . ... .. . .. .... 830/1.8,. ..... 1064/2.3,....... gr.�.l.f?.... „Input Connector _MC4 Compatible Output Wire Type/Connector Double Insulated;MC4 Compatible OutputWireLength..................... ............ ........ 0.95.�,�.0....... ...............�..,,...,.. .... .,,,,.,1.2/3:`x...... ,. !!?�.�..., .O,p!ra09gTemperature Range......... .......................... ................-40-+85/-40-+185........... .. ,....,.......,.....,.,..,.... ...gC.�. .... Protection Rafing .. .. ......... IP68/NEMA6P .. .... ...... Relative Humidity... .......... .... ... . ....... ...... .. .... ............,, .,. 0-100 %.. ... Irl Rated STC power of the module.Module of up to+5%power tolerance allowed. PV SYSTEM DESIGN USING A SOLAREDGE INVERTER(2) SINGLE PHASE THREE PHASE 24$V THR11 EE PHASE 480V Minimum String Length 8 10 18 PowerO timizers ' ...... .... ..................... .............. Maximum String Length 25 25 50 MawmumPowerperStrin8.. ... 5250 ....,.. ,. . 6000.. 12750........ ..... .�...,.. 0 Parallel Strings of Different Lengths Yes or Orientations lzr It is not allowed to mix P405 with P300/P400/PG00/P700 in one string. I ew (8 LG Life's Good i Ne "' n LG's new module,NeONT"°2,adapts Cello technology.Cello technology replaces 3 busbars with 12 thin wires to enhance ArPROV170 PRODUCT 60 cellpower output and reliability.NeCINTm 2 demonstrates LG's CgVEC us efforts to increase customer's values beyond efficiency.It: nn Intertele features enhanced warranty,durability;performance Linder IN 564573 lys CAV elz is real environment,and aesthetic design suitable for roofs. Enhanced Performance Warranty 0 High lower Output LG Ne0N`2 has an enhanced performance warranty. Compared with previous models,the LG NeONTr"2 The annual degradation has fallen from-0.7%/yr to has been designed to significantly enhance its output -0.6%/yr.Even after 25 years,the Cell guarantees 2.4%p efficiency,thereby making it efficient even in limited space. more output than the previous NeONT""modules. �w Aesthetic Roof Outstanding Durability .� LG NeONT11 2 has been designed with aesthetics in mind; With its newly reinforced frame design,LG has extended thinner wires that appear all black at a distance.The the warranty of the NEON T11 2 for an additional 2 years, product may increase the value of a property with its Additionally,LG NeONTr"2 can endure a front load up to modern design. 6000 Pa,and a rear load up to 5400 Pa, Better Performance on a Sunny lay Double-Sided tell Structure LG NeONTed 2 now performs better,oil sunny days thanks The rear of the Celt used in LG NeONT12 will contribute to to its improved temperature c:oeffic:iency. generation,just like the front;the light beam reflected from the rear of the module is reabsorbed to generate a great amount of additional power. About LG Electronics LG Electronics is a global player who has been committed to expanding its capacity,based on molar energy business as its future growth engine.We embarked rna a solar energy source research progrsun in 1985,supported by LG Groups rich expel fence In semi conductor,LCD,chemistry,and materials industry.We successfully released the.hra Mono X set fes to the market in 2016,which were exported to 32 countries in the following 2 years,thereafter In 20'13,NeON1`1(previously known as Morro ser IVeON)won"Intersolar Award which proved LG is the leakier of innovation in the Industry. LG I,..2 EMEM, Mechanicat Properties Etectrical Properties(STC Celts 6X 10320 W —---—----- ...... . .........---—---___.............. Celt Vendor LG MPP Voltage(Vmpp) 316 Tot T—ypeMonocrystiAine/N-type MPP Current(Impp) 9,53 ............ Celt Dimensions 156.75 x 156,75 min/6 x 6 inth Open Circuit Voltage(Vac) 40.9- a of Busbar 12(Multi Wire Busbar) Short Circuit Current(Isc) 10.05 .......... Dimensions(L x W x H) 1640 x 1000 x 40 mm Module Efficiency 14 5 64, 5 7-x 3-—9.3 7 x 1-5 7 inch. ........... .-Operating_Tcmpe_r_aturei('_C`) -40-+90 ------------ Front Load 6000 Pa 125 pot Maximum System Voltage(V) 1000---.—. - _--...... Rear Load 5400 Pa 113 psl Maximum Series Fuse Rating(A) 20 ..................... Weight 17.0*0.5 kg/37.48±11 lbs Power Tolerance 0 0 Connector Type MC4,MC4 CornpaUble,IP67 SW Cm,,nda,d test C.nd�otp,)Wa,Wloc.1000 W/ml,Modal,Trrnp,ator.25T,AM 1 5 T��.,plate povr aLnput il,rneasured aid detern,.-d by LG Llearow,at As sol—rd.1I d,,-o Junction Box IP6 7 with 3 Bypass Diodes Length qlfC�Wes 2 x 1000 mrn/2 x 39.37 inch ............ Glass High Class ---------- Etectrical Properties(N CT*) Frame Anodized Aluminum 320 W Certifications and Warranty Maximum Power(P`1nPP_) 234 MPP Voltage(Vl-npp) 303 .......... Certifications(In Progress) IEC 61215,IEC 61-730-1/-2,UL 1703, MPP Current(Impp) 7.60 ISO 9001,IEC 62716(Aminonia-rest), Open Circuit Voltage(Vac) 37.9 IEC 61701(S alt Mist Corrosion Test) Short Circuit Current(Isc) B.10 Module Fire Performance type 2(UL 1703) 'NOCI(No, lC)p,nn9C0 leolpefatLne)Irradraoce 800 Wfin2,ambient teariperature 20'C,rvind speed i rn/s Product Warranty '12 .......... ............_Y111111 Output warranty of Prdax Linear warranty* Dimensions(mmlin) (measurement olarince±3Y.) Dist ye.,9B%,2)After 2nd year 3)93 6�fcr,25y�ya,., Temperature Coefficients NOCT 46±3'C -0.38"N/T Pmpp Vac 0.28%/'C Isc 0,03%/1C Characteristic Curves 10(row 80ow 600W 600 n\x" �00 200W r Wwg�(vr OOD 500 low, r 5 00 2Doo 2500 3000 3S0O now 45QQ coma (a 20 ................ ------ ----- 14 -25 0 25 So 75 W 'The.distzn m b,rv,,,en thet�, f th.o,nu.,q/gnnd,og II North America War Business Ticarn F'j o(loCt SPPCr9Catr0o%are SUbject to change WthOUt FlOtker W`4111. LG LG Electronics USA.Inc. DS-1\12-60-C-G-F-EW50427 R-AM Life's Good 1000 Sylvan Ave,Englewood Cliffs,NJ 0763) Copyright(D 2015 US Electronics.All rights reserved micivation for a Better IAL Contact Ig.,oIarCq)[qe.(ori 01/04/2015 P jr 10.04 r"T �.Iqsolart.JSa C0111 jr Snap rack- Series 100 Residential Roof Mount System "I he SnapNrack Series '100 l�. 00f MOUnt Systern is engineered 'to optimize ri"iaterial t,.Ise, labor resources arid aesthetic appeal. This innovative systern simplifies the process of installing solar rnodUles, shortens installatioi i tivnes, and lowers installation costs; rnaxirnizing prodUCtiVitY aInd profits. ["he Series 100 Roof Mount Systerri boasts tviiqUO, r,)re-aassernbled, stainless steel "Snap Ira" hardware arid watertight flash attachments. 1"his system is irrstalled with as single tool. No Cutting or drilling means less rail waste. It is fiilly integrated with built-in wire management, solutions for all roof types, on(,-,-size-fitsaI1 'fei1tUres, and can withstand extreme environmental conditions. Series 10() is listed to UL Standard 2703 for Grolim-ling/Bonding, Fire Classification arid Mechanical Loadinf). Ul..... 2703 Certification and ("onipliam:e that SnaiMrack Installers carr continue ,to provide tf-iaa best in (Aass installatioris in quality, safety and efficiency. 0 Appealing design with built-in aesthetics 0 No grounding lugs required for modules 0 All bonding hardware is fully integrated 0 Rail splices bond rails together, no rail jumpers required A 0 No drilling of rail or reaching for ofher tools required 0 Class A Fire Rating for Type 1 and 2 modules rj System Features Include Snap in Single Tool Easy No Cutting Hardware Installation Leveling or Drilling rJ Integrated Wire Preassembled Integrated bonding UL 2703 Certified Management hardware Resources snalonrack.corn/resources Design snapnrack.com/configurator Where to Buy snalonrack.com/where-to-buy Snap rack- 5ktrinless Bolt with -Stainless Steel —Bonding Splice ------- Standard Rail Split-Lock Washer Bolf with Split- Insert b15_09816 Lock Washer Bonding Adjustable End Clanip fop -.Bonding Splice Mid Clamp Bas© Starnlass Hardware Bonding — Bonding Adjustable —BondingChannel Nut End Clamp Bottom Stainless-���- C9rannel Nut rdware with Balt with Split-Lock Washers Spilt Lock Bonding Adjustable Bonding Mid Clamp Bonding Standard Washer End Clamp 242- Rail Splice Ground I ug zaar)2nr,7 242-04015 242-02101 12-6 AWG--- -----.._.-. .............. .. ............ Copper Wire Ground Lug Assembly (ONE REQUIRED PER ROW OF MODULES) —Universal Fn d -arnp(UEC) Wave UEC Pull Strap —/UEC Wedge Stainless Steel Bolt with Flat Washer Universal End Clamp IF IF zn2 a22rs Standoff Clamp Assembly I/, Rubber Serrated Stainless.._,�'� .'..Chain el .Channel Nut Rain Collar Nu Steel Flange Nut t -�.• -Stainless Serreted Stainless— Flange Nut Mill Finish Steel Flange Bolt92Dec„lree --Stainless t.Foot Flange Standoff Bolt All Purpose L Foot Mill Finish Standoff ---Metal Roof Base(1-Hole ,�' ,� . L Foot Base Assembly Base Shown) v' Mill Finish'"' w L Foot Base .....Flashing Metal Roof Base Standoff J L Foot Base with Flashing with L Foot 242-92057 242 920S 242-02037 ♦ • tY " • 6000 Series aluminurn Materials • Stainless steel Galvanized steei and aluminum flashing Silver and black anodized aluminum • Mill finish on select products Material Finish Silver or Mack coated hardware Note:Appearance of mill finish products may vary and Chance over time. Wind Loads 110 -190 mph (ASCE 7-10) Snow Loads 0 - 120 psf Array Pitch 0 - SO degrees 877-732-2860 www.snapnrack.com contact@)snaptnrack.com (c)2016 by Srlal:)NCac[< Solar Mounting Solutions.All right.." reserved TYPICAL 1 THRU 12 PROPOSED EQUIPMENT SPECIFICATIONS (1) LG 315NIC-G4 (2) SOLAREDGE 315 WATT P320 MONO OPTOMIZER (1)SOLAR MODULES-LG 315NIC-G4 315 'U'v [max 15A WATT DC-STC IL OV (3)SOLAREDGE Imp:9.50A Vmp:33.2V Vmax 6 (A) SE760OA-US Iscl0.02A Voc:40,6V (2)SOLAREDGE POWER OPTIMIZER STRINGS OF 13.[max: 15A,Vmax:60V.UL/IEEE LISTED TYPICAL 1 THRU 12 B POWER EQUIPMENT DG AC (3)SOLAREDGE SE760OA-US INVERTER (1) LG 315N1C-G4 (2) SOLAREDGE Imax:32 @ 240V I PHASE 60HZ 315 WATT P320 INTEGRATED REVENUE GRADE METER MONOOPTOMIZER (4)60A 240V NEMA 3R OUTDOOR UNFUSED F�I max 15A UTILITY DISCONNECT Vmax 60V (A) (5)60A 240V NEMA 3 INDOOR FUSED DISCONNECT WITH 40A FUSES POINT OF INTERCONNECTION LINE-SIDE TAP INSIDE EXISTING 200A MAIN BREAKER B) SERVICE PANEL (7)EXISTING 200A MAIN ELECTRIC SERVICE PANEL WITH 200A MAIN BREAKER 240V UM 7) SINGLE PHASE (B) TO UTILITY GENERAL NOTES WIRE AND CONDUIT SIZING 1. BOND THE COMBINED INVERTER DC AC GROUND TERMINAL DIRECTLY TO THE MAIN SERVICE ALL WIRES EXPOSED TO AIR SHALL BE PV- GROUND. WIRE AWG #12/10,ALL OTHER 2, INVERTERS SHALL BE LISTED TO UL I IEEE STANDARDS CONDUCTORS SHALL BE COPPER THVVN-21 3. ALL WORK SHALL CONFORM TO NEC 690 LOCAL AUTHORITIES HAVING JURISDICTION AND CUSTOMER THHN. REQUIREMENTS 4. DISCONNECT SWITCHES SHALL HAVE NUMBER OF POLES REQUIRE TO DISCONNECT ALL CONDUCTORS (A)2 AWG#10 PV WIRES W/AWG#8 GEC PER NEC 690. EXPOSED 5. PV MODULES SHALL BE LISTED TO UL STANDARD 1703. (B)3 AWG#8 W/AWG#8 GEC IN 3/4"EMT 6. SECURE BUILDING PENETRATIONS WATERTIGHT ROOF AND WALLS 7. WIRING TO BE IN ACCORDANCE WITH MANUFACTURE RECOMMENDATIONS AND NEC 690 8. INTERIOR EQUIPMENT SHALL BE NEMA 1 (MIN)AND EXTERIOR EQUIPMENT SHALL BE NEMA 3R(MIN). 9. PROVIDE ALL GROUNDING AND BONDING AS REQUIRED PER NEC 690 AND 250, 10. INSULATION WILL MEET 2014 NEC MINIMUM REQUIREMENTS AND LOCAL CODE SPECIFICATIONS. lt DC GROUND ELECTRODE BONDED TO AC GROUNDED ELECTRODE AS PER NEC 690-47. Project N�; Daae:912 By'Torn Wu comments: logies co ti. prol NDTS T s:Electrical I-Line lnv�leon T"hno, rpo. ins Residence ption:Etactrical 1-Line 26 P-kridge Read.Suite IB Gong D—ving:I D.sfi Haverhill, invWeonsol 20 Full.,NI-d—Road Revision:0 invaleonSite Address: North Andover,VIA 01845 Sheet 2 of 2 78.849.8356 I inl. _ @in,., M_ _ h.. a,Ivaleon Each 5/16" diameter lag screw small have a minimum of 2.5" thread penetration into the existing rafter. It is also important that the L-bracket attachment locations be staggered between adjacent rails so that no single rafter supports more load than under existing conditions, Wind Loading: Provided that the L-bracket attachments to the roof are made in a typical staggered pattern, the overall wind loading imposed on the structure will not be impacted to any great extent. The net wind loads on the roof framing with attachment spacing as described above will be less than the current loading on the rafters, Conclusion; I Our evaluation of the proposed solar-electric installation has established that the roof framing IS adequate to support the addition of the solar panels to the existing roof as indicated on the Solar PV plans, We have only reviewed the adequacy of the connection to the existing rafters and the capacity of the existing rafters to support the vertical and lateral loads from the solar electric system. We do not take responsibility for any other portion of the solar panel array support system, the existing roof framing construction, or the integrity of the structure as a whole, The entire roof structure as --Istinq is capable of supportina the new loads imposed by the installed panels and snow. Do not hesitate to contact my office at 978-899-8316 should you have any questions or if you require any additional information. Respectfully, Invaleon Tech logics Corpor ";»r; l 1 ll �oTechnologiesicMCorporation 26 ' rkr� gr �d, ualc , Haverhill, MA 01835 978-794-1724 1 www,invsloonsolar.cotr, Oftiee of Consumer Affairs&Business4Re gulatio n License or registration valid for individual use only HOME IMPROVEMENT CONTRACTOR before the expiration date. if found return to: Registration: 182825 Typo. Office of Consumer Affairs and Business Regulation Expiration: 7/2912017 Corporation 10 Park Plaza-Suite 5170 Roston,MA 02116 INVALEON TECHNOLOGIES CORP. M KANGKUI WU 26 PARK RIDGE RD SUITE 1B w HAVERHILL,MA 01835 Undersecretary Not valid gout signature i Massachusetts Department u4 PublicSalatrl H Board of Building Regulations and Standards License: CS-104792 Construction Supervisor �j DAVID S PICAZIO / 9 GROVE ST PLACE %! ARLINGTON MA 024 EW r"J, 7 Expiration: Commissioner 09/10/2018 i