Loading...
HomeMy WebLinkAbout2016-10-18 Planning Board Minutes Town of North Andover PLANNING BOARD John Simons, Chairman "fy�li � '. David Kellogg Lynne Rtrdnicki Lara McSherry Peter Boynton Regina Kean (Associate) Tuesday October 18,2016 @,D 7 p.m. 566 Main Street--Sc/tool Adininistration Building,North Andover,MA 0.1845 1 Present: J. Simons, L. Rudnicki, L. McSherry, P. Boynton, R. Kean,D. Kellogg 2 Absent: 3 Staff Present: J. Enright,R. Oldham B. Wolstromer 4 5 J. Simons,Chairman: The Planning Board meeting for Tuesday, October 18,2016 was called to order at 7 p.m. 6 7 BOND RELEASE: 8 140 Academy Road: 9 R. Oldham: A Land Disturbance permit was issued for 140 Academy Road on August 2, 2011 to allow for the 10 construction of five single family residences. As part of the Decision, the Board conditioned a$1 OK Slope 11 Stabilization Bond. In order to release the bond,the Applicant was required to wait three years from the date of 12 completion of slope construction and the environmental monitor was to certify the slopes and retaining walls were 13 constructed in accordance with the approved plan.This has been satisfactorily completed. 14 MOTION: D. Kellogg made a motion to approve the bond release for 140 Academy Road. L. Rudnicki seconded 1.5 the motion. The vote was 5-0, unanimous in favor. 16 17 PUBLIC HEARINGS 18 CONTINUED PUBLIC HEARING: 1210 Osgood Street,Foraetta Development LLC,Robert Bohlen: The 19 Applicant seeks a Site Plan Review Special Permit, a Common Driveway Special Permit and Parking Reduction 20 Special Permit for the construction of approximately 40,000 square feet of commercial space contained within five t 21 (5) separate buildings,parking spaces, stormwater management facilities, landscaping, signage and other 22 improvements to be located on a 4.3-acre portion of currently vacant 13.8 acre parcel. This project is within the B- 23 2 Zoning District. 24 CONTINUED PUBLIC HEAI2ING: 1210 Osgood Street,Princeton Development LLC,Andrew Chaban: 25 The Applicant seeks a Site Plan Review Special Permit, a Multi-Family Use Special Permit, a Common Driveway 26 Special Permit, a Building Height Waiver Special Permit and a Parking Reduction Special Permit for the 27 construction of a market rate rental residential community to be known as Princeton at North Andover Apartment 28 Homes, consisting of a total of 192 one- and two-bedroom units to be contained within four(4)separate,four- 29 story garden-style buildings, each having a building footprint of 15,050 square feet, along with a clubhouse/leasing 30 management office,pool, parking spaces, stormwater management facilities, landscaping, signage and other 31 improvements to be located on approximately 9.5 acres of land on a currently vacant 13.8 acre parcel. This project 32 is located within the B-2 Zoning District. 33 R. Oldham: The stormwater review is pending soil testing results; civil review comments have been submitted and 34 we are waiting on the Applicant's response comments. A DPW escrow fund has been established for review of 35 the pump station. We received a neighborhood petition that was sent to MassDOT in regards to extending 36 sidewalks down Route 125, adding bicycle lanes, etc. The Applicant has submitted an updated landscaping plan 37 based on the discussion at the last meeting. Lastly, after an overview of the civil and stormwater review the 38 Applicant would like to discuss the height waiver memo that was submitted at the last meeting. 39 J Peznola Hancock Associates: We are in the process of a doing a comparative soils analysis on pre and post site 40 development for L. Eggleston and are waiting on those results. TEC and their civil review comments will be 41 responded to in one comprehensive letter once we receive the soil data testing. We"picked up" buildings B & C, l 42 and the parking lot behind them and relocated them five feet to the west and as a result have gained a five foot 1 Town of North Andover PLANNING BOARD John Simons, Chairman o�l �h, �r David Kellogg Lynne Rudnicki Lora McSherry Peter Boynton Regina.Kean (Associate) Tuesday October 18,2016(a) 7 p.mz. 566 Main Street-School Adntinistrtition Building,North Andover,MA 01845 J 1 43 landscaping strip between the parking lot,the residential building and retaining wall. We further developed the 44 main connecting spine with additional landscape features on a five foot lawn area. 45 DISCUSSION: Height waiver memo, connectivity between the residential and commercial site, ADA 46 requirements. 47 Jeff Brown,Princeton Properties: (Reviewed height waiver memo) We came before this Board in April saying we 48 would incorporate the topography which slopes 30 ft. froth. Osgood St. to the back of the site. We intended to 49 incorporate this entire slope however our due diligence resulted in challenges regarding soils and water tables. We 50 now need to bring the soil up to accommodate the stormwater system. We have created one unified development 51 and addressed the ADA issues related to retaining connectivity to "Main Street". (Building B is 14 ft. below grade, 52 Building C is 1 I ft, below grade,D is 23 ft. below the grade of Osgood St. and E is 17 ft. below grade; 65 % of the 53 elevation drop has been incorporated.)By raising the height of the commercial buildings we have masked the 54 height of the residential. 55 T. Dawley,Abutter 95 Hickory Hill Road: Cat)you reduce the amount of 190 units as presented at town meeting 56 and lower the front residential buildings to three floors v. four?The neighbors were here and realized this was 57 going to happen. 58 J. Brown: If you want us to step the buildings down to the original elevation we can; you sacrifice connectivity. 59 J. Simons: This is all in line with the zoning requirements. 60 J. Brown: Regarding the citizens petition, it is directed to MassDOT representing 220 households who are 61 requesting your Board impose mitigation to sidewalks and bike lanes from this site to Great Pond Road. 62 J. Simons: We cannot condition this; it is outside of our control. 63 J. Stnolak: We hope to wrap up the outstanding matters with L. Eggleston and the pump station by the next 64 meeting. We won't have the Conservation piece until thereafter,we may request to continue to the December Err` 65 meeting alter Conservation's November hearing. 66 J. Enright: We may need the November 15th meeting to discuss peer review comments that may be deferred to the 67 Board for input. 68 [Continued to Planning Board meeting November 1, 2016] 69 70 CONTINUED PUBLIC HEARING: Rear of 575 Osgood Street,Edgewood Retirement Community,Bob 71 Coppola and Ken Costello:The Applicant seeks a Modification to a Site Plan Review Special Permit, a 72 Modification to a Continuing Care Retirement Center(CCRC) Special Permit and a Watershed Protection District 73 Special Permit for the construction of a new 38, 760 SF CCRC with forty(40)units in the"Small Home" style. 74 There will be an access road and parking areas associated with the facility. The parcel is 20.29 acres in size, and 75 the development area is approximately 3.5 acres. This project is within the R-1 Zoning District. 76 R. Oldham: The Applicant is before the ZBA for a variance for a new structure in the Watershed. They continued 77 to November I st and will be placed first on the agenda. We received the draft casement and confirmation from the 78 Inspector of Buildings that the frontage is legal non-conforming therefore meeting the requirements, we also 79 received the drafted Conservation Restriction. Staff will forward both legal documents to Town Counsel for 80 review. We received civil review comments and the Applicant responded to stormwater comments; currently they 81 are looking into recent soil tests. Conservation met with the Applicant on site to review proposed parking changes 82 for Half Mile Hill-the prior access and parking was part of an approved Order of Conditions so the Applicant will 83 need Conservation approval prior to construction. We are still waiting on comments from DPW. We will have a 84 draft Decision for our next meeting. 2 Town of North Antlover PLANNING BOARD John Simons, Chairman ���f f�;i� r;�•, David Kellogg Lynne i!!>' Rudnicki Lora McSherr;y Peter Boynton Regina Ifean (Associate) Tuesday Octoher 18,2016 @ 7p.tit. 566 Main Street-School Administration.Building,North Andover;MA 01845 85 K. Costello SMR1'Architects: We made minor modifications to the plan. We have relocated the parking spaces 86 for Half Mile Hill and have dedicated three spots in the gravel lot and another two in the existing Edgewood 87 parking lot. 88 J. Enri ht: These have been reviewed with the Friends of NA Trails. 89 Melissa Flynn, SMR': We had two rounds of detailed responses and comments regarding stormwater. We are 90 waiting on additional testing at the infiltration structure. We are in the process of confirming the groundwater and 91 soil analysis for L. Eggleston. 92 DISCUSSION: The proposed easement location and the need for acceptance by the Board of Selectmen. 93 P. Hedstrom: We are abandoning the lower portion which the town would vacate. It is half on Edgewood and half 94 on the school property. We understand Conservation's question but this project is under your purview not 95 Conservation. This does not impinge on their jurisdiction. 96 [Continued to Planning Board meeting November 1, 20161 97 98 DISCUSSION: 99 Lake Clean Up: The Annual Lake Cochichewiek cleanup date is scheduled for Saturday November 5, 2016 from 8 1.00 a.m. to 1 p.m. 101 102 MINUTES APPROVAL 103 MOTION: L. Rudnicki made a motion to approve the October 4, 2016 minutes. D. Kellogg seconded the motion. 104 The vote was 5-0, unanimous in favor. 105 1.06 ADJOURNMENT 107 MOTION: P. Boynton made a motion to adjourn the rnecting. The motion was seconded by D. Kellogg. The vote 108 was 5-0, unanimous in favor. Meeting adjourned @ 8:30 p.m. 109 110 MEETING MATERIALS: Planning Board.Meeting Agenda October 18,2016;DRAFT Planning Board Minutes October 4, 111 2016; 140 Acaderny_Road:20110802 AS-BUILT PLAN-2013, Certified.Letter 160919,Recorded Decision and Insubstantial 112 Change 1.40 Academy; 1210 Osgood Street: (Commercial&Residential) 1210 Osgood Street Development Neighborhood. 113 Petition Binder, 160930 TEC Peer Review#2,HAI Forgetta L5c 101716,Height Waiver Letter 161004,Layout&Materials 114 Plan 160922;Edgewood: Conservation Comments 114 161018,Conservation Restriction Dratf_20161018,EASEMENT 115 TERMINATION AND RE LOCATION AGREEMENT#1 56022909,Fire Comment-16101 1, Response Cornments_Letter 116 #2 191018, SKC-03, SKC-04 3