As of: 11/30/16
This is to certify that the individual subsurface disposal system received a
SATISFACTORY INSPECTION of the:
Repair of outlet tee in tank, outlet pipe to D-box,
install new D-box, replace leach pipes next to D-box
By: Todd Bateson
At:
151 Carlton Lane
Ma p 106.0 Lot 0082
N rth Andover, MA 01845
Th I suance of this ce 'f a hall not be construed as a guarantee that the system will function satisfactorily.
chele Grant
Public Health Agent
120 Main St.,North Andover,Massachusetts 01845
Phone 978.688.9540 Fax 978.688.9542 Web www.northandoverma.gov
1
i
i
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM. CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 151 Carlton Lane MAP: 106.0 LOT: 0082
INSTALLER: Todd Bateson
DESIGNER:
PLAN DATE:
BOH APPROVAL DATE ON PLAN:
INSPECTIONS
Outlet tee in tank/outlet pipe to D-box/install new d-bo replace leach pipes next
to d-box: � `
DATE OF BED BOTTOM INSPECTION:
DATE OF FINAL CONSTRUCTION INSPECTION:
DATE OF FINAL GRADE INSPECTION:
SITE CONDITIONS
❑ Contractor reports any changes to design plan
❑ Existing septic tank properly abandoned
❑ Internal plumbing all to one building sewer
❑ Topography not appreciably altered
Comments:
SEPTIC TANK
i
❑ Building sewer in continuous grade, on
compacted firm base
❑ Cleanouts per plan
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
❑ 1500 gallon tank has been installed
H-10 loading
❑ Monolithic tank construction
❑ Water tightness of tank has been achieved by
visual testing
F-1 Inlet tee installed, centered under access port
F-1 Outlet tee installed, centered under access port
(gas baffle/effluent filter)
❑ inch cover to within 6" of finish grade
installed over one access port
F-1 Hydraulic cement around inlet & outlet
Comments:
PUMP CHAMBER
❑ Bottom of tank hole has 6" stone base
❑ Weep hole plugged
F-1 1500 gallon Pump Chamber installed
F-1 H-10 loading
F-1 Monolithic tank construction
❑ Inlet tee installed, centered under access port
❑ Pump(s) installed on stable base
❑ Alarm float working
❑ Pump On/Off floats working
❑ Separate on/off floats
❑ Drain hole in pressure line
❑ cover at final grade installed over pump
access port
❑ Water tightness of tank has been achieved by
,testing
F-1 Hydraulic cement around inlet & outlet
Comments:
CONTROL PANEL
F-1 Alarm & Pump are on separate circuits
❑ Alarm sounds when float is tripped
❑ Location of control panel: basement
F-1 Alarm signal located inside: basement
Comments:
DISTRIBUTION-BOX Installed on stable stone base
H-20 D-Box
E/ Inlet tee (if pumped or >0.08'/foot)
P, ( Hydraulic cement around inlet & outlets
Observed even distribution
Speed levelers provided (not required)
Schedule 40 PVC Pipe
Comments: