Loading...
HomeMy WebLinkAboutSINGLE FAMILY HOME (2) BUILDING PERMIT %AORT11, TOWN OF NORTH ANDOVER APPLICATION FOR PLAN EXAMINATION A Date Received Permit No#: P, Date Issued: L IMPORT 2 T1. Applicant must complete all items on this page LOCATION 3 Print PROPERTY OWNER &i( Print 100 Year Structure yes Irro— MAP PARCEL: ZONING DISTRICT: _Historic District yes Machine Shop Village yes TYPE OF IMPROVEMENT PROPOSED USE ResidentialNon- Residential New Building El One family Ll Addition Two or more family 0 Industrial El Alteration No, of units: H o Commercial D Repair, replacement - E Assessory Bldg El Others: El Demolition L Other E1 Wetlands -_ [7ESCRIPTION OF IIVORIC TO BE PERF©R.IVIECI: Identification,- Please Type or Print Clearly OWNER: Name: Phone: sci5(0 Address: M� 10Q TY Contractor Name: t Phone: '5C--G� _3DC� Ci2->3_1 Email: aLCo r, AL Address: P0 t i;"res'k-60 (Y)C,� Supervisor's Construction License: Exp. Date: Address: 6 iuer ak ro) M& Reg. No. FEE SCHEDULE. BULDING PERMIT. $12.00 PER$1000.00 OF THE TOTAL ESTIMATED COST BASED ON$125.00 PER S.F. �� �) �OF') "l, 'f - 1 d Total Project Cost: $ (11 FEE: $ C 1 Check No.:— —Receipt No.: NOTE:. Persons contracting with unregisterk contractors do not have access to the guaranty find u.ce.--of_contmatar_____ r Plans Submitted ❑ Plans Waived ❑ Certified Plot Plan ❑ Stamped Plans ❑ TYPE OF SEWERAGE DISPOSAL {. Public Sewer ❑ Tanning/MassagelBody Art ❑ Swimmivgi'aols ❑ Wei ❑ Tobacco Sakes ❑ Food.Packaging/Sales ❑ j Private(septic faniq etc. ❑ PermacentDuxnpster on.Site ❑ b V A THE FOLLOWING SEOTIONS FOR OFFICE USE ONLY INTERDEPARTMENTAL SIGN OFF - U FORM PLANNING DEVELOPMENT Reviewed On�l � � Signature", COMMENTS m • ` ��'�� CONSERVATION Reviewed on Si nature VW COMMENTS HEALTH Reviewed on Signature COMMENTS Zoning Board of Appeals: Variance, Petition No: Zoning Decision/receipt submitted yes Planning Board Decision: Comments Conservation Decision: Comments Iffater& Sewer Connectionlsi nature & Da - Driveway Permit DPW Town Engineer: Siguabuire: n 84 0s Losated 3 good Street FIRE.-;DEPARsTMENT _Teriip Q �J .ocatecJ at 124 Ma�nStree� , : � .. Orb::Department srgnatureldate Town of Andover 0 VO No. h ver, Mass, h? BOARD OF HEALTH PERMIT LD Food/Kitchen Septic System THIS CERTIFIES THAT ........ IIeBUILDING INSPECTOR .............. ...........� .... .. ..... .. .......... ...................I............ has permission to erect.......................... buildings on ... ..,...... ....... ...,......... ....+... ........................, Foundation if Rough SCO to be occupied as ............. ...... .....,........A.. ................... .......................6................... chimney Car provided that the person accepting this permit shall in every respect conform to the terms of the application Final on file in this office, and to the provisions of the Codes and By-Laws relating to the Inspection,Alteration and Construction of Buildings in the Town of North Andover. PLUMBING INSPECTOR VIOLATION of the Zoning or Building Regulations Voids this Permit. Rough Final PERMIT EXPIRES IN 6 MONTHS ELECTRICAL INSPECTOR UNLESS CONSTRUCTI TA Rough Service ......... .. ...... ... ...... .......... ............................... Final BUILDING INSPECTOR GAS INSPECTOR OccMancv Pennit Retly red to Occkuv Buildi Rough Display in a Conspicuous Place on the Premises — Do Not Remove Final No Lathing orDryall TO Be Done FIRE DEPARTMENT Until Inspected and Approved by the Building Inspector. Burner Street No. Smoke Det. LDL lzo t , EXISTING EXISTING FDN BLDG"Hu BLDG"Go ON ov o /,,/iF0UNDlAT$M'j f ` 34.1 c l rr F � BION � '`� 52 p, � ��. E T L N 0 b 047 48 1 R 1 CERTIFIED PLOT PLAN No OTHM use' EMO t ITMMAMYLWS ARt.Ef� l #dT:S SHTIWN ARE 13 $ED ON THF A?PRQVF_ € REC f IY PLANS FSR Tlfla. Pl CT. T F11tElAll kT AS WN DUES NOT VIOLATE ANY 3� REMIRCl T� s�E"�R351NCs sr�u�TURE TO PROPERTY LINE �tvJ t1GAPiTi E OFFSETS. j s THIS PLAN 15,NOT TO BE USSCD TO ERECT FENCES, OTREP ANCILLARY MST t STRUC1'WS, 139 POR 1-00SCAPING LIQ YS. S1 �T.A7`t RII E fcvkst31JRY, m ttlplis p �Nl15 CER7IFSCF4T 17Td YS Nam-TRANSF'ERRABLt, AND IS F€JP THER MAK WITH THE PlMVISION.THAT THE ItIFORMA?SCS! SHOWN 44AS lleEN ACCURATELY F'UMSHED BY ASMS..00 4 WT 01 TW.. Ulidtn. TO THIS FIM-4 low-63 f ROUTE 1K NORTH ANDOVER, MASS, P! t p�1 �pS .. p� 7ywp-1^L^ Vol ��fi` T�SW tri _-� DRAWN �DYs �"�', }JF'17�£,.1 CHECKED BY, SC REVISED, Mt {P E i. is r: 3 REScheck Software Version 4.6.2 Compliance Certificate Project 161018 Trust_MerrimackCondos_Unit-K_NorthAndover Energy Code: 2012 IECC Location: North Andover, Massachusetts Construction Type: Multi-family Project Type: New Construction Conditioned Floor Area: 2,300 ft2 Glazing Area 13% Climate Zone: 5 (6322 HDD) Permit Date: Permit Number: Construction Site: OwnerlAgent: DesignerlContractor: Unit K4 North Andover, MA Compliance: 0.6%Better Than Code Maximum JA: 352 Your UA: 350 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelo e Assemblies Gross Area Assembly or Cavity. Cont. 11.111-Factor UA Floor SLAB: Slab-On-Grade:Unheated 42 10.0 0,767 32 Insulation depth: 2.0' Wall IST FLOOR 2X6 EXT: Wood Frame, 16" o.c. 416 19.0 0.0 0.060 20 Window DH:Vinyl Frame:Double Pane with Low-E 30 0.280 8 Door SLIDER: Solid 40 0.290 12 Door 15 LITE BACK: Glass 20 0,300 6 Wall SEPARATION 2X6: Wood f=rame, 16" o.c. 132 19.0 0.0 0.060 8 Wall 2X4 GARAGE: Wood Frame, 16" o.c. 275 15.0 0,0 0.077 15 Door METAL FIRE: Solid 20 0,150 3 Floor ABOVE GARAGE:All-Wood joist/Truss:Over Unconditioned Space 520 30.0 0.0 0.033 17 Wall 2Nd FLOOR 2X6: Wood Frame, 16" o.c. 746 19.0 OA 0.060 34 Window DH:Vinyl Frame:Double Pane with tow-E 117 0.260 33 Window BAY: Vinyl Frame:Double Pane with Low-E 21 0'270 6 Door SLIDER: Glass 40 0.290 12 Wall 2ND FLOOR SEPARATION: Wood Frame, 16" o.c. 306 19,0 0.0 0,060 18 Floor 3RD Fir Cantilever: All-Wood Joist/Truss:Over Outside Air 60 30.0 010 0,033 2 Wall 3RD FLOOR 2X6: Wood Frame, 16"ox. 765 19.0 010 0,060 38 Window DH:Vinyl Frame:Double Pane with Low-E 64 0.280 18 Project Title: 161018 Trust�MerrimackCondos_Unit-K NorthAndover Report date: 10/20/16 Data filename: SAEbbeling_Ed1161018_Trust MerrimackCondos Unit- Page 1 of 9 is K_NorthAndover\REScheck1161018 Trust_MerrimackCondos_Unit-K_NorthAndover_K4.rck 3' ciross Area Cavity cont Door Slider: Glass 40 0.290 12 Door French: Glass 33 0.310 10 Wall 3RD FLOOR SEPARATION:Wood Frame, 16" o.c.. 306 19.0 0.0 0.060 18 Ceiling ABOVE 3RD FLOOR: Flat Ceiling or Scissor Truss 948 38.0 0.0 0.030 28 Compliance Statement; The proposed building design described here is consistent with the building plans, specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2012 IECC requirements in REScheck Version 4.6,2 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Name-Title Signature Date Project Notes: Unit K4 Project Title: 161018 Trust_MerrimackCondos_Unit-K NorthAndover Report date: 10/20/16 Data filename; S:1E=bbeling_Ed1161018_Trust MerrimackCondos Unit- Page 2 of 9 K NorthAndover\REScheck1161018 Trust_MerrimackCondos_Unit-K NorthAndover_K4.rck REScheck Software Version 4.6.2 Inspection Checklist Energy Code: 2012 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each L41i requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Sutton Plans Ver le F�oltl 1/erifred Pre Inspectanlplan.:R$v{eur Catnpl�es' CornmentslAssutpfitor}s Vaiue: Value 103.1, 'Construction drawings and '❑Complies 103.2 idocumentation demonstrate Does Not [PR ;energy code compliance for the M si]Not Observable building envelope. ❑Not Applicable 103.1, ',Construction drawings and ❑Complies — 103.2, 'documentation demonstrate =❑Does Not 403.7 energy code compliance for QNot Observable [PR311 ;lighting and mechanics!systems. 'El Not Applicable Systems serving multiple dwelling units must demonstrate :compliance with the IECC ;Commercial Provisions. Heating and cooling equipment is; Heating: ;Heating: ,❑Complies A03'6 ;sized per ACOA Manua! 5 based ' Stulhr Btulhr ;❑Does Not IPR2jz on loads calculated per ACOA Coaling: Cooling, ❑Not Observable Manual J or other methods Btu/hr Btu/hr 1❑Not Applicable l i approved by the code official. Additional Comments/Assumptions, B u 1 High Impact (Tier 1) 2'Medium Impact(Tier 21 3';, Law Impact(Tier 3) Project Title: 161018_Trust_MerrimackCondos_Unit-K_NorthAndover Report date: 10/20/16 Data filename: S:1Ebbeling_Ed1161o18 Trust MerrimackCondos Unit- Page 3 of 9 KJ NorthAndover\REScheck1161018 Trust_MerrimackCondos_Unit-K NorthAndover K4.rck I I I Section Plans VerifiedMeld Verified �oundatron Inspe tion Complies? CutrrmcnWAssumptions & Req.lb Value 402,1.1 Slab edge insulation R-value. R- I R- ❑Complies ;See the Envelope Assemblies [F01]i El Unheated ❑ Unheated =❑Does Not ;tableforvalues. i❑ Heated ❑ Heated ❑Not Observable ❑Not Applicable 303,2, ;Slab edge Insulation installed per ❑Complies '- 402,2.9 manufacturer's Instructions, MODoes Not [F02]' ble le 402.1.1 Slab edge insulation ft 4424EF !See the Envelope Assemblies [FO311 idepth/length, ❑Does Not table for values. ❑Not Observable ❑Not Applicable 30M 1 A protective covering is Installed ;❑Complies [FQ11]� to protect exposed exterior ❑Does Not insulation and extends a ❑Not Observable minimum of 6 in. below grade, ❑Not Applicable 403:8 Snow-and ice-melting system #❑Complies r - [FO12�� 'controls installed, 3❑Does Not =i❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact{Tier 1) 2 Medium Impact{Tier 2) 3 Low Impact frier 31 VProject Title: 161018_Trust�MerrimackCondos_Unit-K_NorthAndover Report date: 10/20/16 Data filename: S:1Ebbeling_Ed1161018_Trust MerrimackCondos Unit- Page 4 of 9 K NorthAndover\RE=Scheck1161018_Trust MerrimackCondes Unit-K NorthAndover K4.rck I SectionPlain peri#ped Field..1lerified Eraminq/Rough in lnspectlonCo,"mpiies,? CommentslAss rr�pt�ans Value 1f. &Req.l — 402.1.1, ;boor U factor. U- U- ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values, (FRl]1 ❑Not Observable ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U- U- E❑Complies see the Envelope Assemblies 402.3.1, average). ❑Does Not ;table for values. 402.3.3, ❑ 402.3.6, Not Observable 402.5 ❑Not Applicable [FR211 303.].3 U-factors of fenestration products ;❑Compiles [FR4]1 are determined in accordance ❑Does Not with the NERC test procedure ar El Observable taken from the default table. '❑Not Applicable 402.4.1.1 ;Air barrier and thermal barrier ❑Complies [FR23]1 !installed per manufacturer's ❑Does Not instructions. : Observable , C Not Applicable 402.4.3 Fenestration that is not site built , _ ❑complies [FR20]1 is listed and labeled as meeting ❑Does Not AAMA IWDMA/CSA 101/1.S.2/A440 ❑Not Observable For has infiltration rates per NFRC 1400 that do not exceed code ©Not Applicable E limits. a.,4.4 ;IC-rated recessed lighting fixtures ❑Complies '. [Fit1G]2 :sealed at housing/interior finish ©Does Not and labeled to indicate s2.0 cfm Not Observable ' �ieakage at 75 Pa. ❑Not Applicable 403.2.1 Supply ducts in attics are R- R- ❑Complies [FR12]1 insulated to aR-8.All other ducts ' R- R- ❑Does Not i3 in unconditioned spaces or ❑Not Observable outside the building envelope are insulated to }R-6. ❑Not Applicable 403.2.2 ;All joints and seams of air ducts, r .I❑Complies [FR13]1 I air handlers, and filter boxes are ❑Does Not sealed, ❑Not Observable NotApplicable 403;2 3 ,Building cavities are not used as , ❑Complies 01513 ducts or plenums, ElDoes Not �., I ❑Not Observable -]❑Not Applicable 403 3 ;HVAC piping conveying fluids R R - ❑Complies .. _ [FRS7j2 �above 105 QF or chilled fluids ❑Does Not below 55 QF are insulated to >_R- ❑Not Observable 3' �❑Not Applicable 403.3.1 Protection of insulation on HVAC ❑Complies [i R24]1 piping, Does Not []Not Observable :` ❑Not Applicable 403 4 2 t Hot water pipes are insulated to� R R- ❑Complies '❑Does Not ; ❑Not Observable j❑Not Applicable 1 High Impact(Tier 1) 2,' Medium Impact(Tier 2) 3;': Low Impact(Tier 3) 6 Project Title: 161018 Trust_MerrimackCondos_Unit-K_NorthAndover Report date: 10/20/16 Data filename: S:IEbbeling_Ed1161018_TrUst MerrlmackCondos Unit- Page 5 of 9 K NorthAndove r\REWScheck1161018 Trust_MerrimackCondos_Unit-K NorthAndover K4.rck V section �Iwts Verified Fieldl Yer�f�ed :. # Tamng/Rough In Inspectiiin a:mplres? Camrtrents. _"urriptipns 6r Req.ID Value Uai.ue 403:5 ;Automatic or gravity dampers are I�Complies [FR1912 installed on all outdoor air ;Does Not intakes and exhausts. 'pNot observable ONot Applicable I Additional Comments/Assumptions: 1 High Impact (Tier 1} 2`. Medium Impact(Tier 2} � ; Law Impact(Tier 31 I Project Title: 161018 Trust MerrlmackCondos_Unit-K NorthAndover Report date: 10/20/16 B Data filename; S:\Ebbeling_Ed\161018—Trust—MerrimackCondos—Unit- Page 6 of 9 i K NorthAndover\REScheck\161018 Trust_MerrimackCondos_Unit-K_NorthAndover_K4.rck 5ectian Plans Verlfted Meld Vertfoed -: insulatfort'lnspac#ion C+�mpliesry Ccsmrtaeh#slAssunAptians & iteq l>n 1/a1ue. Valua 3037 ''All installed insulation is labeled '❑Complies [lN13Y or the installed R-values ❑Does Not ;provided. ❑Not Observable EJ Not Applicable 402.1.1, ~!Floor insulation R-value. RR- ;❑Complies ;See the Envelope Assemblles 402.2.6 E] Wood j❑ Wood ❑Does Not ;table for values. [IN1]1 ❑ Steel ❑ Steel ^❑Not Observable !❑Not Applicable 303.2, ;Floor Insulation installed per ❑Comp)€es TI 402.2.7 imanufacturer's Instructions, and i❑Does Not [IN2]1 In substantial contact with the '❑Not Observable underside of the subfloor. ❑Nat Applicable _ 402.1.1,Wall insulation R-value. If this is a R R- ❑Complies ;See the Envelope Assemblies 402.2.5, mass wall with at least of the ❑ Wood ❑ Wood 1❑Does Not ;table for values. 402.2.6 -wall insulation on the wall ❑ Mass ❑ Mass �❑Not Observable [IN3]1 ;exterior,the exterior insulation ;requirement applies (FR10}, F1 Steel ❑ Steel ;❑Not Applicable Coll303.2 Wall insulation is installed per ❑complies [IN4]1 =manufacturer's instructions. - ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3'' Low Impact(Tier 3) Project Title: 161018 Trust MerrimackCondos Unit-K NorthAndover Report date: 10/20/16 Data filename; S:\Ebbeling_Ed1161018 Trust MerrimackCondos Unit- Page 7 of 9 K NorthAndoverlREScheckN161018_Trust_MerrimackCondos Unit-K_NorthAndover K4.rck 9 Section Plans l/erifed Fier VeYified # Flnai 1n5peCtiott Provisions; Ca.mpifesry Comments/Asuptians &:Req,lil Vaiue Value 402,1,1, ;Ceiling Insulation R value. R- R- 113Complies ;See the Envelope Assemblies 402.2.1, E] Wood j❑ Wood ,❑Does Not table for values, 402.2.2, '❑ Steel ❑ Steel ❑Not Observable €02.2.6 ❑Not Applicable 303.1.1.1, ;Ceiling insulation installed per -s❑complies 303.2 i manufacturer's instructions, ]Does Not [F1211 Blown insulation marked every "ONot Observable ( j 300 ft2. .❑Not Applicable 402'2 3 Vented attics with air permeable ;©Complies JE 122ja insulation include baffle adjacent ❑Does Not to soffit and eave vents that ;extends over insulation. ?❑Nat Observable ❑Not Applicable t 402. 2.4 4 ;Attic access hatch and door R- R- ;❑Complies [FI311 insulation ?R-value of the 10Does Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1,2 !Blower door test @ 50 Pa. ¢=5 ACH 50 = ACH 50 = ;❑Complies [F]171' =ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 403.2.2 Duct tightness test result of<=4 cfm/100 cfm/100 W;❑Complies [F1411 cfm/100 ft2 across the system or I ft2 I ft2 ❑Does Not 4 ; =3 cfm1100 ft2 without air ❑Not Observable handier @ 25 Pa. For rough-in 'tests,verification may need to T❑Not Applicable f occur during Framing Inspection. _ 403.2.2.1 'Air handler leakage designated ❑Complies [F12411 try manufacturer at of '❑Does Not design air flaw, ❑Not Observable ;❑Not Applicable 403:1Programmable thermostats ❑Complies IF1912 'installed on Forced air furnaces. Does Not ' '� ;❑Nat Observable , 3 - ❑Not Applicable 4p3 2 Heat pump thermostat installed {❑Complies (1 11;012 on heat pumps. s❑Does Not „_ � s❑Not Observable ' CINat Applicable 403x'4 1 Circulating service hot water z0Compi1es [FII 1� systems have automatic or ❑Does Not accessible manual controls. ❑Not Observable ❑Nok Applicable ` 4Q3'51 , All mechanical ventilation system ❑Complies [F12,S12' ;fans not part of tested and listed []Does Not HVAC equipment meet efficacy ❑Not Observable and air flow limits, mm ❑Not Applicable 404.1 75%of lamps in permanent ❑Complies (F1611 {fixtures or 75%of permanent ❑Does Not ;fixtures have high efficacy lamps e ;Does not apply to low-voltage :❑Not Observabl ;fighting. - Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3': tow Impact(Tier 3) Project Title: 161018 Trust TMerrimackCondos_Unit-K NorthAndover Report date: 10/20/16 Data filename; 5:\Ebbeling�Ed1161018 Trust MerrimackCondos_Unit- Page 8 of 9 K North And overlREScheck1161018_Trust_Merr!mackCondos_Unit-K_NorthAndover_K4.rck Section Plans Verlfeed Field Varmed l~Enai lnspe�tiorl Pravfsipns` Cpmplies:� Cnmmen#slAssumptions &Req IA Value Value 4.04,1,1--,, Fuel gas lighting systems have ❑Complies [ri23]3 � no continuous pilot light, ❑Does Not a ❑Nat Observable `s❑Not Applicable 401:3 Compliance certificate posted - - r ❑Complies r [F171? F ❑Does Not ❑Not Observable - "'❑NnY Applicable - - �03,3 Manufacturer manuals for °C7Complies [Fi18]3 "i mechanlcaE and wafer heating ;❑Does Not ;systems have been provided. ;❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1High Impact(Tier 1) 2;Medium Impact(Tier 2) _ 3` t ow Impact(Tier 3} Project Title: 161018 Trust_MerrimackCondos_Unit-K NorthAndover Report date: 10/20/16 Data filename: 5:lEbbeling_Ed1161018 Trust MerrimackCondos Unit- Page 9 of 9 K NorthAndover\RE5check1161018_Trust_MerrimackCondos_Unit-K_NorthAndover K4.rck F C2012 IECC Energy Effidency Certificate �J( 11] MIg Above-Grade Wall 19.00 Below-Grade Wall 0.00 Floor 30.00 Ceiling 1 Roof 38.00 Ductwork (unconditioned spaces): Window 0.28 Door 0.29 Pleating System• Cooling System: Water Heater• Name: Date• Comments Kanayo Lala, P.E. .............10117116 PROJECT: Merrimack Condominiums K-TYPE BB-Compass Point, N Andover,MA DESIGN FOR-GIRDERSIJOISTS/RAFTERS Third Floor Beam T1 Supporting Floor,Wall,Attic&Point Load From T5 LOADS: DEAD LOAD 22.54 PSF 323.00 PLF Ce= 1 CF= 1.00 SNOW LOAD PSF 0.00 PLF Cq= 1 Cs= LIVE LOAD 30.00 PSF 429.90 PLF qs= 29.10 Cd= 1 TOTAL LOAD 753 PLF 1= 1 Cm= 1 WIND SPEED 100 MPH 29.10 PSF POINT LOAD 3510 LBS 3.25 FT Ra= 2925 LBS 7341 LB=TOTAL REACTION TRIBUTARY WIDTH 14.33 LF E= 2000000 PSI JOIST/GIRDER SPAN 19.5 LF Fb= 2900 PSI WIDTH- IN 10.50 PSLILVL 11.875 IN = d Fv= 285 PSI ROOF PITCH- N :12= Fc= 2700 PSI Fcp= 750 PSI MOMENT= 35786 LB-FT MOMENT2= 9506 LB-FT 246.78 =S provided OK S= 187.42 IN"3 1465.24 = I Deflection= 0.836 IN =LI 240 For Total Load Required U240 Deflection2= 0.139 IN =LI 421 For Live Load Required U360 Fcp'= 652 PSI OK 1.50 In Bearing Length Fv'= 123 PSI OK USE BETTER HEADER##65 (FLITCH BEAM) 2-LVLs 117/8"WITH 112"STEEL PLATE .%0 Of BOLTED WITH 518"DIA012"O.C. IN TWO ROWS. �KOkNAYO H I.1ltA No.3371" �� fr ISTE&�q �F40 AL ��'\ Kanayo Lala, P.E. .............10117116 PROJECT: Merrimack Condominiums JKTYPE BB-Compass Point, N Andover,MA DESIGN FOR-GIRDERS/JOISTS/RAFTERS Third Floor Beam T3 Supporting Floor &Point Load From T1&T2 LOADS: DEAD LOAD 20.00 PSF 360.00 PLF Ce= 1 CF= 1.00 SNOW LOAD PSF 0.00 PLF Cq= 1 Cs= LIVE LOAD 30.00 PSF 540.00 PLF qs= 29.10 Cd=1 TOTAL LOAD 900 PLF 1= 1 Crn= 1 WIND SPEED 100 MPH 29.10 PSF POINT LOAD 16477 LBS 3.25 FT Ra= 13327 LBS 7650 LB=TOTAL REACTION TRIBUTARY WIDTH 18.00 LF E= 2000000 PSI JOIST/GIRDER SPAN 17 LF Fb= 2900 PSI WIDTH- IN 14,00 PSLILVL 11.875 IN = d Fv= 285 PSI ROOF PITCH- N :12= Fc= 2700 PSI Fcp= 750 PSI MOMENT= 32513 LB-FT MOMENT2= 43313 LB-FT 329.04 =S provided OK S= 313.76 IN"3 1953.65 =I Deflection= 0.433 IN = U 252 For Total Load Required 1-/240 Deflection2= 0.378 IN = U 419 For Live Load Required 1-/360 Fcp'= 499 PSI OK 3.00 In Bearing Length Fv'= 189 PSI OK USE BETTER HEADER#f84 (FLITCH BEAM) 3-LVLS 117/8"WITH 2-3/8"STEEL PLATE pf BOLTED WITH 5/8"DIA @ 12"0.C. IN TWO ROWS. liAlYi4Y0 USE 2-LVLS 11 7/8"FOR BEAM T4. LA1� No 33710-C �S70 0.L '/ 6 Kanayo Lala, P.E. .............10117116 PROJECT: Merrimack Condominiums K-TYPE BB-Compass Point,N Andover,MA DESIGN FOR-GIRDERS/JOISTS/RAFTERS Third Floor Beam T5 Supporting Floor&Wall LOADS: DEAD LOAD 24.00 PSF 240.00 PLF Ce= 1 CF= 1.00 SNOW LOAD PSF 0.00 PLF Cq= 1 Cs= LIVE LOAD 30.00 PSF 300.00 PLF qs= 29.10 Cd= 1 TOTAL LOAD 540 PLF I= 1 Cm= 1 WIND SPEED 100 MPH 29.10 PSF POINT LOAD LBS FT Ra= 0 LBS 3510 LB=TOTAL REACTION TRIBUTARY WIDTH 10.00 LF E= 2000000 PSI JOIST/GIRDER SPAN 13 LF Fb= 2900 PSI WIDTH- IN 3.50 PSL/LVL 11.875 IN = d Fv= 285 PSI ROOF PITCH- N :12= Fc= 2700 PSI Fcp= 750 PSI MOMENT= 11408 LB-FT MOMENT2= 0 LB-FT 82.26 =S provided OK S= 47.20 IN^3 488.41 = Deflection= 0.355 IN =Ll 439 For Total Load Required U240 Deflection2= 0.000 IN =U 790 For Live Load Required L/360 Fcp'= 669 PSI OK 1.50 In Bearing Length Fv'= 127 PSI OK ALSO USE 3-LVLs 11 718"FOR BEAM T6. Df K-kNAYO H. LALA No.3371UC � cra AL u 1 8 0 1 Kanayo Lala, P.E.. .............10117116 PROJECT: Merrimack Condominiums K-TYPE BB-Compass Point,N Andover,MA DESIGN FOR-GIRDERSMOISTS/RAFTERS 2nd Floor Beam S2 Supporting Floor&Point Load From S1 LOADS: DEAD LOAD 15.00 PSF 19.95 PLF Ce= 1 CF= 1.00 SNOW LOAD PSF 0.00 PLF Cq= 1 Cs= LIVE LOAD 40.00 PSF 53.20 PLF qs= 29.10 Cd= 1 TOTAL LOAD 73 PLF 1= 1 Cm= 1 WIND SPEED 100 MPH 29.10 PSF POINT LOAD 4160 LBS 3.25 FT Ra= 3467 LBS 713 LB=TOTAL REACTION TRIBUTARY WIDTH 1.33 LF E= 2000000 PSI JOISTIGIRDER SPAN 19.5 LF Fb= 2900 PSI WIDTH- IN 3.50 PSL/LVL 11.875 IN = d Fv= 285 PSI ROOF PITCH- N:12= Fc= 2700 PSI Fcp= 750 PSI MOMENT= 3477 LB-FT MOMENT2= 11267 LB-FT 82.26 =S provided OK S= 61.01 IN"3 488.41 =I Deflection= 0.244 IN =L/ 318 For Total Load Required L/240 Deflection2= 0.493 IN =L/ 437 For Live Load Required L/360 Fcp'= 398 PSI OK 3.00 In Bearing Length Fv'= 151 PSI OK Of KANAYO H. LALA No.33710-C ° ]t ��5Sff1 kL I KANAYO LALA, P.E........-10117/2016 SPECIFIC CALCULATIONS FOR THE WOOD CONSTRUCTION IN 100MPH WIND ZONE 34&36 COMPASS POINT, NORTH ANDOVER,MA BUILDING"K"UNIT K3, & K4- 26'X 36' BASIC LOADS: GROUND SNOW LOAD 50 PSF LIVE LOAD 40 PSF WIND LOAD 18 PSF Building Length 36 ft Building Width 26 ft Building Aspect Ratio= 1.38 Building Area 936 sf Shear End Wall= 11,664 224 PLF Building Mean Height 36 ft Shear Long Wall= 8,424 117 PLF Total Height 45 ft Dead Load of Building 65,520 lbs 112"A.BOLT SHEAR 801 LB DL Moment End Wall 1,179,360 LB-FT 4 FT SPACING FOR 112"A.BOLTS DL Moment Long Wall 851,760 LB-FT WITH TWO 2X SYP PLATES NET Wind Moment End Wall 209,952 End Wall M -969408 NO UPLIFT Wind Moment Long Wall 151,632 Long W M -700128 NO UPLIFT I.E. NO UPLIFT EXISTS AT THE BASE OF THE BUILDING, SHEAR ANCHORS ARE ADEQUTE. SHEAR WALL_CAPACITY BY TABLE 2306.2.1(1) '/2"OSB 1 CDX PLY WITH 8D NAILS AT 6"ON EDGES AND 6"ON FIELD-270PLF< 224 PLF REQUIRED FOR THREE STORY HEIGHT-OK SHEAR WALL REQUIREMENT BY TABLE R602.10.1.2111 %"OSB WITH 60 NAILS AT 6"ON EDGES AND 12"ON FIELD PER TABLE R602,3(3) 13 FT CONTINUOUS SHEATHING AVAILABLE ALONG LONG WALL= 19 FT THE MOMENT SHEAR AT THE OPENINGS IS RESISTED BY THE METAL CONNECTION PLATES AS DETAILED ON THE PLANS, FOR A TYPICAL 6'WIDE OPENING IN END WALL AT 224 PLF SHEAR:AT THE OPENING CORNER 673 LBS. A SIMPSON PCZ6 POST CAP-LATERAL CAPACITY 1285LBS-OK. THE CALCULATIONS ABOVE MEET THE REQUIREMENTS OF THE IRC2009 R602.10 AND 780CMR51 AMENDMENTS TO IRC2009. 8F KANAYD H L.ALA " No.3371M 0 AL u i I CERTIFICATE OF LIABILITY INSURANCEOATE(MMIDIYYYYY) 8 1a 16 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. .IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(]es) must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In{Neu of such endorssment(s), PRODUCER NA :C Coonan Insurance Agency, Inc. PHONE Fax 267 Main Street ic.N 508 87-71 .2 . (508) 987-7152 Oxford, MA 01540 ADDRESS: aindy@000naninsurance.com INSURER(S)AFFORDING COVERAGE NAIC H INSURERA:Travelers INSURED INSURER B T7K, 'Inc. ENSURER C PO Box 12 1E48LiRER o South Grafton, MA 01560 INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POUCIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTVNTHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE. TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTINSR TYPE OF INSURANCE ASDL 8UBR I PDL! .E T'OLFGYfP POLICY NUMBER MMlDAIY MMIDDIYYYY LfMT9 A GENERALLFABIUTY 680-335MI703-15 11/3/15 11/3/16 EACH OCCURRENCE $ 1 000 000 X COMMERCIAL GENERAL LIA13 ILI TY DAMAGETORENTEDre 00) $ 300,000 CLAIMS-MADE [i]OCCUR MED OP.(Ary one person) $ -91000 PERSONAL&ADVIWURY $ 1 000 0O GENERALAGGR_EOATE $ 2,000,000 GEN'LAGGREGATE LIMIT APPLIES PER PRODUCTS $ 2 000 000 X PRO POLICY LOC _ $ AUTOMOBIL'E'LIABIUTY EsaceldBM N ELI IT $ ANYAUTO BODILY INJURY(Per person) $ ALLOWNED SCHEDULED AUTOS AUTOS BODILY INJURY(Per accident) $ HIRED AUTOS NON UTOSWNED P ROaPERTYraccDAMAGE $ UMBRELLALIA6 E OCCUR EACH OCCURRENCE $ EXCESSLIAB CLAIMS- DE AGGREGATE $ DID RETENTION A YJORKMCOMPENSATION IE- -9914N01^ ^� 1/2.6/16 1/26/17 �{ WCSTATU- OTH- AND EMPLOYERS'LIABILITY Y 1 N ANY PROPRIETOR(PARTNER/EXECUTII E.L.EACH ACCIDENT 100,000 OFFICEMMandatory In ER EXCLtAt D? N!A E.L.DISEASE-EA EMPLOYEE $ iOOdascrib 000 [Myyarxlarory In NH) DESCRPTIONOFOPERATIONS balew E.L.DISEASE-POLICYLIM $ 500,000 DESCRIPTION OF OPERATIONS l LOCATIONS IVEHICLES (Attach ACORD 101,AddhIonal Remarks Schedule,Ifmoreapace Isregrtned) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL 13E DELIVERED IN Town of North Andover ACCORDANCE WITH THE POLICY PROVISIONS. 120 Main Street North Andover, MA 01845 AUTHORIZED RI=PRr;SENTATNE Cindy Davis ©1958.2010 ACORD CORPORATION. All rights reserved. ACORD 25(201 0/06) The AC ORD name and logo are registered marks of ACORD Phone: Fax: E-Mall: tdbuilding@aol.com i V B 6 Massachusetts Depart ment of Public Safety Board of Building Regulations and Standards License: CS-059359 Construction Supervisor TIMOTHy MICHAEL_BARS OW P.O.Box#12 5011TH GRAFTON MA,01560 Expiration: Commissioner 01/2412098 �, r'�/rr rpcvtrtitolrurrr�f�n/'n j'�r3.far�rrd�(�,J Oftice OfConsnmer Affa€rs&Bust/cess Regulation. HOMY IMPROVEMENT CONTRACTOR Reglstration 143758 Type: Expiration; 7129/201 8 DBA N BARLOW BUILDING 1 TIM BARLOW 13 DEPOT ST S.GRAFTON.MA 01560 Undersecretary 0