HomeMy WebLinkAboutCCMeetingMinutes_02.22.12
Conservation Commission Meeting Minutes
February 22, 2012
Members Present:
Louis A. Napoli, Chairman, John T. Mabon, Vice Chairman, Joseph W.
Lynch, Jr., Deborah A. Feltovic, Albert P. Manzi, Jr.,Douglas W. Saal.
Member Absent:
Sean F. McDonough.
Staff Members Present:
Heidi M. Gaffney,Conservation Field Inspector, Donna M.
Wedge, Conservation Secretary.
Staff Member Absent:
Jennifer A. Hughes, Conservation Administrator.
Pledge of Allegiance
Meeting came to Order at: 7:30 P. M. QuorumPresent.
General Business
242-266, PCOC Request, 65 Campion Road (Lot 15) (Title Resource Group)
The field inspector states that this lot is not jurisdictional, the Order of Conditionswas for
drainage on lots 9 & 10 onlyand thatseveral other PCOC‘ s have been issued on other lots.
A motion to grant the PCOC is made by Mr. Manzi, seconded by Ms. Feltovic.
Vote unanimous.
Documents:
WPA Form-8A Request for Partial Certificate of Compliance
o
Copy of Order of Conditions 242-266
o
Quit Claim Deed
o
Definitive Subdivision Plan No 9887 of Land dated 4/12/85, and revised plan 5/13/85
o
242-1481, COC Request, 22-24 Ashland Street (North Andover Housing Authority)
(Allen & Major Associates, Inc.)
The applicant Joanne Comerford of the North Andover Housing Authority was present.
Field Inspector states the project was built in compliance with the Order of Conditions, drainage
outlet has been rip-rapped, erosion controls removed, and site is stabilized.
A motion to grant to issue the COC and release the bond made Mr. Lynch, seconded by Mr.
Mabon.
Vote unanimous.
Documents:
WPA Form-8A Request for Certificate of Compliance
o
Letter from Allen & Major Associates, Inc. dated 12/11/11
o
As-Built Plan dated 2/21/12 added resources
o
Violation
505 Forest Street (Rayner)
The field inspector states that she conductedasite visitfor the pool removal RDA that is also on
the agenda tonightand discovered that nine trees had beenrecently cut in the buffer zone,some
were at or near the 25-foot No-Disturbance zone. The homeowner stated that the trees were cut
in November.
Mr. Manzi states that this is a violation and that an Enforcement Order shouldbe issued requiring
the planting of 18 native trees and shrubs. He states that the majority should be red maple (Acer
rubrum) trees but that some plantings could be high bush blueberry (Vaccinium corymbosum).
Monitoring should be for three seasonswithat least 75%survival rate at the end of three seasons.
The trees should be a minimum height of 5-feet tall.
A motion to issue an Enforcement Order requiring the planting of 18 native trees and shrubs as
discussed andmonitoring for three years with reports sent to the Conservation Departmentis
made by Mr. Lynch, seconded by Mr. Manzi.
Vote unanimous.
Documents:
Photos dated 2/16/12
o
A motion to grant to recess for 10 minutes made by Mr. Lynch, seconded by Mr. Mabon.
Vote unanimous.
Public Hearings: 8:00 PM
Request for Determination of Applicability
505 ForestStreet (Rayner)
The applicant John F. Rayner of 505 Forest Street and William Kelley of Pavers Excavation are
present.
The field inspectorstates thatthe proposal is to remove and fill in an existing in-ground pool.
She states that NHESP originally said this would be exempt activity with the provision that he did
not do any additional clearing to gain access to the pool, however after speaking with NHESP
about the tree cutting that was done, they still consider the removal of the pool exempt as long as
the tree cutting is handled under and enforcement order asdiscussed above.
The commission discusses whether the filing should be a Notice of Intent.
Mr. Kelley statesthat thework wouldbedone within a weekand that all fill will be clean fill.
The commission asks where the septic tank is located.
Mr. Kelly states that it is under a portion of the cement pool deckand that he is aware of it and
has discussed it with the health department.
Mr. Manzi states that the erosion controls needtobe trenched silt fence and double staked
haybales to properly protect the resource area.
The commission discusses stabilization of the soil after the work is done and state that it will need
to be hydroseeded with a tackifier, if the work is to be done outside of the growing season.
A motionto issue a negative determinationnumber 3 with conditions as discussed ismade by Mr.
Manzi, seconded by Mr. Mabon.
Vote unanimous.
Documents:
WPA Form-1-Request for Determination of Applicability and associated documents
o
Legal Notice
o
Copy of Plan of Land with work are and erosion control locations hand sketched dated
o
2/9/12
Photos dated 2/16/12
o
Notice of Intent (NOI)
242-1480, 14 Lorraine Avenue (Breenmore Realty Trust) (The Neve-Morin Group,
Inc. ) (cont. from 2/8/12) (Request to cont. to 3/14/12)
The field inspector states that the applicantis requestinga continuance to the March 14, 2012
meeting.
A motion to grant the request for a continuance to the March 14, 2012meeting ismade by Ms.
Feltovic,seconded by Mr. Lynch.
Vote unanimous.
Documents:
E-Mail from The Neve-Morin Group, Inc. dated 2/22/12 requesting for a continuance to
o
the March 14, 2012 meeting.
242-1539, 102 Peters Street (Dundee Properties, LLC) (Andover Consultants, Inc.) (cont. from
2/8/12) (Request to cont. to 3/14/12)
The field inspector statesthat the applicant is requestinga continuance to the March 14, 2012
meeting.
A motion to grant the request for a continuance totheMarch 14, 2012meeting ismade by Ms.
Feltovic, seconded by Mr. Lynch.
Vote unanimous.
Document:
E-Mail from Andover Consultants, Inc. dated 2/22/12 requesting for a continuance to the
o
March 14, 2012 meeting.
242-1545, 30 Keys Way (Garcia) (Christiansen & Sergi, Inc.)
Philip Christiansen of Christiansen & Sergi, and Abutter Raymond &Elizabeth Letourneau of
700 Salem Street arepresent.
Mr. Manzi readsthe legal notice.
Mr. Christiansen presents that the project is for the construction of an inground pool, decking and
fencing and states that a temporary construction entrance will also be needed.
Mr. Lynch asks about the area for soil stockpilingand states that it wouldn’t be accessible once
the hole has been dug.
Mr. Christiansen states that the soil stockpile location is for the top soil, and that the materials
excavated from the pool hole will be trucked off-site.
Mr. Manzi statesthat the filter should be conditioned to be acartridgestyleonlywithno back
washing into resource areas.
Ms. Feltovic asks about the markers at the 25’ No-disturb.
The field inspector states that the markers should be placed on posts, due to the overgrowth of the
bittersweet and honeysuckle which would prevent the markers from being visible if they were
placed on the trees.
Mr. Saal states there is a lot of bittersweet and huckleberry and asks if the applicant thinking of
cleaning up the area.
The field inspector states that although restoring the area would be wonderful that doing so in just
this one area would be futile.
Mr. Christiansenstatesthatthe applicant will probably leave the area alone.
Mr. & Mrs. Letourneau state that their back yard is very wet and that they are concerned about
more water coming to their yard.
The commission discusses the project location in relation to the Letourneau’s property.
Mr. Lynch asks Mr. Christiansen iftheapplicant can be asked toinstall astone trench around the
deck to stop any water runoff to theabutters property.
Mr. Christiansen agrees to the stone trench.
Mr. Lynch makes a motion to close.
Mr. Lynch withdraws his motion to close because of three week gap between meetings.
Mr. Christiansen requestsa continuance to the March 14, 2012 meeting.
A motion to grant the request for a continuance totheMarch 14, 2012 meeting is made by Mr.
Lynch, seconded by Mr. Mabon.
Vote unanimous.
Documents:
Application Checklist-Notice of Intent
o
WPA Form 3-Notice of Intent and associated documents
o
Site Plan titled “Site Plan for Proposed Swimming Pool at 30 Keyes Way” ,prepared by
o
Christiansen & Sergi, Inc., dated 2/6/12
Streamstats Upgrade Site Report dated 2/15/12
o
Photos taken 2/14/12 of 30 Keyes Way
o
242-1526, 285 Holt Road (Wheelabrator Technologies, Inc.) (Brown and Caldwell)
The field Inspector states that the applicant is requestinga continuance totheMarch 14, 2012
meeting.
A motion to grant the request for a continuance totheMarch 14, 2012 meeting made by Ms.
Feltovic, seconded by Mr. Mabon.
Vote Unanimous.
Document:
E-Mail from Brown and Caldwell J R Frey, P. E. CPESCOdated 2/17/12requestinga
o
continuance to the March 14, 2012 meeting
A motion togrant to adjourn the meeting at: 8:45PM made by Mr. Lynch, seconded by
Ms. Feltovic.
Vote Unanimous.