HomeMy WebLinkAboutCCMeetingMinutes_11.28.12
Conservation Commission Meeting Minutes
November 28, 2012
Members Present:
Louis A. Napoli, Chairman, Joseph W. Lynch, Jr., Vice Chairman,
Deborah A. Feltovic,John T. Mabon,Albert P. Manzi, Jr., Sean F. McDonough(arrived
7:10 p. m.),Douglas W. Saal.
Staff Members Present:
Jennifer A. Hughes, ConservationAdministrator, Donna M. Wedge
Conservation Secretary.
Meeting came to Order at: 7:05PM QuorumPresent.
Pledge of Allegiance
Public Hearings:
Request for Determination of Applicability
37 Millpond (Stevens Pond) (DPW)
Eugene Willis Town Engineer of Division of Public Works states the project is to add
safety grates to outlet structure at Millpond. Mr. Willis states two shrubs will be
removed.
Mr. Lynch discusses the location of the outlet and the safety issue.
Ms. Feltovic asks about the O&M plan and asks about inspections.
Mr. Saal requests that the shrubs be planted away from the outlet to make maintenance
easier.
A motion to issue a negative determination with a condition for post construction
inspectionmade by Mr. Lynch, seconded by Ms. Feltovic.
Vote 6 to 1 (Mr. McDonough abstained)
Documents:
Application Checklist-Request for Determination of Applicability
WPA Form 1-Request for Determination of Applicability
Project Description
Signatures and Submittal Requirements
Mill Grate Installation
Letter from Eugene P. Willis, P. E. sent to Mass DEP dated 11/14/2012
Letter from Eugene P. Willis, P. E. sent to Linda K. Mallen dated 11/14/2012
Photos dated 11/14/2012
& M Plan 11/14/2012
Elevation View Steel Grate dated 11/14/2012
Front Grate 7/12/2012
Top Grate dated 7/12/2012
Aerial Photo
Plan of Stevens Plant dated 3/27/1972
Notice of Intent (NOI)
242-1572, 108 Campion Road (Montopoli) (Andover Consultants, Inc.) (cont. from
11/14/12) (Request to cont. to 2/13/13)
Administrator states the applicant requestsa continuance to the February 13, 2013
meeting so she canfile with the Planning Board for aWatershed Special Permit.
A motion to grant the request for a continuance to February 13, 2013 meeting made by
Ms. Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Document:
E/Mail from applicant Barbara Montopoli of 108 Campion Road requesting a
continuance to February 13, 2013 meeting dated 11/27/2012.
242-1577, 72 Great Pond Road (Lot B) (TLD, LLC) (Sullivan Engineering Group, LLC)
(cont. from 11/14/12)
The applicant Thomas D. Zahoruiko of TLD, LLC, is present.
The Administrator presents a new planMr. Zahoruiko prepared to address stormwater
issues (Lisa Eggleston reviewed an adjacent parcel and made recommendations).
Mr. Zahoruiko describes the project and the subdivision of the larger property. This is an
ANR lot. Mr. Zahoruiko states other access routes to the house were researched. The
water and sewer lines will connect out to the street to minimize impacts. A stonewall will
be installed at the 25’ No-Disturb and another line of erosion control added. He is trying
to keep mature trees to blockviews for abutter, Mr. Coleman at 56 Great Pond Rd.
Mr. Lynch states there are alternatives to this project. The lots could be designed
differently.Mr. Lynch wants to see analternativesanalysis showing the whole project
with the 3 Lots.
Mr. Zahoruiko states he discussed other alternatives including dual driveways with the
Planning Board and is trying to balance the requirements of the different boards. He
would like the commission to see the lot in person to appreciate many of the unique
features.
Mr. Manzi states the applicant is not requesting any waivers.
Mr. Mabon discusses the plan for the wall and the 25’ No-Disturb Zone.
Ms. Feltovic asks about the mowing of the field.
The Conservation Commissiondiscusses options to access the house and keep the
driveway off the slope and out of the buffer zone.
Mr. Saal states the applicant couldraze the exiting house create ashorter roadway for
cluster subdivision.
Mr. Zahoruiko there is not enough frontage for that option.
The Commission would like to see alternatives plans.
The Conservation Commission scheduled a site visit on December 1, 2012 at 10:00 AM
on site to be confirmed by the administrator.
Mr. Coleman, the abutter at 56 Great Pond Road, states his support for maintaining the
large trees on the property.
A motion to grant the request for a continuance to December 12, 2012meeting made by
Ms. Feltovic, seconded by Mr. Lynch.
Vote unanimous.
Documents:
Application Checklist-Notice of Intent
WPA Form 3-Notice of Intent
NOI Wetland Fee TransmittalForm
North Andover Wetlands Protection By-law filing fee Calculation Worksheet
Plan
Legal Notice
Certified Abutter’s List
Abutter’s Notification Form
Site Development Plan of Land dated 10/22/12, revised dated 11/27/12
242-1576, 95 Thistle Road (Lot 28)(Sullivan) (Sullivan Engineering Group, LLC)
Administrator states the applicant requestsa continuance to December 12, 2012 meeting.
A motion to grant the request for a continuance to the December 12, 2012 meeting made
by Ms. Feltovic, seconded by Mr. Lynch.
Vote unanimous.
Documents:
E/Mail from Maureen Hanley of Norse Environmental Services, Inc. requesting a
continuance to December 12, 2012 meeting dated 11/26/12.
242-1575, 21 Fuller Meadow Road (Kissel) (Norse Environmental Services, Inc.)
(cont. from 11/14/12) (Request to cont. to 12/12/12)
Administrator states the applicant requests acontinuanceto December 12, 2012 meeting.
A motion to grant to request for a continuance to the December 12, 2012 meeting made
by Ms. Feltovic, seconded by Mr. Lynch.
Document:
E/Mail from Maureen Hanley of Norse Environmental Services, Inc. requesting a
continuance to December 12, 2012 meeting dated 11/26/12.
General Business:
242-1459, PCOC Request, 1001 Turnpike Street (Orchard Village, LLC) (Christiansen
& Sergi,Inc.) (cont. from 11/14/12) (Request to cont. to 12/12/12)
Administrator states the applicant requests acontinuance to the December 12, 2012
meeting.
A motion to grant the request for a continuance to the December 12, 2012 meeting Ms.
Feltovic, seconded by Mr. Lynch.
Vote unanimous.
Document:
E/Mail from Christians & Sergi, Inc. a request for a continuance to December 12, 2012
meeting dated 11/26/12.
242-1489,COC Request,58 Empire Drive (Lot 13) (Orchard Village, LLC)
(Christiansen & Sergi, Inc.)(cont. from 11/14/12)(Request to cont. to 12/12/12)
Administrator states the applicant requestsa continuance to the December 12, 2012
meeting.
A motion to grant the request for a continuance to the December 12, 2012 meeting made
by Ms. Feltovic, seconded by Mr. Lynch.
Vote unanimous.
Document:
E/Mail from Christiansen & Sergi, Inc. for a continuance to December 12, 2012 meeting
dated 11/26/12.
242-1497, COCRequest, 60, 62, 64 Empire Drive (Lots 14-16) (Orchard Village, LLC)
(Christiansen & Sergi, Inc.) (cont. from 11/14/12) (Request to cont. to 12/12/12)
Administrator states the applicant requestsa continuance to the December 12, 2012
meeting.
A motion to grant the request for a continuance to December 12, 2012 meeting made by
Ms. Feltovic, seconded by Mr. Lynch.
Vote unanimous.
Document:
E/Mail from Christiansen & Sergi, Inc. for a continuance to December 12, 2012 meeting
dated 11/26/12.
242-1490, COC Request, 52 Empire Drive (Orchard Village, LLC) (Christiansen
& Sergi, Inc.) (cont. from 11/14/12) (Request to cont. to 12/12/12)
Administrator states the applicant requestsa continuance to the December 12, 2012
meeting.
A motion to grant the request for a continuance to the December 12, 2012 meeting made
by y Mr. Lynch, seconded by Ms. Feltovic.
Vote unanimous.
Document:
E/Mail from Christiansen & Sergi, Inc. for a continuance to December 12, 2012 meeting
dated 11/26/12.
242-1231, COC Request, North Andover Town Commons (Massachusetts Electric
Company) (Coneco Engineers & Scientists)(Request to cont. to 12/12/12)
Administrator states the applicant could not be present tonightandrequestsa continuance
to the December 12, 2012 meeting.
A motion to grant the requestfora continuance to the December 12, 2012 meeting made
by Mr. Lynch, seconded by Ms. Feltovic.
Vote unanimous.
Document:
E/Mail from Tracy L. Duarte, P. E. of Coneco Engineers & Scientists requesting a
continuance to December 12, 2012 meeting dated 11/27/12.
242-1495, COC Request, 80 Laconia Circle (Jenkins)(The Neve-Morin Group, Inc.)
Administrator statesthe Field Inspector reviewed the plans and inspectedthe site. The
workis in compliance with the Order of Conditions.
Minor changes include the addition of stone at the shed and additional pavement removed
from the driveway.
A motion to grant the COC and release the bond made by Mr. McDonough, seconded by
Ms. Feltovic.
Vote unanimous.
Documents:
Letter from The Neve-Morin Group, Inc. dated 11/12/12
WPA Form 8A-Request for Certificate of Compliance
Copy of Check dated 11/12/12
AS-Built Site Conditions Plan dated 10/9/12
Photos dated 11/28/12
242-1468, COC Request, 998 Salem Street (Mangiameli) (Christiansen & Sergi, Inc.)
The applicant Jeffrey Mangiameli of 998 Salem Street is present.
Administrator statesthe Field Inspector reviewed theplans and inspected the site and itis
in compliance with the Order of Conditions.
There was clearing of brushin the 25’ No-Disturbance zone whenthe fence was installed
but the Field Inspector said it should grow back.
The deck has aslightly differentshape and did not have stairs installed.
A small set of stairs was added to the rear of the house.
A motion to grant the COC and release the bond made by Mr. Manzi, seconded by Ms.
Feltovic.
Vote unanimous.
Documents:
Letter from Christiansen & Sergi, Inc. dated 11/8/12
Letter from the applicant Jeffrey Mangiameli dated 11/8/12
WPA Form 8A-Request for Certificate of Compliance
As-Built Plan dated 11/5/12, revised 11/28/12
Photos dated 11/28/12
242-792, COC Request, Woodlea Road (Ashwood Development Companies)
(Gateway Consultants, Inc.)
Administrator states she has read the entire understands there were many problems with
this project during development.
There is a discussion of the drainage and a need for third party review.The catch basins
have had hoods added and have been cleaned.
Administrator states the detention basin has not been maintained and is overgrown.
Mr. Lynch reviews the record plans to determine how many catch basins were required. It
appears all catch basins are in and properly located.
The Administrator states that easements on the property have not been recorded. There is
discussion and the commission believes the Planning Board will handle this.
The Commission requires the applicant to clean the detention basin before a COC is
issued.
There are violations on two house lots that will be handled separately.
There is discussion of what amount of bond can be released at this time.
A motion to issue a partial bond releasein the amount of $5,000 made by Mr. Manzi,
seconded by Mr.Lynch.
A motion to grant the request for a continuance for detention basin cleaning of trees to
the December 12, 2012 meeting made by Mr. Manzi, seconded by Mr. McDonough.
Vote unanimous.
Documents:
Letter from Gateway Consultants, Inc. dated 11/12/12
WPA Form 8A-Request for Certificate of Compliance
As-Built Plan Roadway Plan dated 10/30/12
Photos dated 11/27/12
North Andover MIMAP 44 Woodlea Road date 11/26/12
North Andover MIMAP Woodlea Utilities
MAGIS dated 11/26/12
North Andover MIMAP Woodlea Roadwaydated 11/26/12
North Andover MIMAP 50 Woodlea Road
Pictometry Online dated 11/26/12
North Andover MIMAP 47 Woodlea Road dated 11/26/12
MAGIS Woodlea Roadwaydated 11/26/12
NACC#94, NACC#95 &242-1550, PCOC Request, 50 Royal Crest Drive (AIMCO
LLC)(Cornerstone Land Consultants, Inc.)
Kenneth Lania of Cornerstone Land ConsultantsInc. is present.
Administrator states that Eggleston Environmental has provided a review letter and that
theStormwater Management Planhasnot beensubmittedyet.
Mr. Lania reviews the work that has been done to date.
Mr. Manzi states the PCOC request are premature the site is not stable and we would not
issue PCOC for this project it would be for a whole COC when all work completed and
site stabilized.
Mr. Napoli statesthat the stormwater management plan is the most important piece of
the work.
Mr. Lynch states that Mr. Lania is doing great work analytically and that the O&M plan
is good.
Mr. Manzi discusses the Eggleston Environmental letter.
Mr. Lania states he has meet the Eugene Willis Town of North Andover Engineer and
making some progress on what needs to be done with the this area of the Town.
Mr. Lynch states that release of additional bond money will be discussed again at the next
meeting.
Mr. Lania stats he hopes to have a complete submittal by the end of the year.
A motion to grant the request for a continuance totheDecember 12, 2012 meeting made
by Mr. Lynch, seconded by Mr. Manzi.
Vote unanimous.
Documents:
Letter from Cornerstone Land Consultants, Inc.dated 11/15/12
WPA Form 8A-Reuqest for Certificate of Compliance
Letter of Transmittal Cornerstone Land Consultants dated 11/7/12
Letter from Cornerstone Land Consultants, Inc addressing Gerald Brown, Inspector of
Buildings dated 11/7/12
Foundation Drainage Site Plan for Building 8 dated 3/15/12.
Construction Photos dated 3/15/12
Foundation Drainage Site Plan dated for Building 10 dated 3/15/12
Construction Photos dated 3/15/12
Letter Transmittal from Cornerstone Land Consultants, Inc. for Building 11 addressing
Gerald Brown, Inspector of Buildings dated 11/7/12
Foundation Drainage Site Plan Buildings 11 dated 3/15/12
Construction Photos dated 3/15/12
Letter Transmittal from Cornerstone Land Consultants, Inc. Building 20 addressing
Gerald Brown, Inspector of BuildingsConstruction Completion Affidavit dated 11/5/12
Cornerstone Land Consultants, Inc. letter addressing Gerald Brown, Inspector of
Buildings dated 11/5/12
Foundation Drainage Site Plan for Building 20 dated 3/15/12
Construction Photos dated 3/15/12
Letter of Transmittal addressing Gerald Brown, Inspector of Buildings for Building 21
dated 11/7/12
Cornerstone Land Consultants, Inc. addressing Gerald Brown, Inspector of Buildings for
Building 21 Construction Completion Affidavit dated 11/5/12
Foundation Drainage Site Plan Building 21 dated 3/15/12
Construction Photos dated 3/15/12
Letter of Transmittal from Cornerstone Land Consultants, Inc. addressing to Gerald
Brown, Inspector of Buildings for Building 22 dated 11/7/12
Letter from CornerstoneLand Consultants, Inc. addressing Gerald Brown, Inspector of
Buildings Construction Completion Affidavit for Building 22 dated 11/5/12
Foundation Drainage Plan Building 22 dated 3/15/12
Construction Photos dated 3/15/12
Letter of Transmittal from Cornerstone Land Consultants, Inc. for Building 25 dated
11/7/12
Cornerstone Land Consultants, Inc. addressing Gerald Brown, Inspector of Buildings
Construction Completion Affidavit for Building 25 dated 11/5/12
Foundation Drainage Site dated 3/15/12
Construction Photos dated 3/15/12
Letter of Transmittal addressing Gerald Brown, Inspector of Buildings dated 11/7/12
Cornerstone Land Consultants, Inc. Construction Completion Affidavit for Building 29
Foundation Drainage Site Plan for Building 29 dated 3/15/12
Construction Photos dated 3/15/12
Letter of Transmittal from Cornerstone Land Consultants, Inc. for Gerald Brown,
Inspector of Buildings Building for 31 dated 11/7/12
Cornerstone Land Consultants, Inc. Construction Completion Affidavit for Building 31
dated 11/5/12
Foundation Drainage Site Plan for Building 31 dated 3/15/12
Construction Photos dated 3/15/12
Letter of Transmittal from Cornerstone Land Consultants, Inc. Addressing Gerald
Brown, Inspector of Buildings for Building 38 dated 11/7/12
Letter from Cornerstone Land Consultants, Inc. addressing Gerald Brown, Inspector of
Buildings for Building 38 Construction Completion Affidavit dated 11/5/12
Foundation Drainage Site Plan for Building 38 dated 3/15/12
Construction Photos dated 3/15/12
Decision
242-1574, 71 Wintergreen Street
The administrator reviews the drafted Order of Conditions.
The Commission accepts Order of Conditions as drafted and amended.
A motion to grant to accept the Order of Conditions as drafted and amended made by Mr.
Mabon, seconded by Ms. Feltovic.
Vote unanimous.
A motion to adjourn the meeting at: 9:30 PM made by Mr. Lynch, seconded by Ms.
Feltovic
Vote unanimous.