Conservation Commission Meeting Minutes
January 22, 2014
Members Present:
Louis A. Napoli, Chairman, Albert P. Manzi, Jr., John T. Mabon,
Deborah A. Feltovic, Sean F. McDonough (arrived at 7:09 p.m.), Douglas W. Saal.
Member Absent:
Joseph W. Lynch, Jr. Vice Chairman.
Staff Members Present:
Jennifer A. Hughes, Conservation Administrator,
Donna M. Wedge, Conservation Secretary.
Pledge of Allegiance
Meeting came to Order at: 7:07 PM Quorum Present.
Public Hearings: 7:09 PM
Approval of Minutes of 11/6/13 Executive Session, & 11/20/13
A motion to accept the meeting minutes of 11/6/13 Executive Session and 11/20/13 as
drafted and reviewed is made by Ms. Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Request for Determination of Applicability
43 Oxbow Circle (Robinson) (Hayes Engineering, Inc.)
The Administrator presents the project: after the fact approval for a pervious patio
-Build Zone.
Mr. Mabon asks about special conditions including keeping the patio impervious, no
enlargements or enclosures.
Mr. Manzi states this needs to be a recordable document for those conditions to survive in
perpetuity.
A motion to accept the waiver request is made by Mr. Manzi, seconded Mr. Mabon.
Vote unanimous.
A motion to issue an after the fact negative determination #3 to be recorded at the registry
of deeds is made by Mr. Manzi, seconded by Mr. Mabon.
Vote 5 to 1 (Mr. McDonough opposed)
Documents:
Application Checklist-Request for Determination of Applicability
WPA Form1-Request for Determination of Applicability
General Information
Project Description
Signatures and Submittal Requirements
North Andover Conservation Commission Waiver Request form dated 12/13/13
USGS Map dated 1/9/14
NHESP Map dated 1/9/14
As-Built Plan of Land dated 11/5/2009
107 Campion Road (Lot 89) (Saragas) (Wetland Preservation, Inc.)
The applicant George Saragas, and Curtis Young of Wetland Preservation, Inc., are
present
Mr. Saal read the legal notice.
Mr. Young presents the delineation plan and describes the nature of the wetland area
present on site. He states this area was used for staging during construction of the
subdivision. Soil test pits reveal 18-inches of impervious fill material above bright upland
soils with no evidence of a water table in the pits.Hydric soils and wetland vegetation are
present within the fill. Mr. Young states the intention is to build a house on this lot. Even
with a negative determination, the Commission would have the opportunity to review and
comment on the plans.
The Commission discusses the nature of the fill material.
Mr. Saal states it sounds like crusher tailings. This would explain why water is just
running off the hill.
Mr. Young states infiltration would be provided in any house design.
Mr. Manzi states that in this case, no one buried a wetland.
The administrator states this area has some wetland functions and values.
Mr. Saal asks if there was a wetland on site prior to the subdivision development. Mr.
Young states that there was not.
Mr. McDonough asks how the commission is supposed to ignore an Isolated Vegetated
Wetland. He states Isolated Wetlands can be created in many different ways.
Mr. Napoli suggests review of wetland area by a third party consultant.
Mr. Young asks if the review would be to confirm that the area is filled upland.
.
Mr. McDonough states he would accept third party review. Mr. Saal states he does not
think it is necessary.
Mr. Young states the lot will be difficult to develop with setbacks and there would be no
attenuation of flows across the site.
Mr. Manzi states he does not disagree with the findings, just with the solution. States he
would prefer an NOI filing that includes an alternatives analysis.
Mr. Mabon supports third party review.
Mr. Young agrees to limited third party review.
Abutter David Anderson of 23 Cochichewick Drive states the area is overgrown and
would be better cleaned up.
Glenn Saba, representing the owner, states the owner purchased the lot 12 years ago and
cost of permitting the lot with the ZBA, the Planning Board and the Commission may not
be worth it. Mr. Saba mentions drainage was installed to mitigate water issues uphill.
The Commission discusses the possibility of mitigating the wetland by creating rain
gardens to mimic the functions and values of the isolated area.
A motion to grant the request for a continuance to allow for third party review to the
February 12, 2014 meeting is made by Ms. Feltovic, seconded by Mr. McDonough.
Vote unanimous.
Documents:
Application Checklist-Request for Determination of Applicability
WPA Form 1-Request for Determination of Applicability
Project Description
Signatures and Submittal Requirements
Copy of Town Check
Affidavit of Service dated 1/9/14
Locus Map
Soil Map dated 1/2/2014
Map Information dated 1/2/2014
Map unit Legend dated 1/2/2014
NHESP Map
FEMA/FIRM Maps dated July 3, 2012
Photographic Log soil test pits
Topographic Plan dated January 6, 2014
Notice of Intent (NOI)
242-1608, 120 Campion Road (Sigman) (Sullivan Engineering Group, LLC) (cont.
from 1/8/14) (Request to cont. to 1/22/14)
A motion to grant the request for a continuance to the February 12, 2014 meeting is made
by Ms. Feltovic, seconded by Mr. Manzi.
Vote unanimous.
Document:
E/Mail from Sullivan Engineering Group, LLC requesting a continuance to February 12,
2014 meeting dated January 15, 2014.
242-1593, 16 Berry Street (North Andover Holdings, LLC) (LEC Environmental
Consultants, Inc.) (cont. from 1/8/14)
Theodore C. Regnante of Regnante, Sterio & Osborne LLP, Ann M. Marton of LEC
Environmental Consultants, Inc., Matthew Bombaci of Goldsmith, Prest & Ringwall, Inc.
are present
Ms. Marton presents proposal for fencing, monumentation signage, and trail kiosks.
Mr. Manzi states what kind of fencing.
Ms. Marton states yes the fencing would be post and rail.
Mr. Manzi states monumentation must be maintained in perpetuity and should be
installed as proposed and at the direction of the Administrator.
Mr. Napoli asks for signage about dog waste and dog waste stations on site.
The Commission discusses mowing within the restriction. Annual.
Mr. Manzi asks who will be in charge of property maintenance.
The applicant states there will be onsite management and maintenance.
The Administrator asks about an O&M plan for site maintenance. Commission agrees
this will be conditioned.
Ms. Marton reviews the status of the CR. Has been submitted to EOEEA. NHESP has
minor changes.
Next meeting with the ZBA is 1/28/14.
Commission discusses the landscape plan.
A motion to grant the request for a continuance to the February 12, 2014 meeting is made
by Ms. Feltovic, seconded by Mr. Manzi.
Vote unanimous.
Documents:
Letter from GPR dated 1/14/2014
Revised watershed computations routing diagram for pre-development dated 1/15/2014
Routing Diagram for post-development revised 3 dated 1/15/2014
Water Budget Analysis
Stormwater Management Report dated December 2013
Compensatory Flood Storage Computations dated 1/15/2014
Letter from GPR dated 1/14/2014 Traffic study
Letter from GPR dated 1/14/2014 waivers driveways, school bus drops, stonewall. Street
alignment, stormwater runoff, shade trees, Berry Street Finish pavement, the project
certificate of occupancy should not be issued till the final pavement of Berry Street
Multi-Family Residential Development Comprehensive Permit Plans dated January 14,
2014.
General Business: 8:30 PM
242-1575, COC Request, 21 Fuller Meadow Road (Kissel) (Kaminski & Associates, Inc.)
(cont. from 1/8/14) (Request to Withdraw)
A motion to withdraw the request for a COC until erosion control can be removed is
made by Ms. Feltovic, seconded by Mr. McDonough.
Vote unanimous.
Document:
E/Mail from Natalie Kissel requesting to withdraw the request for COC dated January
17, 2014.
242-273, PCOC Request, 15 North Cross Road (Lot 5) (Dalton & Finegold Attorneys at
Law)
Field Inspector reviewed this PCOC request and there are no wetlands within 100 feet of
the house.
A motion to issue the PCOC for Lot 5 (15) North Cross Road is made by Mr. Mabon,
seconded by Ms. Feltovic.
Vote unanimous.
Documents:
Letter from Dalton & Finegold Attorneys at Law dated 1/14/2014
WPA Form 8A-Request for Partial Certificate of Compliance
Subsurface Disposal System Plan dated 12/17/2003
North Andover MIMAP dated 1/22/2014
North Andover MIMAP dated 1/22/2014
Request for support for signage grant (Friends of North Andover Trails)
Glen Aspeslagh of the Friends of North Andover Trials is present.
Mr. Aspeslagh reviews the grant proposal to provide consistent and higher quality
signage for the town owned open space.
Glen states he would work closely with the Conservation Department to determine
language on kiosks.
Mr. Manzi asks about the location of the kiosks and states the kiosks will need to
recognize funders.
Proposed Project Locations:
Mazurenko Farm, Carter Fields, Osgood Hill, Half Mile
Hill, Stevens Estate (kiosks not installed yet), Windrush Farm, Foster Farm, James
Swamp, Town Farm, Shawsheen River (wooden kiosks predating the others.)
The Commission discusses need for maintenance at Foster Farm parking lot.
A motion to support the application for funding is made by Mr. McDonough, seconded
by Ms. Feltovic.
Vote unanimous.
Documents:
E/Mail from Glen Aspeslagh from Friends of North Trials dated 1/14/2014.
Letter from Glen Aspeslagh dated 1/14/2014.
Support Letter Conservation Department signed by the Chairman dated 1/22/2014.
A motion to adjourn the meeting at: 8:45 PM is made by Mr. Manzi, seconded by
Ms. Feltovic.
Vote unanimous.