HomeMy WebLinkAboutCCMeetingMinutes_10.22.14
Conservation Commission Meeting Minutes
October 22, 2014
Members Present:
Louis A. Napoli, Chairman, Douglas W. Saal, Vice Chairman,
John T. Mabon, Deborah A. Feltovic.
Members Absent:
Albert P. Manzi, Jr., Joseph W. Lynch, Jr., Sean F. McDonough.
Staff Members Present:
Jennifer A. Hughes, Conservation Administrator,
Donna M. Wedge, Conservation Secretary.
Pledge of Allegiance
Meeting came to Order at: 7:01 PM Quorum Present.
Approval of Minutes 8/27/14
A motion to accept the meeting minutes of 8/27/14 as drafted and reviewed is made by
Ms. Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Public Hearings: 7:04 PM
242-1631, Great Pond Road (Lots 53 & 54) (TKZ, LLC) (Christian & Sergi, Inc.)
(Request to cont. to 11/5/14)
Administrator states the applicant is requesting a continuance to the November 5, 2014
meeting.
A motion to grant the request for a continuance to the November 5, 2014 meeting is made
by Ms. Feltovic, seconded by Mr. Saal.
Vote unanimous.
Documents:
E/Mail from the applicant Thomas D. Zahoruiko of TKZ, LLC requesting a continuance
to November 5, 2014 meeting dated Oct 21,2014
Stormwater Management Peer Review Letter from Eggleston Environmental dated
10/8/14
242-1631, 294 Chestnut Street (Wentzel) (Williams & Sparages, LLC)
The applicant Keith & Lynn Wentzel of 294 Chestnut Street and John Tilton of Williams
& Sparages, LLC are present.
Mr. Mabon read the legal notice
The Administrator reviews the violation history and subsequent filing before the
commission.
Mr. Tilton presents a marked up color copy of the plan. He presents the proposed work
including native plantings, landscaping and relocation of the bridge. He states that
erosion control is in place.
The Administrator states the Commission will likely want to see more plantings and a
permanent No-Disturbance Zone.
Mr. Mabon states the planting needs to continue along the stream to preserve water
quality and enhance wildlife diversity.
Mr. Mabon r
areas.
as far as the walk.
Mr. Tilton states the owners are ok with a variable width planting area along the resource
areas.
Mr. Napoli states that when waivers are sought, there needs to be mitigation.
Mrs. Wentzel states there was not enough nursery stock to do planting this year.
The Commission discusses a small buffer on the opposite side of the stream.
Mr. Wentzel discusses moving the bridge because there is a clogging issue.
Mr. Saal states the new fountain should not be in its current location.
The commission discusses No-Disturb monumentation.
Mr. Napoli asks the rest of the commission about the fountain. It is the only item that has
been reconstructed closer to the wetland. He advises the applicants to make the most
improvements possible.
Mr. Mabon asks about the fountain. Water is recirculated, no chemicals are added and
there are no fish.
The Wentzel,s state the last fountain was leaking and this fountain is mainly for wildlife.
The applicants request a continuance.
A motion to grant the request for a continuance to November 5, 2014 meeting is made by
Ms. Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Documents:
Application Checklist-Notice of Intent
WPA Form 3-Notice of Intent
General Information
Copy of State and Town Check
Project Narrative
North Andover Conservation Commission Waiver Request Form 3.4 25-foot No-
Disturbance zone & 50-foot No-Build zone done by Williams & Sparages LLC dated
9/25/14
Locus Map October 8, 2014
Photos of Site
Affidavit of Service dated October 8, 2014
September 29, 2014
NOI Wetland Fee Transmittal Form
Plan to Accompany Notice of Intent dated October 8, 2014
September 11, 2014
242-1629, 4W High Street (RCG West Mill NA LLC) (Horsley Witten Group, Inc.)
The applicant David Steinberg of RCG West Mill NA LLC and Seth Zeren of RCG West
Mill NA LLC and Jonathan Ford of Horsley Witten Group, Inc. are present.
Mr. Mabon read the legal notice.
Mr. Zeren reviews previous drainage improvements and a new proposal for demolition of
a portion of the mill building, creation of new mixed use space in remaining buildings
and new parking.
Mr. Ford reviews the stormwater management plan using LID. 4,400 s.f. of impervious
will be removed in the buffer zone. The slab under the demolished building would remain
and will be broken where needed for drainage.
Mr. Mabon asks about the slope of the property and if the buffer area would be curbed.
Mr. Ford answers the site would be curbed.
Mr. Mabon asks how problems with the previous drainage improvement area will be
addressed.
Mr. Zeren reviews errors in initial survey and underground obstructions. States pervious
pavers are working and ½ of rain gardens. Repairs will be folded into the new scope of
work.
Mr. Mabon talks about the need for good communication.
The applicants request a continuance to the next meeting.
A motion to grant the request for a continuance to the November 5, 2014 meeting is made
by Ms. Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Documents:
Application Checklist-Notice of Intent
WPA Form 3-Notice of Intent
General Information
NOI Wetland Fee Transmittal Form
North Andover Conservation Commission Waiver Request Form by Horsley Witten
Group Inc. 5:1: 25-foot No-Disturbance zone & 5:2: 50-foot No-Build zone dated
September 16, 2014
Copy of State & Town Checks
Protect Narrative dated September 2014
USGS Quadrangle dated September 16, 2014
Aerial Photo dated September 16, 2014
Existing Constraints dated September 16, 2014
FEMA National Flood Insurance dated September 16, 2014
Essex County Soils dated September 16, 2014
Wetlands Resource Evaluation dated September 16, 2014
DEP Bordering Vegetated Wetland Delineation Field Form dated August 15, 2014
Section II, Indicators of Hydrology dated August 15, 2014
Stacking Table of Proposed Uses
West Mill Redevelopment permitting Plan dated September 25, 2014
242-1632, Interstate I 495 (NB & SB near exist 43 and Massachusetts Avenue) (MA
DOT)(AECOM)
The applicant Brian Cordaro of MA Department of Transportation, James Mitchel of
AECOM and Scott Egan of AECOM are present.
Mr. Cordaro reviews the resurfacing and stormwater improvement project. All
improvements will be in the right-of-way.
Mr. Egan is the wetland scientist for the project. Reviews wetland resource areas. Project
is part of the Impaired Waterways Program. Work is within Riverfront and BLSF. The
project will remove concrete swales and increase BLSF.
The Commission discusses payment of the local fee.
A motion to grant the request for a continuance to the November 5, 2014 meeting is made
by Ms. Feltovic, seconded Mr. Saal.
Vote unanimous.
Documents:
Application Checklist-Notice of Intent
WPA Form 3-Notice of Intent
NOI Wetland Fee Transmittal Form
Project Narrative
Copy of State & Town Check
1.0 Introduction dated May 2014
Project Purpose dated May of 2014
3.0 Proposed Improvements dated May of 2014
4.1 Compliance with Massachusetts Stormwater Policy dated May of 2014
5.0 Mitigation dated May of 2014
5.1 Erosion and Sediment Controls
6.0 Summary dated May of 2014
Appendix C Project Plans dated May of 2014
Letter from AECOM dated October 8, 2014
Figure 1 Proposed I-495 Improvements Locus Map
Figure 2 I-495 Improvements
FEMA Flood Plain Insurance dated July 3, 2012
Photographic Log dated May 2, 2014
Letter from AECOM dated October 8, 2014
4.0 Regulated Area Impacts and General Performance Standards dated May of 2014
Plan of Interstate Maintenance and Related Work on Interstate I 495 MA Dot Dated May
of 2014
242-1630, 75 Summer Street (Herrick Development, LLC) (Wetlands & Land
Management, Inc.) (cont. from 10/8/14)
The applicant Christopher Herrick of Herrick Development, LLC and William Manuel of
Wetlands & Land Management, Inc. are present.
Mr. Manuel reviews a fee issue and the changes to the plan which include moving the
nk, deck stairs, stone under the deck and a stone
patio area.
A
motion to close and issue a decision within 21 days is made by Ms. Feltovic, seconded
by Mr. Saal.
Vote unanimous.
Document:
Site Plan dated August 20, 2014, revised Site Plan dated October 14, 2014
General Business: 8:05 PM
Certificates of Compliance Request
242-1415, COC Request, 233 Johnson Street (Bresnahan) (Pennoni Associates, Inc.)
(cont. 10/8/14)
The administrator states the engineer could not be present tonight but the owner would
like to move forward without an as-built as it is cost prohibitive at this time.
Mr. Napoli states we need to consistent with requiring an as-built plan.
A motion to grant the request for a continuance to the November 5, 2014 meeting is Ms.
Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Document:
E/Mail from Benjamin C. Osgood, Jr. of Pennoni Associates, Inc. requesting a
continuance to the November 5, 2014 meeting dated October 21, 2014
242-1415, COC Request, 20 Anvil Circle (Amin) (Basbanes Wetland Consulting)
(Request to cont. to 11/5/14)
Administrator states the applicant is requesting a continuance to the November 5, 2014
meeting.
A motion to grant the requesting a continuance to the November 5, 2014 meeting is made
by Ms. Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Document:
E/Mail from Basbanes Wetland Consulting for a request for continuance to November 5,
2014 meeting dated October 22, 2014
242-1587, COC Request, Stevens Street (Patenaude) (Andover Consultants, Inc.)
(cont. from 10/8/14) (Request to cont. to 11/5/14)
Administrator states the applicant is requesting a continuance to the November 5, 2014
meeting.
A motion to grant the request for a continuance to the November 5, 2014 meeting is made
by Ms. Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Document:
E/Mail from Thomas Patenaude requesting a continuance to November 5, 2014 meeting
dated October 17, 2014
242-1600, COC Request, 1849 Great Pond Road (Lot 1) (Dehullu Homes) (William G.
Holt Surveying Design Services)
The applicant Stephen Dehullu of Dehullu Homes is present.
Administrator reviews the discrepancies between the proposed and as-built plans
including stairs and a walkway off the back deck, A/C units, a gravel turn around and
landscape plantings that are not native species.
Mr. Mabon discusses the changes with Mr. Dehullu.
A motion to issue the COC is made by Mr. Mabon, seconded by Ms. Feltovic.
Vote unanimous.
Documents:
Letter from William G. Holt Surveying and Design Services dated October 22, 2014
WPA Form 8A-Request for Certificate of Compliance
As Built Site Plan dated September 29, 2014, As Built Plan revised dated October 3, 2014
242-1470, COC Request, 195 Bridle Path (Ercolini) (Andover Consultants, Inc.)
The applicant Robert Ercolini of 195 Bridle Path is present.
The Administrator reviews the discrepancies between the plan of record and the as-built
plan including a swale along the driveway. The stormwater infiltrators are not shown on
the plan.
Mr. Mabon asks why the stone swale is not a grassed swale.
Mr. Ercolini states a smaller swale existed previously. He states the as-built plan was
done by a different engineer and he did not know the location of the infiltrators.
Mr. Ercolini and Mr. Mabon discuss the function of the swale.
Administrator states the infiltrators need to be on the as built plan.
A motion to issue the COC and hold until infiltrators are shown on the as built plan is
made by Mr. Saal, seconded by Ms. Feltovic.
Vote unanimous.
Documents:
Letter from Andover Consultants, Inc. dated August 26, 2014
WPA Form 8A-Request for Certificate of Compliance
AS-Built Topographic Plan dated August 19, 2014
242-1597, Modification Request & COC, 303 Berry Street (Perry) (Sullivan
Engineering Group, Inc.) (cont. from 9/24/14)
The applicant Elizabeth J. Perry of 303 Berry Street is present.
Mrs. Perry states the wall extension was an oversight since she and Mr. Perry did not
know this would be a problem as they were saving two trees.
Mr. Napoli states the commission needs to be consistent regarding modifications and they
need to be proposed prior to construction.
A motion to accept the waiver request is made by Mr. Mabon, seconded by Ms. Feltovic.
Vote unanimous.
A motion to issue the modification is made by Mr. Mabon, seconded by Ms. Feltovic.
Vote unanimous.
A motion to issue the COC is made by Ms. Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Documents:
Letter from the Thomas & Elizabeth Perry dated October 15, 2014
North Andover Conservation Commission Waiver Request section 1.4 of the bylaw dated
October 15, 2014
Letter from Sullivan Engineering Group, LLC dated August 19, 2014
WPA Form 8A-Request for Certificate of Compliance
As-Built Plan of Land dated August 19, 2014
Decision
242-1628, 143 Lacy Street
Administrator reviews the drafted Order of Conditions.
The Commission accepts the Order of Conditions as drafted and amended.
A motion to accept the Order of Conditions as drafted and amended is made by Ms.
Feltovic, seconded by Mr. Mabon.
Vote unanimous.
Bylaw Regulations Revisions
A motion to continue the matter to November 5, 2014 is made by Mr. Mabon, seconded
by Ms. Feltovic.
Vote unanimous.
A motion to adjourn the meeting at: 8:30 PM is made by Ms. Feltovic, seconded by
Mr. Mabon.
Vote unanimous.