HomeMy WebLinkAboutCCMeetingMinutes_04.27.16
North AndoverConservation Commission Meeting Minutes
April 27, 2016
Members Present:
Louis A. Napoli, Chairman, Albert P. Manzi, Vice Chairman, Joseph W.
Lynch, Jr., John T. Mabon, Deborah A. Feltovic, Sean F. McDonough, (arrived at 7:10 p.m.)
Douglas W. Saal.
Staff Members Present:
Jennifer A. Hughes, Conservation Administrator, Donna M. Wedge
Conservation Secretary.
Pledge of Allegiance
Meeting came to Order at: 7:01PM Quorum Present.
Public Meeting: 7:02 PM
NACC#170 981 Johnson Street (Bohenek) (Jenson Building & Remodeling)
The applicant Matthew Bohenek of 981 Johnson Street and Seth Jenson of Jenson Building
& Remodeling are present.
The Administrator reviews the proposal to replace a deck in kind. The deck is rotting. She
reviews an existing violation on the site. A prior owner constructed a retaining wall and filled
the back yard right at the wetland line. She suggests requiring a No-Disturbance Zone
adjacent to the wall until the owner can restore the area. He just purchased the house.
Mr. Mabon states the project looks like a classic small project B.
Ms. Feltovic asks how long the retaining wall will last.
The Administrator states she is unsure but the photos show it is leaning toward the wetland.
Mr. Manzi states there should be a violation notice but no action at this time.
Mr. Lynch states he does not condone the wall as it is precarious and if it failed would impact
the resource area.
Mr. Bohenek confirms the septic system is in the front of the house.
Mr. Saal states the property owner should be on notice that he will need to replace/remove
the wall. He states existing lumber that has fallen in the resource area should be removed.
Mr. Manzi suggests issuing an Enforcement Order and allowing 18-24 months for a plan.
Mr. McDonough asks is the deck replacement is okay.
o-
-Build Zone. He suggests a violation letter and 1 year to plan to remediate
the situation.
The commission supports unanimously.
A motion to accept this as small project 4.4.2B is made by Mr. Manzi, seconded by Mr.
Lynch.
Vote unanimous.
A motion to approve the small project with conditions for pre & post construction inspections
inspections is made by Mr. Manzi, seconded by Mr. Lynch.
Vote unanimous.
Documents:
Application Checklist-Small Project
Small Project Procedures
Copy of Town Check
Letter prepared by Seth Jensen of Jensen Building and Remodeling Scope of work for
repair/replacement of existing deck components
Prepared by Seth Jensen of Jensen Building and Remodeling Existing Deck Layout dated
April 10, 2016
Prepared by Seth Jensen of Jensen Building and Remodeling existing framing Plan dated
April 10, 2016
Photos prepared by the North Andover Conservation Department dated April 27, 2016
Oliver Mass GIS Aerial Mapping prepared by the North Andover Conservation Department
dated 1995
Oliver Mass GIS Aerial Mapping prepared by the North Andover Conservation Department
dated 2008/2009
Oliver Mass GIS Mapping prepared by the North Andover Conservation Department dated
2013/2014
Plan of Land prepared by Merrimack Engineering Services, Inc. December 1, 2015
Administrator states the applicant proposes to replace the existing deck with a larger deck
-Build Zone. She does not recommend wetland markers because the
wetland is off-site on TTOR property and is already marked with their signage.
The Administrator confirms.
A motion to accept the small project 4.4.2A is made by Mr. McDonough, seconded by Mr.
Manzi.
Vote unanimous.
A motion to approve the new deck and stairs as proposed with a condition for post
construction inspection is made by Mr. McDonough, seconded by Mr. Manzi.
Vote unanimous.
Documents:
Application Checklist-Small Project
Small Project Procedure
Copy of Town Check
Scope of Work for Deck Remodel prepared by the applicant Jessica Reed dated
April 19, 2016
Plot Plan Exhibit 1A dated April 20, 2016
Plot Plan Exhibit 1B proposed deck expansion dimension details
North Andover MIMAP of 5 Harwich Street prepared by the North Andover Conservation
Department dated April 22, 2016
Photos prepared by the North Andover Conservation Department dated April 27, 2016
Public Hearings:
Request for Determination of Applicability
Route 133 East of 1650 Great Pond Road (DPW) (Bartlett Consolidated, LLC)
Administrator states the proposal is to repair the damaged stone wall and reinstall guardrail
where the trash truck went into the lake last year.
Mr. Lynch recused has a conflict of interest with the company doing the work.
Mr. Manzi states this is an RDA filing can only put 3 conditions on the RDA per MACC.
Mr. Manzi states the North Andover Conservation Commission needs to know how they are
going to prevent any rocks falling in to the Lake.
Administrator states they are doing the work thru the insurance company settlement from
trash Truck Company.
A motion to grant the request for a continuance to the May 11, 2016 meeting is made by Mr.
McDonough, seconded by Ms. Feltovic.
Vote unanimous.
Documents:
Application Checklist-Request for Determination of Applicability
WPA Form 1-Request for Determination of Applicability
Project Description
Copy of Town Check
Signatures and Submittal Requirements
Notification to Abutters Form
Certified Abutters List prepared by the North Andover Assessors Department dated April 11,
2016
North Andover MIMAP Aerial Map prepared by Bartlett Consolidated, LLC dated April 11,
2016
Photos prepared by Bartlett Consolidated, LLC dated April 11, 2016
Photos prepared by the North Andover Conservation Department dated April 27, 2016
100 Raleigh Tavern Lane (Wondolowski) (Benjamin C. Osgood, Jr.)
The applicant David Wondolowski of 100 Raleigh Tavern Lane is present.
The Administrator reviews the proposed project to rebuild the existing basement walkout and
add a drywell as well as a deck removal and a deck rebuild. She states she reviewed the
wetland delineation and recommends that a note be added to the plan that flag A1 should be
-gradient. -Build Zone but the majority of
the structures are pre-existing.
Mr. Mabon asks about the entrance to the basement and if there will be any change to the
footprint.
Mr. Wondolowski states the footprint will stay the same.
Mr. Mabon asks about erosion control.
The Administrator states erosion control is shown on the plan.
Mr. McDonough asks why the applicant proposes to move the stairs to the other side of the
deck.
Mr. Wondolowski states they would like to add a window to add more light into the
basement and the stairs would block the window.
Mr. Manzi asks about the drywell.
Mr. Wondolowski states this will replace an old basement drain that he believes outlets
directly to the wetland.
A motion to accept the waiver request is made by Ms. Feltovic, seconded by Mr. Mabon.
Vote unanimous.
A motion to issue a negative #3 with conditions for pre & post construction inspections and
removal of minor brush in the resource area is made by Mr. McDonough, seconded by Mr.
Mabon.
Vote unanimous.
Documents:
Application Checklist-Request for Determination of Applicability
WPA Form 1-Request for Determination of Applicability
Scope of Work repair of Basement stairs, removal of small deck and movement of Stairs
Notification to Abutters Form
Certified Abutters List prepared by the North Andover Assessors Department dated March
29, 2016
USGS Map prepared by the North Andover Conservation Department dated April 14, 2016
NHESP Map prepared by the North Andover Conservation Department dated April 14,2016
Photos prepared by the North Andover Conservation Department dated April 27, 2016
Site Plan prepared Benjamin C. Osgood, Jr. dated April 15, 2016
60 Patton Lane (Baez) (Markey Land Development Consulting)
The applicant Escipion Baez of 60 Patton Lane is present.
Administrator states the applicant proposes to install an in-ground pool outside the 100-foot
Buffer Zone, a portion the patio and a retaining are within the 200-foot Riverfront. She states
the bylaw mirrors the Wetlands Protection Act on Riverfront so all work is actually exempt.
Mr. Lynch asks about NHESP.
The Administrator states the applicant has been in contact with NHESP.
Mr. Baez states he received a response that this work is likely exempt.
A motion to issue a positive # 2a for approval of the delineation and negative #5 for the
exemption is made by Mr. Manzi, seconded by Ms. Feltovic. Access for the work is required
to be over the existing driveway which will be swept daily.
Vote unanimous.
Documents:
Application Checklist-Request for Determination of Applicability
WPA Form 1-Request for Determination of Applicability
Project Description
Copy of Town Check
Signatures and Submittal Requirements
Scope of Work for Construction of an in-ground pool, fire pit and patio 2-feet high retaining
wall prepared by the applicant Escipion Baez dated April 19,2016
Notification to Abutters Form
Certified abutters list prepared by the North Andover Assessor Department dated April 12,
2016
USGS Map prepared by the North Andover Conservation Department dated April 14, 2016
NHESP Map prepared by the North Andover Conservation Department dated April 14, 2016
Photos prepared by the North Andover Conservation Department dated April 27, 2016
Notice of Intent (NOI)
242-1678, 88-90 Saunders Street (Papa) (Rimmer Environmental Consulting, LLC)
(cont. from 4/13/16)
Mary Rimmer of Rimmer Environmental Consulting, LLC is present.
Administrator states the plan has been revised to show a drip trench for the addition and the
infiltration areas for the existing downspouts as requested. Plantings have also been added
along the fence and the lawn area will be loamed and seeded.
Mrs. Rimmer reviews the changes and states there will be no additional walkways or stairs.
.
Mrs. Rimmer states the soils are not good in this area so the trenches will not likely infiltrate
water.
Mr. Lynch states the stone will serve to dissipate energy so there is less erosion in the
backyard.
Mrs. Rimmer states the loam and seed should help with the erosion issue too.
Mr. Napoli asks why the addition will be on sono-tubes rather than a full foundation.
Mrs. Rimmer states it is a cost issue.
A motion to close and issue a decision within 21 days is made Mr. McDonough, seconded by
Mr. Manzi.
Vote unanimous.
Documents:
Letter prepared by Rimmer Environmental Consulting, LLC dated April 20, 2016
Proposed Addition Plan prepared by Donohoe Survey, Inc. dated March 25, 2016 revised
dated April 20, 2016
242-1677, 350 Winthrop Avenue (Delta MB, LLC c/o Demoulas Supermarket, Inc.)
(Rimmer Environmental Consulting, LLC) (cont. from 4/13/16)
Eric K. Gerade and Peter Ellison of Technical Environment Corporation and Mary Rimmer
of Rimmer Environmental Consulting, LLC are present.
Administrator states a revised dewatering plan has been submitted.
Mr. Lynch reviews the dewatering plan with the Commission and states it meets his
expectation.
Mr. Manzi asks for a review of the type of culvert that was chosen.
Mr. Napoli asks about improvements to the swale.
Mr. Gerade states there is no timetable for permitting that work.
Mr. Napoli asks how the extra flows will be handled.
Mr. Gerade states there is only a very slight increase in capacity with the new culvert. He
states the culvert backs up under existing conditions.
Mr. Manzi states we should have an O&M plan for the swale. He states bonding is needed.
A motion to close the public hearing and issue a decision within 21 days is made by Mr.
McDonough, seconded by Ms. Feltovic.
Vote unanimous.
Documents:
Site Plan revised dated prepared by TEC revised dated April 20, 2016
Letter revised dated prepared by TEC dated April 12, 2016
General Business:
242-1573, COC Request, 88 Duncan Drive (Wiemann) (ARC Surveying & Engineering
Associates, Inc.)
The applicant Mr. Wiemann of 88 Duncan Drive is present.
The Administrator states the site is in compliance with the proposed plan and approved
modifications. She notes that the stone wall is slightly within the conservation easement
shown on the plan.
Mr. Wiemann explains how the wall ended up slightly within the easement.
-Disturb Zone.
The Administrator states the wall is on the No-Disturb line.
A motion to issue the COC is made by Mr. Mabon, seconded by Ms. Feltovic.
Vote unanimous.
Documents:
Letter prepared by ARC Surveying & Engineering Associates, Inc. request for Certificate of
Compliance dated April 5, 2016
WPA Form 8A-Request for Certificate of Compliance
As-Built Plan prepared by ARC Surveying Engineering Associates, Inc. dated April 5, 2016
Photo prepared by the North Andover Conservation Department dated April 27, 2016
242-1603, COC Request, 315 South Bradford Street (Smolak Farm LLC /H. Michael
Smolak, Jr.) (ESS Engineering & Surveying Services)
Administrator states the request is for the bathroom building at Smolak Farm. She states a
drip trench was part of the proposed plan and was not installed.
The North Andover Conservation Commission states the infiltration trench must be installed.
A motion to grant the request for a continuance to the May 11, 2016 is made by Mr.
McDonough, seconded by Ms. Feltovic.
Vote unanimous.
Documents:
Letter prepared by ESS Engineering & Surveying Services request for Certificate of
Compliance dated April 12, 2016
WPA Form 8A-Request for Certificate of Compliance
Foundation As-Built Plan prepared by Neponset Valley Survey dated January 21, 2014
242-1595, Extension Request, 1661 Great Pond Road (TKZ)
The Applicant Thomas D. Zahoruiko is present.
Mr. Zahoruiko
station. He states he has updated the erosion control.
The Administrator states this is the first extension request.
A motion to issue the 1-year extension is made Mr. Manzi, seconded by Ms. Feltovic.
Vote unanimous.
Documents:
Letter request an 1-year extension prepared by TKZ LLC dated April 20, 2016
Owner Authorization Form undersigned, Susan Wright, Trustee of the Technical Training
Foundation prepared by TKZ LLC dated April 19, 2016
Site Plan prepared by Andover Consultants, Inc. dated April 19, 2016
242-1651, Modification Request, Lot 11 & Lot 12 (Old Salem Village) (Key Lime, Inc.)
John Burke, Esq. is present.
Administrator states the footprint of the duplex unit has been modified from the approved
plan. There is less impervious area resulting from the change. A deck and bulkhead for each
building are also shown.
A motion to issue the modification as drafted is made by Mr. Mabon, seconded by Ms.
Feltovic.
Vote unanimous.
Documents:
Letter prepared by Key Lime, Inc. request a modification dated April 18, 2016
Plan of Land prepared by Hays Engineering, Inc. dated April 8, 2016
242-1261, Enforcement Order /COC Request, Cotuit & Leyden Streets (Robert Burke,
Estate of Robert J. Burke) (TTI Environmental, Inc.) (cont. from 3/23/16)
The applicant John Burke, Esq. is present.
The North Andover Conservation Commission discusses the stone used in the forebays.
A motion to grant the request for a continuance to the May 11, 2016 meeting is made by Ms.
Feltovic, seconded by Mr. Manzi.
Vote unanimous.
Confirmation Emergency Certificate 1761 Salem Street (Salem Realty Trust/Beaver
Solutions)
A motion to confirm the issued Emergency Certificate for installation of a beaver deceiver is
made by Ms. Feltovic, seconded by Mr. Manzi.
Vote unanimous.
Documents:
Letter prepared by the North Andover Board of Health Department dated April 5, 2016
Letter prepared by James & Marinete Henry of 1773 Salem Street dated April 4, 2016
Letter prepared by the North Andover Conservation Department Emergency Certificate
Special Conditions dated April 25, 2016
Letter prepared by the North Andover Board of Health Department Letter of Compliance
dated April 29, 2016
Photos prepared by the North Andover Conservation Department dated April 5, 2016
Enforcement Order Update, 146 Main Street
Administrator states on Monday she received notification that Mr. Smith had fixed the pipe,
in doing so he located one pipe outside of the building in the Riverfront Area. She visited the
site with the plumbing inspector. She states Mr. Smith did this work in violation of the
Enforcement Order that the Commission issued. The Enforcement Order informed him that
any work may require a filing with the Conservation Commission. The work is not finished
and there is stockpiled soil and debris in the Riverfront/Buffer Zone.
Mr. Lynch suggests that an after the fact filing may be necessary.
The Commission discusses the EO and the need for clean-up of debris and soil left behind.
The Administrator notes that an after the fact filing would require triple filing fees.
Mr. Saal asks to receive the inspectors report.
A motion to issue a new Enforcement Order requiring Mr. Smith to clean up the excavation
and construction material by May 4, 2016 is made by Ms. Feltovic, seconded by Mr. Manzi.
Fines will issue if work is not completed as required.
Vote unanimous.
Decisions
242-1677, 350 Winthrop Avenue
Administrator reviews the draft Order of Conditions.
The Commission amends the Order.
A motion to issue the Order of Conditions as amended is made by Ms. Feltovic, seconded by
Mr. Lynch.
Vote unanimous.
242 -1678, 88-90 Saunders Street
Administrator reviews the draft Order of Conditions.
The Commission reviews the Order and makes no changes.
A motion to accept the Order of Conditions as drafted is made by Mr. Manzi, seconded by
Ms. Feltovic.
Vote unanimous.
A motion to adjourn the meeting at: 9:00 PM is made by Mr. Manzi, seconded by Ms. Feltovic.
Vote unanimous.