North AndoverConservation Commission Meeting Minutes
September 14, 2016
Members Present:
Louis A. Napoli, Chairman, Joseph W. Lynch, Jr., John T. Mabon, Deborah
A. Feltovic, Douglas W. Saal.
Members Absent:
Albert P. Manzi, Jr., Vice Chairman, Sean F. McDonough.
Staff Members Present:
Jennifer A. Hughes, Conservation Administrator.
Pledge of Allegiance
Meeting came to Order at: Quorum Present.
Approval of Minutes of 8/10/16
A motion is made by Mr. Mabon and seconded by Ms. Feltovic to approve the minutes of
8/10/16 as drafted.
Vote: Unanimous
Public Meeting:
NACC# 177, 220 Forest Street (Dushane)
The homeowner, David Dushane, is present.
The Administrator presents the proposal to connect to an existing water service in the street.
The applicant has a well that has gone dry. She states the wetland resource area is across the
street and no erosion control is needed.
Mr. Mabon asks if the submittal is complete.
Mr. Lynch asks if dewatering will be necessary.
The administrator states it is unlikely.
Mr. Mabon asks if any special conditions are necessary.
The Administrator states only post construction inspection.
Mr. Mabon makes a motion to consid
Ms. Feltovic seconds the motion.
Vote: Unanimous
Mr. Mabon makes a motion to approve the project as proposed with a condition for post
construction inspection.
Ms. Feltovic seconds the motion.
Vote: Unanimous
Documents:
Application Checklist-Small Project
Small Project Procedures
Copy of Town Check
North Andover MIMAP prepared by Midway Utility Con dated September 8, 2016
Sketched Plan prepared by Midway Utility Contractors LLC for the water main connection
area on the site dated September 8, 2016
Public Hearings:
Request for Determination of Applicability
64 Empire Drive (Wassaf)
Rama Atiya, homeowner is present.
The Commission discusses the location of the home within the subdivision.
Mr. Lynch asks
The owner states no new footings will be required.
Ms. Feltovic asks about special conditions.
Mr. Mabon makes a motion to issue a Negative Determination #3 for the work as proposed
with conditions for post construction inspection and the installation of a permanent drip
trench around the new structure.
Ms. Feltovic seconds the motion.
Vote: Unanimous
Documents:
Application Checklist-Request for Determination of Applicability
WPA Form 1-Request for Determination of Applicability
General Information
Project Description
Signatures and Submittal Requirements
Copy of Town Check
Notification to Abutters Form
Certified Abutters List prepared by the North Andover Assessors Department dated August
26, 2016
As-Built Plan Lots 12-16 prepared by Christiansen & Sergi, Inc. dated November 26, 2012
Photos prepared by the North Andover Conservation Department dated September 12, 2016
50 Stanton Way (Balduino)
The applicant Christopher Balduino is present.
The Administrator
control.
Mr. Mabon asks about new footings.
Ms. Feltovic makes a motion to issue a Negative #3 Determination with pre and post
construction inspections and erosion control to be installed between the work and the wetland
resource area.
Mr. Mabon seconds the motion.
Vote: Unanimous
Documents:
Application Checklist-Request for Determination of Applicability
WPA Form 1-Request for Determination of Applicability
General Information
Project Description
Signatures and Submittal Requirements
Certified Abutters list prepared by the North Andover Assessors Department dated August
26, 2016
Notification to Abutters Form
Sketch Plan of work being proposed dated August 30, 2016
Residential Property Record Card dated August 28, 2016
North Andover MIMAP aerial photo dated August 26, 2016
USGS Map Locus aerial dated August 30, 2016
Conservation As-Built Plan prepared by Christiansen & Sergi dated February 8, 2016 with
hand sketch of deck addition
Photos prepared by the North Andover Conservation Department dated September 12, 2016
Abbreviated Notice of Resource Area Delineation
242- , 44 Hawthorne Place (Skiba) (Seekamp Environmental Consulting, Inc.)
Michael Seekamp of Seekamp Environmental Consulting, Inc. is present the wetland
delineation done for the site. Mr. Seekamp reviews the review done with the Administrator.
One flag was moved during review and the plan has been updated.
The Commission discusses soils and the former use of the site.
Mr. Napoli states loam was previously stockpiled in this area.
The Commission states they will approve the delineation but a file number is needed.
Mr. Mabon votes to continue the matter to the September 28, 2016 meeting.
Ms. Feltovic seconds the motion.
Vote: Unanimous
Documents:
Application Checklist-Abbreviated Notice of Resource Area Delineation
WPA Form 4A-Abbreviated Notice of Resource Area Delineation
Applicant Information
Submittal Requirements
Copy of State and Town Check
Notice to Abutters Form
Certified Abutters List prepared by the North Andover Assessors Department dated August
2, 2016
Letter prepared by Seekamp Environmental Consulting, Inc. dated September 1, 2016
Google Earth View approximately 351 feet from the Shawsheen River prepared by Seekamp
Environmental Consulting, Inc. dated September 1, 2016
Google Earth Terrain View approximately 351.03 feet from the Shawsheen River prepared
by Seekamp Environmental Consulting, Inc. dated September 1, 2016
MA GIS online Mapping tool-Oliver aerial Locus Map prepared by Seekamp Environmental
Consulting, Inc. dated September 1, 2016
DEP Bordering Vegetated Wetland Delineation Field Data Form prepared by Seekamp
Environmental Consulting, Inc. dated July 21, 2016
Wetlands Location Plan prepared by Christiansen & Sergi, Inc. dated September 13, 2016
Notice of Intent (NOI)
242- , 50 Royal Crest Drive (off site inlets) (AIMCO North Andover, LLC) (Cornerstone
Land Associates) (cont. from 8/24/16) (Request to cont. to 9/28/16)
The applicant requests a continuance to the September 28, 2016 meeting.
Ms. Feltovic makes a motion to continue the public hearing to September 28, 2016.
Mr. Mabon seconds the motion.
Vote: Unanimous
Document:
E/Mail prepared by Cornerstone Land Associates request for a continuance to the
September 28, 2016 meeting dated September 14, 2016
Amendment
242-1629, 4 W High Street (RCG West Mill NA, LLC) (Civil Design Group, LLC)
David Steinbergh of RCG West Mill NA, LLC and Phil Henry of Civil Design Group are
present.
The Administrator introduces the request to amend the Order of Conditions to add a parking
lot and stormwater management in the location of the previously demolished building.
Mr. Steinbergh reviews the history of the project and introduces Mr. Henry the engineer on
the project.
Mr. Henry reviews the details of the parking including 108 parking spaces utilizing a rear
access drive. This will result in the loss of 6 spaces from the first phase of the proposal.
Bioretention will be used for stormwater management. There will be additional mitigation
-Disturbance Zone including 13 trees, 70 shrubs and ground cover. The
bioretention area will discharge through an existing manhole to Osgood Pond. Impervious
area will be reduced on site (from the original design) by 300 s.f.
The Administrator states the proposal was reviewed by Eggleston Environmental for
stormwater.
Mr. Mabon asks if pervious pavement will be used.
Mr. Henry states the drainage will go to the bioretention areas which include a forebay and a
concrete trench which will allow stormwater to settle then overflow. Curb inlets will let
stormwater into the sediment forebay and the extended bioretention area.
Photos of the site are presented.
Mr. Napoli asks if there will be a cut in the grade for the parking lot.
Mr. Henry states the grade will be based on the doors of the new building. The cut will be
Mr. Lynch states there will be a net improvement on runoff and treatment. He states a net
improvement is needed.
The Commission discusses an old treatment pond on the site that will no longer be used.
Mr. Mabon asks about the relocated cooling tower.
The Administrator states there will be new trees added.
.
Mr. Henry points out the areas where snow storage is shown.
edge.
Mr. Henry states the O&M Plan is still needed. He states it will be comprehensive.
The applicant requests to continue to the next meeting.
Ms. Feltovic makes a motion to continue the hearing to September 28, 2016.
Mr. Mabon seconds the motion.
Vote: Unanimous
Documents:
Letter prepared by RCG West Mill NA, LLC dated August 25, 2016. Request to modify Order
of Conditions previously approved on February 12, 2015 modified July 23, 2015.
Prepared by Saam Architecture: New door locations Building 36 dated August 24, 2016
Hydrologic Soil Group prepared by Civil Design Group, LLC dated July 28, 2016
Figure-1 Locus Plan prepared by Civil Design Group, LLC dated July 28, 2016
Fig-3 Bioretention Area Watershed Plan prepared by Civil Design Group, LLC dated July
28, 2016
Photos prepared by the North Andover Conservation Department dated September 13, 2016
General Business:
242-1428, Modification Request, Lot 4N-A Turnpike Street (One Hundred Fourteen Trust)
(Garner Company, Inc.) (cont. from 8/24/16)
The Administrator presents the four modification requests associated with an Enforcement
Order.
Mr. Lynch points out that there are successful 40B proposals that do not have enforcement
issues.
Mr. Mabon asks about the flared end pipes.
Mr. Lynch confirms that the Commission received the overlay plan required by the
Enforcement Order.
The Administrator states grading in the No-Disturbance Zone is shown.
Mr. Mabon states the project is out of control. He states the applicant at one point stated that
wetland was not being altered.
Mr. Mabon makes a motion to approve the modifications as requested.
Ms. Feltovic seconds the motion.
Vote: Four in favor, one opposed (Lynch)
Documents:
A letter requesting modifications prepared by Patrick C. Garner of Garner Company, Inc.
dated August 26, 2016
Modification Plan Planting Plan and replication areas prepared by Patrick C. Garner of
Garner Company, Inc. dated August 25, 2016
Photos prepared by the North Andover Conservation Department dated August 22, 2016
242-1419, COC Request, 70 Ogunquit Road (Lot 1) (Hafiz) (The Morin-Cameron Group,
Inc.)
John Morin of Morin-Cameron Group, Inc. is present. Mr. McKay the builder is also present.
Mr. McKay reviews the difficulty he had installing posts for wetland markers since there is
Mr. Lynch states the markers are to identify Riverfront Area and asks if it is all ledge at the
site.
Mr. Saal asks why Riverfront is being marked.
Ms. Feltovic makes a motion to issue a full and final COC to be held until the wetland
markers are installed on boulders.
Mr. Mabon seconds the motion.
Vote: Unanimous
Documents:
Letter request for Certificate of Compliance prepared by The Morin-Cameron Group, Inc.
dated August 25, 2016
WPA Form 8A-Request for Certificate of Compliance
As-Built Site Conditions prepared by The Morin-Cameron Group, Inc. dated August 12, 2016
Photos prepared by the North Andover Conservation Department dated August 2, 2016
242-1405, 655 South Bradford Street (Vana)
The applicant Frank M. Vana, Jr., Trustee is present.
The Administrator reviews the Field Inspectors recommendation that no work was ever done
on this filing.
There is some discussion of understory clearing but it will be made known to future owners
that not additional clearing can be done without a permit.
Mr. Mabon asks if the work never done box will be checked on the form.
It will.
A motion to grant the Certificate of Compliance for an Invalid Order is made by Mr. Mabon
Ms. Feltovic seconds the motion.
Vote: Unanimous
Documents:
Letter prepared by Frank M. Vana, Jr. Trustee request for Certificate of Compliance dated
September 9, 2016
WPA Form 8A-Request for Certificate of Compliance
Photos prepared by the North Andover Conservation Department dated September 7, 2016
0 Riverview Street (Massachusetts Electric Company) (Easement Request)
approved on Riverview Street. She states this easement will be in addition to one held by
GLSD on the same parcel.
Mr. Lynch confirms that is legitimate to have two easements on one parcel.
The Administrator confirms that GLSD knows of the request.
Mr. Mabon states we should have a signature from GLSD acknowledging the new easement.
Mr. Saal sates National Grid should pay for review of easement language by Town Counsel.
The Administrator reads an email from a National Grid representative, Jessica White.
Mr. Mabon states National Grid wrote the easement so it is likely in their favor.
Mr. Napoli states the town should not pay for review.
The Commission requests the Administrator let National Grid know review by counsel is
needed and should be expensed to the applicant.
A motion to continue the matter to September 28, 2016 is made by Ms. Feltovic and
seconded by Mr. Mabon.
Vote: Unanimous.
Documents:
Grant Easement to install 2 new polls within Town of North Andover Conservation
Commission land
Sketch Plan to Accompany Easement for 2 existing so poles and 2 new so poles needs +/-
around each pole for Truck Access prepared by National Grid dated October 9, 2015
A motion to adjourn the meeting at 8:15 is made by Ms. Feltovic and seconded by Mr. Mabon.
Vote: Unanimous.