Loading...
HomeMy WebLinkAboutApplication - 1679 OSGOOD STREET 7/16/2010 �6_ C E I V ` Ill Form C - 2013 � r �a 5 88 Application For Definitive Subdivision Approval � `�`�� �ti ' ' Received; Town of North Andover Town Clerk(Date Stamp) Stamp three (3)forms with the Town Clerk. File one(1) copy with the Town Clerk and two (2) with the Planning Department. To the Planning Board: The undersigned,being an applicant under Chapter 41, 81-0, 81-T, 81-U, MGL, for approval of a proposed subdivision plan, hereby submits a Definitive Plan and makes application for approval to the North Andover Planning Board: The undersigned hereby applies for the approval of said Definitive plan by the Board, and in furtherance thereof hereby agrees to abided by the Board's Rules and Regulations. The undersigned hereby further covenants and agrees with the Town of North Andover, upon approval of said Definitive plan by the Board: a. To install the utilities in accordance with the rules and regulations of the Planning Board,Department of Public Works,the Board of Health, and all general as well as zoning by-laws of said Town, as are applicable to the installation of utilities with the utilities within the limits of ways and streets; b. To complete and construct the street or ways and other improvements shown thereon in accordance with Section V and VI of the Rules and Regulations of the Planning Board, including all Appendices (I-VI) and Figures (1-27), and the approved Definitive plan, profiles and cross-sections of the same. Said plan, profiles, cross-sections and construction specifications are specifically,by reference, incorporated hereing and made a part of this application. This application and the covenants and agreements herein shall be binding upon all heirs, executors, administrators, successors,grantees of the whole or part of said land, and assigns of the undersigned; and C. To complete the aforesaid installations and construction within two (2)years from the date hereof. 1. Name of Applicant: G.M.z Realty Trust Address: 1679 Osgood Street, North Andover, MA 01845 Signature of Applicant 2. Name of Subdivision: Bradford Street Subdivision 3. Location and Description of Property[include Assessor's Map&Lot and Zoning District(s)]:- Subject Parcels are located on Rte 125 & Bradford Street, known as Tax Map 61, Lots 16 and 34. Total lot area consists of 14.42 acres. Address of Property Being Affected: Route 125 & Bradford Street Zoning Residential 2 and Corridor Development District 3 District: Assessors: Map#: 61 Lot# 16 & 34 4. Deed Reference: Book 2857 , Page 347 and/or BK 1720 / PG 193 Certificate of Title No. NA 5. Name of Surveyor/Engineer: Jones & Beach Engineers, Inc. Address: 85 Portsmouth Avenue, PO Box 219, Stratham, NH 03885 Easements&Restrictions of Record(Describe&Include Deed References) None 6. Preliminary Plan Submitt ? Yes Ian approved? No ;Date: Signature of Owner(s): INC— Address: Received: Town of North Andover Town Clerk(date stamp): Signature of Town Official receiving this application: JONES & BEACH ENGINEERS, INC. 85 Portsmouth Avenue Post Office Box 484 Post Office Box 219 Alton, NH 03809 Stratham, NH 03885 Email:jbe@jonesandbeach.com Telephone: (603) 772-4746 www.jonesandbeach.com Fax: (603) 772-0227 July 16, 2010 Town of North Andover Planning Department –; Attn: Mary Ippolito 1600 Osgood Street, Bldg. 20, Suite 2-36 C=. North Andover, MA 01845 -- — RE: Definitive Subdivision Application–GMZ Realty Trust T:I Route 125 & Bradford Street,North Andover, MA _ „o Tax Map 61,Lots 16 & 34 c.:) JBE Project#06163 C Dear Board Members: Jones & Beach Engineers, Inc., on behalf of our client, GMZ Realty Trust, respectfully submits an Application for Definitive Subdivision Approval for the above referenced parcels. The existing parcel currently has 4 dwelling units located at 1679 Osgood Street. The intent of this application is to subdivide the property into seven (7)residential lots with private individual wells and on-site leach field areas. Two (2) new roads are proposed with c„1-de-sacs to provide access to the seven residential homes. The following items are provided in support of this Subdivision Application: 1. Three (3) Completed Applications for Definitive Subdivision Approval (Form Q. 2. Signed Department Acknowledgement List (Form L). 3. Complete Checklist for Definitive Subdivision. 4. Eight (8) copies of Environmental and Community Impact Analysis. 5. Owner's Letter of Authorization. 6. Deed representing ownership. 7. Abutters List (Certified by Assessor's Office) 8. Waiver Request. 9. Construction Schedule and Cost Estimate. 10. Form 11, Soil Suitability Assessment. 11. Lot Closures. 12. Cut and Fill Sheet. 13. Checklist for Stormwater Report. 14. Abutter notification envelopes with certified slips and stamps, additional labels & stamps for letter of decision notices. 15. Fourteen(14) additional stamps for surrounding City and Town notifications. 16. Checks in the amount of$3,200.00 for application filing fees, $2,000 for Stormwater Review and $3,000.00 for Engineering review fees. 17. Two (2) Drainage Analysis Sediment & Erosion Control Plan and Stormwater Pollution Prevention Plan. F:\Land Projects 3\06163-N.Andover-1679-OsgoodSt\WORD FILES\Definitive Subdivision Cover Letter.doc 18. Nine (9) complete full size plan sets. Very truly yours, J NES & BEA ENGINEERS, INC. Jo p A. oronati V e President CC: Town Clerk (plan set & application copy) Board of Health(plan set &application copy) Department of Public Works (plan set& application copy) Fire Department (plan set & application copy) Conservation Department (plan set& application copy) Open Space Committee (plan set & application copy) Building Department (plan set & application copy) School Department (plan set&application copy) Police Department (plan set& application copy) Tim McIntosh, VHB (plan set & application copy) GMZ Realty Trust(plan set& application copy) Mark Johnson(plan set & application copy) Ken Sakurai(plan set & application copy) FALand Projects 3\06163-N.Andover-1679-OsgoodSt\WORD FILES\Definitive Subdivision Cover Letter.doc JONES&BEACH ENGINEERS, INC Form C Application For Definitive Subdivision Approval Received; Town of North Andover Town Clerk(Date Stamp) Stamp three (3) forms with the Town Clerk. File one (1) copy with the Town Clerk and two (2) with the Planning Department. To the Planning Board: The undersigned, being an applicant under Chapter 41, 81-0, 81-T, 81-U, MGL, for approval of a proposed subdivision plan, hereby submits a Definitive Plan and makes application for approval to the North Andover Planning Board: The undersigned hereby applies for the approval of said Definitive plan by the Board, and in furtherance thereof hereby agrees to abided by the Board's Rules and Regulations. The undersigned hereby further covenants and agrees with the Town of North Andover, upon approval of said Definitive plan by the Board: a. To install the utilities in accordance with the rules and regulations of the Planning Board, Department of Public Works, the Board of Health, and all general as well as zoning by-laws of said Town, as are applicable to the installation of utilities with the utilities within the limits of ways and streets; b. To complete and construct the street or ways and other improvements shown thereon in accordance with Section V and VI of the Rules and Regulations of the Planning Board, including all Appendices (I-VI) and Figures (1-27), and the approved Definitive plan, profiles and cross-sections of the same. Said plan, profiles, cross-sections and construction specifications are specifically, by reference, incorporated hereing and made a part of this application. This application and the covenants and agreements herein shall be binding upon all heirs, executors, administrators, successors, grantees of the whole or part of said land, and assigns of the undersigned; and C. To complete the aforesaid installations and construction within two (2) years from the date hereof. 1. Name of Applicant: G.M.z Realty 'trust Address: 1679 Osgood Street, North Andover, MA 01845 Signature of Applicant 2. Name of Subdivision: Bradford Street Subdivision 3, Location and Description of Property[include Assessor's Map&Lot and Zoning District(s)]:- Subject Parcels are located on Rte 125 & Bradford Street, known as Tax Map 61, Lots 16 and 34. Total lot area consists of 14.42 acres. Address of Property Being Affected: Route 125 & Bradford Street Zoning Residential 2 and Corridor Development District 3 District: Assessors: Map#: 61 Lot# 16 & 34 4. Deed Reference: Book 2857 , Page 347 and/or BK 1720 / PG 193 Certificate of Title No. NA 5. Name of Surveyor/Engineer: Jones & Beach Engineers, Inc. Address: 85 Portsmouth Avenue, PO Box 219, Stratham, NH 03885 �.es nS of Record(Deserihe& include Deed references) E.aScii.eniS ax None 6. Preliminary Plan Submitt ? Yes Ian approved? No ;Date: Signature of Owner(s). Address: _t Received: Town of North Andover Town Clerk(date stamp): Signature of Town Official receiving this application: Form L Departmental Referral Form With Signature of Departments Acknowledging Receipt To: Director,Engineering,Jack Sullivan Fire Chief,William Dolan Interim Conservation Administrator,Alison McKay Building Commissioner,Bob Nicetta Health Administrator,Susan Sawyer School Committee Police Department From: Applicant: G.M.Z. Realty Trust Date: 07/16/10 Re: Preliminary Plan x Definitive Subdivision Modification to a Subdivision Special Permit Site Plan Review Address/Development:_ Route 125 & Bradford street (Tax Map 61, Lots 16 and 34) A Public Hearing has been scheduled for to discuss the plans checked above. Please provide your written comments to the Planning Department by (The Wednesday before the scheduled public hearing and/or scheduled Planning Board meeting.) Failure to provide written comments by this date will constitute your approval of this plan. Thank You. JONES & BEACH ENGINEERS, INC. 85 Portsmouth Avenue Post Office Box 484 Post Office Box 219 Alton, NH 03809 Stratham, NH 03885 Email:jbe@jonesandbeach.com Telephone: (603) 772-4746 www.jonesandbeach.com Fax: (603)772-0227 July 16, 2010 North Andover Board of Health 1600 Osgood Street, Bldg. 20, Suite 2-36 North Andover, MA 01845 RE: Definitive Subdivision Application—GMZ Realty Trust Route 125 & Bradford Street,North Andover, MA Tax Map 61, Lots 16 & 34 JBE Project #06163 Dear Board Members: Jones & Beach Engineers, Inc., on behalf of our client, GMZ Realty Trust, respectfully submits an AD-plication for Definitive Subdivision Approval for a 8-lot subdivision on above referenced parcels. The existing parcel currently has 4 dwelling units located at 1679 Osgood Street. We have attached a copy of Form C and a full set of plans for your review. Very truly yours, JO ES & BEA7 ENGINEERS,INC. Jos A. oro ati Vic President F:\Land Projects 3\06163-N.Andover-1679-OsgoodSt\WORD FILES\Board of Health Letter.doc TOWN OF NORTH ANDOVER-PLANNING DEPARTMENT Checklist for a Definitive Subdivision This checklist is to be used as a guide for complying with the Town of North Andover's Definitive Subdivision regulations. A completed checklist must be submitted as part of the required Definitive Subdivision application. The Planning Board shall make a determination to accept,reject, or table an application based on both its review and the review and recommendation of the Department of Planning and Community Development. Please fill out this checklist thoroughly by checking the appropriate box and providing the necessary information. Provide written. justification for any waiver requests (including citing the appropriate section number of the regulations), or for any boxes checked "not applicable"if the reasons are not apparent. The Town of North Andover Bylaw is available for a fee at the Planning Department and Community Development or/on the Web at: www.townofiiortlaandover.coiri, if you have any questions, please contact this office for assistance at: 978-688-9535. NOT WAIVER REOUIlZEMENTS ON PLAN APPLICABLlE. RGOUESTED EXPLANATION Submit 3 copies of plan 1" -40' & Submit 12 copies of plan l.1"x 17". 1.North Arrow/Location Map 1 2.Survey of the Lot/Parcel ( ❑ 2 3.Name/Description of Project (^] El3 4. Easement/Legal Conditions ❑ El 4 5. Topography 5 6. Zoning Information 6. NOT WAIVER REQ JIREMENTS ON PLAN APPLICABLE _-REQUESTED EXPLANTION 7. Stone Water Drainage Plan El 7. 8. Building(s)location8. 0 9. Building elevation El M7 ❑ 9. 10. Location of Parking/Walkways L1 10. I I.Location of Wetlands 12, Location of Walls/Signs 12. 13.Location of Roadways 13. 14. Outdoor Storage/Display Area El 14. 15. Landscaping Plan E] 15. - 16,Refuse Areas El FZK El 16. 17.Lighting Facilities ❑ _111, El 17. M 18.Drainage Basin Study 18. 19, Traffic Impact Study 19. 20. Commonwealth Review F1 ❑ 20. 21. Utilities LVI El 21. _-2_2.Fi-s­c_al-Impact El 22. 1 23. Community Impact L1 El E-I 23 J_ Signature of person preparing the Checklist for a Definitive Subdivision. 5.1.5 Site Evaluation Statement Environmental and Community Impact Analysis (5.4) I. Project Scope: The intent of this project is to conventionally subdivide Map 61, Lots 16 and 34 into eight (8) single family residential lots with municipal water and onsite septic. Parcels A and B as shown on our plans are not buildable lots. Lot 34 is already a building lot in the Town and therefore, this is the creation of seven additional lots. The access will be from Bradford Street and will require the construction of a 1,062' cul-de-sac. All of the proposed homes will have driveways off of the proposed roadway. The lots will be serviced with Town water and onsite septic systems. The existing parcel currently has 4 dwelling units located at 1679 Osgood Street. These units have existed for many years and there is no proposed change to this portion of the lot. The remaining parcel has been commercially used over the years,however, most recently this area has been remained wooded and undeveloped. You can see historical earth moving was performed on the property many years ago and we are not sure for what purpose. Section 5.4.4.1 Natural Environment a. Air &Noise Pollution - The only air and noise pollution generated from the project will be the temporary impacts associated with construction. We expect that this roadway will only take 2-3 months to construct. b. Water Pollution- The drainage design of the stormwater system requires multiple small detention ponds and treatment systems to meet the Town and State requirements. The stormwater impacts offsite will be mitigated by these structures. We have a decrease in stormwater runoff exiting the property and therefore no adverse impacts will occur downstream. This design will be reviewed by the Town Engineer to ensure compliance with Town codes. c. Land—This site consists mostly of uplands and the soils are suitable for construction. We have a buffer to the downhill abutting properties which will not be affected by the development. d. Plants &Wildlife—Our Wetlands Consultant will be addressing the environmental issues associated with this project in his Notice of Intent. This will be reviewed by the Conservation Commission. e. Water Supply— 8 additional 4 bedroom homes using 440 gallons per day adds 3,520 gallons per day. This is a small amount of usage and the actual usage is typically less than the 110 gallons per bedroom. There are larger subdivisions up the hill from us on Bradford Street,therefore,water pressure should not be a concern. f. Sewage Disposal—This development will require 8 septic systems to be constructed. The soils have been evaluated by Ben Osgood, P.E. and he has no concerns about the placement of septic fields on this parcel. Section 5.4.4.2 Man-Made Environment a. Existing Neighborhood Land Use—The existing neighborhoods on Bradford Street consists of old and new residential dwellings. The properties fronting on Bradford Street in North Andover are approximately 50 years old. The properties fronting on Bradford Street in Haverhill are less than 10 years old. On the south side of the property,White Birch Lane Subdivision borders our property. b. Zoning—Our property is split zoned, with Residential 2 and Corridor Development District 3. The proposed subdivision is proposed within the Residential 2 zone and we are utilizing 100' of the Corridor Development District 3 zone for a couple of the lots. Our proposed use is compatible with the zoning. Section 5.4.4.3—Public Services Schools - The impact to the school system will be minimal as the project is small. Not every house will have school age children at the same time. The location is convenient to existing bus routes and the roadway is short enough for school children to walk to the end for pickup. Buses would also be able to drive down the roadway and turnaround if desired. Police—We do not anticipate the need for any above normal police presence because of this proposed project. Fire—We do not anticipate the need for any above normal fire department presence because of this project. We have equipped the roadway with a watermain and hydrants. The road meets the Town standards for design widths and safety. Recreation—Onsite recreation will be provided on each individuals lot as they deem necessary. Offsite recreation is available throughout the Town and Community and this project will not overburden the public facilities. Solid Waste Disposal—We expect the typical trash disposal of this project as every other subdivision house lots within Town. The collection of this material will be provided by the Town and paid for by the taxes collected. Traffic- The additional impact will be from the 7 additional homes that will be constructed from this proposed development. Remembering that one of the lots already exists. Bradford Street is a two lane collector roadway and is residentially developed with frontage lots and subdivisions. The addition of approximately 70 vehicle trips per day from this subdivision will have no adverse impact on Bradford Street. The sight distance from the proposed roadway is acceptable and larger subdivisions exist further to the southeast. Highway—The proposed traffic will not require any changes to the highway system. Future maintenance of Bradford Street will be required despite this development. We do not anticipate that the roadway will have to repaired sooner than expected because of this development. The construction vehicles will have to access Bradford Street during the roadway construction. Typically a road bond is placed by the contractor and developer in order to address any repairs that are necessary prior to road acceptance. Section 5.4.4.4—Aesthetics a. Lighting—At this time, we are not proposing any lighting within the subdivision other than that provided by Homeowners on their houses and driveways. If the Town requires lighting, we can certainly address that concern. b. Landscaping—We are proposing the roadside trees between the sidewalk and the roadway as required by the Town codes. All other landscaping will be dependent on Homeowner's preference. c. Visual—This property is currently wooded and we do not have any homes proposed for the first 400' of the roadway. Therefore, no visual impacts will occur from vehicles on Bradford Street. The residents along Bradford Street will have a couple homes behind their existing dwellings. They have been able to enjoy this property as undeveloped land for many years. Whoever builds the homes within this development has just as much interest in not seeing the neighbors as vice versa. Letter of Authorization I,Nellie Saracusa,Trustee, G.M.Z. Realty Trust, 1679 Osgood Street,North Andover, MA, 01845, owner of property located in North Andover, MA, known as Tax Map 61, Lots 16, do hereby authorize Jones & Beach Engineers, Inc., PO Box 219, Stratham,NH, to act on my behalf concerning the previously mentioned property. The parcel is located on Route 125 and Bradford Street in North Andover, MA. I hereby appoint Jones &Beach Engineers,Inc. as my agent to act on my behalf in the review process, to include any required signatures. 2-.'J L— 1LAZ44ad-- W tness Nel ' Saracusa Date G.M.Z.Realty Trust F:\Land Projects 3\06163-N.Andover-1679-OsgoodSt\06163 Contract 2\Word\06163-Letter of Authorization-Owner.doc JONES &BEACH ENGINEERS, INC. a���� t Bk A0557 P:93 -10-431562 i ... . 12-22-2006 & 02 2 32P Quitclaim Deed We,Russell Moschetto,of North Andover,Massachusetts,Nellie Saracusa, of North Andover, Massachusetts, and Samuel Moschetto of New Port Richey,Florida,being all of the surviving beneficiaries of the G M Z Realty Trust dated December 1, 1988 and recorded in the North Essex Registry of Deeds in Book 2857 Page 340 as amended in Book 5450 Page 307 for consideration paid of Ten($10.00)Dollars grant to Russell Moschetto,of North Andover and Nellie Saracusa,of North Andover, as Trustees of the G M Z Realty Trust, of 1679 Osgood Street,North Andover, Massachusetts, dated December 8, 2006;a Trustees Certificate being recorded herewith With Quitclaim Covenants The land with all the buildings thereon, situated in North Andover,Essex County, Massachusetts, containing sixteen(16) acres more or less, and being more particularly shown on a plan entitled "Plan Showing a Portion of Land Owned By Concettina Coppola,North Andover, Mass.,August 1961, R.B. Brasseur Engr., Haverhill, Mass.",recorded as Plan No.4352,bounded and described as follows: Beginning at the northwesterly corner of the herein described parcel at an iron pipe in the easterly line of Osgood Street and the southwesterly corner of land of John and Marguerite Roche: thence r unnini ` . Southeasterly by land of said John and Marguerite Roche 200 feet to an iron pipe at other land of Concettina Coppola;thence running again d , Southeasterly,but more easterly,by said other land of Concettina Coppola,428 feet,more or less, to the southerly corner of land of Michael and Sarah Maekor and the westerly corner of land of land of John and Rina Morreal,which point is 300 feet westerly of the westerly line of Bradford Street;thence turning and running Southeasterly by land of John and Rina Morreal,land of Richard and Phila Slade, and land of Frank Verrecchia,443.35 feet to a point at other land of said Concettina Coppola, said line being 300 feet westerly of and parallel to the westerly line of Bradford Street; thence again Southeasterly,but more southerly by said other land of Concettina Coppola, and land of Leo P. Poirier,400.10 feet to an iron pipe at land of Barker, said iron pipe being 322.0 feet westerly of a stone monument in the westerly line of Bradford Street; thence turning and running Southwesterly by said land of Barker,443.75 feet,more or less,to an iron pipe at land of Christopher and Elaine Adams; thence turning and running Northwesterly by land of said Christopher and Elaine Adams, 193.19 feet to an iron pipe;thence Bk 10557 Pg 4 #43562 turning and running Southwesterly still by land of Christopher and Elaine Adams,414.26 feet to an iron pipe at land of Tremarco Corp.; thence turning and running Northerly by land of said Tremarco Corp,land of Local C.W.A., land of Bernard and Marguerite Bresnahan and land of Philip and Mary Roche,656.34 feet to a corner in the fence;thence running Westerly as the fence now stands and by land of Philip and Mary Roche,283.0 feet,more or less, to the easterly line of Osgood Street as altered and laid out as a State Highway by the Department of Public Works in 1955;thence running Northerly and slightly easterly by said easterly line of Osgood Street and a curve of 1208.78 foot radius, a distance of 472.84 feet,more or less,to a stone monument in the said easterly line of Osgood Street, marking the northerly end of said curve of 1208.78 foot radius;thence Northeasterly, still by said easterly line of Osgood Street 44.5 feet,more or less,to an iron pipe at the southwesterly comer of land of John and Marguerite Roche and the paint of beginning. Excepting herefrom the land previously conveyed to Loius G. Brunelle by deed of Concettina Coppola dated February 27, 1978 and recorded in Book 1332 Page 517. The M Z Realty Tn�et nr ,ixYtttFJer , 1988 expire b ire i iYi4z Dec nber II ���+� _unaant to Article VII the beneficiaries of said trust were named as Russell Moschetto, Sam Moschetto, aka Samuel Moschetto,Nellie Rose Marie Saracusa, aka Nellie Saracusa and Joseph Zocco or their respective estates.Joseph Zocco deceased October 21, 1997. His will was duly probated in Essex County Probate No.97P2874-AA1. He left all of his estate,real and personal to his spouse, Grace Zocco. The mother of Russell Moschetto, Samuel Moschetto, and Nellie Saracusa, Grace Zocco deceased January 10,2003 intestate leaving only her three children as heirs at law. Being the same premises conveyed to the trustees of the expired G M Z Realty Trust in Book 2857 Page 347. Bk 10557 Pg 5 #43562 Witness our Hands and Seals this gam'"day of December,2006 C;isIII Ne husa Samuel Moschetto Commonwealth of Massachusetts Essex, ss I ,.gyp On this `+"` day of December ,2006,before me,the undersigned notary public, personally appeared Russell Moschetto and Nellie Saracusa, and proved to me through satisfactory evidence of identification;that bung a Massachusetts Driver's License and personal knowledge,to be the persons whose names are signed on the attached document, and acknowledged to me that they signed it voluntarily and for its stated purpose. Ellen A.Zipeto Notary Public My commission expires: 7/12107 Abutter to Abutter( ) Building Dept. ( ) Conservation ( X ) Zoning ( ) Town of North Andover Abutters Listing REQUIREMENT: MGL 40A,Section 11 states in part"Parties in Interest as used in this chapter shall mean the petitioner, abutters,owners of land directly oppositeon any public or private way,and abutters to abutters within three hundred(300)feet of the property line of the petitioner as they appear on the most recent applicable tax list,not withstanding that the land of any such owner is located in another city or town,the planning board of the city or town,and the planning board of every abutting city or town." Subiect Property: MAP PARCEL Name Address 61 16&34 GMZ Realty Trust 1679 Osgood Street,North Andover,MA 01845 Abutters Properties Map Parcel Name Address 34 1 &2 Tyler Munroe 100 Foster Street,North Andover,MA 01845 34 3 Grocery Place Investors 1 Chestnut Street,Arlington,MA 002474-1225 34 4&31 S P E C Realty Trust 35 Webster Street#302,East Boston,MA 02128 34 5 JDP Development Co.lnc 12 Rogers Road,Haverhill,MA 01835 34 28 Hang'n Tree Realty Trust 2110 White Lane,Haslet,TX 076052 34 41 Microwave Engineering Corp 1551 Osgood Street,North Andover,MA 01845 34 44 Mark Valentino 1615 Osgood Street,North Andover,MA 01845 34 �17&54 Osgood Landing,LLC 1600 Osgood Street,North Andover,MA 01845 61 7 Glen Randall 29 White Birch Lane,North Andover,MA 01845 61 17&38 Roy McKinney P.O.Box 8373,Ward Hill,MA 01835 61 22 Hazel Orchard 11 Bradford Street,North Andover,MA 01845 61 23 Victor Andreoli 15 Bradford Street,North Andover,MA 01845 61 24 Gerald Hall 55 Bradford Street,North Andover,MA 01845 61 25 Richard Slade 21 Bradford Street,North Andover,MA 01845 61 31 Emma Uliano 31 Bradford Street,North Andover,MA 01845 61 32 Russell Moschetto 63 Bradford Street,North Andover,MA 01845 61 33 Richard Walker 23 Bradford Street,North Andover,MA 01845 61 35 Jennifer Teneriello 27 Bradford Street,North Andover,MA 01845 61 36 Elizabeth Poirier 29 Bradford Street,North Andover,MA 01845 61 58 Robert Gioseffi 19 Bradford Street,North Andover,MA 01845 61 66 Carey Storage I LLC 208 East Ridgeville Blvd.#202,MT.Airy,MD 021771 61 67&74 P E A Films,Inc 799 Crandon Blvd,Key Biscayne,FL 033149 61 89 Douglas Swatski 45 White Birch Lane,North Andover,MA 01845 61 90 Francis Banacos 53 White Birch Lane,North Andover,MA 01845 61 91 Jill Sloper 61 White Birch Lane,North Andover,MA 01845 61 92 Joan Betty 67 White Birch Lane,North Andover,MA 01845 61 93 Joseph Andriolo 37 White Birch Lane,North Andover,MA 01845 City of Haverhill Haverhill City Hall 4 Summer Street,Haverhill,MA 01830 JONES & BEACHENGINEERS, INC. 85 Portsmouth Avenue Post Office Box 484 Post Office Box 219 Alton, NH 03809 Stratham, NH 03885 Email:jbe@jonesandbeach.com Telephone: (603) 772-4746 http://www.jonesandbeach.com Fax: (603) 772-0227 July 13, 2010 North Andover Planning Department 1600 Osgood Street, Building 20, Suite 2-36 North Andover, MA 01845 RE: Waiver Request Route 125 & Bradford Street,North Andover,MA Tax Map 61,Lots 16 &34 JBE Project No. 06163 Dear Planning Department, Jones & Beach Engineers, Inc., respectfully requests a waiver from Section 6.8.1 — Streets—Design Standards, Table 1 A Minimum Design Standards for Local Streets— Maximum Length(roadway plus turnaround) = 600 feet, for the above-referenced parcel on behalf of our client, GMZ Realty Trust. If you have any questions or need any additional information, please feel free to contact our office. Thank you very much for your time and consideration of this request. Very truly yours, +JO$ES BE NGINEERS, INC. oronati dent F:\Land Projects 3\06163-N.Andover-1679-OsgoodSt\WORD FILES\Waiver Request Letter.doc 5.1.8 List of Waivers On behalf of our client, GMZ Realty Trust, we respectfully request a waiver of the following section of the Town of North Andover Subdivision Regulations be granted for the proposed Subdivision at 1679 Osgood Street and Bradford Street. Section 6.8.1 — Streets—Design Standards, Table IA Minimum Design Standards for Local Streets—Maximum Length (roadway plus turnaround) = 600 feet 5.1.9 Construction Schedule Start of Construction: March 1, 2011 Completion of Construction: December 31, 2013 Actual dates may vary based on contractor,market conditions and housing market demands. 5.1.10 Type of Performance Guarantee The type of Performance Guarantee will be specified once the project is sold to a builder or constructed by the landowner. We cannot predict what type of Guarantee they will decide to utilize, but it will have to one suitable to the Town prior t0 project commencement. This wvuid be a well suited topic for the pre-construction meeting. 5.1.11 Quitclaim Deed to streets subject to acceptance: and to open space areas subiect to Town Purchase This seems like it would be a suitable condition of approval. We will provide the legal deed to the street at a later date. J/B • W • • J/BMap 61 Lots 16 and 34, North AndJones &Beach Engineers, Inc. GMZ Realty Trust 85 Portsmouth Avenue 1679 Osgood Street P.O. Box 219 North, Andover, MA 01845 Stratham, NH 03885 JBE Project No. 06163 July 12, 2010 Total Length of Road = 1,000 lin.ft. UNIT TOTAL ITEM DESCRIPTION UNIT QTY COST COST SUBTOTAL GENERAL CONSTRUCTION Clearing and Grubbing AC 10.7 $ 5,000.00 $ 53,500.00 Stump Disposal AC 4.6 $ 3,000.00 $ 13,800.00 Common Excavation Cuts CY 14525 $ 4.00 $ 58,100.00 Common Excavation Fills CY 15820 $ 4.00 $ 63,280.00 Loam Stripping CY 5811 $ 2.50 $ 14,527.50 Gravel Subbase CY 1003 $ 17.00 $ 17,051.00 Dense Graded Sub Base Course Gravel, MHD Section 402 CY 334 $ 20.00 $ 6,680.00 Top Course TON 257 $ 65.00 $ 16,705.00 Binder Course TON 686 $ 60.00 $ 41,160.00 Construction Entrance LS 1 $ 1,500.00 $ 1,500.00 Sloped Granite Curbing LF 1365 $ 22.00 $ 30,030.00 Vertical Granite Curbing LF 611 $ 30.00 $ 18,330.00 5'Paved Sidewalk LF 979 $ 12.50 $ 12,237.50 Loam and Seed Slopes SY 1900 $ 5.00 $ 9,500.00 Iron Bounds EA 2 $ 100.00 $ 200.00 Granite Bounds EA 40 $ 200.00 $ 8,000.00 GENERAL CONSTRUCTION SUBTOTAL $ 364,601 DRAINAGE SYSTEM 6"Perf ADS Drainpipe LF 735 $ 16.00 $ 11,760.00 12"ADS-N12 Culvert LF 936 $ 24.00 $ 22,464.00 EA 7 $ 350.00 $ 2,450.00 12"Flared End Section Catch Basin EA 8 $ 1,500.00 $ 12,000.00 Drain Manhole EA 5 $ 1,500.00 $ 7,500.00 Catch Basin Control Structure EA 5 $ 1,500.00 $ 7,500.00 Standard Headwall EA 1 $ 650.00 $ 650.00 Detention Pond LS 5 $ 4,000.00 $ 20,000.00 Rip Rap Erosion Control CY 61 $ 18.00 $ 1,098.00 Silt Fence LF 2517 $ 4.00 $ 10,068.00 DRAINAGE SYSTEM SUBTOTAL $ 95,490 WATER SERVICE 8"D.I.Water Main LF 850 $ 60.00 $ 51,000.00 EA 7 $ 400.00 $ 2,800.00 Concrete Thrust Block 1"K-Copper Service LF 8 $ 18.00 $ 144.00 1"Curb Stop&Corp.Box EA 8 $ 250.00 $ 2,000.00 8"x 6"D.I.Tee EA 2 $ 450.00 $ 900.00 8"Gate Valve EA 2 $ 1,200.00 $ 2,400.00 6"Gate Valve EA 2 $ 950.00 $ 1,900.00 1"Water Shut Off EA 8 $ 250.00 $ 2,000.00 8"D.I. 11.25 Degree Elbow EA 3 $ 450.00 $ 1,350.00 8"D.I.22.5 Degree Elbow EA 1 $ 450.00 $ 450.00 Sleeve&Tap Exist Main EA 1 $ 2,500.00 $ 2,500.00 Jones and Beach Page 1 7/13/2010 J/B • •UI kvi J/B Map 61 Lots 16 and 34, North Andover, MA Jones &Beach Engineers, Inc. GMZ Realty Trust 85 Portsmouth Avenue 1679 Osgood Street P.O. Box 219 North, Andover, MA 01845 Stratham, NH 03885 JBE Project No. 06163 July 12, 2010 Total Length of Road = 1,000 lin.ft. UNIT TOTAL ITEM DESCRIPTION UNIT QTY COST COST SUBTOTAL Fire Hydrant EA 2 $ 1,800.00 $ 3,600.00 WATER SERVICE SUBTOTAL $ 71,044 UTILITIES Underground Conduit LF 950 $ 18.00 $ 17,100.00 Transformer Pads EA 4 $ 500.00 $ 2,000.00 EA 1 $ 2,000.00 $ 2,000.00 Drop Utility Pole UTILITIES SUBTOTAL $ 21,100 SEWER SERVICE EA 8 $ 14,000.00 $ 112,000.00 Septic Field SEWER SERVICE SUBTOTAL $ 112,000 SUBTOTAL $ 664,235 10% CONTINGENCY $ 66,424 GRAND TOTAL $ 730,659 Jones and Beach Page 2 7/13/2010 Commonwealth of Massachusetts 1- City/Town of North Andover Form 1 i - Soil Suitability Assessment for On-Site Sewage Disposal MassDEP has provided this form for use by on-site professionals and local Boards of Health. Other forms may be used, but the information must be substantially the same as provided here. Before using this form, check with your local Board of Health to determine the form they use. A. Facility Information G.M.Z. Realty Trust Owner Name _ Map 61, Parcels 16 & 34 1679 Osgood Street Map/Lot# Street Address North Andover MA 01845 State Zip Code City B. Site Information 1. (Check one) ® New Construction ❑ Upgrade ❑ Repair 1981 1:15,840 Wnc& De 2. Published Soil Survey Available? ® Yes ❑ No If yes: Year Published Publication Scale Soil Map Unit Windsor& Deerfield WnC Very rapid perm and slope De-Very rapid permeability Soil Name Soil Limitations 3. Surficial Geological Report Available? ❑ Yes ® No If yes: Year Published Publication Scale Map Unit Geologic Material Landform 4. Flood Rate Insurance Map Above the 500-year flood boundary? ® Yes ❑ No Within the 100-year flood boundary? ❑ Yes ® No Within the 500-year flood boundary? ❑ Yes ® No Within a velocity zone? ❑ Yes ® No n/a 5. Wetland Area: National Wetland Inventory Map Map Unit Name n/a Wetlands Conservancy Program Map Map Unit Name Title 5 Form 11_1 •rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 1 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment: for On-Site Sewage Disposal o B. Site Information (Continued) 6. Current Water Resource Conditions USGS : Nov. 2007 Range: Month/Year El Above Normal ❑ Normal ® Below Normal 7. Other references reviewed: C. On-Site Review (minimum of two holes required at every proposed primary and reserved disposal area) Deep Observation Hole Number: TP1 12/19/07 9:00 35 Cloudy Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan), see plan 2. Land Use Residential None 8% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) Grass Outwash Plain _Back slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body f et00 Drainage Way 360 Possible Wet Area 360 Property Line et et eget Drinking Water Well fee50 Other feet 4. Parent Material: Proglacial OLItwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 39" (redox) inches elevation Title 5 Form 11_1 rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 2 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On Sewage Disposal C. On-Site Review (Continued) TP1 Deep Observation Hole Number: Redoximorphic Features Coarse Fragments Soil (mottles) Soil Texture %by Volume Soil Consistence Other Soil Horizon/Soil Matrix:Color- (USDA) Cobbles& Structure (Moist) Depth(in.) Layer Moist(Munsell) Gravel Depth Color Percent Stones 0-9 A 10YR 2/2 S L 9-17 131 10YR 5/8 LS ' L S 17-32 B2 2.5Y 514 7.5YR4/6 M/F S 5% Gray. 5% Cobb. M F 32-93 C 2.5Y 6/3 39„ 2.5Y 7/2 Additional Notes: No refusal — Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 3 of 8 Title 5 Form 11_1 •rev. 10/07 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP2 12/19/07 9:00 35 Cloudy Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Residential None 8% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) Grass Outwash Plain _ Backslope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Oen Water Body 1200 320 Open y Drainage Way 320 feet 9 y feet Possible Wet Area feet Property Line e0t Drinking Water Well '150 Other feet feet 4. Parent Material: Proglacial outwasn Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes 0 No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 41" (redox) inches elevation i i Title 5 Form 11_2-rev. 10107 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP2 Redoximorphic Features Coarse Fragments Soil (mottles) Soil Texture %by Volume Soil Consistence Other Depth(in.) Soil Horizon/Soil Matrix:Color- — (USDA) Cobbles& Structure (Moist) Layer Moist(Munsell) Depth Color Percentnt Gravel Stones 0-38 FILL - 7.5YR4/6 L S 38-56 B 10YR 5/8 41 2.5Y 7/2 F/M S 5% Gray. 5% Cobb. M F 56-106 C 2.5Y 6/3 Additional Notes: No refusal Fill has buried debris and old 1"copper water line — Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Title 5 Form 11_2•rev. 10/07 Commonwealth of Massachusetts City/Town of North Andover —� Form I I - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP3 12/19/07 9:00 35 Cloudy Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Residential _ None 5% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) Grass Outwash Plain _ Backslope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body 1300 Drainage Way 320 320 feet g y feet Possible Wet Area feet Property Line eet Drinking Water Well fee�0 feet Other 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock EJ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: inches elevation Title 5 Form 11_3 rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 12-\ Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP3 Redoximorphic Features Coarse Fragments Soil (mottles) Soil Texture %by Volume Soil Soil Horizon/Soil Matrix:Color- Structure Consistence Other Depth(in.) Layer Moist(Munsell) (USDA) Cobbles& (Moist) Depth Color Percent Gravel Stones 0-12 A 10 YR 2/2 S L 7.5YR4/6 L S 12-33 B 10YR 4/6 30" 2.5Y6/4 33-93 C 2.5Y 6/6 M/F S 5% Gray. 5% Cobb. M F Additional Notes: No refusal Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Title 5 Form 11_3•rev. 10/07 1;4�1 Commonwealth of Massachusetts City/Town of North Andover 'T ) Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP4 12_/19/07 9:00 35 Cloudy Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Residential None 5% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) Grass OUtwash Plain Backslope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feett Drainage Way f00 eett Possible Wet Area feett Property Line 35 feet Drinking Water Well >1fee50 Other feet 4. Parent Material: Prog►acial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 29" redox) inches elevation Title 5 Form 11_4-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP4 Redoximorphic Features Coarse Fragments Soil (mottles) Soil Texture %by volume Soil Consistence Other Soil Horizon/Soil Matrix:Color- (USDA) Structure Depth(in.) Layer Moist(Munsell) Cobbles e (Moist) Depth Color Percent Gravel Stones 0-23 A 10 YR 2/2 S L 23-51 B 10YR 4/6 29" 7.5YR4/6 L S2.5Y6/4 10% Cobb. M F 51-100 C 2.5Y 6/6 M S 1% Stone Additional Notes: No refusal - Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Title 5 Form 11_4-rev. 10/07 Commonwealth of Massachusetts ISL City/Town of North Andover I Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP5 12/19/07 10:00 35 Cloudy Date Time Weather 1. Location Ground Elevation at Surface of Hole: — Location (identify on plan): See plan 2. Land Use Residential None 5% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) Grass Outwash Plain Backs lope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: O 1500 415 Open Water Body feet Drainage Way ee5 Possible Wet Area feet Property Line ❑t Drinking Water Well '150 Other feet feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 17" (redox) inches elevation Title 5 Form 11_5- rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover '=1 Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP5 Redoximorphic Features Coarse Fragments Soil (mottles) Soil Texture %by Volume Soil Depth(in.) Soil Horizon/Soil Matrix:Color- Consistence Other Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 0-12 A 10 YR 2/2 S L 12-19 B 2.5Y 5/4 17 7.5YR5/8 L S2,5Y 6/2 19-91 C 2.5Y 6/3 F/M S M F Additional Notes: No refusal — Title 5 Form 115•rev. 10/07 Form 11 –Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover � ) Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal g C. On-Site Review (Continued) Deep Observation Hole Number: TP6 12/18/07 12:00 22 Sunny Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Lic2ht woodland None 2%(e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones o 12"trees, saplingS, brush Slope(io) Outwash Plain Top slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body2000 115 feet Drainage Way Possible Wet Area 115 feet feet Property Line 70 >150 feet Drinking Water Well Other feet 4. Parent Material: Proglacial Outwash feet Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil El Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ® Yes ❑ No94" If yes.- Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 25" (redox inches elevation Title 5 Form 11_6-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole NumTP6ber: — Redoximorphic Features Coarse Fragments (mottles) Soil Texture %by Volume Soil Soil Soil Horizon/Soil Matrix: Color- Consistence Other Depth(in.) Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 10-0 Oi - 0-10 A 10YR 4/2 S L 10-17 131 7.5YR 2.5/2 L S 17-32 B2 5YR 3/4 25" 7.5YR5/8 L S2.5Y 6/2 32-78 C1 2.5Y 6/4 M/F S M F 78-96 C2 2.5Y 6/1 M/F S M F Additional Notes: No refusal Weep at 94" Title 5 Form 116•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 i Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP7 12/18/07 12:00 22 Sunny_, Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan Light woodland 2. Land Use and None 2% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees, saplings, brush _Outwash Plain Shoulder slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body 2000 Drainage Way 150 feet g y eet� Possible Wet Area feet Property Line 90t Drinking Water Well '150 Other feet 4. Parent Material: Proglacial Outwash feet -- Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: W _ Depth eeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 45" (redox) inches elevation Title 5 Form 117-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover la Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP7 Redoximor hic Features Coarse Fragments p %by Volume Soil Soil Soil Horizon)Soil Matrix:Color- (mottles) Soil Texture Consistence Other Depth(in.) (USDA) Structure Layer Moist(Munsell) Gravel Cobbles a (Moist) Depth Color Percent Stones 3-0 Oi - 0-8 A 10YR 43/4 S L 8-36 B 10YR 5/6 L S 36-90 C1 2.5Y 6/4 45» 7.5YR5/8 F/M S 2.5Y 6/2 90-100 C2 2.5Y 6/1 F/M S M F Additional Notes: No refusal -- Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Title 5 Form 11_7•rev. 10/07 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for - On Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP8 -12/18/07 10:00 22 Sunny Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland None 200 (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stoneso 12" trees saplings brush Slope(/o) Outwash Plain Toe slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body1900 feet Drainage Way 300 Possible Wet Area 300 feet feet Property Line 50 >150 feet Drinking Water Well Other feet feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes N No If yes: De _ pth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 44" (redox) inches elevation Title 5 Form 11_8 •rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 i Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP8 Redoximorphic Features Coarse Fragments Soil (mottles) Soil Texture %by Volume Soil Consistence Other Depth(in.) Soil Horizon/Soil Matrix:Color- Structure Layer Moist(Munsell) (USDA) Gravel Cobbles (Moist) • Depth Color Percent Stones 3-0 Oi - 0-8 A 10YR 3/2 S L 8-38 B 10YR 5/8 L S 38-96 C 2.5Y 6/8 44, 7.5YR5/8 F/M S M F 2.5Y 6/2 Additional Notes: No refusal _ — Form 11 –Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Title 5 Form 11_8•rev. 10/07 Commonwealth of Massachusetts I City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal g p al C. On-Site Review (Continued) Deep Observation Hole Number: TP9 12/18/07 10:00 22 Sunny Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan Light woodland 2. Land Use - None 2% (e.g.,woodland,agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees saplings, brush Outwash Plain Toe slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Oen Water Body 1900 250 P Y Drainage Way 250 feet g y feet Possible Wet Area feet Property Line 60 Drinking Water Well '150 feet feet Other feet 4. Parent Material: Proglacial outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 41" redox) inches elevation Title 5 Form 119-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment: for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP9 Redoximorphic Features Coarse Fragments mottles %by Volume Soil Soil Soil Horizon/Soil Matrix: Color- (mottles) Soil Texture Consistence Other Depth(in.) Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 3-0 Oi - - 0-6 A 10YR 3/4 S L 6-33 B 10YR 5/6 L S 33-72 C1 2.5Y 6/4 41" 7.5YR5/8 F/M S2.5Y 6/2 72-98 C2 2.5Y 6/1 F/M S M F Additional Notes: No refusal — -- B-Horizon has pockets of loamy sand 5YR 4/6 Title 5 Form 119•rev. 10/07 Form 11 –Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover �= Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP10 12/18/07 10:00 22 Sunny Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan acant Light woodland 2. Land Use None 5% (e.g.,woodland, agricultural field,vlot,etc.) Surface Stones Slope(%) 12" trees, saplings, brush Outwash Plain Back slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: O 1800 Open Water Body feet Drainage Way ee� Possible Wet Area 240 feet Property Line 60t — Drinking Water Well '150 Other feet feet 4. Parent Material: Proglacia► outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock E] Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: D — epth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 36" (redox) inches elevation Title 5 Form 11_10-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts a: City/Town of North Andover IU- ) Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP10 Redoximorphic Features Coarse Fragments mottles %by Volume Soil Soil WB2.5Y atrix:Color- ( Soil Texture Consistence Other st(Munsell) (USDA} Cobbles& Structure (Moist) Depth Color Percent Gravel Stones -0YR 3/4 S L 2.5Y 6/6 L S 7.5YR5/8 F1M S M F 32-96 C 2.5Y 6/4 36" 2.5Y 6/2 Additional Notes: No refusal -- -- Title 5 Form 1110•rev. 10/07 Foran 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Y n Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP11 12/18/07 10:00 _ 22 Sunny Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland None _ 8% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees, saplin s, brush Outwash Plain Back slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Oen Water Body1800 Open feet Drainage Way e00_ Possible Wet Area 200 feet Property Line 110 >150 p y feet Drinking Water Well feet Other feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: _ Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 53° (redox) inches elevation Title 5 Form 1111 • rev. 10/07 Form;11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 s~ Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP11 Redoximorphic Features Coarse Fragments (mottles) Soil Texture %by Volume Soil Soil Soil Horizon/Soil Matrix: Color- Consistence Other Depth(in.) Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 0-13 A 10YR 3/2 S L 13-31 B 10YR 4/6 L S 31-53 C 1 2.5Y 6/6 FIM S M F 53-101 C2 2.5Y 6/4 53" 7.5YR5/8 F/M S M F2.5Y 7/2 Additional Notes: No refusal Title 5 Form 1111 rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site S ewage Disposal ,q ° C. ®n-Site Review (Continued) Deep Observation Hole Number: TP12 12/18/07 9:00 22 Sunny Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland None 3% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones o 12" trees, saplin s, brush slope(io) Outwash Plain Back slope Vegetation Landform Position on Landpe(attasheet scach ) 3. Distances from: Open Water Body1 180 feeett Drainage Way Possible Wet Area 180 feet feet Property Line 35 >150 feet Drinking Water WellOther feet 4. Parent Material: feet Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil El Fill Material ❑ Irnpervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: El Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 32" (redox) inches elevation Title 5 Form 11_12 -rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 s Commonwealth of Massachusetts r= �r City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP12 Redoximorphic Features Coarse Fragments mottles %b Volume Soil Depth(in.) Soil Horizon/Soil Matrix: Color- (mottles) Soil Texture y Soil Consistence Other (Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 0-16 A 10YR 3/2 S L Sabk F 16-32 B 10YR 5/8 L S Sabk F 32-108 C 2.5Y 6/3 M/F S M F Additional Notes: No refusal Title 5 Form 1112°rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal °Page 5 of 8 Commonwealth of Massachusetts G� City/Town of North Andover �r Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal 3�> C. On-Site Review (Continued) Deep Observation Hole Number: TP13 12/19/07 10:00 35 Cloudy Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland None 3% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees, saplings brush Outwash Plain Top slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body 1700 Drainage Way 140 feet g Y feeQ Possible Wet Area feet Property Line 220 0Drinking Water Well '150feet Other feet feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: El Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater. 22" redox inches elevation Title 5 Form 1113•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts l - City/Town of North Andover I - ) Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP13 Redoximorphic Features Coarse Fragments mottles %b Volume Soil Depth(in.) Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture y uctl Consistence Other Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 0-8 A 10YR 3/2 S L 8-26 B 10YR 5/8 L S 26-88 C 2.5Y 6/3 22" 7.5YR5/8 F/M S M F 2.5Y 6/1 Additional Notes: No refusal Title 5 Forni 1113•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover fy( Form 11 - Soil SuitabilityAssessment went for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP14 12/18/07 3:00 22 Sunny Dale Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland None 8% (e.g.,woodland,agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees, saplings, brush Outwash Plain Top slope Vegetation Landform Position on landscape(attach sheet) f 3. Distances from: Open Water Body feet Drainage Way 00 e 200 feet ePossible Wet Area feet Property Line 35 feet Drinking Water Well '150 Other feet feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: El Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: El Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 56" (redox) inches elevation Title 5 Form 11_14-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover - Form 11 - Soil Suitability Assessment: for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP15 Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Depth(in.) USDA Structure Consistence Other Layer Moist(Munsell) (USDA) Cobbles& Depth Color Percent Gravel Stones (Moist) 3-0 Oi - - 0-11 A 10YR 3/3 S L 11-33 B 10YR 5/8 L S 33-86 C 2.5Y 6/4 56" 7.5YR5/8 F/M S M F 2.5Y 6/2 Additional Notes: No refusal Title 5 Form 1114•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 ri. Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal g C. ®n-Site Review (Continued) Deep Observation Hole Number: TP15 12/18/07 3:00 22 Sunn Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): S_ee_Alan 2. Land Use Li ht woodland None 5o�o (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones o 12" trees, saplings, brush Slope(/o) --_ Outwash Plain Vegetation Landform Top slopePosition on Landscape(attach sheet) 2100 feet 3. Distances from: Open Water Body Drainage Way 230 230 feet g y feet Possible Wet Area feet Property Line 90t Drinking Water Well '150 Other feet feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Estimated Depth to High Groundwater: Depth Weeping from Pit Depth Standing Water in Hole i56" (redox)nches elevation Title 5 Form 11_15•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover - Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP15 Redoximorphic Features Coarse Fragments mottles %b Volume Soil Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture y uctl Consistence Other Depth(in.) Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 3-0 Oi - - 0-8 A 10YR 3/3 SL 8-33 B 10YR 5/8 LS 33-84 C 2.5Y 6/4 56" 7.5YR5/8 F/M S M F2.5Y 6/2 Additional Notes: No refusal Title 5 Form 1115-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover - / Form 11 - Soil Suitability Assessment: for On-Site Sewage g Disposal C. On-bite Review (Continued) Deep Observation Hole Number: TP16 12/18/07 2:00 22 Sunn Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland None (e.g.,woodland, agricultural field,vacant lot,etc.) 5%Surface Stones 12" trees, saplin s, brush Slope(%) OuPlain Vegetation Landdformform Back slope Position on Landscape(attach sheet) 3. Distances from: y Open Water Body 2100 -feet feet Drainage Way et Area Possible Wet 200feet Property Line 135 D >150 feet Drinking Water Well Other feet 4. Parent Material: Proglacial Outwash feet Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 45" (redox) inches elevation i Title 5 Form 1116-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 f' Commonwealth of Massachusetts I <,_ �� City/Town of North Andover T Form 11 Fl Soil Suitability Assessmenll for On-Site Sewage Disposal r C. On-Site Review (Continued) Deep Observation Hole Number: TP16 Redoximorphic Features Coarse Fragments mottles %by Volume Soil Soil Soil Horizon/Soil Matrix: Color- (mottles) Soil Texture Consistence Other Depth(in.) Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 3-0 Oi - - 0-7 A 10YR 3/3 S L 7-26 B 10YR 5/8 L S 7.5YR5/8 M/F S M F 26-54 C1 2.5Y 6/4 45" 2.5Y 6/2 54-102 C2 2.5Y 7/3 M/F S M F Additional Notes: No refusal — Title 5 Form 1116 rev. 10/07 Form 11 –Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts I- City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP17 12/18/07 2:00 2 Date Time Weather 2 Sunn 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland _ 5%None (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Back o 12" trees saplings, brush Outwash Plain Slope(/o) Vegetation Landform slope Position on Landscape(attach sheet) 3. Distances from: Open Water Body2100 170 feet Drainage Way Possible Wet Area 170 feet feet Property Line >150 feeetet Drinking Water Well Other 4. Patent:Material: feet feet Proglacial Outwash Unsuitable Materials Present, ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: El Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 42" (redo q__ inches elevation Title 5 Form 1117 -rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. Ort-Site Review (Continued) Deep Observation Hole Number: TP17 Redoximorphic Features Coarse Fragments mottles %by Volume Soil Soil Soil Horizon/Soil Matrix: Color- (mottles) Soil Texture Consistence Other Depth(in.) Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 3-0 Oi - - 0-6 A 10YR 3/3 S L 6-40 B 10YR 5/8 L S 7.5YR5/8F/M S M F 40-66 CI 2.5Y 6/4 42" 2.5Y 6/2 66-94 C2 2.5Y 6/1 F/M S M F Additional Notes: No refusal Title 5 Form 1117•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts a= City/Fown of North Andover Form 11 Soil Suitability Assessment for On-Site Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP18 12/18/07 2:00 D 22 Sunn 1. Location ate Time Weather Ground Elevation at Surface of Hole: See plan Location (identify on plan): 2. Land Use Light woodland (e.g.,woodland, agricultural field,vacant lot,etc.) None 3% 12"trees saplings, brush Surface Stones Slope(%) Vegetation Outwash Plain Toe slope Landform — Position on Landscape(attach sheet) 3. Distances from: Open Water Body2300 115 feet Drainage Way Possible Wet Area 115 feet feet Property Line 130 >150 feet Drinking Water WellOther 4. Parent Material Pro IacialOutwash feet feet Unsuitable Materials Present: Yes No If Yes: ❑ Disturbed Soil EJ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 26" (redox) inches elevation Title 5 Form 11_18 rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts r City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP18 Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix: Color- (mottles) Soil Texture %by Volume Soil Soil Depth(in.) layer Moist(Munsell) (USDA) Cobbles& Structure ConsistenceOther Depth Color Percent Gravel Stones 3-0 Oi - 0-10 A 10YR 3/3 SL 10-26 B 10YR 3/6 LS 26-60 C1 2.5Y 6/1 26" 7.5YR5/8 F/M S 2.5Y 6/2 60-93 C2 2.5Y 5/3 S L M F Additional Notes: No refusal Title 5 Form 1118-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover EF Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP18a 12/18/07 2:00 22 Sunn Date Time- Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland None 3% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones o 12" trees, sa s, brush _O_utwash Plain Back slope Slope(/o) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body2300 feet Drainage Way 60— Possible Wet Area 60 feet 125 >150 feet Property Line Te Drinking Water Well — Other feet 4. Parent Material: Proglacial Outwash feet Unsuitable Materials Present: ❑ Yes ® NO If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If VeS: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 26" (redox) inches elevation Title 5 Form 11_18a - rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover - Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP18a Redoximorphic Features Coarse Fragments Soil Horizon!Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Depth(in.) Layer Moist Munsell (USDA) Structure Consistence Other Y (Munsell) ) Cobbles& (Moist) Depth Color Percent Gravel Stones 3-0 Oi - 0-5 A 10YR 3/3 S L 5-30 B 10YR 5/8 26° 7.5YR5/8 L S 2.5Y 6/2 30-34 C1 2.5Y 6/4 F/M S 34-54 C2 2.5Y 6/1 F/M S M F 54-88 C3 2.5Y 5/3 S L Additional Notes: No refusal Title 5 Form 11 18a•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal p C. On-Site Review (Continued) Deep Observation Hole Number: TP18b 12/19/07 1:00 35 Cloudy Dsite Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland None goo (e.g.,woodland,agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees, saplings brush Outwash Plain Shoulder slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body 2300 Drainage Wa170 y 170 feet 9 Y fee Possible Wet Area feet Property Line e°t Drinking Water Well '150 Other feet feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) p ❑ Weathered/Fractured Rock El Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 108" (pit bottom) inches elevation Title 5 Form 11_18b-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts pCity/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP18b Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Depth(in.) Layer Moist Munsell USDA Structure Consistence Other Y (Munsell) (USDA) Cobbles& (Moist) Depth Color Percent Gravel Stones 3-0 Oi - - 0-6 A 10YR 3/3 S L 6-24 B 10YR 5/8 L S 24-108 C 2.5Y 6/3 M S Additional Notes: No refusal No redox observed Title 5 Form 11 18b•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover - Form 11 - Soil Suitability Assessment; for On-Site Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP19 12/18/07 2:00 22 Sunny Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan Light woodland 2. Land Use None 300 (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees, saplings, brush Outwash Plain Toe slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Oen Water Body2300 100 100 Open feet Drainage Way feet Possible Wet Area feet Property Line 85 Drinking Water Well '150 Other feet feet 4. Parent Material: Proglacial outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 26" (redox) inches elevation Title 5 Form 11_19-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal °Page 4 of 8 Commonwealth of Massachusetts �s City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP19 Redoximorphic Features Coarse Fragments (mottles) Soil Texture %by Volume Soil Soil Depth(in.) Soil Horizon/Soil Matrix: Color- Consistence Other Layer Moist(Munsell) (USDA) Cobbles& Structure (Moist) Depth Color Percent Gravel Stones 3-0 Oi - - 0-14 A 10YR 3/3 SL 14-30 B 10YR 5/8 26° 7.5YR5/8 LS 2.5Y 6/6 30-36 C1 2.5Y 6/4 F/M S M F 36-46 C2 2.5Y 6/1 F/M S M F 46-96 C3 2.5Y 5/3 S L M F Additional Notes: No refusal - Title 5 Form 11 19•rev. 10/07 Form 11 -Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment: f - or On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP19b 12/19/07 1:00 35 Cloud Date 1. Location Time Weather Ground Elevation at Surface of Hole: LocatiSee plan on (identify on plan): 2. Land Use Light woodland None 5% - ----- (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones 12" trees, saplin s brushVegetation Slope(°io) Outwash Plain Shoulder slope Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body2300 180 feet Drainage Way Possible Wet Area 180 feet 60 >150rifeet Property Line feet Drinking Water Well Other feet 4. Parent Material: Profeet glacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 108" (pit bottom) inches elevation Title 5 Form 11_19b•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts �- —� City/Town of North Andover i - Form 11 - Soil Suitability Assessment: for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP19b Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Depth(in.) Layer Moist(Munsell) (USDA) Structure Consistence Other Depth Color Percent Gravel Cobbles& (Moist) Stones 3-0 Oi - - 0-6 A 10YR 3/3 S L 6-24 B 10YR 5/8 L S 24-108 C 2.5Y 6/3 M S Additional Notes: No refusal No redox observed Title 5 Form 1119b•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts _ City/Town of North Andover ';- Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal osal g p C. On-Site Review (Continued) Deep Observation Hole Number: TP20 12/18/07 12:00 22 Sunny Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan Light woodland 2. Land Use None 5% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees saplin s, brush Outwash_ Plain _ Back slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body 2000 Drainage Way 80 80 feet g y feet Possible Wet Area feet Property Line feet 8Drinking Water Well '150 Other feet feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: D _ epth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 37" redox inches elevation Title 5 Form 11_20•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 < Commonwealth of Massachusetts City/Town of North Andover - Form 11 - Soil Suitability Assessment: for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP20 Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Depth(in.) Layer Moist Munsell (USDA) Structure Consistence Other Y (Munsell) ) Cobbles& (Moist) Depth Color Percent Gravel Stones 3-0 Oi - - 0-6 A 10YR 3/3 S L 6-28 B 10YR 5/8 L S 28-66 C1 2.5Y 6/4 37" 7.5YR5/8 M/F S M F 2.5Y 6/2 66-90 C2 2.5Y 5/3 M/F S M F Additional Notes: No refusal Title 5 Form 1120• rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 — 1 - Soil Suitability Assessment: for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP21 12/19/07 12:00 35 Cloudy Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan 2. Land Use Light woodland None 5% (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones o 12" trees, sa lin s, brush Slope(/o) P 9 Outwash Plain Back slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body1800 feet Drainage Way 80 Possible Wet Area 80 feet feet Property Line 75 feet feet Drinking Water Well '150 Other feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present, ❑ Yes ® No If Yes: ❑ Disturbed Soil El Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: El Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 36" (redox) inches elevation i Title 5 Form 11_21 •rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts ( City/Town of North Andover Form 11 - Soil Suitability Assessment: for Cin-Site Sewage Disposal C. ®n-Site Review (Continued) Deep Observation Hole Number: TP21 Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix: Color- (mottles) Soil Texture %by Volume Soil Soil Depth(in.) Layer Moist Munsell USDA Structure Consistence Other y (Munsell) Depth Color Percent ( ) Gravel Cobbles 8s Stones (Moist) 3-0 Oi - 0-10 A 10YR 3/3 S L 10-34 B 10YR 5/8 L S 34-54 C1 2.5Y 6/3 36" 7.5YR5/8 M S 2.5Y 6/2 54-108 C2 2.5Y 7/2 F/M S Additional Notes: No refusal Title 5 Form 11_21 rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts —I, City/Town of North Andover W_/ Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP22 12/19/07 12:00 35 Cloudy Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan Light woodland 2. Land Use None 5% (e-g.,woodland,agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees, saplin s brush Outwash Plain Back slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body Drainage Wa75 y 75 feeetet g y feet Possible Wet Area feet Property Line 80t feet Drinking Water Well '150 Other feet 4. Parent Material: Proglacial Outwash Unsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: El Yes No If yes: Depth Weeping from Pit Depth Standing Water in Ho_le Estimated Depth to High Groundwater: 35" redox) inches elevation Title 5 Forme 11_22 -rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for ®n-Site Sewage Disposal C. ®n-Site Review (continued) Dee Observation Hole Number: TP35 04-14-2010 Sunny 60d Deep Date Time Weather 1. Location Ground Elevation at Surface of Hole: 100.0 Location (identify on plan): Lot 16-5 Drainage Area 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%} Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Depth to High Groundwater: 36 97.0 Estimated De p g inches elevation i i Lot 16-6.doc•rev. 1/10 Form 11—Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover �F� Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP34 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix:color- (mottles) Layer Moist(Munsell) Soil Texture %by Volume Soil Soil Depth Color Percent (USDA) es& Structure Consistence Other Cobbles (Moist) Stones -4" O i 91, A 10yr 211 L 36" Bw 7.5yr 5/8 18" L.S. 55" C1 5y 5/1 F.S. 120" C2 5y 414 S.L. Additional Notes: Lot 16-8.doc•rev. 1/10 Form 11—Soil Suitability Assessment for On-Site Sewage Disposal •Page 3 of 8 4_N Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (minimum of two holes required at every proposed primary and reserved disposal area) Deep Observation Hole Number: TP34 04-14-2010 Sunny 60d Date Time W eath er 1. Location Ground Elevation at Surface of Hole: 124.5 Location (identify on plan): Lot 16-8 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 18" 123.0 inches elevation Lot 16-8.doc-rev. 1/10 Foran 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 2 of 8 Commonwealth of Massachusetts City/Town of North Andover l Form 11 - Soil Suitability Assessment forOn-Site Sewage Disposal C. On-Site Review (continued) 15 Deep Observation Hole Number: TP38- Redoximorphic Features Coarse Fragments Depth in. Soil Horizon/Soil Matrix:Color- (mottles) o P t� ) Soil Texture /a by Volume Soil Soil Layer Moist(Munsell) (USDA) Consistence Other Depth Color Percent Cobbles& Structure Gravel (Moist) Stones 6" A 10yr 3/2 S.L. 24" Bw 10yr 5/8 L.S. 120" C 2.5y 5/6 64" 10yr 5/8 US. Additional Notes: i Lot 16-4tp33(2).doc-rev. 1/10 Form 1—Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 XX Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability /assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP33 0414-2010 Sunny 60d Date Time W eather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): 2. Land Use (e.g.,woodland,agricultural Feld,vacant lot,etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole inc Estimated Depth to High Groundwater: inches elevation Lot 16-4tp33(2).doc-rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Fy As sessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP32 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix:Color- (mottles) Layer Moist(Munsell) o Soil Soil Texture /o by Volume Soil Depth Color Percent (USDA) Cobbles& Structure Consistence Other -2" Oi Stones Gravel (Moist) 6" A 10yr 3/2 S.L. 32" B 10yr 5/8 L.S. 120" C 2.5y 5/6 100" M.S. Additional Notes: Lot 16-6.doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 3 of 8 Commonwealth of Massachusetts North Andover Form 11 f Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (minimum of two holes required at every proposed primary and reserved disposal area) Deep Observation Hole Number: TP32 04-14-2010 ' Sunny 60d Date Time Weather 1. Location Ground Elevation at Surface of Hole: 122.0 Location (identify on plan): Lot 16-6 2. Land Use (e.g.,woodland,agricultural field,vacant lot,etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Irnpervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 1001, 113.67 inches elevation Lot 16-6.doc-rev. 1/10 Form 11—Soil Suitability Assessment for On-Site Sewage Disposal •Page 2 of 8 Commonwealth of Massachusetts City/Town of North Andover f-1 Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP31 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix:Color- (mottles) o Soil Soil Texture /o by Volume Soil Layer Moist(Munsell) Depth Color Percent (USDA) Cobbles& Structure Consistence Other Gravel Stones (Moist) -4" Oi 10" A 10yr 3/2 S.L. 24" Bw 10yr 5/8 F.L.S. 120" C 5y 4/4 16" L.S. Additional Notes: Lot 16-5.doc-rev. 1/10 Form 11—Soil Suitability Assessment for On-Site Sewage Disposal -Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP31 04-14-2010 Sunny 60d Date Time Weather 1. Location Ground Elevation at Surface of Hole: 91'0 Location (identify on plan): Lot 16-5 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 16" 89.67 Inches elevation Lot 16-5.doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment f Y or ®n-Site Sewage Disposal C. ®n-Site Review (continued) Deep Observation Hole Number: TP30 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Layer Moist(Munsell) uctl Consistence Other Depth Color Percent (USDA) Cobbles& Structure Gravel (Moist) Stones -4" Oi 10" A 10yr 3/2 S.L. 24" Bw 10yr 5/8 F.L,.S. 120" C 5y 4/4 16" L.S. Additional Notes: Lot 16-5.doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 3 of 8 Commonwealth of Massachusetts City/Town of North Andover Farm 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. Oii-Site RevieW (minimum of two holes required at every proposed primary and reserved disposal area) TP30 04-14-2010 Sunny 60d Deep Observation Hole Number: Date Time Weather 1. Location Ground Elevation at Surface of Hole: 87.0 Location (identify on plan): Lot 16-5 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body Leet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ NO If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole i 16" 85.67 Estimated Depth to High Groundwater: inches elevation Lot 16-5.doc•rev. 1/10 Form 11 —Soil suitability Assessment for On-Site Sewage Disposal •Page 2 of 8 Commonwealth of Massachusetts City/Town of North Andover jForm 11 - Soil Suitability Assessor ent for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP29 SoiRedoximorphic Features Coarse Fragments Depth(in.) l Horizon/Soil Matrix:Cotor- (mottles) Layer Moist(Munsell) Soil Texture %by Volume Soil Soil Depth Color Percent (USDA) Cobbles& Structure Consistence Other Gravel (Moist) Stones 20" A 10yr 3/2 S.L. 29" B 2.5y 5/4 26° S.L. 120" C 2.5y 4/4 S.L. Additional Notes: Lot 16-4.doc-rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 �ID_N Commonwealth of Massachusetts "DT) City,"I owi i offoi Jh Andover Soil Suitability A,-_-,sessmer�0 for On,,-S;te Sewagc-, Dispos'al Form 11 . On-Site Rqview (continued) TP29 04-14-2010 Sunny 60d Deep Observation Hole Number- Dale Time OJeather 1. Location Ground Elevation at Surface of Hole: 83.0 Location (identify on plan): Lot 16-4 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation -Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body Drainage Way feet Possible Wet Area feet feet Property Line -feet Drinking Water Well -feet Other feet 4. Parent Material: - Unsuitable Materials Present: El Yes F] No If Yes: El Disturbed Soil El Fill Material El Impervious Layer(s) 171 Weathered/Fractured Rock El Bedrock 5. Groundwater Observed: El Yes E1 No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 26" 80.B4 inches elevation Lot 16-4,doc•rev. 1/10 Form 11 -Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover y Form 11 - Soil Suitability Assessment for On-Site Sew age Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP28 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Layer Moist(Munsell) (USDA) Structure Consistence Other Depth Color Percent Gravel Cobbles& (Moist) Stones 10" A 10yr 3/2 S.L'. 24" B 2.5y 5/4 22" S.L. 120" C 2.5y 4/4 S.L. Additional Notes: Lot 16-4.doc-rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 3 of 8 Commonwealth of Massachusetts City/Town of North Andover Form I I - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (minimum of two holes required at every proposed primary and reserved disposal area) Deep Observation Hole Number: TP28 04-14-2010 Sunny 60d Date Time Weather 1. Location Ground Elevation at Surface of Hole: 81.0 Location (identify on plan): Lot 16-4 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 22" 79.17 inches elevation i i Lot 16-4.doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 2 of 8 Commonwealth of Massachusetts North Andover Form 11 f Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP27 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Layer Moist(Munsell) (USDA) Structure Consistence Other Depth Color Percent Gravel Cobbles& (Moist) Stones 18" Ap 10yr 3/3 S.L. 45" Bw 10yr 5/8 L.S. 120" C 5y 5/6 42" 5% L.S. Additional Notes: Lot 16-3.doc•rev. 1/10 Form 11—Soil Suitability Assessment for On-Site Sewage Disposal •Page 3 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 1 ! - Soil Suitability Assessment for On-Site Sewage Disposal C. Ort-Site Review (minimum of two holes required at every proposed primary and reserved disposal area) TP27 04.14-2010 Sunny 60d Deep Observation Hole Number: Date Time Weather 1. Location 0 Ground Elevation at Surface of Hole: 80. Location (identify on plan): Lot 16-3 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole 42" 76.5 Estimated Depth to High Groundwater: inches elevation Lot 16-3.doc-rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 2 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suita bility Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP26 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix:Color- (mottles) Layer Moist(Munsell) Soil Texture %by Volume Soil Soil Depth Color Percent (USDA) Gravel Cobbles& Structure Consistence Other (Moist) 12° Stones Ap 10yr 3/3 S.L. 55" B/C 2.5y 5/6 S 120" C 2.5y 5/6 48" 10yr 5/8 S 5y 6/3 Additional Notes: Lot 16-12.doc•rev. 1/10 Form 11—Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On'-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP26 04-14-2010 Sunny 60d Date Time W Bather 1. Location Ground Elevation at Surface of Hole: 96.5 Location (identify on plan): Lot 16-2 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line Leet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 48 92.5 inches elevation Lot 16-12.do6•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage ge Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP25 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Layer Moist(Munsell) SOil Consistence Other Depth Color Percent (USDA) Cobbles& Structure Gravel (Moist) Stones -2" Oi 12" A 10yr 3/2 L.S. 34" B 10yr 5/8 L.S. 120" C 2.5y 5/6 48" 10yr S Additional Notes: Lot 16-12.dod•rev. 1/10 Form 11—Soil Suitability Assessment for On-Site Sewage Disposal •Page 3 of 8 Commonwealth of Massachusetts l� City/Town of North Andover �i Form 11 -• Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (minimum of two holes required at every proposed primary and reserved disposal area) Deep Observation Hole Number: TP25 04-14-2010 Sunny 60d b—ate Time Weather 1. Location 0 Ground Elevation at Surface of Hole: 111. Location (identify on plan): Lot 16-1 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed:. ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 48 107.0 inches elevation Lot 16-12.doc-rev. 1/10 Form 11 –Soil Suitability Assessment for On-Site Sewage Disposal •Page 2 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal F. Certification I certify that I am currently approved by the Department of Environmental Protection pursuant to 310 CMR 15.017 to conduct soil evaluations and that the above analysis has been performed by me consistent with the required training, expertise and experience described in 310 CMR 15.017. 1 further certify that the results of my soil evaluation, as indicated in the attached Soil Evaluation Form, are accurate and in accordance with 310 CMR 15.100 through 15.107. iA—�— 12Y21/07 Signature of Soil Ejaluator Date Thomas Hector November 9, 2004 Typed or Printed Name of Soil Evaluator/License# Date of Soil Evaluator Exam Randy Burley, Mill River Consulting _ North Andover Name of Board of Health Witness Board of Health Note: In accordance with 310 CMR 15.018(2)this form must be submitted to the approving authority within 60 days of the date of field testing, and to the designer and the property owner with Percolation Test Form 12. Title 5 Form 11_24•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 7 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal D. Determination of High Groundwater Elevation 1. Method Used: A. B. ❑ Depth observed standing water in observation hole inches inches A. B. ❑ Depth weeping from side of observation hole inches inches A. See Individual Soil Logs B. ® Depth to soil redoximorphic features (mottles) inches inches A. B. ❑ Groundwater adjustment(USGS methodology) inches inches 2. Index Well Number Reading Date Index WeII Level Adjustment Factor Adjusted Groundwater Level E. Depth of Pervious Material 1. Depth of Naturally Occurring Pervious Material a. Does at least four feet of naturally occurring pervious material exist in all areas observed throughout the area proposed for the soil absorption system? ® Yes ❑ No See Individual b. If yes, at what depth was it observed? Upper boundary: Soil Lo See Individual Lower boundar y" Soil Log Title 5 Form 1124•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 6 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP24 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix: Color- (mottles) Soil Texture %b Volume Soil Soil Layer Moist(Munsell) (USDA) Consistence Other Depth Color Percent Cobbles& Structure Gravel (Moist) Stones 0-24 A 10YR 3/2 S L Sabk F 24-58 B 10YR 4/6 L S Sabk F 58-110 C 2.5Y 6/4 66" 7.5YR5/8 M/FS 2.5Y 7/2 M F Additional Notes: No refusal Title 5 Form 11_24•rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover la � Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Dee Observation Hole Number: TP24 12/18/07 9:00 22 Sunny P Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan Light woodland None 5% 2. Land Use (e.g.,woodland, agricultural field,vacant lot,etc.) Surface Stones Slope(%) 12" trees saplings, brush Outwash Plain Back slope Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body f 600 Drainage Way 300 Possible Wet Area 30et 0 Property Line 60t Drinking Water Well feet>150 Other feet lacial Outwash 4. Parent Material: ProgUnsuitable Materials Present: ❑ Yes No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: ❑ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 66" (redox) inches elevation Title 5 Form 1124-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts uim, City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewa a ®i� Disposal Sewage p C. On-Site Review (Continued) Deep Observation Hole Number: TP23 Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix:Color- (mottles) o/o Depth(in.) Soil Texture by Volume Soil Layer Moist(Munsell) Soil (USDA) Structure Consistence Other Depth Color Percent Gravel Cobbles& (Moist) Stones 0-12 A 10YR 3/2 S L Sabk F 12-30 B 10YR 4/6 L S Sabk F 30-103 C 2.5Y 6/4 42" 7.5YR5/8 M/F S 2.5Y 7/2 M F Additional Notes: No refusal Title 5 Form 11_23-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 Commonwealth of Massachusetts iz City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage disposal C. On-Site Review (Continued) Dee Observation Hole Number: TP23 Date 07 Time W Sunny Deep Date Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): See plan Light woodland None 3% 2. Land Use Surface Stones Slope(%) (e.g.,woodland, agricultural field,vacant lot,etc.) 12" trees saplings, brush Outwash Plain Back slope Vegetation Landform Position on Landscape(attach sheet) 1600 DPossible 240 Pible Wet Area 240 3. Distances from: Open Water Body feet rainage Way feet feet >150 Property Line f et Drinking Water Well feet Other feet l Proglacial Outwash 4. Parent MateriaUnsuitable Materials Present: ❑ Yes ® No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: EJ Yes ® No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 42" (redox)inches elevation i Title 5 Form 1123-rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (Continued) Deep Observation Hole Number: TP22 Redoximorphic Features Coarse Fragments Depth(in.) Soil Florizon/Soil Matrix:Color- (mottles) Layer Moist(Munsell) Soil Texture %by Volume Soil Soil Depth Color Percent (USDA) Cobbles& Structure Consistence Other Gravel Stones (Moist) 3-0 Oi _ 0-12 A 10YR 3/3 S L 12-35 B 10YR 5/8 L S 35-58 C1 2.5Y 6/3 35" 7.5YR5/8 2.5Y 6/2 M S 58-108 C2 2.5Y 7/2 F/M S Additional Notes.- No otes:No refusal Title 5 Form 1122 •rev. 10/07 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 ��_N Commonwealth of Massachusetts City/Town of North Andover Form 11 Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP35 Redoximorphic Features Coarse Fragments Depth(in.) Soil (Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Layer Moist(Munsell) Consistence Other Y ( ) (USDA) Cobbles& Structure Moist Depth Color Percent Gravel Stones ( ) -4" Oi 10" Ap 10yr 3/2 S.L. 24" Bw 10yr 5/8 L.S. 68" C 2.5y 5/6 36" S Additional Notes: Lot 16-6.doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-site Review (minimum of two holes required at every proposed primary and reserved disposal area) Deep Observation Hole Number: TP36 04--14-2010 Sunny 60d Date Time Weather 1. Location Ground Elevation at Surface of Hole: 110.0 Lot 16-7 Drainage Area Location (identify on plan): 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way Possible Wet Area feet feet Property Line feet Drinking Water WellOther feet feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: FI Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 30 107.5 inches elevation i Lot 16-7(2).doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 2 of 8 Commonwealth of Massachusetts f Ig City/Town of North Andover i Form 11 - Soil Suitability Assessment for ®n-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP36 Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Depth(in.) Soil Consistence Other Layer Moist(Munsell) (USDA) Cobbles& Structure Depth Color Percent Gravel Stones (Moist) -4" Oi 10" Ap 10yr 3/2 S.L. 24" Bw 10yr 5/8 L.S. 60" C 2.5y 5/6 30" S Additional Notes: Lot 16-7(2).doc-rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 3 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment: for On-Site Sewage Disposal C. On-Site Review (minimum of two holes required at every proposed primary and reserved disposal area) Deep Observation Hole Number: TP37 0.4-14-2010 Sunny 60d Date Time Weather 1. Location Ground Elevation at Surface of Hole: 79.0 Location (identify on plan): Lot 16-4 Drainage Area 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way feet Possible Wet Area feet Property Line feet Drinking Water Well feet Other feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layers) ❑ Weathered/Fractured Rock El Bedrock 5. Groundwater Observed: ❑ Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 16" 77.67 inches elevation i Lot 16-4tp33(2).doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal -Page 2 of 8 4k Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP37 Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Depth(in.) Layer Moist(Munsell) (USDA) Cobbles& Structure Consistence Other Depth Color Percent Gravel (Moist) Stones 10" A 10yr 3/1 S.L. 32" B 10yr 5/8 16" L.S. 72" C 10yr 4/6 L.S. Additional Notes: Lot 16-4tp33(2).doc•rev. 1/10 Form 11—Soil Suitability Assessment for On-Site Sewage Disposal -Page 3 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C- Ort-Site Review (continued) Deep Observation Hole Number: TP38 04-14-2010 Sunny 60d Date Time Weather 1. Location Ground Elevation at Surface of Hole: 81.0 Lot 16-3 Drainage Area Location (identify on plan): 2. Land Use (e.g.,woodland,agricultural field,vacant lot,etc.) Surface StonesSlope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage Way Possible Wet Area feet feet Property Line feet Drinking Water WellOther feet feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: El Yes ❑ No If yds: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 30 78.5 inches elevation Lot 16-3.doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts = City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP38 Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Soil Depth(in.) ) ( )La er Moist Munsell USDA Structure Consistence Other y ( Depth Color Percent Gravel Cobbles& (Moist) Stones 12" Ap 10yr 3/2 S.L. 24" Bw 10yr 5/8 L.S. 60" C 5y 5/3 30" S Additional Notes: Lot 16-3.doc-rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover I°orrn 11 - Soil Suitability\ �t y A ssessment for ®n-Site Sewage Disposal C. ®n-Site Review (continued) Deep Observation Hole Number: TP39 04-14-2010 Sunny 60d Date Time Weather 1. Location Ground Elevation at Surface of Hole: Lot 16-8 U g Location (identify on plan): peer Right Side 2. Land Use (e.g.,woodland,agricultural Feld,vacant lot, etc.) Surface stones Slope-Cl.) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water Body feet Drainage WayPossible Wet Area feet feet Property Line feet Drinking Water WellOther feet feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: 171 Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: 1­71 Yes ❑ No If yes: Depth Weeping eying from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 100 inches elevation Lot 16-8.doc-rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 4 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP39 Redoximorphic Features Coarse Fragments Depth(in.) Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by VolumeSoil Soil Layer Moist(Munsell) (USDA) Cobbles& Structure Consistence Other Depth Color Percent Gravel (Moist) Stones -2" Oi 6" A 10yr 3/2 S.L. 20" Bw 10yr 5/8 L.S. 120" C 2.5y 5/6 100" 10yr 5/8 Additional Notes: Lot 16-8.doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 5 of 8 Commonwealth of Massachusetts City/Town of North Andover Form 1 °I - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (minimum of two holes required at every proposed primary and reserved disposal area) Deep Observation Hole Number: TP40 04-14-2010 Sunny 60d Dale Time Weather 1. Location Ground Elevation at Surface of Hole: Location (identify on plan): Lot 16-8 Upper Left Side 2. Land Use (e.g.,woodland,agricultural field,vacant lot, etc.) Surface Stones Slope(%) Vegetation Landform Position on Landscape(attach sheet) 3. Distances from: Open Water BodyDrainage Way Possible Wet Area feet feet feet Property Line feet Drinking Water WellOther feet feet 4. Parent Material: Unsuitable Materials Present: ❑ Yes ❑ No If Yes: ❑ Disturbed Soil ❑ Fill Material ❑ Impervious Layer(s) ❑ Weathered/Fractured Rock ❑ Bedrock 5. Groundwater Observed: El Yes ❑ No If yes: Depth Weeping from Pit Depth Standing Water in Hole Estimated Depth to High Groundwater: 84 inches elevation Lot 16-8-2.doc•rev. 1/10 Form 11—Soil Suitability Assessment for On-Site Sewage Disposal -Page 2 of 8 Commonwealth of Massachusetts p City/Town of North Andover W Form 11 - Soil Suitability Assessment for On-Site Sewage Disposal C. On-Site Review (continued) Deep Observation Hole Number: TP40 Redoximorphic Features Coarse Fragments Soil Horizon/Soil Matrix:Color- (mottles) Soil Texture %by Volume Soil Depth(in.) Soil Layer Moist(Munsell) (USDA) Cobbles& Structure Consistence Other Depth Color Percent Gravel Stones (Moist) -2" Oi 6" A 10yr 3/2 S.L. 24" Bw 10yr 5/8 L.S. 120" C 2.5y 5/6 84" 10yr 5/8 M.S. Additional Notes: Lot 16-8-2.doc•rev. 1/10 Form 11 —Soil Suitability Assessment for On-Site Sewage Disposal •Page 3 of 8 ------------------------- ------------------------- Parcel name: CHECK-PERIMETERO ° East 5370.0037 ° North: 5169.4363 ° Line Course: S 35-12-56.0000 E Length: 99 54020.2885 O North: 5088.2767 Line Course: S 52-12-54.0000 W Length: 310.4700 9193 O O North: 4898.0517 Line Course: S 32-49-16.0000 E Length: 261.2500 5214 O ° North: 4678.5058 Line Course: S 58-53-56.0000 W Length: 444. 60002.8295 O O North: 4448.8477 Line Course: N 30-54-17.0000 W Length: 193-1900 6049 O North: 4614. 6091 Line Course: S 58-55-47.0000 W Length: 414448007767 O ° North: 4400.8140 O Line Course: N 09-25-14.0000 W Length: 90 4404.0455 O North: 4489.6002 O Line Course: N 09-26-52.0000 W Length: 109-5900 0565 ° North: 4597.7037 Line Course: N 10-05-40.0000 W Length: 178.1500 8319 O ° North: 4773.0960 Line Course: N 09-00-21.0000 W Length: 280 .54009176 O U North: 5050.1776 O Line Course: S 86-54-15.0000 W Length: 44 3600 223 O North: 5047.7819 Line Course: S 75-23-43.0000 W Length: 148 .76006690 O O North: 5010.2722 O Line Course: S 85-21-57.0000 W Length: 89-8800 48003.0828 ° North: 5003.0105 East Curve Length: 227.8201 Radius: 1208.7791 O Delta: 10-47-54.9870 Tangent: 114.2484 O Chord: 1-27.4831 Course: N 05-31-44. 4469 EO Course In: S 89-52-13.0466 E Course out: 53119-08-18.0596JWO Rp North: 5000.2740 East End North: 5229.4352 East 4125.0007 ° O Line Course: S 79-11-38.0000 E 79.9300 4203.5134 O North: 5214.4495 100-000 00D Line Course: N 55-22-36.0000 E LengEast 4285.8039 O North: 5271.2674 Line Course: S 76-18-12.0000 E LengEast5 : 40060 ° 4431 O North: 5151. 6926 -0000 O Line Course: N 10-57-02.0000 E Leng20 East 048114.4355 O North: 5348.0509 Line Course: S 41-14-30.0000 E LengEast4 : 51060° 6618 ° North: 5014.7329 O Line Course: N 50-01-04.0000 E Leng3 East : S33605886 O North: 5207.5428 Line Course: S 41-14-56.0000 E Length: 50- 6900 5300.0101 O North: 5169.4314 ° 081 Line. Course: N 52-34-43.0464 W LengEast 0:055370. 0037 O North: 5169.4363 Perimeter: 4571.1882 Area.: 628,352.2479 S.F. 14.4249 AC-D Mapcheck Closure - (Uses listed courses h Course: N16-54-21.6745 EO Error Closure: 0.0000 East : 0.00001 Error North: 0.00003 Precision l: 4, 570,851, 200.0000° n u ❑ ---------------------------------------------------------------------------❑ Parcel name: CHECK-LOT-16-1❑ North: 5210.8656 East : 4787.8922 ❑ Line Course: S 35-06-43.0000 E Length: 241.4530 ❑ North: 5013.3498 East : 4926.7701 ❑ Line Course: S 85-35-40.0000 E Length: 119. 9200 ❑ North: 5004.1381 East : 5046.3358 ❑ Curve Length: 66.1290 Radius: 230.0000 ❑ Delta: 16-28-24.7008 Tangent: 33.2942 ❑ Chord: 65.9014 Course: N 86-10-07. 6496 E❑ Course In: N 04-24-20.0000 E Course Out: S 12-04-04.7008 E❑ RP North: 5233.4585 East 5064.0034 ❑ End North: 5008.5414 East 5112.0899 ❑ Line Course: N 41-14-30.0000 W Length: 8.2340 ❑ North: 5014.7329 East : 5106. 6618 ❑ Line Course: N 41-14-30.0000 W Length: 443.2800 ❑ North: 5348.0509 East : 4814.4354 ❑ Line Course: S 10-57-02.0000 W Length: 139.7296 ❑ North: 5210.8656 East : 4787. 8921 ❑ Perimeter: 1018.7456 Area: 43,561.1163 S.F. 1.0000 AC.❑ Mapcheck Closure - (Uses listed courses and chords)❑ Error Closure: 0.0001 Course: N 64-24-56.5660 W❑ Error North: 0.00003 East : -0.00006 ❑ Precision 1: 10, 185,180.0000 ❑ El -------------- ❑ Parcel name: CHECK-LOT-16-2[j ❑ North: 5032.1084 East : 4675.7753 ❑ Line Course: N 42-57-56.0000 W Length: 254.7790 . North: 5218.5464 East : 4502.1284 ❑ Line Course: S 76-18-12.0000 E Length: 282.3437 ❑ North: 5151. 6926 East : 4776.4431 Line Course: N 10-57-02.0000 E Length: 60.2704 ❑ North: 5210.8656 East : 4787.8922 ❑ Line Course: S 35-06-43.0000 E Length: 241.4530 North: 5013.3498 East : 4926.7701 ❑ Line Course: N 85-35-40.0000 W Length: 30.1300 ❑ North: 5015.6643 East : 4896.7291 ❑ Curve Length: 71.0155 Radius: 250.0000 Cl Delta: 16-16-32.0000 Tangent: 35.7485 ❑ Chord: 70.7770 Course: S 86-16-04.0000 W❑ Course In: S 04-24-20.0000 W Course Out: N 11-52-12.0000 W❑ RP North: 4766.4030 East 4877.5252 ❑ End North: 5011.0572 East 4826.1022 ❑ Line Course: S 78-07-48.0000 W Length: 59.9300 ❑ North: 4998.7301 East : 4767.4537 ❑ Curve Length: 47. 7920 Radius: 50.0000 ❑ Delta: 54-45-56.0953 Tangent: 25.8985 ❑ Chord: 45. 9933 Course: N 74-29-13. 9524 W❑ Course In: N 11-52-12.0000 W Course Out: S 42-53-44.0953 W❑ RP North: 5047. 6609 East 4757.1691 ❑ End North: 5011.0311 `East 4723.1359 ❑ Curve Length: 52.7918 Radius: 80.0000 ❑ Delta: 37-48-33.5474 Tangent: 27.3974 ❑ Chord: 51. 8391 Course: N 66-00-32. 6784 W❑ Course In: S 42-53-44 .0953 W Course Out: N 05-05-10.5479 E❑ RP North: 4952.4235 East 4668' 6828 rl End North: 5032.1085 East 4675.7752 ❑ ❑ Perimeter: 1100.5053 Area: 43, 663.7085 S.F. 1.0023 AC.❑ Mapcheck Closure - (Uses listed courses and chords)❑ Error Closure: 0.0001 Course: N 38-36-43.8422 W❑ Error North: 0.00005 East : -0.00004 ❑ Precision l: 10, 975, 155.0000 ❑ ❑ ❑ -------------------------❑ ----------------------------- Parcel name: CHECK-LOT-16-3G 5321 4590. ❑ North: 4935.3219 East : DLine Course: S 22-47-21.0000 W Length: 48 2000 8622 ❑ North: 4890.8846 Line Course: S 86-25-05.0000 W Length: 113.8500 ❑ North: 4883.7717 East : 4458.2346 ❑ Line Course: N 02-21-03.0000 W Length: 125.07001045 ❑ ❑ North: 5008.7364 East : Curve Length: 217 .1529 Radius: 858.7800 ❑ Delta: 14-29-16.5484 Tangent: 109-1587 100.158 31.1006 ❑E❑ Chord: 216.5748 _ Course In: S 89-23-07 .1736 E Course out: 5 74-53-50. 625251 ❑W❑ RP North: 4999.5236 East End North: 5223.2773 East 4482.7166 ❑ Line Course: S 76-18-12.0000 E Length: 19 45002.1285 ❑ ❑ North: 5218.5464 Line Course: S 42-57-56.0000 E Length: 254.77907753 ❑ North: 5032.1084 0000: 80 Radius: . ❑ Curve Length: 150.0000 Ra ❑ Delta: 107-25-46.5117 Tangent: 108.96S8 1 17 .2920 W❑04198 22 Chord: 128.9730 Course In: S 05-05-10.5479 W Course Out: S 77-39-24 .0362 WO RP North: 4952.4234 East 4668.6828 End North: 4935.3218 East 4590.5321 ❑ Perimeter: 929:0319 Area: 43, 618. 6482 S.F. 1. 0013 AC-0 Mapcheck Closure - (Uses listed courses and chords)❑ Course: S 06-43-19. 4953 E❑ Error Closure: 0.0001 East 0.00001 -! Error North: -0.00009 Precision l: , 074,268 .0000 ❑ CI ❑ --------- ----------------------❑ ------------------ D Parcel name: CHECK-LOT-16-4D ❑ North: 4883.1229 East : 4708 .6507 ❑ Line Course: S 00-32-38.0000 W Length: 164.31000910 J North: 4718.8203 Line Course: S 85-27-32.0000 W Length: 139. 52000090 C ❑ North: 4707 .7739 Line Course: S 85-27-32.0000 W Length: 100.13301903 ❑ North: 4699.8459 Line Course: N 03-05-54.0000 W Length: 184 .19502346 ❑ North: 4883.7717 Line Course: N 86-25-05.0000 E Length: 113450008622 ❑ North: 4890.8846 East : Line Course: N 22-47-21.0000 E Length: 48 4000 590.5321 ❑ ❑ North: 4935.3219 0000s: 80 Radius: . ❑ Curve Length: 150.2800 Ra ❑ Delta: 107-37-48.4386 Tangent: 530.1831 E❑06634 09 Chord: 129. 1385 Course In: N 77-39-24.0362 E course Out: 46689-82-24.4024 ❑ nE RP North: 4952.4234 Fast End North: 4883.1229 East 4708.6507 ❑ Perimeter: 900.4880 Area: 43,714. 6227 S.F. 1. 0035 AC. Mapcheck Closure - (Uses listed courses and chords)❑ Course: S 17-05-29.5071 W❑ Error Closure: 0.0000 East -0.00001 Error North: -0.00004 Precision l: 879, 346, 500.00000 r ❑ ------------------------------------------------ ---------------------------❑ 0 Parcel name: CHECK-LOT-16-50 11 North: 4960.2936 East : 4827. 6674 ❑ Line Course: S 02-38-22. 9141 E Length: 346.0517 ❑ North: 4614.6091 East : 4843.6049 ❑ Line Course: S 58-55-47.0000 W Length: 307.4220 ❑ North: 4455.9519 East : 4580.2872 ❑ Line Course: N 02-47-29.0000 W Length: 252.1211 ❑ North: 4707.7739 East : 4568.0090 ❑ Line Course: N 85-27-32.0000 E Length: 139.5200 ❑ North: 4718.8203 East : 4707.0910 ❑ Line Course: N 00-32-38.0000 E Length: 164.3100 ❑ North: 4883.1229 East : 4708. 6507 0 Curve Length: 51.1900 Radius: 80.0000 ❑ Delta: 36-39-43.6929 Tangent: 26.5056 ❑ Chord: 50.3212 Course: N 41-41-43.7512 E❑ Course In: N 29-58-24.4024 W Course Out: S 66-38-08.0953 E❑ RP North: 4952.4235 East 4668.6828 ❑ End North: 4920.6973 East 4742.1229 ❑ Curve Length: 47.7920 Radius: 50.0000 Delta: 54-45-56.0953 Tangent: 25.8985 ❑ Chord: 45.9933 Course: N 50-44-49. 9524 E❑ Course In: S 66-38-08.0953 E Course Out: N 11-52-12.0000 W❑ RP North: 4900.8684 East 4788.0230 End North: 4949.7992 East 4777.7384 Line Course: N 78-07-48.0000 E Length: 51.0200 ❑ North: 4960.2936 East : 4827. 6674 ❑ 0 Perimeter: 1359.4268 Area: 76,132. 6606 S.F. 1.7477 AC.❑ Mapcheck Closure - (Uses listed courses and chords)❑ ? -25_� 9 Error Closure: 0.0000 Course: 9 , .0 457 En Error North: 0.00002 East : 0.00001 ❑ Precision 1: 1, 356,759, 300.00000 --------------------------- Parcel name: CHECK-LOT-16-60 North: 4959.1206 East : 4979.7410 ❑ Line Course: S 02-49-48.0000 W Length: 250.7700 ❑ North: 4708. 6564 East : 4967.3598 ❑ Line Course: S 31-06-04.0000 E Length: 209.7919 ❑ North: 4529.0206 East : 5075.7278 ❑ Line Course: S 58-53-56.0000 W Length: 155.2084 ❑ North: 4448.8477 East : 4942.8295 Line Course: N 30-54-17.0000 W Length: 193.1900 ❑ North: 4614.6091 East : 4843. 6048 ❑ Line Course: N 02-38-22.9141 W Length: 346.0517 ❑ North: 4960.2936 East : 4827. 6673 ❑ Line Course: N 78-07-48.0000 E Length: 8 .9100 ❑ North: 4962.1263 East : 4836.3868 11 Curve Length: 56.8124 Radius: 200.0000 ❑ Delta: 16-16-32.0000 Tangent: 28.5988 ❑ Chord: 56.6216 Course: N 86-16-04.0000 E❑ Course In: S 11-52-12.0000 E Course Out: N 04-24-20.0000 E❑ RP North: 4766.4029 East 4877.5252 ❑ End North: 4965.8120 East 4892.8883 ❑ Line Course: S 85-35-40.0000 E Length: 87 .1100 ❑ North: 4959.1206 East : 4979.7409 Perimeter: 1307.8444 Area: 72, 964.4677 S.F. 1. 6750 AC.❑ Mapcheck Closure - (Uses listed courses and chords)❑ Error Closure: 0.0001 Course: N 55-14-51.8431 W❑ Error North: 0.00003 East : -0.00004 Precision 1: 13,076,536.0000 ❑ ❑ --------------------------------------------------------------------------- Parcel name: CHECK-LOT-16-7❑ North: 4961.2933 East : 5129.7767 ❑ Line Course: S 03-58-51.0000 W Length: 210.4100 North: 4751.3910 East : 5115.1695 ❑ Line Course: S 28-35-13.0000 E Length: 170.1965 ❑ North: 4601.9428 East : 5196.6071 ❑ Line Course: S 58-53-56.0000 W Length: 141.1717 ❑ North: 4529.0205 East : 5075.7278 ❑ Line Course: N 31-06-04.0000 W Length: 209.7919 North: 4708.6563 East : 4967.3598 ❑ Line Course: N 02-49-48.0000 E Length: 250.7700 ❑ North: 4959.1205 East : 4979.7410 ❑ Line Course: S 85-35-40.0000 E Length: 62.9400 11 North: 4954.2857 East : 5042.4951 ❑ Curve Length: 87. 9233 Radius: 280.0000 ❑ Delta: 17-59-29.5903 Tangent: 44.3265 ❑ Chord: 87.5625 Course: N 85-24-35.2048 E❑ Course In: N 04-24-20.0000 E Course Out: S 13-35-09.5903 E❑ RP North: 5233.4584 East 5064.0035 ❑ End North: 4961.2932 East 5129.7767 ❑ Perimeter: 1133.2034 Area: 60, 937.7355 S.F. 1.3989 AC.❑ Mapcheck Closure - (Uses listed courses and chords)❑ Error Closure: 0.0001 Course: S 05-28-09.4163 E❑ Error North: -0.00007 East 0.00001 ❑ Precision 1: 11, 328, 426.0000 ❑ n 11 Parcel name: CHECK-LOT-16-8❑ North: 4961.2885 East : 5129.7803 ❑ Curve Length: 128. 9756 Radius: 280.0000 ❑ Delta: 26-23-31.1971 Tangent: 65.6528 ❑ Chord: 127. 8384 Course: N 63-13-01.5985 E❑ Course In: N 13-35-12.8029 W Course Out: S 39-58-44.0000 E❑ RP North: 5233.4527 East 5064.0027 ❑ End North: 5018.8939 East 5243.9042 _ Line Course: N 50-01-16.0000 E Length: 21.0200 Ej North: 5032.3994 East : 5260.0114 ❑ Line Course: S 37-45-47 .0000 E Length: 58.3300 ❑ North: 4986.2866 East : 5295.7326 ❑ Line Course: S 52-12-54.0000 W Length: 144.0100 ❑ North: 4898.0516 East : 5181.9192 ❑ Line Course: S 32-49-16.0000 E Length: 261.2500 North: 4678.5058 East : 5323.5214 ❑ Line Course: S 58-53-56.0000 W Length: 148.2199 ❑ North: 4601.9428 East : 5196. 6071 Line Course: N 28-35-13.0000 W Length: 170.1965 ❑ North: 4751.3910 East : 5115.1695 ❑ Line Course: N 03-58-51.0000 E Length: 210.4100 ❑ North: 4961.2933 East : 5129.7767 ❑ Line Course: S 36-41-17.4098 E Length: 0.0059 ❑ North: 4961.2886 East : 5129.7802 ❑ ❑ Perimeter: 1142.4180 Area: 45, 479.5519 S:F. 1.04'40 AC.❑ Mapcheck Closure - (Uses listed courses and chords)❑ Error Closure: 0.0001 Course: N 18-37-46.3056 W❑ Error North: 0.00007 East : -0.00002 ❑ Precision 1: 11, 412, 807.0000 ❑ ------------------------------ Parcel name: CHECK-LOT-18❑ 11 North: 4455.9519 East : 4580.2872 ❑ Line Course: S 58-55-47.0000 W Length: 106.8380 ❑ North: 4400.8140 East : 4488.7767 ❑ Line Course: N 09-25-14 .0000 W Length: 90.0000 ❑ North: 4489.6002 East : 4474.0455 ❑ Line Course: N 09-26-52 .0000 W Length: 109.5900 ❑ North: 4597 .7037 East : 4456.0565 ❑ Line Course: N 10-05-40.0000 W Length: 178.1500 North: 4773.0960 East : 4424.8319 ❑ Line Course: N 09-00-21.0000 W Length: 280.5400 ❑ North: 5050.1776 East : 4380.9176 ❑ Line Course: S 86-54-15.0000 W Length: 44.3600 ❑ North: 5047 .7819 East : 4336.6223 ❑ Line Course: S 75-23-43.0000 W Length: 148.7600 0 North: 5010.2722 East : 4192. 6690 ❑ Line Course: S 85-21-57.0000 W Length: 89.8800 North: 5003.0105 East : 4103.0828 ❑ Curve Length: 227.8201 Radius: 1208.7800 ❑ Delta: 10-47-54. 9568 Tangent: 114.2484 ❑ Chord: 227. 4831 Course: N 05-31-44.4469 E❑ Course In: S 89-52-13.0315 E Course Out: N 79-04-18.0747 W❑ RP North: 5000.2739 East 5311.8597 ❑ End North: 5229.4352 East 4125.0007 ❑ Line Course: S 79-11-38.0000 E Length: 79.9300 North: 5214.4495 East : 4203.5134 ❑ Line Course: N 55-22-36.0000 E Length: 100.0000 ❑ North: 5271.2674 East : 4285. 8039 ❑ Line Course: S 76-18-12.0000 E Length: 202.6763 ❑ North: 5223.2773 East : 4482.7166 ❑ Curve Length: 217 .1529 Radius: eJ8.7800 u Delta: 14-29-16.5484 Tangent: 109.1587 ❑ Chord: 216.5748 Course: S 07-51-31.1006 W❑ Course In: S 74-53-50. 6252 E Course Out: N 89-23-07.1736 W❑ RP North: 4999.5236 East 5311. 8351 ❑ End North: 5008.7365 East 4453.1045 ❑ Line Course: S 02-21-03.0000 E Length: 125.0700 ❑ North: 4883.7718 East : 4458.2346 ❑ Line Course: S 03-05-54.0000 E Length: 184.1950 ❑ North: 4699.8460 East : 4468. 1903 ❑ Line Course: N 85-27-32.0000 E Length: 100.1330 ❑ North: 4707.7740 East : 4568. 0090 ❑ Line Course: S 02-47-29.0000 E Length: 252.1211 ❑ North: 4455. 9520 East : 4580.2872 ❑ 11 Perimeter: 2537 .2164 Area: 123, 440.5680 S.F. 2.8338 AC.❑ Mapcheck Closure - (Uses listed courses and chords)❑ Error Closure: 0.0001 Course: N 18-26-18.8441 E❑ Error North: 0.00009 East : 0.00003 ❑ Precision 1: 25, 363, 013.0000 ❑ ----------------------------- 171 Parcel name: CHECK-PARCEL-AD CI North: 5207 .5428 East : 5336.5886 ❑ Line Course: S 50-01-04.0000 W Length: 300.0700 ❑ North: 5014 .7328 East : 5106. 6618 ❑ Line Course: S 41-14-30.0000 E Length: 8 .2340 C, North: 5008 .5414 East : 5112. 0900 ❑ Curve Length: 112.0416 Radius: 230.0000 ❑ Delta: 27-54-39.2992 Tangent: 57.1556 ❑ Chord: 110. 9371 Course: N 63-58-35.6496 E❑ Course In: N 12-04-04.7008 W Course Out: S 39-58-44.0000 E❑ RP North: 5233.4585 East 5064. 0034 ❑ End North: 5057.2138 East 5211. 7797 Line Course: N 50-01-16.0000 E Length: 167 .4400 ❑ North: 5164.7949 East : 5340. 0858 ❑ Curve Length: 39.8241 Radius: 25.0000 ❑ Delta: 91-16-12.0000 Tangent: 25.5604 ❑ Chord: 35.7450 Course: N 04-23-10.0000 E❑ Course In: N 39-58-44.0000 W Course Out: N 48-45-04. 0000 E❑ RP North: 5183.9519 East 5324. 0232 ❑ End North: 5200.4352 East 5342. 8195 ❑ Line Course: N 41-14-21.2478 W Length: 9.4521 ❑ North: 5207.5428 East : 5336. 5886 ❑ Perimeter: 637.0617 Area: 9, 431.0747 S.F. 0. 2165 AC.❑ 0 Mapcheck Closure - (Uses listed courses and chords)❑ Error Closure: 0.0001 Course: N 15-39-56.3408 E❑ Error North: 0.00005 East : 0.00001 ❑ Precision 1: 6, 318,782.0000 ❑ ---------------------------------------------------------------------------❑ Parcel name: CHECK-PARCEL-B❑ North: 5032.4052 East : 5260.0121 ❑ Line Course: S 37-45-47.0000 E Length: 58.3342 ❑ North: 4986.2891 East : 5295.7359 ❑ Line Course: N 52-12-54.0000 E Length: 166. 4500 ❑ North: 5088.2730 East : 5427.2839 Line Course: N 35-12-56.0000 W Length: 37.7200 North: 5119.0898 East : 5405.5325 ❑ Curve Length: 41.3483 Radius: 25.0000 ❑ Delta: 94-45-48.0000 Tangent: 27.1698 Chord: 36.7940 Course: N 82-35-50.0000 W❑ Course In: S 54-47-04.0000 W Course Out: N 39-58-44.0000 W❑ RP North: 5104.6735 East : 5385. 1078 ❑ End North: 5123.8305 East 5369. 0451 ❑ Line Course: S 50-01-16.0000 W Length: 142.2900 ❑ North: 5032.4084 East : 5260. 0110 ❑ Line Course: S 20-08-20.0461 E Length: 0.0035 ❑ North: 5032.4051 East : 5260. 0122 ❑ ❑ Perimeter: 446.1459 Area: 10, 171.8964 S.F. 0 .2335 AC.❑ ❑ Mapcheck Closure - (Uses listed courses and chords)❑ Error Closure: 0.0001 Course: S 46-20-54.1728 E❑ Error North: -0.00005 East : 0.00006 ❑ Precision 1: 4, 415, 917.0000 ❑ ----------------------------------------------- ❑ Parcel name: CHECK-ROW❑ North: 5169.4324 East : 5369. 9981 ❑ Line Course: S 35-12-56.0000 E Length: 61. 6236 ❑ North: 5119.0866 East : 5405.5336 ❑ Curve Length: 41.3483 Radius: 25.0000 ❑ Delta: 94-45-48 .0000 Tangent: 27.1698 ❑ Chord: 36.7940 Course: N 82-35-50.0000 W❑ Course In: S 54-47-04.0000 W Course Out: N 39-58-44.0000 W❑ RP North: 5104.6703 East 5385.1089 ❑ End North: 5123.8273 East 5369.0463 ❑ Line Course: S 50-01-16.0000 W Length: 142.2900 North: 5032.4052 East : 5260.0121 ❑ Line Course: S 50-01-16.0000 W Length: 21.0200 ❑ North: 5018.8997 East : 5243.9049 ❑ Curve Length: 216.9033 Radius: 280.0000 ❑ Delta: 44-23-04.0000 Tangent: 114.2215 ❑ Chord: 211.5205 Course: S 72-12-48.0000 W❑ Course In: N 39-58-44.0000 W Course Out: S 04-24-20.0000 W❑ RP North: 5233.4585 East 5064.0034 ❑ End North: 4954.•2858 East 5042.4950 ❑ Line Course: N 85-35-40.0000 W Length: 150.0500 ❑ North: 4965.8120 East : 4892.8883 ❑ Curve Length: 56.8124 Radius: 200.0000 ❑ Delta: 16-16-32.0000 Tangent: 28.5988 ❑ Chord: 56. 6216 Course: S 86-16-04.0000 W❑ Course In: S 04-24-20.0000 W Course Out: N 11-52-12.0000 W❑ RP North: 4766.4029 East 4877.5252 ❑ End North: 4962.1263 East 4836.3868 ❑ Line Course: S 78-07-48.0000 W Length: 59.9300 ❑ North: 4949.7992 East 4777.7383 ❑ Curve Length: 47.7920 Radius: 50.0000 _ Delta: 54-45-56.0953 Tangent: 25.8985 ❑ Chord: 45. 9933 Course: S 50-44-49.9524 W❑ Course In: S 11-52-12.0000 E Course Out: N 66-38-08.0953 W❑ RP North: 4900.8683 East 4788.0229 ❑ End North: 4920.6972 East 4742.1229 Curve Length: 404.2618 Radius: 80.0000 ❑ Delta: 289-31-52.1906 Tangent: 56.5058 Chord: 92.3077 Course: N 11-52-12.0000 W❑ Course In: N 66-38-08.0953 W Course Out: N 42-53-44.0953 E❑ RP North: 4952.4235 East 4668. 6828 ❑ End North: 5011.0311 East 4723. 1359 ❑ Curve Length: 47.7920 Radius: 50.0000 ❑ Delta: 54-45-56.0953 Tangent: 25.8985 ❑ Chord: 45.9933 Course: S 74-29-13. 9524 E❑ Course In: N 42-53-44.0953 E Course Out: S 11-52-12.0000 E❑ RP North: 5047. 6609 East 4757. 1691 u End North: 4998.7300 East 4767. 4537 ❑ Line Course: N 78-07-48.0000 E Length: 59.9300 ❑ North: 5011.0571 East : 4826. 1022 ❑ Curve Length: 71.0155 Radius: 250.0000 ❑ Delta: 16-16-32.0000 Tangent: 35.7485 ❑ Chord: 70.7770 Course: N 86-16-04.0000 E❑ Course In: S 11-52-12.0000 E Course Out: N 04-24-20.0000 E❑ RP North: 4766.4029 East 4877. 5252 End North: 5015. 6643 East 4896. 7291 Line Course: S 85-35-40.0000 E Length: 30.1300 ❑ North: 5013.3498 East : 4926. 7701 ❑ Line Course: S 85-35-40.0000 E Length: 119. 9200 E. North: 5004.1381 East : 5046. 3358 ❑ Curve Length: 178.1706 Radius: 230.0000 ❑ Delta: 44-23-04.0000 Tangent: 93.8248 ❑ Chord: 173.7489 Course: N 72-12-48.0000 E Course In: N 04-24-20.0000 E Course Out: S 39-58-44 .0000 E❑ RP North: 5233.4585 East 5064.0034 ❑ End North: 5057.2138 East 5211.7796 ❑ Line Course: N 50-01-16.0000 E Length: 167.4400 n North: 5164.7949 East : 5340.0857 El Curve Length: 39.8241 Radius: 25.0000 ❑ Delta: 91-16-12.0000 Tangent: 25.5604 C' Chord: 35.7450 Course: N 04-23-10.0000 E❑ Course In: N 39-58-44.0000 W Course Out: N 48-45-04.0000 E❑ RP North: 5183.9519 East 5324.0231 C End North: 5200.4352 East 5342.8194 ❑ Line Course: S 41-14-56.0000 E Length: 41.2300 ❑ North: 5169.4363 East : 5370.0036 ❑ Line Course: S 54-47-04.0000 W Length: 0.0068 North: 5169.4324 East : 5369.9980 Perimeter: 1957.4903 Area: 55,235.1164 S.F. 1 .2680 AC.❑ 11 Mapcheck Closure - (Uses listed courses and chords)❑ Error Closure: 0.0001 Course: N 75-27-45. 6611 W❑ Error North: 0.00002 East : -0.00007 ❑ Precision 1: 16,230, 717.0000 ❑ El ❑ Parcel name: CHECK-LOT-16-111 El Perimeter: 1018.7456 Area: 43, 561.1163 S.F. 1 .0000 AC.❑ ❑ ---------------------------------------------------------------------- ❑ Parcel name: CHECK-LOT-16-211 Perimeter: 1100.5053 Area: 43, 663.7085 S.F. 1.0023 AC.❑ I L: ---- ----❑ ----------------------------------------------------------------------- ❑ Parcel name: CHECK-LOT-16-30 n Perimeter: 929.0319 Area: 43, 618 .6482 S.F. 1 . 0013 AC.❑ -------------------------------------------- ---❑ ---------------- Parcel name: CHECK-LOT-16-4[1 ❑ Perimeter: 900.4880 Area: 43,714. 6227 S.F. 1 . 0035 AC.❑ ❑ Parcel name: CHECK-LOT-16-50 ❑ Perimeter: 1359.4268 Area: 76, 132.6606 S.F. 1.7477 AC.2 Lj Parcel name: CHECK-LOT-16-60 Perimeter: 1307.8444 Area: 72, 964.4677 S.F. 1.6750 AC.❑ -------------------------------------❑ Parcel name: CHECK-LOT-16-7E] ❑ Perimeter: 1133.2034 Area: 60, 937.7355 S.F. 1.3989 AC-D ❑ Parcel name: CHECK-LOT-16-80 Perimeter: 1142.4180 Area: 45, 479.5519 S.F. 1.0440 AC.❑ El - ----------------------- --------------- ---------- Parcel name: CHECK-LOT-18C' D Perimeter: 2537.2164 Area: 123, 440.5680 S.F. 2. 8338 AC.❑ ❑ -------------- ----------------------------------------------------------- D Parcel name: CHECK-PARCEL-AE Perimeter: 637.0617 Area: 9, 431.0747 S.F. 0.2165 AC.❑ ---------------------------------------------------------------------------❑ 11, Parcel name: CHECK-PARCEL-B❑ Perimeter: 446.1459 Area: 10, 171.8964 S.F. 0. 2335 AC.CI ---------------------------------------------------------------------------❑ ❑ Parcel name: CHECK-ROW❑ El Perimeter: 1957.4903 Area: 55,235.1164 S.F. 1 .2680 AC.❑ ❑ ------------------------------------------------ Parcel name: CHECK-PERIMETER❑ El Perimeter: 4571.1882 Area: 628, 352.2479 S.F. 14.4249 AC.❑ LllMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program l� Checklist for Stormwater Report A. Introduction Important:When A Stormwater Report must be submitted with the Notice of Intent permit application to document filling out forms compliance with the Stormwater Management Standards. The following checklist is NOT a substitute for on the computer, (which hich ort R t St e Stormwater e wsprovide more substantive and detailed information use only the tab thp p ) but is offered key to move your here as a tool to help the applicant organize their Stormwater Management documentation for their cursor-do not Report and for the reviewer to assess this information in a consistent format.As noted in the Checklist, use the return the Stormwater Report must contain the engineering computations and supporting information set forth in key. Volume 3 of the Massachusetts Stormwater Handbook.The Stormwater Report must be prepared and certified by a Registered Professional Engineer(RPE) licensed in the Commonwealth. The Stormwater Report must include: • The Stormwater Checklist completed and stamped by a Registered Professional Engineer(see page 2)that certifies that the Stormwater Report contains all required submittals.' This Checklist is to be used as the cover for the completed Stormwater Report. • Applicant/Project Name • Project Address • Name of Firm and Registered Professional Engineer that prepared the Report • Long-Term Pollution Prevention Plan required by Standards 4-6 • Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan required by Standard 82 • Operation and Maintenance Plan required by Standard 9 In addition to all plans and supporting information, the Stormwater Report must include a brief narrative describing stormwater management practices, including environmentally sensitive site design and LID techniques, along with a diagram depicting runoff through the proposed BMP treatment train. Plans are required to show existing and proposed conditions, identify all wetland resource areas, NRCS soil types, critical areas, Land Uses with Higher Potential Pollutant Loads (LUHPPL), and any areas on the site where infiltration rate is greater than 2.4 inches per hour. The Plans shall identify the drainage areas for both existing and proposed conditions at a scale that enables verification of supporting calculations. As noted in the Checklist, the Stormwater Management Report shall document compliance with each of the Stormwater Management Standards as provided in the Massachusetts Stormwater Handbook. The soils evaluation and calculations shall be done using the methodologies set forth in Volume 3 of the Massachusetts Stormwater Handbook. To ensure that the Stormwater Report is complete, applicants are required to fill in the Stormwater Report Checklist by checking the box to indicate that the specified information has been included in the Stormwater Report. If any of the information specified in the checklist has not been submitted, the applicant must provide an explanation. The completed Stormwater Report Checklist and Certification .................................................................................................................................................................................................................................................... The Stormwater Report may also include the Illicit Discharge Compliance Statement required by Standard 10. If not included in the Stormwater Report,the Illicit Discharge Compliance Statement must be submitted prior to the discharge of stormwater runoff to the post-construction best management practices. 2 For some complex projects,it may not be possible to include the Construction Period Erosion and Sedimentation Control Plan in the Stormwater Report. In that event,the issuing authority has the discretion to issue an Order of Conditions that approves the project and includes a condition requiring the proponent to submit the Construction Period Erosion and Sedimentation Control Plan before commencing any land disturbance activity on the site. B. Stormwater Checklist and Certification swcheck.docx-04/01/08 Stormwater Report Checklist-Page 1 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report The following checklist is intended to serve as a guide for applicants as to the elements that ordinarily need to be addressed in a complete Stormwater Report. The checklist is also intended to provide conservation commissions and other reviewing authorities with a summary of the components necessary for a comprehensive Stormwater Report that addresses the ten Stormwater Standards. Note:Because stormwater requirements vary from project to project, it is possible that a complete Stormwater Report may not include information on some of the subjects specified in the Checklist. If it is determined that a specific item does not apply to the project under review, please note that the item is not applicable (N.A.)and provide the reasons for that determination. A complete checklist must include the Certification set forth below signed by the Registered Professional Engineer who prepared the Stormwater Report. Registered Professional Engineer's Certification I have reviewed the Stormwater Report, including the soil evaluation, computations, Long-term Pollution Prevention Plan, the Construction Period Erosion and Sedimentation Control Plan (if included), the Long- term Post-Construction Operation and Maintenance Plan, the Illicit Discharge Compliance Statement(if included) and the plans showing the stormwater management system, and have determined that they have been prepared in accordance with the requirements of the Stormwater Management Standards as further elaborated by the Massachusetts Stormwater Handbook. I have also determined that the information presented in the Stormwater Checklist is accurate and that the information presented in the Stormwater Report accurately reflects conditions at the site as of the date of this permit application. Registered Professional Engineer Block and Signature IU! * 711 Z, 2010 .x Signa ure ancr Date Checklist Project Type: Is the application for new development, redevelopment, or a mix of new and redevelopment? ® New development ❑ Redevelopment ❑ Mix of New Development and Redevelopment Checklist (continued) swcheck.docx•04/01/08 Stormwater Report Checklist•Page 2 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report LID Measures: Stormwater Standards require LID measures to be considered. Document what environmentally sensitive design and LID Techniques were considered during the planning and design of the project: ❑ No disturbance to any Wetland Resource Areas ❑ Site Design Practices (e.g. clustered development, reduced frontage setbacks) ❑ Reduced Impervious Area (Redevelopment Only) ® Minimizing disturbance to existing trees and shrubs ❑ LID Site Design Credit Requested: ❑ Credit 1 ❑ Credit 2 ❑ Credit 3 ❑ Use of"country drainage"versus curb and gutter conveyance and pipe ❑ Bioretention Cells (includes Rain Gardens) Zl Constructed Stormwater Wetlands (includes Gravel Wetlands designs) ❑ Treebox Filter ❑ Water Quality Swale ® Grass Channel ❑ Green Roof ❑ Other(describe): Standard 1: No New Untreated Discharges ® No new untreated discharges ® Outlets have been designed so there is no erosion or scour to wetlands and waters of the Commonwealth ® Supporting calculations specified in Volume 3 of the Massachusetts Stormwater Handbook included. Checklist (continued) swcheck.docx•04/01/08 Stormwater Report Checklist-Page 3 of 8 Massachusetts Department of Environmental Protection T' Bureau of Resource Protection -Wetlands Program Checklist for Stormwater Report Standard 2: Peak Rate Attenuation ❑ Standard 2 waiver requested because the project is located in land subject to coastal storm flowage and stormwater discharge is to a wetland subject to coastal flooding. ® Evaluation provided to determine whether off-site flooding increases during the 100-year 24-hour storm. ® Calculations provided to show that post-development peak discharge rates do not exceed pre- development rates for the 2-year and 10-year 24-hour storms. If evaluation shows that off-site flooding increases during the 100-year 24-hour storm, calculations are also provided to show that post-development peak discharge rates do not exceed pre-development rates for the 100-year 24- hour storm. Standard 3: Recharge ® Soil Analysis provided. ® Required Recharge Volume calculation provided. ❑ Required Recharge volume reduced through use of the LID site Design Credits. ® Sizing the infiltration, BMPs is based on the following method: Check the method used. ® Static ❑ Simple Dynamic ❑ Dynamic Field' ❑ Runoff from all impervious areas at the site discharging to the infiltration BMP. ® Runoff from all impervious areas at the site is not discharging to the infiltration BMP and calculations are provided showing that the drainage area contributing runoff to the infiltration BMPs is sufficient to generate the required recharge volume. ® Recharge BMPs have been sized to infiltrate the Required Recharge Volume. ❑ Recharge BMPs have been sized to infiltrate the Required Recharge Volume only to the maximum extent practicable for the following reason: ❑ Site is comprised solely of C and D soils and/or bedrock at the land surface ❑ M.G.L. c. 21E sites pursuant to 310 CMR 40.0000 ❑ Solid Waste Landfill pursuant to 310 CMR 19.000 ❑ Project is otherwise subject to Stormwater Management Standards only to the maximum extent practicable. ® Calculations showing that the infiltration BMPs will drain in 72 hours are provided. ❑ Property includes a M.G.L. c. 21 E site or a solid waste landfill and a mounding analysis is included. .....................................................................................................................................................................................................-............................................ 80%TSS removal is required prior to discharge to infiltration BMP if Dynamic Field method is used. Checklist (continued) swcheck.docx-04/01/08 Stormwater Report Checklist-Page 4 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Standard 3: Recharge(continued) ❑ The infiltration BMP is used to attenuate peak flows during storms greater than or equal to the 10- year 24-hour storm and separation to seasonal high groundwater is less than 4 feet and a mounding analysis is provided. ❑ Documentation is provided showing that infiltration BMPs do not adversely impact nearby wetland resource areas. Standard 4: Water Quality The Long-Term Pollution Prevention Plan typically includes the following: • Good housekeeping practices; • Provisions for storing materials and waste products inside or under cover; • Vehicle washing controls; • Requirements for routine inspections and maintenance of stormwater BMPs; • Spill prevention and response plans; • Provisions for maintenance of lawns, gardens, and other landscaped areas; • Requirements for storage and use of fertilizers, herbicides, and pesticides; • Pet waste management provisions; • Provisions for operation and management of septic systems; • Provisions for solid waste management; • Snow disposal and plowing plans relative to Wetland Resource Areas; • Winter Road Salt and/or Sand Use and Storage restrictions; • Street sweeping schedules; • Provisions for prevention of illicit discharges to the stormwater management system; • Documentation that Stormwater BMPs are designed to provide for shutdown and containment in the event of a spill or discharges to or near critical areas or from LUHPPL; • Training for staff or personnel involved with implementing Long-Term Pollution Prevention Plan; • List of Emergency contacts for implementing Long-Term Pollution Prevention Plan. ® A Long-Term Pollution Prevention Plan is attached to Stormwater Report and is included as an attachment to the Wetlands Notice of Intent. ® Treatment BMPs subject to the 44%TSS removal pretreatment requirement and the one inch rule for calculating the water quality volume are included, and discharge: ❑ is within the Zone II or Interim Wellhead Protection Area ❑ is near or to other critical areas ® is within soils with a rapid infiltration rate(greater than 2.4 inches per hour) ❑ involves runoff from land uses with higher potential pollutant loads. ❑ The Required Water Quality Volume is reduced through use of the LID site Design Credits. ® Calculations documenting that the treatment train meets the 80%TSS removal requirement and, if applicable, the 44% TSS removal pretreatment requirement, are provided. Checklist (continued) swcheck.docx•04/01/08 Stormwater Report Checklist•Page 5 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Standard 4: Water Quality(continued) ® The BMP is sized (and calculations provided) based on: ® The'/" or 1"Water Quality Volume or ❑ The equivalent flow rate associated with the Water Quality Volume and documentation is provided showing that the BMP treats the required water quality volume. ❑ The applicant proposes to use proprietary BMPs, and documentation supporting use of proprietary BMP and proposed TSS removal rate is provided. This documentation may be in the form of the propriety BMP checklist found in Volume 2, Chapter 4 of the Massachusetts Stormwater Handbook and submitting copies of the TARP Report, STEP Report, and/or other third party studies verifying performance of the proprietary BMPs. ❑ A TMDL exists that indicates a need to reduce pollutants other than TSS and documentation showing that the BMPs selected are consistent with the TMDL is provided. Standard 5: Land Uses With Higher Potential Pollutant Loads (LUHPPLs) ❑ The NPDES Multi-Sector General Permit covers the land use and the Stormwater Pollution Prevention Plan (SWPPP) has been included with the Stormwater Report. ❑ The NPDES Multi-Sector General Permit covers the land use and the SWPPP will be submitted prior to the discharge of stormwater to the post-construction stormwater BMPs. ❑ The NPDES Multi-Sector General Permit does not cover the land use. ❑ LUHPPLs are located at the site and industry specific source control and pollution prevention measures have been proposed to reduce or eliminate the exposure of LUHPPLs to rain, snow, snow melt and runoff, and been included in the long term Pollution Prevention Plan. ❑ All exposure has been eliminated. ❑ All exposure has not been eliminated and all BMPs selected are on MassDEP LUHPPL list. ❑ The LUHPPL has the potential to generate runoff with moderate to higher concentrations of oil and grease(e.g. all parking lots with >1000 vehicle trips per day) and the treatment train includes an oil grit separator, a filtering bioretention area, a sand filter or equivalent. Standard 6: Critical Areas ❑ The discharge is near or to a critical area and the treatment train includes only BMPs that MassDEP has approved for stormwater discharges to or near that particular class of critical area. ❑ Critical areas and BMPs are identified in the Stormwater Report. Checklist (continued) swcheck.docx•04/01/08 Stormwater Report Checklist•Page 6 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Standard 7: Redevelopments and Other Projects Subject to the Standards only to the maximum extent practicable ® The project is subject to the Stormwater Management Standards only to the maximum Extent Practicable as a: ❑ Limited Project ® Small Residential Projects: 5-9 single family houses or 5-9 units in a multi-family development provided there is no discharge that may potentially affect a critical area. ❑ Small Residential Projects: 2-4 single family houses or 2-4 units in a multi-family development with a discharge to a critical area ❑ Marina and/or boatyard provided the hull painting, service and maintenance areas are protected from exposure to rain, snow, snow melt and runoff ❑ Bike Path and/or Foot Path ❑ Redevelopment Project ❑ Redevelopment portion of mix of new and redevelopment. ❑ Certain standards are not fully met(Standard No. 1, 8, 9, and 10 must always be fully met)and an explanation of why these standards are not met is contained in the Stormwater Report. ❑ The project involves redevelopment and a description of all measures that have been taken to improve existing conditions is provided in the Stormwater Report. The redevelopment checklist found in Volume 2 Chapter 3 of the Massachusetts Stormwater Handbook may be used to document that the proposed stormwater management system (a) complies with Standards 2, 3 and the pretreatment and structural BMP requirements of Standards 4-6 to the maximum extent practicable and (b) improves existing conditions. Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan must include the following information: • Narrative; - • Construction Period Operation and Maintenance Plan; Names of Persons or Entity Responsible for Plan Compliance; Construction Period Pollution Prevention Measures; • Erosion and Sedimentation Control Plan Drawings; • Detail drawings and specifications for erosion control BMPs, including sizing calculations; Vegetation Planning; • Site Development Plan; Construction Sequencing Plan; Sequencing of Erosion and Sedimentation Controls; • Operation and Maintenance of Erosion and Sedimentation Controls; • Inspection Schedule; Maintenance Schedule; • Inspection and Maintenance Log Form. ® A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan containing the information set forth above has been included in the Stormwater Report. Checklist (continued) swcheck.docx•04/01/08 Stormwater Report Checklist•Page 7 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control (continued) ❑ The project is highly complex and information is included in the Stormwater Report that explains why it is not possible to submit the Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan with the application. A Construction Period Pollution Prevention and Erosion and Sedimentation Control has not been included in the Stormwater Report but will be submitted before land disturbance begins. ❑ The project is not covered by a NPDES Construction General Permit. ❑ The project is covered by a NPDES Construction General Permit and a copy of the SWPPP is in the Stormwater Report. ® The project is covered by a NPDES Construction General Permit but no SWPPP been submitted. The SWPPP will be submitted BEFORE land disturbance begins. Standard 9: Operation and Maintenance Plan ® The Post Construction Operation and Maintenance Plan is included in the Stormwater Report and includes the following information: ® Name of the stormwater management system owners; ® Party responsible,for operation and maintenance; ® Schedule for implementation of routine and non-routine maintenance tasks; Pian showing the location of all stormwater BMPs maintenance access areas; ® Description and delineation of public safety features; ® Estimated operation and maintenance budget; and ® Operation and Maintenance Log Form. ❑ The responsible party is not the owner of the parcel where the BMP is located and the Stormwater Report includes the following submissions: ❑ A copy of the legal instrument(deed, homeowner's association, utility trust or other legal entity) that establishes the terms of and legal responsibility for the operation and maintenance of the project site stormwater BMPs; ❑ A plan and easement deed that allows site access for the legal entity to operate and maintain BMP functions. Standard 10: Prohibition of Illicit Discharges ❑ The Long-Term Pollution Prevention Plan includes measures to prevent illicit discharges; ❑ An Illicit Discharge Compliance Statement is attached; ® NO Illicit Discharge Compliance Statement is attached but will be submitted prior to the discharge of any stormwater to post-construction BMPs. swcheck.docx•04/01/08 Stormwater Report Checklist•Page 8 of 8