Loading...
HomeMy WebLinkAboutBuilding Permit # 3/21/2017 3/28/2017 *Building Permit#23554-View Point Cloud *Building Permit—Construction of Additions,Alterations,and Remodeling O Building Permit Issued TIMELINE OSubmission received Mar 15,2017 at 11:01am 10 Building Department Review IP 0 Completed Mar 16,2017 at 2:11pm © Conservation Department Review Ono Skipped Mar 16,2017 at 2:21pm © Planning Department Review Skipped Mar 16,2017 at 2:18pm OHealth Department Revies Completed Mar 17,2017 at 10:37am ODPW Engineering Review Completed Mar 20,2017 at 3:51pm ODPW Operations Review Completed Mar 16,2017 at 2:57pm J1%% Fire Department Review Completed Mar 20,2017 at 10:59amQ OTreasurer Review Completed Mar 16,2017 at 4:27pm https://northandover m a.vi ewpoi ntcl oud.com/#/records/23554 1/5 3/28/2017 *Building Permit#23554-View Point Cloud Building Inspector Approval OIP Completed Mar 20,2017 at 5:15pm OAdditions/Alterations/Remodeling Bldg Permit Fee Paid Mar 21,2017 at 8:30am OPermit Issued Issued Mar 21,2017 at 8:29am *Building Permit#23554 Construction of Additions,Alterations,and Remodeling 0 Applicant Location Robert Isbell 201 AMBERVILLE ROAD , NORTH ANDOVER, MA t. 978-387-3217 Owner @ rob@isbellgeneralcont... HOTALING, DEAN,C. Attachments PDF ^'OTT8LM1001F Wed Mar 15 2017 1.PDF Uploaded March 15,2017 by Robert Isbell Application Submission Required information varies depending on who is applying for a building permit. Are you submitting this application as the Homeowner? https://northandoverma.viewpointcloud.com/#/records/23554 2/5 3/28/20 17 *Building Permit#cnno4 vw*PomClov NO Primary Contractor Search for your contractor using the search bar below. Either the Licensee Name or License#is required. Firm(Business)Name Licensee~ License#~ License sxn/,v«on mme~ License rype~ License Active License Status Mailing Address~ ROBERT E |SBELL C5-081684 10/09/2017 Construction Supervisor [] Active .Andover K4AO1810 Preferred Telephone#:~ Alternate Phone# Email 978'387'3217 rob(OisbeUgenera|contmctingzom I certify,under the pains and penalties of perjury,that the information on this application is true and complete. Br Project Information Persons contracting with unregistered contractors do not have access to the guaranty fund. Fee Schedule: Building Permit: Project Cost(if new construction base on $125 per square foot and if addition/alteration/renovation base on actual contract price). ELECTRICAL: Movement of Meter location, mast or service drop requires approval of Electrical Inspector. Type of Improvement~ Proposed use~ Description of Work to be Performed^ Is property on Town wn/e,~ Is property on Town sewer~ Alteration One-Two Family updating the master bath Yes Yea Project Cost(if new construction uavo on$125 per square foot and xadd mon/aIteration/renovation base on actual contract price) 38,400 Does this project require utemporary construction trailer? ~ NO Does this project require atemporary construction sign? ~ NO mps://northandovermumewpointc|oud.com/#"/rmmrdd23554 3/5 3/28/2017 *Building Permit#23554-View Point Cloud Danger Zone Literature(MGL CHapter 166 Section 21A-F and G min.$100-$1,000 fine) NO Registered Design Professional Architect/Engineer Name Architect/Engineer Address Architect/Engineer Phone Number Architect/Engineer Reg.# Hammond Design Insurance INSURANCE COVERAGE: I have a current liability insurance policy or its substantial equivalent. Yes If yes,indicate the type of coverage* If other,specify Liability Worker's Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers To be filed with the permitting authority Are you an employer?Select the appropriate type.Any applicant that selects#1 must also fill out the section below showing their workers'compensation policy information. 2. 1 am a sole proprietor or partnership and have no employees working for me in any capacity.(No workers'comp. insurance required). Type of project* 8. Remodeling Workers' Compensation Affidavit Signature hftps://northandoverma.viewpointcloud.com/#/records/23554 4/5 3/28/2017 *Building Permit#23554-View Point Cloud I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. RV ig To Be Completed By Town Staff la Zoning District* la Is this a 100 Year or older structure* la Is property within an Overlay District* Is the property within the Floodplain* Is the project within 100'of Wetlands? VR No No Yes hftps://northandoverma.viewpointcloud.com/#"/rer,ords/23554 5/5