Loading...
HomeMy WebLinkAboutApplication - 1018 OSGOOD STREET 12/13/2012 (2) F� October 19,2012 North Andover Planning Board Planning Department 1600 Osgood Street North Andover, Massachusetts 01845 Re: Site Plan Special Permit Application 1018 Osgood Street Dear Board Members: This letter is authorization for MHF Design Consultants, Inc.to represent the interests of JFJ Holdings, LLC and Cafua Realty Trust LLC at meetings before the Town of North Andover for the Site Plan Special Permit application proposed on the above referenced property. Sincerely, Mr. Greg Nolan for JFJ Holdings, LLC Cafua Realty Trust,LLC 5 Lawrence Road Salem LLC ,AORTFI 4, V,;- Al .. v " 1 0 L-�i 0 DEC 13 Town of North Andover S C USES Office of the Planning Department Community Development and Services Division P(978)688-9535 1600 Osgood Street F(978)688-9542 Building 20, Suite 2-36 North Andover,Massachusetts 01845 Town of North Andover Planning Board Application for Special Permit Please type or print clearly. 1.Petitioner: Mark Gross,PE c/o MIF Design Consultants,Inc. Petitioner's Address: 44 Stiles Road,Suite One,Salem,NH 03079 Telephone number: 603-893-0720 2.Owners of the Land: JFJ Holdings,LLC Address: 751 Main Street,Sanford,ME 04073 Number of years of ownership: Less than one year 3.Year lot was created: 1920+/- 4.Description of Proposed Project: Construction of a proposed 2,250 sf Donut Shop with a drive-thru.window. 5.Description of Premises: Existing Single Family Dwelling(vacant) 6.Address of Property Being Affected: 1018 Osgood Street Zoning District: B-2 Assessors Map: 035 Lot#: 0019 Registry of Deeds:Book#: 12798 Page#: 255 7.Existing Lot: Lot Area(Sq.Ft): 28,230 Building Height: 28'+/- — Street Frontage: 149.23 Side Setbacks: 60743' Front Setback: 28' Rear Setback: 134'+/- Floor Area Ratio: 0.08 Lot Coverage: 5% 8.Proposed Lot(if applicable): N/A Lot Area(Sq.Ft): Building Height: Street Frontage:- Side Setbacks: BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Front Setback: Rear Setback: Floor Area Ratio: Lot Coverage: 9.Required Lot(as required by Zoning Bylaw): Lot Area(Sq.Ft): 25.000 Building Height: 35' Street Frontage: 125' Side Setbacks: 25' Front Setback: 25' Rear Setback: 30' Floor Area Ratio: 0.75:1 Lot Coverage: 35% 10.Existing Building(if applicable): Ground Floor(Sq.Ft.): 1.134 #of Floors: 2 Total Sq.Ft.: 1.868 Height: 2 stories Use: Residential Type of Construction: Wood Frame 11.Proposed Building: Ground Floor(Sq.Ft.): 2.250 #of Floors: 1 Total Sq.Ft. 2.250 Height: 25'6" Use: Commercial Type of Construction: EFS 12.Has there been a previous application for a Special Permit from the Planning Board on these premises? No If so,when and for what type of construction? 13.Section of Zoning Bylaw that Special Permit Is Being Requested 8 1 8b-Modifications to Parking/Loading Area Design Standards 8.1.8 -Reduction in the required parking. 14.Petitioner and Landowner signature(s): Every application for a Special Permit shall be made on this form,which is the official form of the Planning Board.Every application shall be filed with the Town Clerk's office.It shall be the responsibility of the petitioner to fumish all supporting documentation with this application.The dated copy of this application received by the_ own Clerk or Planning Office does not absolve the applicant from this responsibility.The petitioner shall be responsible for all expenses for filing and legal notification.Failure to comply with application requirements,as cited herein and in the Pl&ming hoard nd Regulations may result in a dismissal by the Planning Board of this application as incomplete. ' Petitioner's Signature: _ \ Print or type name here: r S. Owner's Signature: X/11, L; Print or type name here: Mark S Gross PE Agent for the owner 15.Please list title of plans and documents you will be attaching to this application. Site Development Plan Correspondence dated December 11 2012 requesting a Special Permit for Parking and Loading BU Requirements _ = 44 Stites Road •Suite One•Salem, New Hampshire 03079 TEL (603) 893-0720 FAX (603) 893-0733 MHF Design Consultants, Inc. www.mhfdbsign.com December 11 2012 Mr.John Simons North Andover Planning Board Town of North Andover 1600 Osgood Street North Andover,MA`01845 Re: 1018 Osgood Street Special Permit for Parking Reduction and Loading Bay Requirements MHF#305312 Dear Mr. Simons; On behalf of JFJ Holdings,LLC,MHF Design Consultants,Inc. is requesting that the Planning Board, as the SPCA, grant a Special Permit under Section 8.1 Off Street Parking and Loading paragraph 8, Special Permits,based on the requirements under section g,Reduction in Parking, and section b, Modification of Parkingloading Area Design Standards, and believe that we fall under the other circumstances as may be deemed appropriate by the Planning Board as described below. With respect to section g,Reduction in Parking,the required parking for the site is calculated at 27 spaces and 19 spaces have been provided. We are requesting a reduction of eight(8) spaces which represents only 30%reduction of the required amount,which is less than the 35%which would be allowed under this section of the By-Law. We believe that the reduction is appropriate since for this type of fast food restaurant(coffee shop),more than 50% of the business is conducted thru the drive thru which is much more than you might find for a more food driven type of restaurant. Additionally a more common type of application for parking requirement is based on seats. This facility will have 25-26 seats in addition to the takeout. Using a standard rate of one space per two seats,plus employees,this site would require 13 spaces for the seating and 5 spaces for employees or a total of 18 spaces.Additionally,we have conducted a Parking Demand Evaluation Analysis based on a similar type facility in Methuen,Massachusetts. A copy of the excerpt from the Response Comments to MDM's review of the traffic study including the actual Parking Demand data is included for your review and consideration. ENGINEERS • PLANNERS SURVEYORS W r MHF Design Consultants,Inc. With respect to section b,Modification of Parking/Loading Area Design Standards, we are requesting that the site not be required to have a specific designated loading area of the dimensions required given the nature of this type of development.-Typically,this type of use has deliveries made on off peak hours and off loads the products onto hand trucks and wheeled into the rear entrance of the building. There is no-formal loading dock area that is necessary given the nature of the type and size of deliveries that are made to the site. Additionally, deliveries are not made but every few days and at off peak business hours, generally in the area to the rear of the drive thru in the by-pass lane of the site. We respectfully request that the Board make a finding as to the adequacy of the parking and loading areas for this site and issue a Special Permit as filed for this project. If you should have any questions,please contact our office at your convenience. Very Truly Yours, MHF Desi C, ns ts,I ;.` A ark S. r ,P.E. Principal RESPONSE TO COMMENTS Proposed Dunkin'Donuts—North Andover,Massachusetts signals provide gaps in the traffic stream which allow motorists more opportunity to enter and exit driveways and curb cuts along Osgood Street. From this, it can be concluded that the proposed Dunkin' Donuts development is not expected to have a significant impact on the operations of Osgood Street. Site Circulation Continent: MDM has reviewed the Site Plan and has the following comments: • In order to reduce conflict points along Osgood Street and to eliminate the conflict between exiting vehicles and patrons destined tothe drive-thru, the proposed northerly driveway should be designed as an enter-only driveway. • The pavement markings designating the drive-through lane should be extended to and terminated at the parking field so that motorists can clearly differentiate between the drive-thru lane and the by-pass lane. • Parking stalls that could be obstructed by vehicles stacked in the drive-thru lane should be designated for employee parking so as to limit the frustration to patrons. Response: As recommended by MDM and as commented on by MassDOT, the northern site driveway has been modified to an entrance-only driveway. The updated Site Plan has revised the parking field, as well as the drive-through lane and by-pass lane area. With these modifications, the pavement markings have been extended to be visible from the parking field. The Applicant is willing to designate employees to park in the stalls that could be obstructed by vehicles stacked in the drive-through lane. If the Town wishes, EMPLOYEE PARKING signs can be installed. On-Site Parking Comment: MDM notes that a parking study was not conducted as part of the TMS. Given that the Applicant does not meet the zoning requirements for the number of .required parking spaces, MDM recommends that the Applicant conduct a parking study to determine if the number of proposed parking spaces will adequately accommodate anticipated patron demand. The analysis should include parking data collected at a local, freestanding Dunkin' Donuts restaurant. 12066 RTC Memo 121I12 Page 13 RESPONSE TO COMMENTS Proposed Dunkin'Donuts—North Andover,Massachusetts Response: As requested, a parking demand evaluation was conducted at an existing freestanding Dunkin' Donuts restaurant (3,527 square feet) located at 450 Broadway in Methuen, Massachusetts. This facility was chosen as Broadway has similar characteristics as Osgood Street in that they both provide two lanes in each direction, directional flow is separated by a double-yellow centerline, and they have comparable daily traffic volumes. According to historical traffic-volume data(South Broadway north of Lawrence Road) carried approximately 22,000 vehicles per day in 20112 and the TIAS depicted that Osgood Street carried approximately 25,660 vehicles per weekday. The New Hampshire Department of Transportation historical traffic-volume data is provided in the Appendix. A parking demand survey was conducted at the Methuen Dunkin' Donuts parking lot during the weekday AM peak period (7:00 AM to 9:00 AM) and the Saturday midday peak period (11:00 AM to 2:00 PM) in 15-minute increments. The time periods selected for evaluation were determined based on discussion at the November 19`'' meeting with the Town of North Andover's traffic peer review consultant, Mr. Daniel J. Mills, P.E., PTOE, of MDM. The survey included noting the number of parked vehicles and the number of available parking spaces. The observations were conducted on Thursday, December 6, 2012, and on Saturday, December 8, 2012. The parking demand survey data for the parking areas are provided in the Appendix. Table 3 summarizes the total number of occupied parking spaces during each 15-minute interval within the Methuen Dunkin' Donuts parking lot_ As shown in Table 3,the peak parking demand for the weekday AM peak period was found to be 13 vehicles and occurred at 7:45 AM and at 8:45 AM, and the peak parking demand for the Saturday midday peak period was found to be 17 vehicles and occurred at 11:00 AM. Based on these observations, there were 18 remaining available parking spaces (31 total provided minus 13 occupied) during the weekday AM peak demand period and 14 remaining available parking spaces (31 total provided minus 17 occupied) during the Saturday midday peak demand period. A graphical representation of the parking survey results for the Methuen Dunkin' Donuts parking lot is provided in the Appendix. 2 New Hampshire Department of Transportation Traffic Volume Report; 2011;NH 28 (South Broadway)north of Lawrence Road. 12066 RTC Memo 1211I2 Page 14 RESPONSE TO COMMENTS Proposed Dunldn'Donuts—North Andover,Massachusetts Table 3 PARKING DEMAND SURVEY— Methuen Dunkin'Donuts Parking Lot Thursday,December 6,2012 Saturday,December 8,2012 Number of Number of Start Time Occupied Spaces Start Time Occupied Spaces 7:00 AM 6 11:00 AM 17 7:15 8 11:15 16 7:30 9 11:30 10 7:45 13 11:45 4 8:00 11 12:00 PM 8 8:15 9 12:15 4 8:30 12 12:30 6 8:45 13 12:45 8 1:00 8 1:15 9 1:30 7 1:45 8 These parking observation data reveal that the parking areas are only ±42 percent utilized (13 occupied/31 total) during the weekday AM peak parking demand period and only ±55 percent utilized (17 occupied/31 total) during the Saturday midday peak parking demand period_ Therefore, the observations suggest that the proposed 19 parking spaces to be provided on the site would accommodate the peak parking demands of the Dunkin' Donuts restaurant. Mitilzaion Measures Comment: MDM notes that no off-site mitigation is proposed in the TIAS. We recommend that the Applicant provide off-site mitigation to allow for enhanced accessl egress for vehicles and pedestrians and to address the traffic impacts and safety issues related to the project. In addition, MDM recommends that the Applicant undertake some level of traffic signal improvements at adjacent intersections should MassDOT's traffic signal betterment project be delayed or put on hold. Response: As provided within this RTC memorandum, the proposed Dunkin' Donuts development is not expected to have a significant impact on the operations of 12066 RTC Memo 121112 Page 15 GPIGreenman-Pedersen, Inc. Dunkin' Donuts Parking Lot Survey 450 Broadway, Methuen, MA (3,527 sf) Start Time 12/6/2012,Thu 12/812012,Sat 7:00 AM 6 7:15 AM 8 7:30 AM 9 7:45 AM 13 8:00 AM 11 8:15 AM 9 8:30 AM 12 8:45 AM 13 11:00 AM 17 11:15 AM 16 11:30 AM 10 11:45 AM 4 12:00 PM 8 12:15 PM 4 12:30 PM 6 12:45 PM 8 1:00 PM 8 1:15 PM 9 1:30 PM 7 1:45 PM 8 ................---............... ......... ...........--------------- Dunkin Donuts Parking Observations 35 31 parking spaces ................................ --------- 30 V) 25 M CL 20 --4—Weekday AM 15 ---------13... SaturMidday 13 12 CL ----------- 9-- ------ O 10 i 8 8 8 9 10 9 6 8 7 5 ---------- 6 4 0 ------ CL a a CL a CLCa. CL o H Ln Ln Ln Ln Ln L-n Ln Ln 0 Ln 0 %r M :T H M ICT 0 9 �i (n 7i I- I 66 66 66 66 ;4 N N (N H H Time